Design of Marine Loading Arms & Hose Towers for MOTEMS Compliance
Gayle S. Johnson, P.E.
Simpson Gumpertz & Heger Inc (SGH)Oakland, CA
28 September 2016
![Page 2: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/2.jpg)
Agenda
• What’s happening in the world of MLAs and hose towers
• Issues with MOTEMS compliance– Seismic
• Future efforts
2
![Page 3: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/3.jpg)
![Page 4: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/4.jpg)
4
Oil products transferred
through marine loading arm
![Page 5: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/5.jpg)
5
Oil products transferred
through hoses supported by
tower
![Page 6: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/6.jpg)
What’s New with MLAs and Hose Towers ?
• 1st MLAs since MOTEMS installed 2015– Last MLA installed in California ~early to mid 2000’s– Previously 1990’s (?)
• 1st Hose Towers designed per MOTEMS being built– Last new hose tower was (ever ???)
6
![Page 7: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/7.jpg)
Southern California MLAs
7
![Page 8: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/8.jpg)
Northern California MLAs
8
![Page 9: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/9.jpg)
New Hose Towers
9
![Page 10: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/10.jpg)
New Hose Towers
10
![Page 11: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/11.jpg)
Typical Design Practice – MLAs
• MLA designed by vendor– May be international with no knowledge of MOTEMS– Seismic design is pipe stress
• Anchorage and maybe base riser designed by structural engineers– To CBC requirements (ASCE 7)
• Entire design may be subject to local building officials review– Likely CBC / ASCE 7
• Local engineers need to review and coordinate the vendor seismic design– Loads factored properly– Units the same
![Page 12: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/12.jpg)
MLAs - OCIMF
• 1999 Edition
• Outdated: References “UBC” for seismic design
• No consensus on how to map with ASCE 7
• ASD
• Requires project-specific seismic design basis
12
![Page 13: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/13.jpg)
Seismic Design Code Issues - MLAs
• Categorizing structure– Nonbuilding structure– Equipment– Piping
• R / Rp values
• Code-based seismic input
• Period limitations
• Scaling dynamic results
• Drift limitations
13
![Page 14: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/14.jpg)
MOTEMS Compliance – not just seismic
• Operating envelope• QC/DC and ERS• Markings• Alarms• Hazard classification• Drainage• Electrical isolation
14
![Page 15: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/15.jpg)
Typical Design Practice – Hose Towers
• Designed by structural and mechanical engineers• Seismic design to building codes (ASCE 7 in US)
15
![Page 16: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/16.jpg)
Hose Towers
• Looks like a structure
• Straightforward
• Not so fast!!!
16
![Page 17: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/17.jpg)
Seismic Design Issues for Hose Towers
• Categorizing structure– Nonbuilding structure similar to building– Penthouse– Pipe support
• Code-based seismic input
• Structure on structure
• Amplification– Elevation– Flexibility
• Cranes on top
17
![Page 18: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/18.jpg)
Similar Issues for all Deck-Mounted Equipment & Structures
18
![Page 19: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/19.jpg)
ASCE 7
• Chapter 13 (Nonstructural Components) and Chapter 15 (Nonbuilding Structures) both revert to same equation
• 3 separate terms require interpretation
19
0.41 2 13.3‐1
![Page 20: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/20.jpg)
Definition of: SDS ?
20
USGS Code-based Spectrum Site-Specific Spectrum
?
![Page 21: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/21.jpg)
Definition of: 1+2(z/h)?
21
“h”? “h”?
![Page 22: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/22.jpg)
Help is on the way !
22
![Page 23: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/23.jpg)
Changes to ASCE 61-19
• Equations will look like ASCE 7, but not reference ASCE 7 explicitly
• Take advantage of single-degree of freedom dynamic behaviors
• Use site-specific spectrum at period of wharf structure, Sw
23
1 2
![Page 24: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/24.jpg)
Proposed Changes to ASCE 61-19
• Choice of “simplified” with amplification of 3 or “coupled” model with dynamic analysis
• Table with choice of Rp values for different items– Rp = 3.0 for MLAs
• Period dependent ap values
24
![Page 25: Design of Marine Loading Arms & Hose Towers for · PDF fileDesign of Marine Loading Arms & Hose Towers for MOTEMS Compliance ... 19 ( É L 0.4 ã 5 ½ Ì 9 ... Proposed Changes to](https://reader030.vdocuments.us/reader030/viewer/2022012314/5a9e08237f8b9adb388d5f35/html5/thumbnails/25.jpg)
Summary
• First new design and construction of MLAs and hose towers in years is happening now
• First ever with MOTEMS in place
• MOTEMS compliance is a challenge but can be done
• Lessons learned in seismic design will be helpful next time
• Experience in seismic design will be used to improve practice industry-wide
25