Facility Layout of an Electronic/ LED Manufacturing Industry- A Case Study By Maheer Sohbat 11.01.07.014 Imtiaz Kabir Oly 11.01.07.020 Fabiha Binte Haider 11.01.07.026 Md. Mohiuddin 11.01.07.034 Rumaiya Faruki Probha 11.01.07.041 A Thesis Submitted to the Department of Mechanical and Production Engineering in Partial Fulfillment of the Requirements for the Degree of BACHELOR OF SCIENCE IN INDUSTRIAL & PRODUCTION ENGINEERING DEPARTMENT OF MECHANICAL & PRODUCTION ENGINEERING AHSANULLAH UNIVERSITY OF SCIENCE & TECHNOLOGY DHAKA, BANGLADESH June, 2015 i

Upload: maheer-sohbat

Post on 16-Aug-2015

39 views

Category:

Engineering


5 download

TRANSCRIPT

Page 1: Design of facilty Layout of a LED bulb Production sysem

Facility Layout of an Electronic/ LED

Manufacturing Industry- A Case Study

By

Maheer Sohbat 11.01.07.014

Imtiaz Kabir Oly 11.01.07.020

Fabiha Binte Haider 11.01.07.026

Md. Mohiuddin 11.01.07.034

Rumaiya Faruki Probha 11.01.07.041

A Thesis Submitted to the

Department of Mechanical and Production Engineering

in Partial Fulfillment of the Requirements for the Degree

of BACHELOR OF SCIENCE IN INDUSTRIAL & PRODUCTION ENGINEERING

DEPARTMENT OF MECHANICAL & PRODUCTION ENGINEERING AHSANULLAH UNIVERSITY OF SCIENCE &

TECHNOLOGY DHAKA, BANGLADESH

June, 2015

i

Page 2: Design of facilty Layout of a LED bulb Production sysem

This project work entitled Facility Layout of an Electronic/ LED Manufacturing Industry-

A Case Study submitted by the following students has been accepted as satisfactory in

partial fulfillment of the requirement for the degree of B. Sc. in Industrial & Production

Engineering on June, 2015

Maheer Sohbat

11.01.07.014

Imtiaz Kabir Oly

11.01.07.020

Fabiha Binte Haider

11.01.07.026

Md. Mohiuddin

11.01.07.034

Rumaiya Faruki Probha

11.01.07.041

ii

Professor Dr. A.F.M. Anwarul Hoque,

Head of the Department,

Department of Mechanical and Production

Engineering, AUST

Dr. Nikhil R. Dhar

Professor

Department of Industrial & Production Engineering

Bangladesh University of Engineering & Technology

Dhaka-1000, Bangladesh

Page 3: Design of facilty Layout of a LED bulb Production sysem

Declaration

We do hereby declare that this thesis work has been done by us and neither this thesis nor any part of it has been submitted elsewhere for the award of any degree or diploma.

Maheer Sohbat 11.01.07.014

Imtiaz Kabir Oly 11.01.07.020

Fabiha Binte Haider 11.01.07.026

Md. Mohiuddin 11.01.07.034

Rumaiya Faruki Probha 11.01.07.041

ii

Professor Dr. A.F.M. Anwarul Hoque,

Head of the Department,

Department of Mechanical and Production

Engineering, AUST

Dr. Nikhil R. Dhar

Professor

Department of Industrial & Production Engineering

Bangladesh University of Engineering & Technology

Dhaka-1000, Bangladesh

iii

Page 4: Design of facilty Layout of a LED bulb Production sysem

Contents

List of table………………………………………………………………..…….….....…..v

List of figure…………………………………………………………………….…...……vi

Acknowledgements……………………………………………….…......….vii

Abstract…………………………………………………………...…..........viii

Chapter 1 Introduction……………………………………………………………...…….1

1.1.1 Introduction…………………………………………………...…….1

1.1.2 Basic Production Layout Format……………………......................1

1.1.3 Project Aim and Objectives………………………….............…….5

1.1.4 Factors in Determining Layout and De………………....…...…..…5

1. Literature Review…………………………………………………………….6

1.2.1 Facility shapes and dimensions…………………………………..…6 .

1.2.2 Material handling systems……………………………...……......….7

1.2.3 Multi-floor layout…………………………………………….…..…8

1.2.4 Facility Layout Problem……………………………………….....…9

1.2.5 Time and Motion Study …………………………………………...10

1.2.6 Assembly Line Balancing …………………………………..….…11

1.2.7 5S…………………………………………...………………...……13

1.2.8 SWOT Analysis ……………………………………………..…….15

Chapter-2 Data analysis and result………………………………………………..……17

2.1 Computerized Relative Allocation of Facilities Technique (CRAFT).17

2.2 Systematic layout planning (SLP) ……………………………...……23

2.3 Analysis of layout with minimum product travel method……………25

2.4 Line balancing and efficiency………………….………...………...…28

2.5 Capacity Calculation: Time Study………….……………………...…31

2.6 Implementation of 5S…………………………………...…….…...…33

2.7 Bill of material…………………………………...………………...…34

2.8 SWOT analysis…………………………………...…………......……37

Chapter-3 Discussion on Results……………………………………….…………......…39

3.1 CRAFT…………………………………...…………...….………….39

3.2 Systematic layout planning (SLP) ……………………...……...……40

iv

Page 5: Design of facilty Layout of a LED bulb Production sysem

3.3 Assembly Line Balancing…………………………...........................40

3.4 Demand forecasting………………………........................................42

3.5 Ergonomics………………………......................................................43

3.6 Safety of workplace……………........................................................46

3.7 Lean Processes ...................................................................................... 49

3.8 Implementation of 5S…….................................................................52

Chapter-4 Conclusions and Recommendations…..........................................................54

4.1 Conclusions…….....................................................................................54

4.2 Recommendations……...........................................................................55

Chapter-5 References……………………………............................................................56

Appendix…………………………………………………………………….66

v

Page 6: Design of facilty Layout of a LED bulb Production sysem

List of Table

Table 2.1: Included tasks and Area of the departments........................................................ 17

Table 2.2: From-To chart (Number trips of material per hour ............................................. 18

Table 2.3: Rectilinear distance between the departments for initial layout…………….…18

Table 2.4: Total distances travelled per hour between departments for initial layout …..........18

Table 2.5: Rectilinear distance between the departments .................................................... 19

Table 2.6: Total distances travelled per hour between departments for layout……..…….19

Table 2.7: Rectilinear distance between the departments…………………………...…….20

Table 2.8: Total distances travelled per hour between departments for layout……….…..20

Table 2.9: Reason for rating various departments…………………………………….…..21

Table 2.10: Closeness and line code for various departments………………………….…22

Table 2.11: Relationship chart…………………………………………………………….22

Table 2.12: Distances between the adjacent departments…………………………………25

Table 2.13: Precedence chart……………………………………………………………...27

Table 2.14: Time Study……………………………………………………………...…….29

Table 3.1: Monthly demand for 4 month………………………………………………….42

vi

Page 7: Design of facilty Layout of a LED bulb Production sysem

List of Figure

Figure 2.1: Centroid allocation of departments in Initial layout………………………………...17

Figure 2.2: Centroid allocation in changed layout (Departments B and C)………………….….19

Figure 2.3: Centroid allocation in changed layout (Departments A and B)…………………..…20

Figure 2.4: Initial Relationship diagram………………………………………………………...…...22

Figure 2.5: Block diagram for initial layout……………………………………………………..…..23

Figure 2.6: Block diagram for improved layout………………………………………..………..…..24

Figure 2.7: Activity relationship diagram……………………………………………..…………..…28

Fig 3.1: Proposed U- shape line layout…………………………………………………..………..…41

vii

Page 8: Design of facilty Layout of a LED bulb Production sysem

Acknowledgements

At the very beginning, the authors of this report wish to express our warmth gratitude

especially to the Department of Industrial and Production Engineering, AUST for arranging this

Project and Thesis Course that facilitates integration of theoretical knowledge with practical

situations.

We would like to express our sincere respect to Professor Dr. A.F.M. Anwarul Hoque,

Head of the Department of Mechanical and Production Engineering, AUST and Dr. Nikhil R.

Dhar, Professor, Department of Industrial & Production Engineering, BUET for their whole-

hearted supervision during their one year course period. His understanding, encouraging,

guidance and instructions throughout the progress of report preparing and writing have provided

a good basis for this Thesis. Without his direct help, suggestions assistance it would be

impossible to complete this work.

The author would like to convey their gratitude towards all the teachers of Department

of MPE, AUST for helping directly throughout the whole research work.

The author would like to convey their gratitude to the executives of Hosaf Proficient

Energy Ltd. and those who provided helping materials for working on industries. The authors are

pleased to express their heartiest gratitude to the manager of the industry who let us work on

every sections of their industry

Finally, the authors offer their sincere thanks and apologies to several others whom they

have no doubt overlooked.

Authors

viii

Page 9: Design of facilty Layout of a LED bulb Production sysem

Abstract

The LED light manufacturing industry started developing in Bangladesh primarily as an

export-oriented industry. Productivity improvement is a vital issue in case of LED industry to

increase the profit and quality of the product and to reduce the manufacturing cost and also for

en effective work place. For these an effective layout model is necessary for the industry. By

decreasing process bottlenecks, reducing lead times and increasing the production line efficiency

productivity can be improved. Line balancing and time study are effective to reduce the

operation time and improvement for the productivity. Time study was performed in the industry

to increase its production efficiency and reduce the operation time and associated cost. Assembly

line balancing technique was also used in single production line to identify and remove the non-

value added activities and increase the productivity. Computerized Relative Allocation of

Facilities Technique (CRAFT), Systematic layout planning (SLP) and Analysis of layout with

Minimum Product Travel Method (MPTM) were used for an effective layout.

In this facility layout system, time study is performed and the production lines are

balanced through the distribution of works among the work stations by line balancing. A new

product layout is modeled with the balanced capacity combining both modular line and

traditional manufacturing system together. The feasible problem areas which occurred in

different places are pin pointed by strength, weakness, opportunities and threats for the facility

layout was also identified by SWOT analysis. This project report will provide practical and

pragmatic guidelines for the improvement of facility layout of small LED manufacturing

industry to improve their industrial productivity and capacity by applying some essential tools

like- CRAFT, SLP, MPTM, 5S etc.

ix

Page 10: Design of facilty Layout of a LED bulb Production sysem

1

Chapter-1

Introduction

1.1 Introduction

For an organization or industry to have an effective and efficient manufacturing unit,

it is important that special attention is given to facility layout. Facility layout is an

arrangement of different aspects of manufacturing in an appropriate manner as to achieve

desired production results. Facility layout considers available space, final product, safety

of users and facility and convenience of operations.

In industry sectors, it is important to manufacture the products which have good

quality products and meet customers‘ demand. This action could be conducted under

existing resources such as employees, machines and other facilities. However, plant layout

improvement, could be one of the tools to response to increasing industrial productivity.

Plant layout design has become a fundamental basis of today‘s industrial plants which can

influence parts of work efficiency. It is needed to appropriately plan and position

employees, materials, machines, equipment, and other manufacturing supports and

facilities to create the most effective facility layout.

The integration of the needs of people (personnel and customers), materials (raw,

finished, and in process), and machinery in such a way that they create a single, well-

functioning system.

J. L. Zundi, defines ―Plant layout ideally involves allocation of space and

arrangement of equipment in such a manner that overall operating costs are minimized.

Riggs defines, ―the overall objective of plant layout is to design a physical

arrangement that most economically meets the required output – quantity and quality.‖

Page 11: Design of facilty Layout of a LED bulb Production sysem

2

1.1.1 Basic Production Layout Formats

The formats by which departments are arranged in a facility are defined by the

general pattern of work flow; there are three basic types (process layout, product layout,

and fixed-position layout) and one hybrid type (group technology or cellular layout).

Process Layout Process Layout involves arranging departments consisting of like

processes in a way that optimizes their relative placement. In many installations, optimal

placement often means placing departments with large amounts of interdepartmental

traffic adjacent to one another. The work has to be allocated to each department in such a

way that no machines are chosen to do as many different job as possible i.e. the emphasis

is on general purpose machine. The work, which has to be done, is allocated to the

machines according to loading schedules with the object of ensuring that each machine is

fully loaded. The grouping of machines according to the process may be done keeping in

mind the following principles of process layout designing:

The distance between departments should be as less as possible for

avoiding long distance movement and handling of materials.

The Layout should be in sequence of manufacturing operations.

The arrangement should be convenient for inspection and supervision

Advantages

Disadvantages

Suitability

Lower initial capital

investment

High degree of machine

utilization,

Low overhead costs

variety of products

Effective and specialized

supervision

Greater Flexibility and

expansion scope

Material handling Cost is

high

More Skilled labor

requirement

Gap in Production is

Higher

WIP inventory is High

More frequent

inspection is needed

resulting in high cost

Mostly non standardized

product are produced

Where Production

volume required is lower

Products are not

standardized

There are frequent

changes in design and

style of product

Job shop type of work is

done

Machines are very

expensive

Suitability

Page 12: Design of facilty Layout of a LED bulb Production sysem

3

Product layout Product layout is arrangement where machines and equipment are

arranged in one line depending upon the sequence of operations required for the product.

The materials move from one workstation to another sequentially without any

backtracking or deviation. Under this, machines are grouped in one sequence. Therefore

materials are fed into the first machine and finished goods travel automatically from

machine to machine, the output of one machine becoming input of the next. The raw

material moves very fast from one workstation to other stations with a minimum work in

progress storage and material handling. The grouping of machines should be done by

following principles:

All the operations including assembly, testing packing must be included in the Product line

All the machine tools or other items equipment‘s must be placed at the point

demanded by the sequence of operations

There should no points where one line inters another line. Materials may be

supplied where they are required for assembly.

Advantages

Disadvantages Suitability

Low cost of material

handling

Smooth, uninterrupted

operations

Continuous flow of

work

Lesser investment in

inventory and WIP

Optimum use of floor

space

Shorter processing

time

Less congestion of

work in the process

High initial capital

investment in special

purpose machine

Heavy overhead

charges

Breakdown of one

machine will hamper

the whole production

process

Lesser flexibility as

specially laid out for

particular product.

Mass production of

standardized products

Simple and repetitive

manufacturing process

Operation time for

different process is

more or less equal

Reasonably stable

demand for the

product

Continuous supply of

materials

Page 13: Design of facilty Layout of a LED bulb Production sysem

4

Fixed Position Layout This is the type of layout in which the major product being

produced is fixed at one location. Equipment labor and components are moved to that

location. All facilities are brought and arranged around one work center. This type of

layout is not relevant for small scale entrepreneur.

Advantages

Disadvantages Suitability

It saves time and

cost involved on the

movement of work

from one

workstation to

another.

The layout is

flexible as change in

job design and

operation sequence

can be easily

incorporated.

It is more

economical when

several orders in

different stages of

progress are being

executed

simultaneously.

Production period

being very long,

capital investment is

very heavy

Very large space is

required for storage

of material and

equipment near the

product.

As several

operations are often

carried out

simultaneously, there

is possibility of

confusion and

conflicts among

different

workgroups.

Manufacture of bulky

and heavy products

such as locomotives,

ships, boilers,

generators, wagon

building, aircraft etc.

Construction of

building, flyovers,

dams.

Hospital medical

services.

Combined layout or Group Technology Many of Production units require all

three processes namely intermittent process (job shops), the continuous process (mass

production shops) and the representative process combined process or miscellaneous shop

production. In most of industries, only a product layout or process layout or fixed location

layout does not exist. Thus, in manufacturing concerns where several products are

Page 14: Design of facilty Layout of a LED bulb Production sysem

5

produced in repeated numbers with no likelihood of continuous production, combined

layout is followed. Generally, a combination of the product and process layout or other

combination are found, in practice, e.g. for industries involving the fabrication and

manufacturing of parts and assembly, fabrication tends to employ the process layout, while

the assembly areas often employ the product layout. In LED, manufacturing plant, the

machinery manufacturing forms are arranged on the product line principle, but ancillary

services such as heating, the mixing of spices, the power house, the water treatment plant

etc. are arranged on a functional basis.

1.1.2 Project Aim and Objectives

The aim of this project is to find the optimal assembly plant layout for a

replaceable traffic light production line, by using industrial engineering techniques

such as assembly line analysis, quality control, ergonomics and cost analysis. Objectives

acting as a basis for the aim:

Create a detailed plan to illustrate the optimal facilities layout in order to increase

production rates of the assembled LED light.

Create a storage location for the finished product, making it easier for the

installation team to access.

Reduced/eliminated assembly blockage as well as more equipment and

assembly points in working order resulting in higher output.

Improved quality control for parts assembly.

Lower ergonomics risk for periodic work.

Reduced cost for space utilization resulting in less waste.

Better understanding of the facilities layout preventing stoppages in the

assembly line.

Improvement of overall efficiency of the LED manufacturing industry.

Ensure high employee morale and safety.

1.1.3 Factors in Determining Layout and Design

Small business owners need to consider many operational factors when building or

renovating a facility for maximum layout effectiveness. These criteria include the

following:

Page 15: Design of facilty Layout of a LED bulb Production sysem

6

1. Space utilization

2. Shipping and receiving

3. Ease of communication and support

4. Impact on employee morale and job satisfaction

5. Promotional value

6. Safety

"Facility layout must be considered very carefully because we do not want to

constantly redesign the facility," summarized Weiss and Gershon. "Some of the goals in

designing the facility are to ensure a minimum amount of materials handling, to avoid

bottlenecks, to minimize machine interference, to ensure high employee morale and safety,

and to ensure flexibility. Essentially, there are two distinct types of layout. Product layout

is synonymous with assembly line and is oriented toward the products that are being made.

Process layout is oriented around the processes that are used to make the products.

Generally, product layout is applicable for high-volume repetitive operations, while

process layout is applicable for low-volume custom-made goods."

1.2 Literature Review

A facility layout is an arrangement of everything needed for production of goods or

delivery of services. A facility is an entity that facilitates the performance of any job. It

may be a machine tool, a work center, a manufacturing cell, a machine shop, a department,

a warehouse etc. [Heragu, 1997]. Due to the variety of considerations found in the

articles, researchers do not agree about a common and exact definition of layout problems.

The most encountered formulations are related to static layout problems. [Koopmans and

Beckmann, 1957] were among the first to consider this class of problems, and they

defined the facility layout problem as a common industrial problem in which the objective

is to configure facilities, so as to minimize the cost of transporting materials between them.

[Meller, et al. 1999] considered that the facility layout problem consists in finding a non-

overlapping planar orthogonal arrangement of rectangular facilities within a given

rectangular plan site so as to minimize the distance based measure. [Azadivar and Wang,

2000] defined that the facility layout problem as the determination of the relative locations

for, and allocation of, the available space among a given number of facilities. [ Lee and

Page 16: Design of facilty Layout of a LED bulb Production sysem

7

Lee, 2002] reported that the facility layout problem consists in arranging unequal-area

facilities of different sizes within a given total space, which can be bounded to the length

or width of site area in a way to minimize the total material handling cost and slack area

cost. [Shayan and Chittilappilly 2004] defined the facility layout problem as an

optimization problem that tries to make layouts more efficient by taking into account

various interactions between facilities and material handling systems while designing

layouts.

1.2.1 Facility shapes and dimensions

Two different facility shapes are often distinguished regular, i.e., generally

rectangular [Kim & Kim, 2000] and irregular, i.e., generally polygons containing at least a

2708 angle [Lee & Kim, 2000]. As mentioned by [Chwif et al. 1998] a facility can have

given dimensions, defined by a fixed length (Li) and a fixed width (Wi). In this case, the

facilities are called fixed or rigid blocks. According to the same authors, a facility can also

be defined by its area, its aspect ratio: ai =Li /Wi.The aspect ratio was also used by

[Meller et al. 1999].

1.2.2 Material handling systems

A material handling system ensures the delivery of material to the appropriate

locations. Material handling equipment can be conveyors (belt, roller, wheel), automated

guided vehicles (AGV), robots, etc. [El-Baz, 2004]. [Tompkins et al. 1996] estimated that

20–50% of the manufacturing costs are due to the handling of parts and then a good

arrangement of handling devices might to reduce them for 10–30%. When dealing with a

material handling system, the problem consists in arranging facilities along the material

handling path. Two dependent design problems are considered: finding the facility layout

and selecting the handling equipment. The type of material-handling device determines the

pattern to be used for the layout of machine [Devise & Pierreval, 2000]; [Heragu &

Kusiak, 1988]. [Co et al. 1989] also pointed out that the facility layout impacts the

selection of the handling device.

Given the difficulty of solving both problems jointly, they are mainly solved

sequentially [Hassan, 1994]. Among the major types of layout arrangement based on the

type of material handling, one can distinguish, single row layout, multi-rows layout, loop

Page 17: Design of facilty Layout of a LED bulb Production sysem

8

layout and open-field layout [Yang et al. 2005]. The single row layout problem occurs

when facilities have to be placed along a line [Djellab & Gourgand, 2001; Ficko,

Brezocnick, & Balic, 2004; Kim, Kim, & Bobbie, 1996; Kumar, Hadjinicola, & Lin,

1995]. Several shapes may be considered from this basic situation, such as straight line,

semi-circular or U-shape [Hassan, 1994]. The loop layout problem deals with the

assignment of facilities to candidate locations in a closed ring network, around which parts

are transported in one direction [Chaieb, 2002; Cheng & Gen, 1998; Cheng, Gen, &

Tosawa, 1996; Nearchou, 2006; Potts & Whitehead, 2001]. The loop layout

incorporates a Load/Unload (L/U) station, i.e., location from which a part enters and leaves

the loop. This station is unique. The multi-rows layout involves several rows of facilities

[Hassan, 1994]. The movements of parts occur between facilities from the same row and

from different rows [Chen et al. 2001; Ficko et al. 2004; Kim et al. 1996]. The open field

layout corresponds to situations where facilities can be placed without the restrictions or

constraints that would be induced by such arrangements as single row or loop layout

[Yang et al., 2005].

1.2.2 Multi-floor layout

Nowadays, when it comes to construct a factory in urban area, land supply is

generally insufficient and expensive. The limitation of available horizontal space creates a

need to use a vertical dimension of the workshop. Then, it can be relevant to locate the

facilities on several floors. The vertical movement of parts requires a vertical

transportation device: elevator. In such situations, both the position on the floor and the

levels has to be determined for each facility, so that the related problems are referred to as

multi-floor layout problems [Kochhar & Heragu, 1998]. [Johnson 1982] seems to be

among the firsts to address a multiple-floor layout problem. He dealt with the problem of

defining relative locations of facilities in a multiple-floor building. Later, other researchers

focused on taking into consideration vertical movements of parts from one floor to another

[Bozer, et al. 1994; Meller &.Bozer, 1996, 1997]. Elevators are often the material

handling system reported [Lee et al. 2005]. Their number and location are either known

(Lee et al., 2005) or to be determined through optimization [Matsuzaki et al. 1999]. In

[Matsuzaki et al. 1999], the capacity of each elevator was considered as a constraint. The

number of floors can be known [Lee et al., 2005] or to be determined, depending on each

Page 18: Design of facilty Layout of a LED bulb Production sysem

9

floor area and on the number and dimensions of the facilities [Patsiatzis & Papageorgiou,

2002].

Backtracking and bypassing

Backtracking and bypassing are two particular movements that can occur in flow-

line layouts, which impact the flow of the products. Backtracking is the movement of a

part, from one facility to another preceding it in the sequence of facilities in the flow-line

arrangement [Braglia, 1996; Kouvelis]

1.2.4 Facility Layout Problem

[Anucha Watanapa 2011], proposed an improved the plant layout of pulley‘s

factory to eliminate obstructions in material flow and thus obtain maximum productivity.

The present plant layout and the operation process of each section have been investigated.

The problem in term of material flow of each operation section was identified.

Disassembly surface finishing and inspection sections should be allocated to make

the good material flow. The suitable of new plant layout can decrease the distance of

material flow, which rises production. [W. Wiyaratn 2010], study plant layout of iron

manufacturing based on the systematic layout planning pattern theory (SLP) for increased

productivity. The detailed study of the plant layout such as operation process chart, flow of

material and activity relationship chart has been investigated. The new plant layout has

been designed and compared with the present plant layout. The SLP method showed that

new plant layout significantly decrease the distance of material flow from billet cutting

process until keeping in ware house. [Pinto Wilsten, 2007], experiments application of

different heuristic approaches to a real facility layout problem at a furniture manufacturing

company. All the models are compared (Graph Theory, CRAFT, BLOCPLAN, Optimum

Sequence) here a number of parameters of interest are employed. The experiment shows

that formal layout modeling approaches can be effectively used real problems faced in

industry, leading to significant improvements. [Saifallah Benjaafar 2010], address the

problem of designing flexible plant layouts for manufacturing facilities where product

demands are subject to variability. A flexible layout is one that maintains low material

handling costs despite fluctuations in the product demand levels. Optimal and heuristic

Page 19: Design of facilty Layout of a LED bulb Production sysem

10

methods (CRAFT) are presented for generating flexible layouts and determining flow

allocations under various design and operation assumptions.

1.2.5 Time and Motion Study

Time study is considered to be one of the most widely used means of work

measurement. Time study procedure involves timing a sample of a worker‘s performance

and using it to set a standard [lleizer and Render 20081]. The worker sample can be

selected from a single facility or it may be a composite sample selected from several

facilities [Philip Vaccaro 2011]. Time study is a work measurement technique for

recording the times of performing a certain specific j. or its elements carried out under

specified condition, and for analyzing the data to obtain the time necessary for an operator

to carry it out at a defined rate of performance [Shumon et al.2013].1t is the application of

a scientific method of determining process times using data collection and statistical

analysis. This study is concerned with the establishment of time standards far a worker to

perform a specified job at a defined level of performance. It was originally proposed by

[Fredrick Taylor 1881] and was modified to include a performance rating adjustment.

Taylor used the most qualified different parameters such as machine time, material

handling (with personal allowances) time and bundle time [Babu 2011]. Material handling

and bundle time is calculated by motion analysis.

Motion study offer a great potential for saving any areas of human effort and

reduce the cost by combining the elements of one task with elements of another. It

involves the analysis of the basic hand, arm and body movements of workers as they

perform work. Motion study uses the principles of motion economy to develop the work

stations that are friendly to the human body and efficient in their operation. This study is

used to develop the best work method and create motion consciousness on the part of all

employees by developing economical and efficient tools, fixtures and production aids. In

RMG industries the purpose of motion study is to analysis the motions of the operator's

hand, leg, shoulder and eyes in a single motion of work or in a single operation cycle, to

that unless motions can be eliminated. Motion study was first introduced to look at how

body motions were used in the process of completing a job by using camera [Frank and

Lillian Gilbreth 1885].This concept provide smooth and easy motion to improve

capability of performer and get more output of time investment done by the particular

resource towards their given tasks. So, it is vital to analyze the movement of workers and

Page 20: Design of facilty Layout of a LED bulb Production sysem

11

eliminate the unwanted motions, which lead increased worker's efficiency and improved

productivity in a firm.

1.2.6 Assembly Line Balancing

Assembly Line Balancing (ALB) is the term commonly used to refer to the

decision process of assigning tasks to workstations in a serial production system. Line

balancing is an optimum distribution of the workload evenly across all process in a cell or

value stream to remove bottleneck or excess capacity [Kumar and Mahto 2013]. It is the

assignment of work to stations in a line to as to achieve the desired output rate with the

smallest number of workstations [Krajewski and Ritzman 2008] .Line balancing is one

of the most common optimization technique which is used to allocate task of workers in

different workstation in Order to in union productivity Single model represents a type of

assembly line when product is assigned in the same direction from the certain set up and

won‘t variant its set up.

A mix model assembly line produces several items belonging to same family. In

contras-t single model assembly line produces one type of product with no variation but

mixed enables a plant to achieve both high volume production and product variety.

However, it complicates scheduling and increases the need for good communication about

the specific parts to be produced at each station and minimizing the number of station

[Kumar and Mahto 2013].

Multi model assembly line is the combination of simple and mix model assembly

line. In this model the uniformity of the assembled products and the production system is

not that much sufficient to accept the enabling of the product and the production levels. To

reduce the time and money this assembly is arranged in batches, and this allows the short

term lot-sizing issues which made in groups of the models to batches and result will be on

the assembly levels. The line balancing method sometime s causes an unequal time

assignments .The U shaped layout which is assigned by standard task helps to solve these

unequal time assignments situations in line balancing U shaped .It avoids constant

displacement to the start of the line and solve money of the distribution problem. It

improves the tasks assignment by offering production rate flexibility. The number of

workers assigned can be changed at any time. It makes easy to adapt the cycle time to the

tack time without rearranging the task assignments [lqbal et al. 2013].

Page 21: Design of facilty Layout of a LED bulb Production sysem

12

A sequence of operations is involved in making a product. In bulk production

works in an assembly line (Progressive Bundle system) and each operator does one

operation and passes it to other operator to do the next operation. In this way product

finally reaches to the end of the line as a finished product. In the assembly line after

sometime of the line setting, it is found that at some places in the line, work is started to

pile up and few operators sit idle due to unavailability of work [Shumon soil. 2013]. This

type of situation is known as bottleneck. So bottleneck can tined as delay in transmission

that causes slow production rate. When this situation happens in the line it is called an

imbalanced line. Normally it happens due to two main reasons which are variation in work

content (time needed to do an operation) in different operations and operator's performance

level. To identify the location of bottleneck and eliminate them line balancing is important

[Kumar and Mahto 2013]. A well-balanced assembly line reduces wastes such as

operator idleness, the need of fluctuating operators, stock and faulty products. It also

decreases the production costs of the unit and allows the company to reduce the price of

their products. To meet the production target, maintaining level work flow in the line is

very essential. So it is very important to know the basics of quick line balancing. Line

balancing can be classified as follows [Babu 2011]

Initial balancing: The sequence of operations of an industry is analyzed and the

Standard Minute Values (SMV) is allocated. The SMVs are determined by most

manufacturers using standard databases available whereas some companies use

their own databases based on past experience and using time studies.

Rebalancing: This is performed after few hours while the whole line is completely

laid down and may be performed several times in order to make the material flow

with the last bottle necks in the line. Capacity studies conducted on the line a help

the line balancing process.

Reactive balancing: Despite the production line being balanced spontaneous

variations are inevitable due to problems on the line. Reactive balancing is often

done due to machine break down, operator absenteeism, quality defects and

shortages. The operators or the machines are moved to the bottleneck until the

severity of the problem is concealed.

Late hour balancing: In order to fulfill the daily demanded output from a

production line the upstream operators are moved to the line end by the supervisors

Page 22: Design of facilty Layout of a LED bulb Production sysem

13

of some garment manufacturing companies. This happens unofficially but not

uncommon and makes the line unbalanced in the next day especially in early hours.

The downstream operators are waiting to receive garment pieces resulting

extremely low output in early hours.

The proposed manufacturing cells for garment manufacturing totally oppose late hour

balancing and only initial balancing can give the preeminent result. In Indian industries

assembly line was designed with a number of operations by simulation and heuristic

method to minimum the balancing loss and system loss. [Roy and Kban 20101].

1.2.7 5S

Sort (Seiri) Sorting is the first step-removing all surplus items from the work

center which are not needed for the immediate continual operations [Hough,2008]. At

this stage it is decided what is really needed and what is not. Any item or tool that is

unaccounted out of place or unnecessary needs to be clearly documented. A red tag is a

document made on red colored paper that is attached to potential junk items in a

workplace. The items are stored temporarily until assignable action can be undertaken; it is

usually the starting point of a 5S exercise. Items are red tagged with the best

description of use or placement recorded on it. All red tagged articles are moved to a

temporary holding area, and that area clearly is identified as the red tag or Seiri area.

Equipment or anything else that is not of use, should be discarded as refuse to be

thrown out [Howell, 2009]. To implement the first step of 5S, a production team needs to

know what material is used when the material in storage are to used where the required

materials are, and what the users requirement are [Hirano 1993]. This is an opportunity

for every team to re-evaluate the tools at their disposal and make sure that they are

using the best available tools for the process [Cooper et. al 2009].

Set in Order (Seiton) The second step in a 5S launch is taking the stored items and

putting them where they best support the function they provide. Workers should be

motivated to place items at their point of use and improve the workplace‗s visual

management [Van Pattern 2006]. Before and after photos should be taken to document

progress and explain activity benefits are of key importance at this stage [Samuels, 2009].

One important advantage of Set in order is that everything needed for the job is clearly

visible. Another objective of this step is to arrange the work in such a manner that

missteps can be easily identified and corrected which is one of the main reason why the

Page 23: Design of facilty Layout of a LED bulb Production sysem

14

implementation of visual controls is encouraged during this step. Associates may apply

these philosophies by referring to checklists, designing tool boards, parts container and

improving workplace design. The practice of shadow boarding can be quickly identified

when a piece of equipment is missing from a work station [Becker 2001]. The main

advantage of tool shadowing is that people instantly know which tool is missing and where

it stored.

Shine (Seiso) Once the unneeded is thrown away and sorting and set in order

has taken place, it is now time for the sanitize phase [Howell, 2009]. A cross functional

team should agree on what the cleaning standards need to be [Samuels, 2009]. This is

sometimes referred to as shine or sweep stage where teams thoroughly remove clutter

and fix equipment or building components [Hough 2008]. The objective of this

phase is to identify and eliminate the root cause of waste, dirt and damage as well

as clean up the work station [Van Pattern, 2006]. 5S projects that are almost entirely

focused on cleaning and painting prevent recording the valuable information that can be

gained from assessing it [Van Pattern, 2006]. This step needs to have the full involvement

of employees to gather the data of what they feel needs to be cleaned and how often

it should be cleaned [Samuels, 2009]. Although it is imperative to create a cleaning

schedule along with appointed duties for all personal working in designated areas, some

employees may mistakenly believe that they are not being paid to clean. In that situation,

[Cooper. et. al. 2007] make the suggestion to list all applicable responsibilities in detail,

including an area to be cleaned and desired expectations where they are assigned. Another

issue worth considering is that an unclean area is more susceptible to safety hazards

that could potentially cause worker injury [Howell, 2009]. This is of such importance that

[Cooper et. al. 2007] also recommends this particular event be followed as a daily

regimen.

Standardize (Seiketsu) After the organizing and cleaning of a production

area, it is essential that the area is maintained [Cooper, et. al. 2007]. This stage

requires that the improvements of the previous three phases are maintained. That‗s why

organization develop standardized procedures, rules and expectations for maintaining

continuous activity in all of the areas shift by shift and crew. This is a means of creating

consistent ways for implementing the tasks outlined above on daily basis [Cooper. et. al.

2007].The challenge is to visually maintain known agreed upon conditions rather than to

Page 24: Design of facilty Layout of a LED bulb Production sysem

15

write work instructions [Van Pattern, 2006]. Teams can develop their own standards by

using the 5M‗s borrowed from Kaoru Ishikawa‗s Fishbone diagram. In it, he lists

Manpower, Methods, Materials, Machines and Measurements as the 5 components of

the standardizing step [Ishikawa, 1986]. An organization achieves conformity when

employees value working to one common metric, rather than working however they feel

like working or how they think a job should be done [Van Pattern, 2006].

Sustain (Shitsuke) The benefits of the above four phases of 5S are powerful,

visual and easily measured. However without self-discipline, elements for sustainability

the success of 5S program is brief and everything will atrophy or revert to the

previous messy state [Maggie, 2006]. In daily life, when we diet to lose weight, we still

need discipline to help us maintain our objective. Therefore discipline and motivation go

hand and hand to reach your goals [Santos et. al. 2006]. Several studies identify the fifth

phase as the most difficult phase to perform of this program [Bullington, 2003]; [Cooper

et. al, 2007]; [Womack & Jones 1991]. To continue the gains from implementing the 5S

system, efforts should be taken to instill the importance of maintaining employee

dedication for a neat, orderly and safe workplace and reinforcing good work habits

[Maggie, 2006]. Every employee needs to understand the importance of safety, order and

cleanliness and be willing to take the necessary steps that guarantee the prescribed

standards are accommodated [Cooper et. al 2007] when every square foot of a

production floor is assigned to an associate then clutter will not build up [Samuels,

2009]

1.2.7 SWOT Analysis

The SWOT analysis is an extremely useful for understanding and decision-making

tools. SWOT is an acronym for Strengths, Weaknesses, Opportunities and Threats. SWOT

analysis is a subjective assessment of data which is organized into a logical order that

helps understanding, presentation, discussion and decision-making. It provides a

framework for analyzing a company's strengths, weaknesses, opportunities and threats it

faces. This analysis can be carried out for a product place, an industry or person. A SWOT

analysis enables firms to identify factors which need to be taken into account when

developing marketing and corporate strategy. The objective of the firm or industry should

be determined after the SWOT analysis has been performed. This would allow the

Page 25: Design of facilty Layout of a LED bulb Production sysem

16

organization to achieve the goals or objectives [Philip and Koshy 2012], 1n this analysis

strengths and weaknesses, are 'mapped‘ or 'graphed' against opportunities and threats.

Strengths refer to the characteristics which are of high importance as well as

provide a business or project significant advantages over others

Weaknesses refer to the characteristics or the areas which provide disadvantages

and require immediate actions

Opportunities are the dements those should be further implemented and exploited

to achieve the desired performance

Threats refer to the elements in the environment that could cause trouble for the

business or project

SWOT analysis aims to identify the key internal and external factors seen as

important to achieving an objective. The factors come from within a company's unique

value chain. Internal factors - the strengths and weaknesses internal to the organization.

External factors- the opportunities and threats presented by the environment external to the

organization. The SWOT analysis provides information that is helpful in matching the

firm's resources and capabilities to the competitive environment in which it operates.

In India, SWOT analysis was practiced to throw light on its present retail scenario and to

identify weakness such as multi-diversified business, no bargaining markets etc. and

various threats such as increasing competitors, government and local policies

unrecognized modem retailing etc. The analysis also discussed some customer-centric

initiatives to be taken in future by the retailers [Archana 2012].

SWOT analysis helped to identify the strengths challenges, opportunities and

threats of LED sector in Bangladesh. According to the analysis, many problems area were

identified in the factory which is related to the global challenges of the organization such

as high prices of quality products, high rated gas, electricity and oil prices, political unrest

and inadequate sales center for the local market etc. [Mustafa 2006].

Page 26: Design of facilty Layout of a LED bulb Production sysem

17

2.1 Computerized Relative Allocation of Facilities Technique (CRAFT)

Now days use computer is well established in every type of designing so is the facility

layout also. A number of computerized layout programs have been developed since the

1970s to help devise good manufacturing layouts. Out of these, the most widely applied is

the Computerized Relative Allocation of Facilities Technique (CRAFT).The CRAFT

method follows the same basic idea, but with some significant operational differences, it

requires a load matrix and a distance matrix as initial inputs, but in addition, it requires a

cost per unit distance traveled, With basic inputs and an initial layout in the program,

CRAFT tries to improve the relative placement of the departments as measured by total

material handling cost for the layout. (Material handling cost between departments (Flow

points) = Number of loads × Rectilinear distance between department centroids × Cost per

unit distance.) It makes improvements by exchanging pair departments iteratively until no

further cost reductions are possible. That is, the program calculates the effect on total cost

of exchanging departments; if this yields a reduction, the exchange is made, which

constitutes iteration. Departments are part of a material flow network, so even a simple

pairwise exchange generally will affect flow patterns among many other departments. It is

a heuristic program.

1. CRAFT uses a simple rule of thumb in making evaluations that is Compare two

departments at a time and exchange them if it reduces the total cost of the layout.

This type of rule is obviously necessary to analyze even a modest size layout.

2. CRAFT does not guarantee an optimal or model solution.

3. CRAFT is biased by its starting conditions: where you start (that is, the initial

layout) will determine the final layout.

4. Starting with a reasonably good solution is more likely to yield a lower-cost final

solution, but it does not always. This means that a good strategy for using CRAFT

Chapter-2

Data Analysis and Result

Page 27: Design of facilty Layout of a LED bulb Production sysem

18

is to generate a variety of different starting layouts to expose the program to

different pairwise exchange.

5. It can handle up to 40 departments and rarely exceeds 10 iterations in arriving at a

solution.

6. CRAFT departments consist of combinations of square modules. This permits

multiple departmental configurations, but often results in strange departmental

shapes that have to be modified manually to obtain a realistic layout.

7. A modified version called SPACECRAFT has been developed to handle multistory

layout problems.

8. CRAFT assumes the existence of variable-path material handling equipment such

as forklift trucks. Therefore, when computerized fixed-path equipment is

employed, CRAFT‘s applicability is greatly reduced.

The result of design shows minimum total transfer cost between departments. The

calculation is based on the following equation:

If the distance between departments are rectilinear, d ij is calculated based on the following

equation-

dij= |∆x| + |∆y|

If the distance between departments is Euclidean, dij is calculated based on the following

equation-

Dij = √ (∆x) 2

+ (∆y) 2

To calculate the distance between departments, centroid of each department is calculated

using the following equation

X =

(x2

2 - x1

2) (y2 – y1)

Y =

(y2

2 –y1

2) (x2 –x1)

Based on these calculations, the result design will show only a transfer cost

between departments. The good result design means less transfer cost between

departments. However, there are other parameters missing such as total time in system,

waiting time, or utilization.

Page 28: Design of facilty Layout of a LED bulb Production sysem

19

Cost matrix analysis using CRAFT method

The 26 processes of producing 3W LED bulb (shown in appendix A) are included

into 6 departments (A, B, C, D, E, and F). The process names are shown in table no 2.1

Table 2.1 Included tasks and Area of the departments

Department Included task Area (sq. ft.)

A A,B,C,M 15*15=225

B D,E,F,G,H 20*15=300

C I,J,K 25*15=375

D N,L,O 15*15=225

E P,Q,R 15*15=225

F S,T,U,V,W,X,Y,Z 30*15=450

Fig.2.1 Centroid allocation of departments in initial layout

One of the inputs required by craft is the flow data. That is the number of material

handling trips per unit time from every department to other department. This data is given

in the from-to chart appearing in the table 2.2.

The distance between departments is assumed to be the rectilinear distance between

centroid locations. From figure- 2.1, the centroid locations of the initial layout are

(XA, YA) = (7.5, 7.5), (XB, YB) = (10.5, 22.5)

(XC, YC)= (32.5, 22.5), (XD, YD) = (22.5, 7.5)

(XE, YE) = (52.5, 22.5), (XF, YF) = (45, 7.5)

Page 29: Design of facilty Layout of a LED bulb Production sysem

20

The rectilinear distance between A and B. for example, is given by the formula-

|XA-XB| + |YA-YB| = |7.5-10.5| + |7.5-22.5| = 17.5

Table 2.2 From-To chart (Number trips of material per hour)

Table 2.3 Rectilinear distance between the departments for initial layout

F T A B C D E F

A 17.5 40 15 60 37.5

B 22.5 27.5 42.5 50

C 25 20 27.5

D 45 22.5

E 22.5

F

Table 2.4 Total distances travelled per hour between departments for initial layout

F T A B C D E F

A 315 165 1575 2055

B 562 1020 1582

C 825 560 1385

D 3825 3825

E 675 675

F

315 562 990 5405 2250 9522

Total distance = Number of material handling per hour × Rectilinear distance between the

departments

If B and C are exchanged then the predicted cost extending from 9522 to 10172.50,

or about 6 percent.

If A and B are exchanged the new layout with A and B exchanged appear in figure.

Because A has the small area, it is placed in the upper left hand corner of the space

formally occupied by B, so that the remaining space allows B to be continuous. Notice that

F T A B C D E F

A 18 11 42

B 25 24

C 33 28

D 85

E 30

F

Page 30: Design of facilty Layout of a LED bulb Production sysem

21

B is no longer rectangular. The actual cost of the new layout is not necessarily equal to the

predicted value of 9522. The centroid of B is determined by first finding the moments MX

and MY.

Here, MX = {(152-0) (15-0) + (20

2-15

2) (30-15)}/2A where A = area of B =300 sq. ft.

=6000/2*300

=10

And MY= {(152-0) (15-0) + (30

2-15

2) (20-15)}/2A

=11.3

Now, interchanging departments B and C

Fig.2.2 Centroid allocation in changed layout (Departments B and C)

Table 2.5 Rectilinear distance between the departments

F T A B C D E F

A 42.5 20 15 60 37.5

B 22.5 27.5 42.5 25

C 25 40 47.5

D 45 22.5

E 22.5

F

Page 31: Design of facilty Layout of a LED bulb Production sysem

22

Table 2.6 Total distances travelled per hour between departments for layout

F T A B C D E F

A 765 165 1575 2505

B 562.5 660 1222.5

C 825 1120 1945

D 3825 3825

E 675 675

F

765 562.5 990 5605 2250 10174.5

Now interchanging the departments A and B

Fig.2.3 Centroid allocation in changed layout (Departments A and B)

Table 2.7 Rectilinear distance between the departments

F T A B C D E F

A 13.7 25 30 45 52.5

B 33.7 16.3 53.7 38.8

C 25 20 27.5

D 45 22.5

E 22.5

F

Page 32: Design of facilty Layout of a LED bulb Production sysem

23

Table 2.8 Total distances travelled per hour between departments for layout

F T A B C D E F

A 246.6 330 2205 2781.6

842.5 1288.8 2131.3

C 825 560 1385

D 3825 3825

E 675 675

F

246.6 842.5 1150 5673.8 2880 10797.9

2.2 Systematic layout planning (SLP)

In certain types of layout problems, numerical flow of items between departments

either is impractical to obtain or does not reveal the qualitative factors that may be crucial

to the placement decision. In these situations, the venerable technique known as systematic

layout planning (SLP) can be used. It involves developing a relationship chart showing the

degree of importance of having each department located adjacent to every other

department. From this chart, an activity relationship diagram, similar to the flow graph

used for illustrating material handling between departments, is developed. The activity

relationship diagram is then adjusted by trial and error until a satisfactory adjacency

pattern is obtained.

This pattern, in turn, is modified department by department to meet building space

limitations. The SLP approach has been quantified for ease of evaluating alternative

layouts. This entails assigning numerical weights to the closeness preferences and then

trying different layout arrangements.

Table 2.9 Reason for rating various departments

Rating Reason

1 Type of works

2 Ease of supervision

3 Common personnel

4 Contact necessary

5 Share same space

6 Psychology

Page 33: Design of facilty Layout of a LED bulb Production sysem

24

Table 2.10 Closeness and line code for various departments

Value Closeness Line code

A Absolutely necessary

E Especially important

I Important

O Ordinary closeness OK

U Unimportant

X Undesirable

Table 2.11 Relationship chart

F T A B C D E F Area

(sq.ft)

A A/4 O/2 A/4 U/1 U 225

B U I/4 A/1 U 300

C O/2 U 375

D A/ O 225

E A 225

F 450

Fig.2.4 Initial Relationship diagram

A D

B E C

F

Page 34: Design of facilty Layout of a LED bulb Production sysem

25

2.3 Analysis of layout with minimum product travel method

A layout which minimizes the product or material travel with in manufacturing

process is obtained by minimum product travel method (MPTM). The input for MPTM is

processing sequence, number of product processing department movement combination

and distance between departments.

The block diagram for existing layout,

Fig.2.7. Block diagram for initial layout

80

9

7 10

6 1

2 5

3 4

Page 35: Design of facilty Layout of a LED bulb Production sysem

26

Block diagram for proposed layout on the basis of minimum product travel length,

Fig.2.8 Block diagram for improved layout

100

8 1

7 2

3 6

4 5

9

Page 36: Design of facilty Layout of a LED bulb Production sysem

27

Table 2.13 Distances between the adjacent departments

SR NO Department

movement

condition

Distance between (in feet)

Original layout Improved layout

1 1-2 12 12

2 2-3 12 12

3 2-7 30 15

4 3-4 12 12

5 3-6 30 15

6 4-5 12 15

7 1-5 48 45

8 5-6 15 12

9 6-7 12 12

10 7-8 12 12

11 8-9 12 12

12 9-10 12 15

219 189

We assumed prescribed travel length to be = 200 ft.

Efficiency of original layout =

=

=.913

=91.30%

Efficiency of improved layout =

=

=1.05

=105%

Percentage improvement =

=15.90 %

Page 37: Design of facilty Layout of a LED bulb Production sysem

28

2.4 Line balancing and efficiency

Assembly Lines are a special case of product layout. In a general sense, the term

assembly line refers to progressive assembly linked by some material handling device. The

usual assumption is that some form of pacing is present and the allowable processing time

is equivalent for all workstations. Within this broad definition, there are important

differences among line types.

A few of these are material handling devices (belt or roller conveyor, overhead

crane)

Line configuration (U-shape, straight, branching)

Pacing (mechanical, human)

Product mix (one product or multiple products)

Workstation characteristics (workers may sit, stand, walk with the line, or ride the

line)

Length of the line (few or many workers)

Assembly Line Balancing Though primarily a scheduling issue, assembly-line

balancing often has implications for layout. This would occur when, for balance purposes,

workstation size or the number used would have to be physically modified.

The most common assembly line is a moving conveyor that passes a series of work

stations in a uniform time interval called the work station cycle time. At each workstation,

work is per-formed on a product either by adding parts or by completing assembly

operations. The work performed at each station is made up of many bits of work, termed

tasks, elements, and work units. Such tasks are described by motion–time analysis.

Generally, they are groupings that cannot be subdivided on the assembly line without

paying a penalty in extra motions.

Cycle time which is also the time between successive units coming off the end of

the line.

Cycle time =

Minimum number of work station =

Efficiency =

Page 38: Design of facilty Layout of a LED bulb Production sysem

29

Table 2.14 Precedence chart

Task Task name Performance time

(min)

Task must followed

A Wire cutting (long + short) 0.63 None

B Wire stapling (long + short) 0.94 A

C Wire leading (long + short) 1.78 A

D Driver lead 0.21 None

E Soldering wear and driver outline 0.78 B , C , D

F Cutting tube fiber 0.65 E

G Fiber enter driver 0.26 F

H Driver heating 0.60 G

I PCB LED soldering 0.63 None

J Helper (PCB folding + passing) 0.76 I

K PCB breaking 0.43 J

L PCB heat paste 0.37 K

M Shell lock

0.17 None

N Shell heat paste 0.33 M

O Shell +PCB 0.003 L ,N

P Cleaning shell + PCB 0.958 O

Q Shell + PCB cover adjust 0.45 P

R Driver pass (helper) 0.50 H

S Driver input 1.90 R , Q

T PCB soldering 0.56 S

U End capping 1.50 T

V Fiber heating 0.76 U

W End cap fitting 0.40 V

X Cleaning 0.25 W

Y Testing 0.50 X

Z Packaging 0.68 Y

Total performance time 17.001

Page 39: Design of facilty Layout of a LED bulb Production sysem

30

Fig.2.9 Activity relationship diagram

Here, Production time available per day = 7 hours

= 420 min

Unit required per day = 200 units

Cycle time =

=

= 2.1 min/day

Minimum number of work station =

=

= 8.0957

≈ 9

Efficiency =

=

= 0.899

= 89.90 %

Page 40: Design of facilty Layout of a LED bulb Production sysem

31

2.5 Capacity Calculation: Time Study

Table 2.15 Time Study

No Task name Total

O.T

Average

O.T

Rating Basic

time

1 2 3

1 Wire cutting (long

+ short)

0.61 0.63 0.65 1.90 0.63 100 0.63

2 Wire stapling

(long + short)

0.98 0.94 0.902 2.8 0.94 100 0.94

3 Wire leading

(long + short)

1.78 1.76 1.80 5.3 1.78 100 1.78

4 Driver lead 0.21 0.25 0.17 0.60 0.21 100 0.21

5 Soldering wear

and driver outline

0.78 0.74 0.82 2.3 0.78 100 0.78

6 Cutting tube fiber 0.65 0.60 0.70 2.0 0.65 100 0.65

7 Fiber enter driver 0.26 0.24 0.28 0.8 0.26 100 0.26

8 Driver heating 0.59 0.60 0.61 1.8 0.60 100 0.60

9 PCB LED

soldering

0.60 0.57 0.63 1.9 0.63 100 0.63

10 Helper (PCB

folding + passing)

0.76 0.75 0.77 2.3 0.76 100 0.76

11 PCB breaking 0.42 0.43 0.41 1.3 0.43 100 0.43

12 PCB heat paste 0.37 0.35 0.39 1.1 0.37 100 0.37

13 Shell lock 0.17 0.11 0.22 0.5 0.17 100 0.17

14 Shell heat paste 0.33 0.30 0.35 1.0 0.33 100 0.33

15 Shell +PCB 0.003 0.003 0.003 0.009 0.003 100 0.003

16 Cleaning shell +

PCB

0.958 0.10 0.901 2.87 0.958 100 0.958

17 Shell + PCB cover

adjust

0.45 0.42 0.48 1.35 0.45 100 0.45

18 Driver pass

(helper)

0.49 0.51 0.50 1.50 0.50 100 0.50

19 Driver input 1.90 1.91 1.91 5.7 1.90 100 1.90

20 PCB soldering 0.52 0.56 0.60 1.68 0.56 100 0.56

21 End capping 1.49 1.48 1.53 4.50 1.50 100 1.50

22 Fiber heating 0.76 0.73 0.79 2.28 0.76 100 0.76

23 End cap fitting 0.40 0.41 0.40 1.2 0.40 100 0.40

24 Cleaning 0.25 0.26 0.25 0.75 0.25 100 0.25

25 Testing 0.50 0.52 0.54 1.5 0.50 100 0.50

26 Packaging 0.68 0.70 0.67 2.04 0.68 100 0.68

Total basic time 17.001 17.001

Observation no

Page 41: Design of facilty Layout of a LED bulb Production sysem

32

Calculation of Standard Minute Value (SMV):

Total basic time = 17.001 min

Personal allowances = 11 %

Machine allowances = 2 %

SAM (Standard Allowed Minute)

SAM = Basic time + total allowance time

= 17.001 + (11*17.001/100) + (2 17.001/100)

= 19.211 min

Calculation of line efficiency:

Number of operators = 36

Working hours = 7 hours

Line output (production) = 200 units

SAM = 19.211 min

Total minute attended = no. of operators working hours 60

= 36 7 60

=15120 min

Total minute produced = Line output SAM

=200 19.211 min

=3842.2 min

Line efficiency =

=

= .2541 100%

= 25.41 %

Capacity in hours:

Number of operators = 36

Total working hours = 7 hours

So, factory capacity (in hours) = (36 7) hours

= 252 hours

Page 42: Design of facilty Layout of a LED bulb Production sysem

33

Production capacity of factory (in pieces):

Capacity =

=

=199.98

~ 200 pieces

2.6 Implementation of 5S

5S is a philosophy based on five Japanese terms utilized for creating and sustaining

a well-organized workplace that is more efficient and productive in operation.

The objective of implementation of 5S in the industry was to increase the

storing place create and preserve standards and service procedures specific to the

workshop, reduce unproductive time redefine access, working and storage spaces,

readjust the location. Changes that take place after 5S Implementation in our industry-

1S

During the activity Red labels have been applied to all marks which were not necessary

within the workshop.

All useless things have been sorted and eliminated.

Rubbish about approximately 300kg was thrown away.

The reason for scantling accumulation was found out.

The activity related rules have been stated and are to be implemented.

2S

The inappropriate objects have been taken inventory of

In the workshop, the location of all necessary objects have been defined and

marked.

Colors have been used to mark the different areas.

The arranging way has been set according to destination and degree of usage.

3S

Washing of floors was done.

All floors have been cleaned.

All storing shelves have been cleaned.

Page 43: Design of facilty Layout of a LED bulb Production sysem

34

All machines and tools have been washed and cleaned.

Existing disturbances/non conformities have been detected.

All boards have been cleaned as well as all the windows.

The supply wiring has been redone.

4S

The daily checklists were carried out.

The specific procedure was followed.

All obligatory rules in the company are obeyed.

Rules and regulations of the company were followed.

Establishment of Rules and Standard Operation Procedure (SOP)

Improvement in operation and workflow

5S

It gives a scope for Workers participation in the work area design and maintenance.

Workers absenteeism has been lowered down.

Team spirit and discipline were developed.

5S slogans and posters were introduced.

Enhancement of operation effectiveness in a better working environment was

created

2.6 Bill of material

A bill of materials or product structure (sometimes bill of material, BOM or

associated list) is a list of the raw materials, sub-assemblies, intermediate assemblies, sub-

components, parts and the quantities of each needed to manufacture an end product. A

BOM may be used for communication between manufacturing partners, or confined to a

single manufacturing plant. A BOM can define products as they are designed (engineering

bill of materials), as they are ordered (sales bill of materials), as they are built

(manufacturing bill of materials), or as they are maintained (service bill of materials or

pseudo bill of material). The different types of BOMs depend on the business need and use

for which they are intended. In process industries, the BOM is also known as the formula,

recipe, or ingredients list. In electronics, the BOM represents the list of components used

on the printed wiring board or printed circuit board. Once the design of the circuit is

Page 44: Design of facilty Layout of a LED bulb Production sysem

35

completed, the BOM list is passed on to the PCB layout engineer as well as component

engineer who will procure the components required for the design.

Creating a Bill of Materials Creating a bill of material should include:

BOM level

Part number

Part name

Phase

Description

Quantity

Unit of measure

Procurement type

Reference designations

BOM notes

What to include in an effective bill of materials

Because one of the main functions of the BOM is to ensure that the product is built

right, it is best to include specific pieces of product data in the BOM record. Whether you

are creating your first bill of materials or are looking for ways to improve how you create a

bill of materials, here is a high level list of information to include in your BOM record:

BOM Level—Assign each part or assembly a number to detail where it fits in the

hierarchy of the BOM. This allows anyone with an understanding of the BOM

structure to quickly decipher the BOM.

Part Number—Assign a part number to each part or assembly in order to

reference and identify parts quickly. It is common for manufacturers to choose

either an intelligent or non-intelligent part numbering scheme. Whichever scheme

you use, make sure you avoid creating multiple part numbers for the same part.

Part Name—Record the unique name of each part or assembly. This will help you

identify parts more easily.

Phase—Record what stage each part is at in its lifecycle. For parts in production, it

is common to use a term like ‗In Production‘ to indicate the stage of the part. New

parts that have not yet been approved can be classified as 'Unreleased' or 'In

Design'. This is helpful during new product introduction (NPI) because it allows

you to easily track progress and create realistic project timelines.

Page 45: Design of facilty Layout of a LED bulb Production sysem

36

Description—Provide a detailed description of each part that will help you and

others distinguish between similar parts and identify specific parts more easily.

Quantity—Record the number of parts to be used in each assembly or

subassembly to help guide purchasing and manufacturing decisions and activities.

Unit of Measure—Classify the measurement in which a part will be used or

purchased. It is common to use ‗each‘, but standard measures like inches, feet,

ounces and drops are also suitable classifications.

Procurement Type—Document how each part is purchased or made (i.e. off-the-

shelf or made-to-specification) to create efficiencies in manufacturing, planning

and procurement activities.

Reference Designators—If your product contains printed circuit board assemblies

(PCBAs), you should include reference designators that detail where the part fits on

the board in your BOM. Capturing this information in the BOM can save time and

help you avoid confusion down the road.

BOM Notes—Capture other relevant notes to keep everyone who interacts with

your BOM on the same page.

Documenting all this information in your BOM will keep business activities and

manufacturing tasks on target. In addition to capturing this information, you should also

consider the following questions when creating a bill of materials.

An accurate BOM supports efficient manufacturing processes

Creating a bill of materials is not only a necessary step in the product development

process; it is also what makes your product design a reality. Before you create a BOM

record, it is important to consider who will utilize the information and how you will

maintain and manage all associated product documentation like part datasheets and CAD

files. Develop more efficient manufacturing practices by capturing detailed part

information when creating a bill of materials. A bill of material of the industry is shown in

Appendix E.

Page 46: Design of facilty Layout of a LED bulb Production sysem

37

2.7 SWOT analysis

A SWOT analysis (alternatively SWOT matrix) is a structured planning method

used to evaluate the strengths, weaknesses, opportunities and threats involved in a project

or in a business venture. A SWOT analysis can be carried out for a product, place, industry

or person. It involves specifying the objective of the business venture or project and

identifying the internal and external factors that are favorable and unfavorable to achieve

that objective. Some authors credit SWOT to Albert Humphrey, who led a convention at

the Stanford Research Institute (now SRI International) in the 1960s and 1970s using data

from Fortune 500 companies. However, Humphrey himself does not claim the creation of

SWOT, and the origins remain obscure. The degree to which the internal environment of

the firm matches with the external environment is expressed by the concept of strategic fit.

Strengths characteristics of the business or project that give it an advantage

over others.

Weaknesses characteristics that place the business or project at a

disadvantage relative to others.

Opportunities elements that the project could exploit to its advantage.

Threats elements in the environment that could cause trouble for the

business or project.

Identification of SWOTs is important because they can inform later steps in planning to

achieve the objective.

First, the decision makers should consider whether the objective is attainable, given

the SWOTs. If the objective is not attainable a different objective must be selected and the

process repeated. Users of SWOT analysis need to ask and answer questions that generate

meaningful information for each category (strengths, weaknesses, opportunities, and

threats) to make the analysis useful and find their competitive advantage.

Page 47: Design of facilty Layout of a LED bulb Production sysem

38

Strengths

Weakness

This layout reduces lead time

It increases the worker‘s

efficiency and production time

There is a high degree of labor

and equipment utilization

Easy material handling process

It reduces production time

The raw materials were kept

unorganized in the ware house

Same route for raw material flow

and final product flow

A constraints was found that the

shell lock machine is fixed

Opportunities Threats

The industry has the ability to

handle a variety of processing

requirements Since workers are crossed trained

to perform every jobs, boredom

is less of a factor.

The work area may be crowded as

the little storage space is available.

This also can cause material

handling problems.

Page 48: Design of facilty Layout of a LED bulb Production sysem

39

3.1 CRAFT

In CRAFT method obtains the hourly cost of transporting materials to and from

each of the department s by simply multiplying the entries in the from-to-chart of figure by

the entries in the from–to-chart of figure. These calculations are summarized in fig.2.1.

The total distance traveled per hour for the initial layout is 9522 feet.

If B and C are exchanged then the predicted cost extending from 9522 to 10172.50,

or about 6 percent. (fig.2.2)

If A and B are exchanged the new layout with A and B exchanged appear in fig.

2.3 Because A has the small area, it is placed in the upper left hand corner of the space

formally occupied by B,

So that the remaining space allows B to be continuous. Notice that B is no longer

rectangular. The actual cost of the new layout is not necessarily equal to the predicted

value of 9522. The centroid of B is determined by first finding the moments MX and MY.

Exchanging A and B, the predicted cost is 10977.90

Since none of the predicted cost is less than the initial cost the lay out

recommended by CRAFT ,pictured in figure , required two iterations and resulted in a

reduction of total distance traveled from 10977.90 feet to 9522 feet, or about 15 percent.

Limitation of applying CRAFT

It cannot handle a change in material flow. It assumes the material flow is

deterministic. For different material flows it creates different layouts. Each layout is only

used for a specific situation. Limitations are-

Chapter-3

Discussion on Results

Page 49: Design of facilty Layout of a LED bulb Production sysem

40

Path dependence: Different initial layouts give different final solutions.

Department shapes deteriorate rapidly with the number of iterations. Outputs

contain unrealistic locations, shapes, and alignments. Manual adjustments are

always required.

The improvement algorithms cannot generally consider a negative "X"

relationship.

The improvement algorithms do not deal easily with other-than flow

relationship.

Architectural influences and other qualitative factors are very difficult to

consider. They are usually ignored.

Costs may not be significant, known, and linear in distance as assumption

3.2 Systematic layout planning (SLP)

This pattern, in turn, is modified department by department to meet building space

limitations. The SLP approach has been quantified for ease of evaluating alternative

layouts. This entails assigning numerical weights to the closeness preferences and then

trying different layout arrangements. The layout with the highest total closeness score is

selected. The proposed layout by SLP is shown in appendix D.

Limitation of SLP

It cannot handle a change in relationship among departments. If a relationship

changes, SLP has to create a new layout.

The building shape may be irregular. Manual adjustment is needed.

Shortest rectilinear path may not always be a realistic measure.

Limitations for general construction routines

Ignores the direction of flow among departments.

Some important relationships are not considered.

It is the departments instead of relationships that are considered in order of

priority or importance.

3.3 Assembly Line Balancing

In assembly line balancing cycle time was 2.1 min and the longest time required

for the task ―Driver input‖ is 1.9 min. If the task time was greater than the cycle time the

bottleneck is created. In that case following steps might be taken in action-

Page 50: Design of facilty Layout of a LED bulb Production sysem

41

1. Split the task: splitting the task so that complete units are processed in two

workstations.

2. Share the task: The task somehow to be shared with an adjacent workstation

which is part of the work.

3. Use parallel workstations: It may be necessary to assign the task to two

work-stations that would operate in parallel.

4. Use a more skilled worker: Because this task exceeds the workstation cycle

time a faster worker may be able to meet the task time.

5. Work overtime: working overtime may reduce the task time

6. Redesign: It may be possible to redesign the product to reduce the task time

slightly.

U- Shape line layout for further expansion can be implemented in line layout with

minimum worker movement.

Fig 3.1 Proposed U- shape line layout

Advantages of U-shape line layout

The IN and OUT are close, allowing visual control and management, according

to the production, a single person can handle both the cell input feeding and

The shortening of distances allow sharing of work, as well as reduction of

transportation waste

These layouts provide convenient foundation for one piece flow

Page 51: Design of facilty Layout of a LED bulb Production sysem

42

Communication among team mates in the cell is easier

The work is done inside the , supplies remain outside

Usually machines and tables are on rollers (if possible) for quick

reconfiguration

The floor space is generally fewer with a U cell than stretched line (including

inventories and supplies), walk distances are also reduced, as they are Muda

(waste).

3.4 Demand forecasting

During the line balancing the daily production rate was assumed by the monthly

demand of LED lights. The demand is forecasted by SMA or WMA method.

Table 3.1 Monthly demand for 4 month

Time period/ month Demand (units)

January 4200

February 4800

March 4500

April 5000

SMA (Simple Moving Average)

Here, actual data is available for 4 periods (months)

So, t = 4

And Dt = D4

We need the forecast for period 5 (May)

So F5 =Ft+1 =F4+1

Here, n= 4, it‘s a 4 period or 4 months moving average

We would take 4 more recent observations (data) i.e. April, March, February & January

Ft+1=

=

= 4625 unit

Weight Moving Average (WMA)

In simple moving average equal weight are assigned to all the value in the moving

average.

Page 52: Design of facilty Layout of a LED bulb Production sysem

43

WMA assigns more weights to the more recent values.

Now we want to forecast for 5th

period (May)

In a 4 period weighted moving average the weights may be given as-

The most recent period (April) might be assigned a weight of 0.5

The most recent period (March) might be assigned a weight of 0.2

The most recent period (February) might be assigned a weight of 0.2

The most recent period (January) might be assigned a weight of 0.1

The summation of the weight must be equal to 1.0

Now, F5 = 0.5*5000+0.2*4500+0.2*4800+0.1*4200 = 4780 units

3.5 Ergonomics

Ergonomics is the study of how to interact with working environment and how

these interactions can be improved so that the wellbeing is maximized. Ergonomics can be

applied to offices in several ways. Looking at how the industry is laid out, including where

people sit in relation to equipment, windows, doors and each other. Then check that

equipment and furniture is suitable for the type of work that people are doing. This

includes seating, desks, computers, printers and anything else that they might use to do

their job. Assess the environment that is, the temperature, ventilation, lighting, decoration.

All these aspects of an industry are considered in relation to the individuals in the industry

with emphasis on their safety, health, comfort - and productivity! Much of the following

information and advice can be applied to anywhere. After all, healthy computing is good

for everybody.

The layout which is proposed to the industry includes the following-

Arranging where people need to sit that work in the industry

What equipment the workers need to do their job

What sort of working environment they need

Some workers need a very quiet area to work, for example if they need to

concentrate, and could be put in a separate area away from noisy people and

equipment.

Other people may need to work creatively in teams, and would be better off in a

relaxed, open plan area.

Page 53: Design of facilty Layout of a LED bulb Production sysem

44

The facilities that people will need for storage.

The furniture used by the worker also used by the officers and the environment should be

as follows-

Seats should be adjustable so that the range of users can be accommodated

comfortably and they provide support where it's needed. Seats should have an adjustable

seat pan height, backrest height and backrest tilt, at least. Computer seats are available

with more features than this, such as seat pan tilt, many of which make sitting more

comfortable.

Armrests can provide good support but should be removable if you don't want

them, or they restrict posture, such as when they stop you getting as close to the desk as

you would like. Seats should have a 5-castor base for stability. It is also important that

everyone understands how to adjust their seats and what posture they should be aiming for

some seats can be quite complicated. Make sure that the seat comes with clear instructions.

Desks are usually a standard height of about 720mm. This is fine for most people,

but it should be checked to make sure that all users can be seated comfortably at a desk of

this height. Particularly short or tall people may need an adjustable-height desk. Enough

desk space is required for paperwork, the computer (monitor, keyboard and mouse) and

any additional equipment.

The desk should not have any obstructions underneath like drawers or supports

those forces to sit in uncomfortable positions. Computer desks should also have a fairly

'thin' top - not like a kitchen worktop. This is to make sure that worker can get legs under

without squashing thighs.

Some desks are 'radial' - L-shaped with a curve in the middle. These can be quite

comfortable for computer work as operators can have everything they need close at hand

in an arc around.

Lighting Most people like to be able to see daylight as it gives them a feeling

about how the day is going outside and natural light is also thought to make people feel

better too. Most people also like to be able to control the artificial lighting levels in their

work area but individual control is not often possible in large offices. Different amounts of

Page 54: Design of facilty Layout of a LED bulb Production sysem

45

light are needed for paperwork and screen work as screens emit their own light. In this

case, individual desk lights may be better for some people.

Temperature and ventilation It is clearly important to be warm enough, but

temperature and humidity can also make a difference to how alert or tired you feel by the

end of the day. Your response to the temperature of your environment depends not only

upon air temperature but also upon radiant temperatures (such as sunshine coming through

a window), air movement and humidity, as well as the type of clothing you are wearing

and what you are doing. Humans produce about 100 Watts of heat for typical office

activities, and computer terminals about twice that much or more depending upon type.

Remember that some people will not be able to move away from an uncomfortable or

stressful environment. Personal control systems where individuals have local control over

the air movement and temperature of their own environment - by the use of fans or heaters

etc., can help.

Noise In the work place can affect concentration, can be an irritation, and can be a

source of stress to some people. With the development of quieter equipment, especially

printers, noise levels in offices have generally decreased. However, in open-plan offices it

can still be a problem with the noise mainly due to people! Screens and good quality

flooring and ceiling tiles can help to absorb noise.

When assemblers need to sit to perform tasks, the optimal work surface height varies with

the type of work performed:

Precision work: 31 to 37 inches

Reading and writing: 28 to 31 inches

Typing and light assembly: 21 to 28 inches

The height of both the chair seat and the backrest should be adjustable. For a seated

person, the boundary for vertically reaching to grasp objects is 32 inches, with an

occasional extended reach of 38 to 40 inches.

When assemblers must stand to perform tasks, workbench heights should be as follows:

Precision work: above elbow height.

Page 55: Design of facilty Layout of a LED bulb Production sysem

46

Light work: just below elbow height.

Heavy work: 4 to 6 inches below elbow height.

Individuals with good posture should have their elbows at a 90-degree angle and

their wrists in a neutral position. The head should be straight, not too far forward, and

operators should neither lean forward at the waist nor lift their arms above shoulder height.

This workstation features a rack with bins set up so all the parts are within the operator‘s

reach.

3.6 Safety of workplace

When it comes to warehouse safety there are many benefits that are often

overlooked. Safety procedures are frequently disregarded in a variety of workplaces due to

insufficient time, inadequate resources or an opportunity to cut corners in an attempt to

save money. However, when safety procedures are soundly implemented there are major

benefits such as higher employee satisfaction as well as increased productivity. By

minimizing the risk of injury, fewer workplace disruptions take place and absenteeism

associated with injury is also reduced. Equipment downtime is another factor which can be

avoided through the appropriate use of safety procedures.

Here a few safety guidelines to help keep the industry safe

Ensure Safety Equipment is used at all Times In the warehouse it is vital that

forklifts or hydraulic dollies are used to lift items that are too heavy. Appropriate eyewear

and hard hats should also be worn when required. Employees should be aware of

emergency exits and the sprinklers installed in the roof should not be blocked at any time.

Safety equipment is implemented in order to minimize workplace injury, so although it

may be time consuming to initiate its use; it does pay off in the long run.

Page 56: Design of facilty Layout of a LED bulb Production sysem

47

Eliminate Any Potential Safety Hazards Ensure all warehousing floors are free

of ‗slip and trip‘ hazards. It is important that this safety check is carried out on a regular

basis, by all employees, and that the floor is always free of stray cords, liquids and any

other potentially hazardous items. It is also essential that any cracks and pits in the flooring

are attended to as these can cause serious injuries to employers as well as damaging

expensive machinery.

Clearly Label Designated Hazardous Zones Dangerous equipment should be

stored away in an area that is clearly labeled and safe walk ways should be highlighted

through necessary signage. The easiest way to illuminate hazardous zones is by using tape

or painting black and white stripes on the floor of the designated area. This enables

employees to be aware of dangerous surroundings and can be useful in avoiding accidents

that can cause serious injury.

Always Use Safe Lifting Techniques When a load requires transporting, firstly

assess what method is the best option for its movement. If lifting is the most suitable

method; check the route to ensure no obstacles are in the way and ensure there is enough

space for the load at its destination. Safe lifting techniques should always be carried out

and the load should not obstruct the view of the lifter. Use all materials handling

equipment carefully and follow the proper operating procedures including push rather than

pull, whenever possible and lean in the direction that is being travelled.

Page 57: Design of facilty Layout of a LED bulb Production sysem

48

Provide Training and Refresher Courses Ensure all staffs are educated and up to

date with knowledge about safe practices within the workplace. This allows for greater

adherence to procedures as staff members will be completely aware of the consequences

that can emanate from an unsafe workplace. Accidents most commonly occur when

corners are cut in an attempt to save time. If staff and management are completely aware

of the repercussions that can arise from this fact, procedures may be followed more

closely.

Promote Awareness in your Warehouse Having a sense of awareness in the work

place is an important safety factor. This can be achieved through communication between

staff members. By employees being vocal and yelling out to others their location, collision

incidents can be drastically reduced. When carrying items or driving machinery, a simple

―coming through‖ can alert other coworkers of their whereabouts and can allow them to

steer clear of dangerous pathways. All staff members should be encouraged to be

constantly aware of what‘s around them and to communicate where they are to ensure the

avoidance of collision accidents.

Page 58: Design of facilty Layout of a LED bulb Production sysem

49

3.7 Lean Processes

While it hasn‘t always been practiced with any great rigor, the concept of waste

reduction has long been a part of American business tradition. Ben Franklin's common-

sense reminders of "waste not, want not," and "a penny saved is a penny earned" have been

well taken by such luminaries as Henry Ford, who introduced the modern assembly line,

and the founders of time-and-motion studies and scientific management,

Systematic elimination of these wastes can result in faster processes, lower costs, higher

quality, happier workers and, most importantly, happier customers.

Defects, mistakes that require additional time, resources, and money to fix. In a

manufacturing process, a defect might involve a defective part that has to be remade; in a

white-collar job, it might include erroneous paperwork that needs to be redone. Defects

tend to be the result of:

Poor quality control

Poor repair

Poor documentation

Lack of standards

Weak or missing processes

A misunderstanding of customer needs

Poor inventory control

Poor design

Undocumented design changes

Over production, In some organizations, workers just blindly keep producing,

even when those who receive their output either aren't ready for it or don't need it.

Basically, what you end up with is too much stuff, too early, that the customer doesn't

necessarily want. This is especially common in manufacturing, but it can occur in any

workplace situation in which there's a bottleneck. Overproduction may occur due to:

Just-in-case production

Unclear customer needs

Producing to a forecast

Long set-up times

Attempts to avoid long set-up times

Poorly applied automation

Page 59: Design of facilty Layout of a LED bulb Production sysem

50

The solution to overproduction is to establish a reasonable work flow for the benefit of the

customer, which in this case is whoever acts as the downstream consumer of what you

produce: your client, another organization within the company, the general public, or

whatever the case may be. Be sure that there are well-established procedures in place for

every process in your organization, and if necessary, implement new processes to keep

work from backing up behind particular bottlenecks in the organization.

Waiting, speaking of bottlenecks, one of the worst in any organization. This is

actual downtime, which occurs whenever work has to stop for some reason: because the

next person in line is overwhelmed, because something broke down, because you're

waiting for approval, or because you've run out of something. Causes of waiting can also

include:

Mismatched production rates

Very long set-up time

Poor shop layout

Insufficient staffing

Work absences

Poor communications

Non-utilized/underutilized talent, while not included in the original Japanese list

of the seven wastes, is an integral part of the American concept. Rather than being

transparent to the system, people themselves have been plugged into the equation, in the

sense that poor utilization of existing talents, ideas, abilities, and skill sets is a waste as real

as using ten pounds of iron when five will do. This type of waste can be caused by a

myriad of things, not least:

Lack of teamwork

Lack of training

Poor communications

Management's refusal to include employees in problem-solving

Narrowly defined jobs and expectations

Poor management in general

Transportation, waste caused by moving things around. This is less of a problem

in a business office than in a manufacturing plant, since most of what white collar workers

Page 60: Design of facilty Layout of a LED bulb Production sysem

51

"transport" can be sent by email these days. Otherwise, too much transportation tends to

increase costs, wastes time, increases the likelihood of product damage and deterioration,

and can result in poor communication. In general, transportation waste can be caused by:

Poor plant/office layout

Excessive or unnecessary handling

Misaligned process flow

Poorly-designed systems

Unnecessary steps in system processes

Transportation issues can be defeated by common-sense efforts such as simplifying

processes, repairing physical layouts, handling products less often, and making distances

between steps as short as possible. In an office situation, simply providing enough printers

and other equipment for everyone can limit transportation waste.

Inventory, another item more important in manufacturing that in the standard

office environment, but still something you must be aware of. The actual issue here is

having too much inventory. Excess Inventory may be caused by:

Overproduction

Poor layout

Mismatched production speeds

Unreliable suppliers

Long set-up times

Misunderstood customer needs

Basically, eliminating excess inventory involves adjusting the workflow and

adopting the JIT process, which can be adapted to office environments as well as

manufacturing. Remember, all you really need to do is produce enough to satisfy your

downstream customer.

Motion, because simply having to move around too much can slow down

significantly. Typical causes of excessive motion include:

Poor workstation/shop layout

Poor housekeeping

Shared tools and machines

Workstation congestion

Isolated operations

Page 61: Design of facilty Layout of a LED bulb Production sysem

52

Lack of standards

Poor process design and controls

The solution here is to tighten things up: basically, to make sure everything can be easily

located and put into play whenever it's needed. Re-arrange the office or shop layout to

decrease the distance between stations, and make it easier to reach things that are often

used. Make sure all tools and parts are close at hand, and provide extra printers, copiers,

and fax machines for your employees. Standardize all folders, drawers, and cabinets, and

make sure everything stays organized so that it doesn't take more than a few seconds for

anyone to find a file they need. Finally, make sure everything about the work area stays

neat.

Excess Processing, This is any unnecessary effort expended in order to complete a

task: double-handling, permission seeking, unnecessary steps, re-entering data, making too

many copies or reports, and the like. Excess Processing can arise from:

Poor process control

Lack of standards

Poor communication

Overdesigned equipment

Misunderstanding of the customer's needs

Human error

Producing to forecast

Whatever the cause, the result is predictable: wasted money, time, effort, and

resources. Your only option is to closely examine your processes and fix them: institute

standard operating procedures, empower employees, get your documentation up to par,

implement J-I-T processes (if applicable), and do everything you can to shrink processes

without sacrificing quality. If you're working in an office, stop copying everyone on emails

and quit sending out so many reports...and see who screams. Eliminate as many meetings

as you can, and let people do their jobs without getting permission every step of the way.

3.8 Approach of 5S

The advantages from implementing the 5S rules:

1S

Process development by cost reduction

Stock confinement

Page 62: Design of facilty Layout of a LED bulb Production sysem

53

Better usage of workplace

Prevention of losing tools

2S

Process growth

Increasing Efficiency

Shortening of time required for searching necessary things

3S

Improvised working conditions for workers.

The number of customers has been increased after maintaining a clean and

neat layout.

Machine maintenance cost has been reduced.

4S

The standards of the company came to next level.

Improvement in safety has supported in reducing the injuries of workers.

Slips and falls of the material have been reduced.

Travel time of materials is reduced which led to reduction of work hazards.

5S

It gives a scope for Workers participation in the work area design and

maintenance.

Workers absenteeism has been lowered down.

Increasing of the awareness and morale.

Decreasing of mistakes quantity resulting from the inattention.

Proceedings according to decisions.

Improvement of the internal communication processes.

Improvement of the inter human relations.

Page 63: Design of facilty Layout of a LED bulb Production sysem

54

Chapter-4

Conclusions and Recommendations

4.1 Conclusions

A layout is considered with keeping A, D and F departments together and B, C and E

together at the first time when the distances traveled is 9522 feet. There are two types of

distance. They are – rectilinear distance and Euclidian distance. The rectilinear distance is

considered.

If B and C are exchanged then the predicted cost extending from 9522 to 10172.50, or

about 6 percent.

If A and B are exchanged the new layout with A and B exchanged appear in fig. 2.1

Exchanging A and B, the distances traveled is 10977.90 feet.

Since none of the predicted cost is less than the initial cost the lay out recommended by

CRAFT, pictured in figure 2.2, required two iterations and resulted in a reduction of total

distance traveled from 10977.90 feet to 9522 feet, or about 15 percent.

Comparing this exchanging layout, the layout 1 is preferable due to the lowest distances

traveled among the departments.

An enter relation among the department is found by SLP. The departments is also rated

by various types of reason such as types of work, ease of supervision, common personal, contact

necessary, share same space and psychology. Absolutely necessary is found among A and B, A

and D , B and E, C and D and E and F department.

Three layouts are proposed. In the first layout picture in appendix B.1. the distance from

department 2 to department 7, department 3 to department 6 and department 1 to department 5

are high. In the second proposed lay out the distance from department 2 to department 7,

department 3 to department 6 are minimized. As the shell lock machine is fixed so the distance

Page 64: Design of facilty Layout of a LED bulb Production sysem

55

from department 1 to department 5 could not be minimized. If the shell lock machine could be

replaced, then this distance will be minimized.

By the time study, SMV and production capacity of the processes were calculated

separately for production line. Line balancing has decreased 3-10 % work force. After line

balancing 2-10% of work stations, 27-28 % of waiting time and 20-100% of process bottlenecks

are reduced from the production line. The reduced workforce after line balancing can be shifted

to other production lines to minimize the total labor cost.

Different problem areas associated to man, machine, maintenance, material, method,

measurement, management and environment were recognized during observation.

In the industry, the layout is planned very carefully, as many people with different jobs

will be using the area. As the space is restricted, the layout becomes important to ensure that the

working space isn't too cramped, and people don't get in each other's way. Access and emergency

routes need to be defined and laid out to ensure that people can move around the industry easily

and quickly if necessary.

By SWOT analysis it becomes possible to identify various internal factors such as

strength and weakness and external factors such as opportunity and threats of LED light

manufacturing industry to improve its productivity, capacity, and export growth in the global

markets

4.2 Recommendations

A layout is proposed for the future expansion pictured in Appendix A3. Here the shell

lock machine is replaced and the lead time is reduced. An exit door for the final production with

the warehouse. The ware house is decorated with some selves for the product storage.

Only skilled workers should be entitled for the production processes and that‘s why

proper training and supervision must necessary to achieve the optimum improvements in

productivity and efficiency.

Page 65: Design of facilty Layout of a LED bulb Production sysem

56

An

uch

a Watanapa.( 2011). Analysis Plant Layout Design for Effective Production. Proceeding

of the International Multi Conference of Engineers and Computer Scientists, Vol.2, pp.

543-559.

Afentakis, P. A. (1989). Loop layout design problem for flexible manufacturing systems.

International Journal of Flexible Manufacturing Systems, 1, 143–175.

Aiello, G., & Enea, M. (2001). Fuzzy approach to the robust facility layout inuncertain

production environments. International Journal of Production Research, 39(18), 4089–

4101.

Aiello, G., Enea, M., & Galante, G. (2002). An integrated approach to the facilities and material

handling system design. International Journal of Production Research, 40(15), 4007 4017.

Aiello, G., Enea, M., & Galante, G. (2006). Multi-objective approach to facility layout problem

by genetic search algorithm and Electre method. Robotics and Computer-Integrated

Manufacturing, 22, 447–455.

Al-Hakim, L. (2000). On solving facility layout problems using genetic algorithms. International

Journal of Production Research, 38(11), 2573–2582.

Aleisa, E. E., & Lin, L. (2005). For effectiveness facilities planning: Layout optimization then

simulation, or vice versa? In Proceedings of the 2005 Winter Simulation Conference.

Armour, G. C., & Buffa, E. S. (1963). A heuristic algorithm and simulation approach to relative

allocation of facilities. Management Science, 9(2), 294–300.

Asef-Vaziri, A., & Laporte, G. (2005). Loop based facility planning and material handling.

European Journal of Operational Research, 164(1),1–11.

Chapter-5

References

Page 66: Design of facilty Layout of a LED bulb Production sysem

57

Azadivar, F., & Wang, J. (2000). Facility layout optimization using simulation and genetic

algorithms. International Journal of Production Research,38(17), 4369–4383.

Balakrishnan, J., & Cheng, C. H. (1998). Dynamic layout algorithms: A state of-the-art survey.

Omega, 26(4), 507–521.

Balakrishnan, J., & Cheng, C. H. (2000). Genetic search and the dynamic layout problem.

Computers & Operations Research, 27(6), 587–593.

Balakrishnan, J., Cheng, C. H., & Wong, K. F. (2003a). FACOPT: A user friendly Facilility

layout Optimization system. Computers & Operations Research, 30(11), 1625–1641.

Balakrishnan, J., Cheng, C. H., Conway, D. G., & Lau, C. M. (2003b). A hybrid genetic

algorithm for the dynamic plant layout problem. International Journal of Production

Economics, 86(2), 107–120.

Balakrishnan, J., Robert Jacobs, F., & Venkataramanan, M. A. (1992). Solutions for the

constrained dynamic facility layout problem. European Journal of Operational Research,

57(2), 280–286

Banerjee, P., & Zhou, Y. (1995). Facilities layout design optimization with single loop material

flow path configuration. International Journal of Production Research, 33(1), 183–204.

Baykasoglu, A., Dereli, T., & Sabuncu, I. (2006). An ant colony algorithm for solving budget

constrained and unconstrained dynamic facility layout problems. Omega, 34(4), 385–396.

Baykasoglu, A., & Gindy, N. N. Z. (2001). A simulated annealing algorithm for dynamic layout

problem. Computers & Operations Research, 28(14), 1403– 1426.

Benjaafar, S., Heragu, S. S., & Irani, S. A. (2002). Next generation factory layouts: Research

challenges and recent progress. Interface, 32(6), 58–76.

Bock, S., & Hoberg, K. (2007). Detailed layout planning for irregularly-shaped machines with

transportation path design. European Journal of Operational Research, 177, 693–718.

Bozer, Y. A., Meller, R. D., & Erlebacher, S. J. (1994). An improvement-type layout algorithm

for single and multiple floor facilities. Management Science, 40(7), 918–932.

Braglia, M. (1996). Optimization of a simulated-annealing-based heuristic for single row

machine layout problem by genetic algorithm. International Transactions in Operational

Research, 3(1), 37–49.

Page 67: Design of facilty Layout of a LED bulb Production sysem

58

Braglia, M., Zanoni, S., & Zavanella, L. (2003). Layout design in dynamic environments:

Strategies and quantitative indices. International Journal of Production Research, 41(5),

995–1016.

Chen, C. W., & Sha, D. Y. (2005). Heuristic approach for solving the multiobjective facility

layout problem. International Journal of Production Research, 43(21), 4493–4507.

Chen, D. S., Wang, Q., & Chen, H. C. (2001). Linear sequencing for machine layouts by a

modified simulated annealing. International Journal of Production Research, 39(8), 1721

1732.

Cheng, R., & Gen, M. (1998). Loop layout design problem in flexible manufacturing systems

using genetic algorithms. Computers & Industrial Engineering, 34(1), 53–61.

Cheng, R., Gen, M., & Tosawa, T. (1996). Genetic algorithms for designing loop layout

manufacturing systems. Computers & Industrial Engineering, 31(3–4), 587–591.

Chiang, W. C., & Kouvelis, P. (1996). An improved tabu search heuristic for solving facility

layout design problems. International Journal of Production Research, 34(9), 2565–2585.

Chittratanawat, S., & Noble, J. S. (1999). An integrated approach for facility layout, P/D location

and material handling system design. International Journal of Production Research, 37(3),

683–706.

Chung, Y. K. (1999). A neuro-based expert system for facility layout construction. Journal of

Intelligent Manufacturing, 10(5), 359–385.

Chwif, L., Pereira Barretto, M. R., & Moscato, L. A. (1998). A solution to the facility layout

problem using simulated annealing. Computers in Industry,36(1–2), 125–132.

Co, H. C., Wu, A., & Reisman, A. (1989). A throughput-maximizing facility planning and layout

model. International Journal of Production Research,27(1), 1–12.

Das, S. K. (1993). A facility layout method for flexible manufacturing systems. International

Journal of Production Research, 31(2), 279–297.

Deb, S. K., & Bhattacharyya, B. (2005). Fuzzy decision support systems for manufacturing

facilities layout planning. Decision Support Systems, 40,305–314.

Devise, O., & Pierreval, A. (2000). Indicators for measuring performances of morphology and

materials handling systems. International Journal of Production Economics, 64(1–3),

209–218.

Dilworth, J. B. (1996).Operation management. McGraw Hill.

Page 68: Design of facilty Layout of a LED bulb Production sysem

59

Djellab, H., & Gourgand, A. (2001). A new heuristic procedure for the single row facility layout

problem. International Journal of Computer Integrated Manufacturing, 14(3), 270–280.

Drezner, Z. (1987). A heuristic procedure for the layout of a large number of facilities.

International Journal of Management Science, 33(7), 907–915.

Dunker, T., Radonsb, G., & Westka¨mpera, E. (2003). A evolutionary algorithm for a facility

layout problem. International Journal of Production Research, 41(15), 3479–3500.

Dunker, T., Radonsb, G., & Westka¨mpera, E. (2005). Combining evolutionary computation and

dynamic programming for solving a dynamic facility layout problem. European Journal

of Operational Research, 165(1), 55–69.

Dweiri, F., & Meier, F. A. (1996). Application of fuzzy decision-making in facilities layout

planning. International Journal of Production Research, 34(11), 3207–3225.

El-Baz, M. A. (2004). A genetic algorithm for facility layout problems of different

manufacturing environments. Computers & Industrial Engineering, 47(2–3), 233–246.

Evans, G. W., Wilhlem, M. R., & Karwowsky, W. (1987). A layout design heuristic employing

the theory of fuzzy sets. International Journal of Production Research, 25, 1431–1450.

Ficko, M., Brezocnick, M., & Balic, J. (2004). Designing the layout of single and multiple-rows

flexible manufacturing system by genetic algorithms. Journal of Materials Processing

Technology,157–158: 150–158.

Fruggiero, F., Lambiase, A., & Negri, F. (2006). Design and optimization of a facility layout

problem in virtual environment. In Proceeding of ICAD 2006 (pp. 2206–).

Garey, M. R., & Johnson, D. S. (1979).Computers and intractability: A guide to the theory of

NP-completeness. New York: WH Freeman.

Gen, M., Ida, K., & Cheng, C. (1995). Multi row machine layout problem in fuzzy environment

using genetic algorithms. Computers & Industrial Engineering, 29(1–4), 519–523.

Grobeiny, J. (1987a). The fuzzy approach to facility layout problems. Fuzzy Sets and Systems,

23, 175–190.

Grobelny, J. (1987b). On one possible ‗fuzzy‘ approach to facility layout problems. International

Journal of Production Research, 25, 1123–1141.

Gupta, T., & Seifoddini, H. (1990). Production data based similarity coefficient for machine

component grouping decisions in the design of cellular manufacturing system.

International Journal of Production Research, 28(4), 1247–1269.

Page 69: Design of facilty Layout of a LED bulb Production sysem

60

Gupta, Y. P., Gupta, M. C., Kumar, A., & Sundaram, C. (1996). A genetic algorithm-based

approach to cell composition and layout design problems. International Journal of

Production Research, 34(2), 447–482.

Hamamoto, S., Yih, Y., & Salvendy, G. (1999). Development and validation of genetic

algorithm-based facility layout-a case study in the pharmaceutical industry. International

Journal of Production Research,37,749–768.

Hamann, T., & Vernadat, F. (1992). The intra cell layout problem in automated manufacturing

system.8th international Conference on CAD/CAM, robotics and factory of the future

(CARs & FOF 92).

Harmonosky, C. M., & Tothero, G. K. (1992). A multi-factor plant layout methodology.

International Journal of Production Research, 30(8), 1773–1789.

Hassan, M. M. D. (1994). Machine layout problem in modern manufacturing facilities.

International Journal of Production Research, 32(11), 2559–2584.

Hassan, M. M. D., Hogg, G. L., & Smith, D. R. (1986). SHAPE: A construction algorithm for

area placement evaluation. International Journal of Production Research, 24(5), 1283

1295.

Heragu, S. S. (1997).Facilities design. Boston: BWS.

Heragu, S. S., & Kusiak, A. (1988). Machine layout problem in flexible manufacturing systems.

Operations Research, 36(2), 258–268.

Heragu, S. S., & Kusiak, A. (1990). Machine layout: An optimization and knowledge-based

approach. International Journal of Production Research,28, 615–635.

Heragu, S. S., & Kusiak, A. (1991). Efficient models for the facility layout problem.

European Journal of Operational Research, 53(1), 1–13.

Islier, A. A. (1998). A genetic algorithm approach for multiple criteria facility layout design.

International Journal of Production Research, 36(6), 1549–1569.

Johnson, R. V. (1982). SPACECRAFT for multi-floor layout planning. Management Sciences,

28(4), 407–417.

Khalil, T. M. (1973). Facilities relative allocation technique (FRAT).International Journal of

Productions Research, 11(2), 183–194.

Page 70: Design of facilty Layout of a LED bulb Production sysem

61

Kim, C. B., Kim, S. S., & Bobbie, L. F. (1996). Assignment problems in singlerow and double

row machine layouts during slow and peak periods. Computers & Industrial Engineering,

30(3), 411–422.

Kim, J. G., & Kim, Y. D. (1999). A branch and bound algorithm for locating input and output

points of departments on the block layout. Journal of the operational research society,

50(5), 517–525.

Kim, J. G., & Kim, Y. D. (2000). Layout planning for facilities with fixed shapes and input and

output points. International Journal of Production Research, 38(18), 4635–4653.

Kim, J. Y., & Kim, Y. D. (1995). Graph theoretic heuristics for unequal-sized facility layout

problems. Omega, 23(4), 391–401.

Kochhar, J. S., & Heragu, S. S. (1998). MULTI-HOPE: A tool for multiple floor layout

problems. International Journal of Production Research, 36(12),3421–3435.

Koopmans, T. C., & Beckmann, M. (1957). Assignment problems and the location of economic

activities. Econometrica, 25(1), 53–76.

Kouvelis, P., & Chiang, W. C. (1992). A simulated annealing procedure for the single row layout

problems in flexible manufacturing systems. International Journal of Production

Research, 30, 717–732.

Kouvelis, P., & Kim, M. W. (1992). Unidirectional loop network layout problem in automated

manufacturing systems. Operations Research, 40, 533–550.

Kouvelis, P., Kurawarwala, A. A., & Gutierrez, G. J. (1992). Algorithms for robust single and

multiple period layout planning for manufacturing systems. European Journal of

Operations Research, 63(2), 287–303.

Kumar, K. R., Hadjinicola, G. C., & Lin, T. L. (1995). A heuristic procedure for the single-row

facility layout problem. European Journal of Operational Research, 87(1), 65–73.

Kusiak, A., & Heragu, S. S. (1987). The facilities layout problem. European Journal of

Operational Research, 29(3), 229–251.

Lacksonen, T. A. (1997). Preprocessing for static and dynamic facility layout problems.

International Journal of Production Research, 35(4), 1095–1106.

Lacksonen, T. A., & Enscore, E. E. (1993). Quadratic assignment algorithms for the dynamic

layout problem. International Journal of Production Research, 31, 503–517.

Page 71: Design of facilty Layout of a LED bulb Production sysem

62

Lee, G. C., & Kim, Y. D. (2000). Algorithms for adjusting shapes of departments in block

layouts on the gird-based plane, Omega, 28(1), 111–122.

Lee, K. Y., Roh, M. I., & Jeong, H. S. (2005). An improved genetic algorithm for multi-floor

facility layout problems having inner structure walls and passages. Computers &

Operations Research, 32(4), 879–899.

Lee, R., & Moore, J. M. (1967). CORELAP-computerized relationship layout planning. The

Journal of Industrial Engineering, 18, 195–200.

Lee, Y. H., & Lee, M. H. (2002). A shape-based block layout approach to

facility layout problems using hybrid genetic algorithm. Computers & Industrial

Engineering, 42, 237–248.

Leung, J. (1992). A graph-theoretic heuristic for flexible manufacturing systems. European

Journal of Operational Research, 57(2), 243–252.

Levary, R. R., & Kalchik, S. (1985). Facilities layout-a survey of solution procedures.Computers

& Industrial Engineering, 9(2), 141–148.

Mahdi, A. H., Amet, H., & Portman, M. C. (1998).Physical layout with minimization of the

transport cost(Research Internal Report). Nancy, France: LORIA.

Mak, K. L., Wong, Y. S., & Chan, F. T. S. (1998). A genetic algorithm for facility layout

problems. Computer Integrated Manufacturing Systems, 11(1–2), 113–127.

Matsuzaki, K., Takashi, I., & Yoshimoto, K. (1999). Heuristic algorithm to solve the multi-floor

layout problem with the consideration of elevator utilization. Computers & Industrial

Engineering, 36(2), 487–502.

McKendall, A. R., & Shang, J. (2006). Hybrid ant systems for the dynamic facility layout

problem. Computers & Operations Research, 33(3), 790–803.

McKendall, A. R., Shang, J., & Kuppusamy, S. (2006). Simulated annealing heuristics for the

dynamic facility layout problem. Computers & Operations Research, 33(8), 2431–2444.

Meller, R. D., & Bozer, Y. A. (1996). A new simulated annealing algorithm for the facility

layout problem. International Journal of Production Research, 34, 1675–1692.

Meller, R. D., & Bozer, Y. A. (1997). Alternative approaches to solve the multifloor facility

layout problem. Journal of Manufacturing Systems, 16(3), 192–203

Page 72: Design of facilty Layout of a LED bulb Production sysem

63

Meller, R. D., Narayanan, V., & Vance, P. H. (1999). Optimal facility layout design.Operations

Research Letters, 23(3–5), 117–127.

Meng, G., Heragu, S. S., & Zijm, H. (2004). Reconfigurable layout problem. International

Journal of Production Research, 42(22), 4709–4729.

Mir, M., & Imam, M. H. (2001). A hybrid optimization approach for layout design of unequal

area facilities. Computers & Industrial Engineering,39(1–2), 49–63.

Micheal schenk(1988).Manufacturing Facilities - Location, Planning and Design.PWS-KENT

Publishing, Boston U.S.A., vol 12, pp. 337-339.

Nehal Elsayar, Elwood S., Armour G. C. and Vollmann T. E.( March-April 1964)

Allocating Facilities with Computerized Relative Allocation Facility Technique

Harvard Business Review, Vol. 42, No.2, pp.136-158.

Nearchou, A. C. (2006). Meta-heuristics from nature for the loop layout design

problem.International Journal of Production Economics, 101(2),312–328.Page, A. L.

(1991). New product development survey: Performance, and best practices.PDMA

Conference.

Patsiatzis, D. I., & Papageorgiou, L. G. (2002). Optimal multi-floor process plant layout.

Computers and Chemical Engineering, 26(4–5),575–583.

Pierreval, H., Caux, C., Paris, J. L., & Viguier, F. (2003). Evolutionary approaches to the design

and organization of manufacturing systems. Computers & Industrial Engineering, 44(3),

339–364.

Potts, C. N., & Whitehead, J. D. (2001). Workload balancing and loop layout in the deign of a

flexible manufacturing system. European Journal of Operational Research, 129(2), 326

336.

Proth, J. M. (1992).Conception et gestion des syste`mes de production. Presses Universitaires de

France. pp. 68–77.

Richard Muther, ‗Pant layout and flow improvement‘, McGraw-Hill Companies: New

York, 1994.

Rajasekharan, M., Peters, B. A., & Yang, T. (1998). A genetic algorithm for facility layout

design in flexible manufacturing systems. International Journal of Production Research,

36(1), 95–110.

Page 73: Design of facilty Layout of a LED bulb Production sysem

64

Raoot, A. D., & Rakshit, A. (1991). A ‗fuzzy‘ approach to facilities layout planning.

International Journal of Production Research, 29, 835–857.

Rosenblatt, M. J. (1986). The dynamics of plant layout. Management Science,32(1), 76-86.

Saifallah benjafaar & Hillier, F. S. ( 1963). Quantitative Tools for Plant Layout Analysis, Journal

of Industrial Engineering. IIE Transaction, Vol. 14, No. 1, pp. 33-40

Seehof, J. M., & Evans, W. O. (1967). Automated layout design program.The Journal of

Industrial Engineering, 18, 690–695.

Shayan, E., & Chittilappilly, A. (2004). Genetic algorithm for facilities layout problems based on

slicing tree structure. International Journal of Production Research, 42(19), 4055–4067.

Solimanpur, M., Vrat, P., & Shankar, R. (2005). An ant algorithm for the single row layout

problem in flexible manufacturing systems. Computers & Operations Research, 32(3),

583–598.

Tobiah r. master, Francis, R. L., L. F. McGinnis and J. A. White. (1992). Facility Layout and

Location: An Analytical Approach. 2nd ed. Englewood Cliffs, NJ: Prentice Hall, vol. 9,

pp. 153-155.

Thomas lacknsonen.(2010).Facilities Layout Optimization Method Combining Human Factors

and SLP‖, International Conference on Information Management, Innovation

Management and Industrial Engineering. Vol 1, pp. 608-611.

Tam, K. Y. (1992). Genetic algorithms, function optimization and facility layout

design.European Journal of Operational Research, 63(2), 322–346.

Tam, K. Y., & Chan, S. K. (1998). Solving facility layout problems with geometric constraints

using parallel genetic algorithms: Experimentation and findings. International Journal of

Production Research, 36(12),3253–3272.

Tompkins, J. A., & Reed, J. R. (1976). An applied model for the facilities design problem.

International Journal of Production Research, 14, 583–595.

Tompkins, J. A., White, J. A., Bozer, Y. A., Frazelle, E. H., Tanchoco, J. M., &Trevino, J.

(1996).Facilities planning. New York: Wiley.Tsuchiya, K., Bharitkar, S., & Takefuji, Y.

(1996). A neural network approach to facility layout problems. European Journal of

Operational Research, 89(3),556–563.

Urban, T. L. (1993). A heuristic for the dynamic facility layout problem. IIE Transactions, 25(4),

57–63.

Page 74: Design of facilty Layout of a LED bulb Production sysem

65

Wang, M. J., Hu, M. H., & Ku, M. H. (2005). A solution to the unequal area facilities layout

problem by genetic algorithm. Computers in Industry, 56(2), 207–220.

Welgama, P. S., & Gibson, P. R. (1993). A construction algorithm for the machine layout

problem with fixed pick-up and drop-off points. International Journal of Production

Research, 31(11), 2575–2590.

Wu, Y., & Appleton, E. (2002). The optimisation of block layout and aisle structure by a genetic

algorithm. Computers & Industrial Engineering, 41(4), 371–387.

Yang, T., & Kuo, C. (2003). A hierarchical AHP/DEA methodology for the facilities layout

design problem. European Journal of Operational Research, 147, 128–136.

Yang, T., Peters, B. A., & Tu, M. (2005). Layout design for flexible manufacturing systems

considering single-loop directional flow patterns. European Journal of Operational

Research, 164(2), 440–455

Page 75: Design of facilty Layout of a LED bulb Production sysem

66

Appendix-A

The procedures of a 3W LED bulb manufacturing

SR. No Task Task name Performance time (min)

1 A Wire cutting (long + short) 0.63

2 B Wire stapling (long + short) 0.94

3 C Wire leading (long + short) 1.78

4 D Driver lead 0.21

5 E Soldering wear and driver outline 0.78

6 F Cutting tube fiber 0.65

7 G Fiber enter driver 0.26

8 H Driver heating 0.60

9 I PCB LED soldering 0.63

10 J Helper (PCB folding + passing) 0.76

11 K PCB breaking 0.43

12 L PCB heat paste 0.37

13 M Shell lock

0.17

14 N Shell heat paste 0.33

15 O Shell +PCB 0.003

16 P Cleaning shell + PCB 0.958

17 Q Shell + PCB cover adjust 0.45

18 R Driver pass (helper) 0.50

19 S Driver input 1.90

20 T PCB soldering 0.56

21 U End capping 1.50

22 V Fiber heating 0.76

23 W End cap fitting 0.40

24 X Cleaning 0.25

25 Y Testing 0.50

26 Z Packaging 0.68

Page 76: Design of facilty Layout of a LED bulb Production sysem

67

Appendix B.1

Existing layout

Page 77: Design of facilty Layout of a LED bulb Production sysem

68

Appendix-B.2

Proposed layout

Page 78: Design of facilty Layout of a LED bulb Production sysem

69

Appendix B.3

Future expansion layout

Page 79: Design of facilty Layout of a LED bulb Production sysem

70

Appendix C

Distance matrix chart

Appendix D

Proposed layout by SLP

9000

9200

9400

9600

9800

10000

10200

10400

layout 1 layout 2 layout 3

Dis

tan

ce

Layout

Chart Title

Page 80: Design of facilty Layout of a LED bulb Production sysem

71

Appendix E

Bill of material

No. of

part Component

Quantit

y Price Unit Cost

01 Wire 1200 56.63 sq-ft 31 24

03 Aluminum shell 8 57.20 557 60

05 Aluminum hi-comer bracket 8 52.40 519.20

06 Fiber 0.4 69.00

10

sheets 527.60

08 Teensy 2.0 Microcontroller 1 516.00 516.00

09 Micro SD Card Adapter 1 8.00 58.00

10 USB adapter 1 55.50 5.50

11 Individually addressable RGB

LED pixel strands 4 39. 95 1 strand

= 25

pixels

5 1 5 9 . 8 0

12 5V DC power supply 1 525.00 525.00

13 PCB Board 0.5 46.95 523.48

14 Molex Header + Wiring 1 51.95

51 95

15 DC Barrel Jack 1 52.95 52.95

16 Rocker power switch 1 50.96 50.96

17 Momentary Button 1 51.80 1.80

18 Terminal Block 1 2.43 2.43

19 22awg wire 50.00

20 Resistor 50.00

Total 5539.39