Page 1: Design, Manufacture and Microtunnel Construction ... - NW Pipe

1Revitalizing Global Underground Utility InfrastructureRevitalizing Global Underground Utility Infrastructure

Design, Manufacture and Microtunnel Construction of the 108-

inch Diameter Low Level Outlet at NYC DEP Gilboa Dam

Everette Knight, PE/Project Engineer - HazenRichard Mielke, PE/Director of Engineering,

Permalok© A Northwest Pipe Company

Page 2: Design, Manufacture and Microtunnel Construction ... - NW Pipe

2Revitalizing Global Underground Utility Infrastructure

Project History and Background

Page 3: Design, Manufacture and Microtunnel Construction ... - NW Pipe

3Revitalizing Global Underground Utility Infrastructure

Project History and Background

Page 4: Design, Manufacture and Microtunnel Construction ... - NW Pipe

4Revitalizing Global Underground Utility Infrastructure

Project History and Background

Page 5: Design, Manufacture and Microtunnel Construction ... - NW Pipe

5Revitalizing Global Underground Utility Infrastructure

Project History and Background

Page 6: Design, Manufacture and Microtunnel Construction ... - NW Pipe

6Revitalizing Global Underground Utility Infrastructure

• Capacity to evacuate 90% of the reservoir storage volume under average inflowconditions; that is draw down to El 1053, in 4 months or less.

• Capacity to maintain the reservoir in a substantially dewatered state under averageinflow conditions (El 1053).

• An invert elevation for the lowest drain in the range of elevation 980-1000.• Maximum daily drawdown rates in the range of 1 to 2 feet per day, unless higher

rates are deemed to be required by extreme emergencies.

Regulatory and Design Criteria

Page 7: Design, Manufacture and Microtunnel Construction ... - NW Pipe

7Revitalizing Global Underground Utility Infrastructure

HYDROGRAPHSSCHOHARIE RESERVOIR

ROUTING WITH AVERAGE DAILY INFLOW108-INCH DIAMETER TUNNEL OUTLET - 2230 FT. LENGTH

TERMINAL STRUCTURE OUTFLOW AT EL. 967

0

500

1000

1500

2000

2500

31-Dec 31-Jan 29-Feb 31-Mar 30-Apr 31-May 30-Jun 31-Jul 31-Aug 30-Sep 31-Oct 30-Nov 31-Dec

TIME (days)

DIS

CH

AR

GE

(cfs

)

980

1000

1020

1040

1060

1080

1100

1120

1140

STA

GE

(FEE

T)

INFLOWOUTFLOWSTAGE

RESERVOIR 90%DRAINED

(ELEV. 1053)

PEAK SPRING STAGEEL. 1054.2

RESERVOIR EMPTYEL. 989

RESERVIOR FULL

EL. 1130

90% DRAINEDIN 19 DAYS

AVG. DAILY INFLOWMAX. 1921 cfs

Hydraulic Modeling

Page 8: Design, Manufacture and Microtunnel Construction ... - NW Pipe

8Revitalizing Global Underground Utility Infrastructure

970.0

990.0

1010.0

1030.0

1050.0

1070.0

1090.0

1110.0

1130.0

00+00 05+00 10+00 15+00 20+00 25+00

Hyd

raul

ic H

ead

(ft.)

Tunnel Station

HYDRAULIC PROFILft.GILBOA DAM LOW-LEVEL OUTLET WITH HYDROPOWERTUNNEL OPERATING AT FULL POOL (EL. 1130)

9'-0" DIAMETER TUNNEL - 2225 FT. LENGTHLOW-LOSS SYSTEM: Ke = 4.1

DUAL 78-INCH FIXED CONE VALVES

Hydraulic Modeling

Page 9: Design, Manufacture and Microtunnel Construction ... - NW Pipe

9Revitalizing Global Underground Utility Infrastructure

Preliminary Design Options

Page 10: Design, Manufacture and Microtunnel Construction ... - NW Pipe

10Revitalizing Global Underground Utility Infrastructure

• Jacking Forces During the Microtunneling• External loads• Internal hydrostatic pressure• Seismic• Pipe joint• Solution = 108” Diameter Permalok steel

casing pipe with 1.375” wall thickness

Steel Tunnel Liner Design

Page 11: Design, Manufacture and Microtunnel Construction ... - NW Pipe

12Revitalizing Global Underground Utility Infrastructure

Manufacture-Permalok Joint

Page 12: Design, Manufacture and Microtunnel Construction ... - NW Pipe

13Revitalizing Global Underground Utility Infrastructure

Permalok is Manufactured per ASTM A1097

Page 13: Design, Manufacture and Microtunnel Construction ... - NW Pipe

15Revitalizing Global Underground Utility Infrastructure

Polyurethane lining per AWWA C222

Miscellaneous Lines Added In the Field For Tunnel Work

Interior Corrosion Control

Page 14: Design, Manufacture and Microtunnel Construction ... - NW Pipe

16Revitalizing Global Underground Utility Infrastructure

Construction

Page 15: Design, Manufacture and Microtunnel Construction ... - NW Pipe

17Revitalizing Global Underground Utility Infrastructure

Construction

Page 16: Design, Manufacture and Microtunnel Construction ... - NW Pipe

18Revitalizing Global Underground Utility Infrastructure

Construction

Page 17: Design, Manufacture and Microtunnel Construction ... - NW Pipe

19Revitalizing Global Underground Utility Infrastructure

To help protect your privacy, PowerPoint has blocked automatic download of this picture.

Page 18: Design, Manufacture and Microtunnel Construction ... - NW Pipe

20Revitalizing Global Underground Utility Infrastructure

Page 19: Design, Manufacture and Microtunnel Construction ... - NW Pipe

21Revitalizing Global Underground Utility InfrastructureRevitalizing Global Underground Utility Infrastructure

Design, Manufacture and Microtunnel Construction of the

108-inch Diameter Low Level Outlet at NYC DEP Gilboa Dam

Everette Knight, PE/Project Engineer – [email protected]

Richard Mielke, PE/Director of Engineering, [email protected]

Permalok© A Northwest Pipe Company

Page 20: Design, Manufacture and Microtunnel Construction ... - NW Pipe

22Revitalizing Global Underground Utility Infrastructure

Design, Manufacture and Microtunnel Construction of the 108-inch Diameter Low

Level Outlet at NYC DEP Galboa DamEverette Knight, PE/Project Engineer - HazenRichard Mielke, PE/Director of Engineering,

Permalok© A Northwest Pipe Company