TRC engineer and scientist John Rice highlights TRC’s patented sediment capping technologies that address NAPL-containing sediment and bank soils at former manufactured gas plant (MGP) sites. The presentation was part of the Fifth International Symposium & Exhibition on the Redevelopment of Manufactured Gas Plant Sites (MGP 2014) .TRANSCRIPT
![Page 1: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/1.jpg)
www.trcsolu*ons.com
Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment
Presented at: FiBh Interna*onal Symposium and Exposi*on on the Redevelopment of Manufactured Gas Plant Sites
Des,n, Florida
Presented by:
John Rice, Alyssa Sellwood, Katherine Vater, Vince Buening and Colin Daining
TRC Environmental Corpora*on -‐ Madison, WI, and Ann Arbor, MI
Shayne Wiesemann DTE Energy -‐ Detroit, MI
April 7, 2014
![Page 2: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/2.jpg)
DTE Broadway Street Former MGP
I. Background
II. Inves,ga,on
III. Remedy Design
IV. Construc,on
![Page 3: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/3.jpg)
3
I. Background
![Page 4: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/4.jpg)
Former Broadway Street MGP ~2010
![Page 5: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/5.jpg)
Huron River Shoreline Improvements/Restora,on
![Page 6: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/6.jpg)
II. Inves*ga*on
• Sediment Cores - Bulk samples • Poke Testing • Corral Sampling
![Page 7: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/7.jpg)
• Portable 2” Vibracore • Hand-driven core • Wildco Ponar Sampler
Sediment Core Collec,on Using Vibracore
![Page 8: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/8.jpg)
NAPL in Sediment Cores
![Page 9: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/9.jpg)
Sheen Producing Sediment from Cores
![Page 10: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/10.jpg)
Poke Tes,ng
![Page 11: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/11.jpg)
Sheen Corral Sampling
![Page 12: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/12.jpg)
Poten,al Modes of Contaminant Transport
• Ebulli,on-‐facilitated DNAPL migra,on from sediment
• LNAPL seepage from the river bank
• Erosion of hardened asphal,c tar and transport as solid par,cles
• Erosion of tarry/oily sediment from river bank
![Page 13: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/13.jpg)
Conceptual Model of NAPL Transport
![Page 14: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/14.jpg)
III. Remedy Design
Sediment Cap Integrated with Upland Removal
Removal of Tarry Sediment
![Page 15: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/15.jpg)
NAPL Trapping Cap Design with NAPL Collec,on Sump
U.S. Patents Nos. 8,419,314 and 8,651,768
![Page 16: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/16.jpg)
Transmission Layer – Crushed Rock
![Page 17: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/17.jpg)
Containment Layer – AquaBlokTM
![Page 18: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/18.jpg)
Rip Rap Armor – 18-‐inch Field Stone
![Page 19: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/19.jpg)
IV. Construc*on Excava,on of Upland Coal Tar Source Area
![Page 20: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/20.jpg)
Excava,on of Sediment and Bank Soil
![Page 21: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/21.jpg)
Placement of NAPL Transmission/Collec,on Layer
![Page 22: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/22.jpg)
Installa,on of the NAPL Collec,on Sumps – Allows Collec,on of Poten,al LNAPL and DNAPL
![Page 23: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/23.jpg)
AquaBlokTM Containment Layer Being Spread over Transmission Layer
![Page 24: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/24.jpg)
Grading Out the AquaBlokTM Containment Layer
![Page 25: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/25.jpg)
Capping in Progress – Transmission Layer Being Laid Down inside Double Turbidity Curtain
![Page 26: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/26.jpg)
Capping in Progress – Erosion Control and Rip Rap
![Page 27: Design of a Remedy to Control NAPL Transport and Allow for Flexible Redevelopment](https://reader033.vdocuments.us/reader033/viewer/2022052820/5483f379b47959dd0c8b4adb/html5/thumbnails/27.jpg)
Huron River aber Site Restora,on