●INABA DENKI offers SLIMDUCT RD to meet the ever more sophisticated needs of comfortable environment and space.
●SLIMDUCT RD enables to fit multiple linesets into a simple container. SLIMDUCT RD is an innovative lineset ducting system for VRF installations to accommodate the diversified requirements such as the less space and construction period while enhanced the sleek appearance.
●“SLIMDUCT RD Design & Installation” manual is a guide for the proper and reasonable use. Read through the manual to make comfortable environment and space.
SLIMDUCT RD Design and Installation
●Refer to “SLIMDUCT RD Design & Installation” manual before use.●SLIMDUCT RD IS NOT WATERPROOF. To waterproof, use RDB DUCT BASEPLATE, RSP WALL PLATE or RSB WALL SLEEVE and seal all penetrations with weatherproof sealant or putty.
For all SLIMDUCT RD series
●Do not walk on SLIMDUCT RD Walkway type on a regular basis as it was designed only as a walkway to facilitate periodic maintenance of AC outdoor unit at irregular intervals.
●Always wear gloves and a helmet for your safety when walking on RDWN duct.●Attach brackets to RDWN duct only at cross strut, not at coupler. For Ells, REWN, RFWN & RTWN, attach brackets to all standard and supplementary cross struts and anchor them to roof surface. For Cross, RXWN, attach 3 brackets to bottom plate.
●Do not walk on the joint and end of ducts where anti-slip tape is not coated.●Depending on the frequency of use, the anti-slip may wear away over a period of 5 to 8 years. Always replace the RDWN duct cover whenever any of the edges become torn up or the surface shows signs of wear.
For SLIMDUCT RD - WALKWAY type
●Although ZAM, like hot dip galvanizing, is subject to white rust, this will actually form a protective coating and will not materially affect the corrosion resistance.
●Although ZAM, like hot dip galvanizing, is subject to black tarnishing, this will not materially affect the corrosion resistance.
●Black soot on the welded part of screws at duct inside is not pro-oxidant and has no problem in use.●Although the edges may show early traces of red rust as they are exposed to the elements, over a period of several months these will become coated with a zinc based film which leaches from the base layer and will change to a grayish black, providing a high level of corrosion protection for the edges.
●Always use safety protection gear (drop cloth, gloves & goggles) during installation.● Inevitable abrasion or scratching which might happen during manufacturing process will not materially affect the corrosion resistance, as base steel would never be exposed.
●When cutting duct on site, always repair cut edges with a coat of Zinc Chromate paint (ZN-AL).
For SLIMDUCT RD-ZA series
SLIMDUCT RD Design & Installation Manual
Caution 1
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC Outdoor Units
1 Specifications
Caution
2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
Caution
SLIMDUCT RD Design & Installation Manual
●Use the data on this catalog exclusively with the design study for INABA DENKO products.●The data on this catalog is not guaranteed the specification of INABA DENKO products. Inaba Denki Sangyo shall not be liable for any loss or damage either special or consequential arising out of any use, function, or service of the data on this catalog.
●Values shown in the drawing and list on this catalog are for reference purposes only, and all figures shown are not guaranteed.
●Data in this catalog is subject to change for product improvement without notice.●Any falsification, reprinting, or distribution is strictly prohibited without permission from the catalog administrator.
●Take full responsibility for your actions to use this catalog.
Read the following condition before use of the data on this catalog. When you do not agree with this condition, do not use the data. In your using data, we assume you consented to this licensing condition.
Licensing
■ Change in Appearance of ZA TypeThe surface of a high grade corrosion resistant hot dip galvanized steel sheet is formed of a precise coat of oxide which protects the surface of the metal coating and comprises 2 layers as follows :
1. A film of Zinc which contains Magnesium & Aluminum.2. A second film of Zinc which contains Magnesium.
The thin film makes zinc glitter by the transmitted light. Over a period and environmental influence, the coat of oxidize will thicken and not allow the light to pass through, so the surface of the metal coating will change into grayish black. The phenomenon is called black tarnishing.
■ White Rust on ZA Type DuctThe coating layer on high grade corrosion resistant hot dip galvanized steel sheet contains Zinc which offers a higher degree of ionization, preventing white rust (Zinc Hydroxide) from eroding the base steel at cut edges and at any point where the surface has been damaged by abrasion or scratching.The surface of the coating layer reacts to carbon dioxide and water in air and is formed zinc oxide (white rust) which protects the surface of the metal coating and suppresses the progress of corrosion. The zinc oxide (white rust) is formed evenly over the surface of the metal coating.In the case of accelerating to be formed by dew condensation etc. and damaging the surface protection, the zinc oxide (white rust) is formed in a limited area in a short time of two hours.It is important not to damage the surface protection coating during installation and storage in order to maintain long term corrosion resistance.
■ Caution during Handling1) Do not damage the surface of the duct or fittings.2) Do not store the duct or fittings directly on bare ground. When storing on ground, always use a spacer material other than wood to elevate the product.
3)Avoid handling piled-up product in rain.4)Cover all material before and after installation with a protective cover to prevent any damage from any alkaline liquids or metal shavings from copper pipe cutting operations nearby.
■ Caution during Storage1)Store the product in ventilated indoor.2)When storing outside, always elevate the product from well drained ground.3)If material is stored outside, protect from rain with a waterproof cover and remove this when rain stops. If material is to be shipped by ocean freight, do not permit material to become exposed to sea water during shipping, handling or storage at dockside.
4)When storing piled-up product, always use a spacer material other than wood to elevate the product and make more room between product and ground.
For SLIMDUCT RD-ZA series
Caution 2
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC O
utdoor Units1 Specifications
Caution2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC Outdoor Units
1 Specifications
Caution
2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
1
1 SpecificationsSLIMDUCT RD Design & Installation Manual
Material
Maximum Load Capacities
Material Surface Treatment
SaltTolerance Coating Volume Tensile Strength Stretch
High Grade Corrosion Resistant Hot Dip Galvanized Steel Sheet ZAM
- Salt Resistant Specification
274.6N/mm2
(28kgf/mm2)or more
28%or more
190g/m2
or moreat one side
Specification
Torque Shift Starting Load (4 bolts)
Cover Loading
per 1m2 Stress level on 200m × 100mm loading plate
Standard Type 4,903N/m2 (500kgf/m2) or less
29.4J(300kg-cm) 6,374N(650kgf)
49,030N/m2 (5,000kgf/m2) or less
98N(10kgf) or less
980N(100kgf) or lessWalkway Type
Condition : Data is based on complete assembly of base and cover, and in case of size 450 & 600, additional reinforcement plate.
When brackets are fastened with 4 bolts tightened to the torque specification in column 1, column 2 shows the maximum allowable load before the RZM & RZB bracket/riser combination will shift and fail.
SLIMDUCT RD Capacity (per 2M)
1 Meter bracket spacing RZ BRACKETItem
Duct size
2 Meter bracket spacing RZ BRACKET
RD-150RD-300RD-450RD-600RD-900RD-450HRD-600HRD-900H
12548N(1280kgf)
5281N( 539kgf)
3448N( 352kgf)
2513N( 256kgf)
1552N( 158kgf)
3396N( 347kgf)
2461N( 251kgf)
3076N( 314kgf)
9387N(958kgf)
3929N(401kgf)
2546N(260kgf)
1837N(187kgf)
1102N(112kgf)
2494N(255kgf)
1785N(182kgf)
2231N(228kgf)
Load
10101010
SLIMDUCT RD
Bracket:RZ(RZB+RZM)
2020
SLIMDUCT RD
Bracket:RZ(RZB+RZM)
Zinc6% Aluminium3% Magnesium( )
a. Maximum Load for Duct Base and Brackets
b. Maximum Load for Duct Cover
c. Maximum Load for Brackets
2 Installation Step / DuctSLIMDUCT RD Design & Installation Manual
Installation Step
・ Make pipe shaft and wall penetration hole.
Duct Size SelectionTo select the duct size, refer the condition of wall inlet (pipe shaft etc.), diameter and quantity of pipe, space for ducting and maintenance, and application.2 applications of standard (simplex) and duplex enable SLIMDUCT RD to be customized.Design the layout of SLIMDUCT RD Walkway type RDWN to facilitate periodic maintenance of AC outdoor unit at irregular intervals.
Standard(simplex)
Duplex
■ Duct Section150 300~600
Use RZY with L or LL type of RZB and RZM for duplex mountings. This is an optional accessory except size 900.
Caution
Refer the table for lineset capacity of SLIMDUCT RD on the website.Ref
Duct size WidthA
HeightB
CoverC
150300300H450450H600600H900900H
150300300450450600600900900
111131251131251131251131251
-2020202020202020
(mm)
1. Create wall inlet
・ Select the size of bracket.・ Assemble RZM and RZB bracket / riser.・ Set the bracket in place.
2. Set bracket
・ Fix the base of duct and fittings temporarily.・ Cut the duct if required.・ Apply anti-rust treatment.
3. Fix temporarily
・ Secure the bracket and the base of duct and fittings.・ Select coupler.・ Fix coupler.・ Install END CAP REC.
4. Secure the base
・ Attach RAH HANGER SUPPORT for SLIMDUCT UD, RZY DOUPLEX BRACKET, and RDK RD LINESET SUPPORT STRUT.・ Install the piping inside the channel formed by the base.・ Put RAH HANGER SUPPORT for SLIMDUCT UD.・ Fit in SLIMDUCT UD and make branch.
5. Piping
・ Lock in place the covers of duct and fittings.・ Install WALL FLANGE RWP.
6. Lock in place the cover
・ Seal all penetrations with weatherproof sealant or putty.7. Finish
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC O
utdoor Units1 Specifications
Caution2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
2
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC Outdoor Units
1 Specifications
Caution
2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
3
3 Wall Penetration ConstructionSLIMDUCT RD Design & Installation Manual
Installation
Installation at Pipe Shaft or Wall PenetrationSLIMDUCT RD IS NOT WATERPROOF. For external use, SLIMDUCT RD is required the waterproof treatment as follows.
A
B
WALL FLANGE(RWP)
VERTICAL ELL(RC / RCF)
WALL FLANGE(RWP)
CUT-OFF WALL PLATE(RSP-A)
VERTICAL ELL(RC / RCF)
Caution These methods are given only as examples. Follow detail instructions of a site supervisor.
Size 150 : WALL FLANGE RWP
For size 150, use WALL FLANGE RWP and 45° VERTICAL ELL RCF to waterproof at wall penetration.Seal the wall penetration with mortar or putty, and caulk all lateral and longitudinal seams and screw heads of WALL FLANGE RWP.
Caulking
VERTICAL ELL(RC / RCF)
WALL FLANGE(RWP)
Putty + Caulkingor
Mortar + Caulking
Use in combination with CUT-OFF WALL PLATE RSP-A, WALL FLANGE RWP, 45° VERTICAL ELL RCF for waterproof.
Size B CA300450600300H450H600H
160310400160310400
192
312.4
54
117
Unit:(mm)
364514664364514664
D
Size
300450600300H450H600H900H
Heightof opening
118
238
Widthof opening
300450600300450600900
Unit:(mm)
※ Height of opening is under review.
<300(H) ・ 450(H) ・ 600(H)> <900H>
B
AC
D
320
312
117
485650964
3. Screw into 2 places of center top and bottom of RSP-A. For size 900H, tighten screws at total 4 places as each 2 places of top and bottom.
4. Set the base of Wall Flange, Vertical Ell, and Duct, second install the piping inside the channel formed by the base, finally lock in place the covers of each segment.
5. Apply caulking treatment all lateral and longitudinal seams and screw heads of CUT-OFF WALL PLATE RSP-A and WALL FLANGE RWP with waterproof sealant.
Caulking
WALL FLANGE RWPCaulking
CUT-OFF WALL PLATE
WALL FLANGE Cover
WALL FLANGE Base
VERTICAL ELL Cover
VERTICAL ELL Base
Caulking
A
Installation Size 300~900(H) : CUT-OFF WALL PLATE RSP-A with WALL FLANGE RWPB
1. Create an opening referring to its dimensions list at right.
2. Drill holes for the tapping screws or hammer anchor bolts against openings. The hole pitch size is shown in the right.
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC O
utdoor Units1 Specifications
Caution2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
4
4 BracketSLIMDUCT RD Design & Installation Manual
Maximum LoadWhen brackets are fastened with 4 bolts tightened to the torque specification in column 1, column 2 shows the maximum allowable load before the RZM & RZB bracket/riser combination will shift and fail.
Torque Shift Starting Load (4 bolts)
29.4N・m(300Kg・cm) 6,374N(650Kgf)
Load
■ Duplex Installation
Height of RZY : H1● H1(using standard duct RD)=160mm~(H-250)mm● H1(using H type duct RD)=160mm~(H-350)mm
RISER for RZM BRACKET RZB
BRACKET for RD DUCT RZM-L/LL
DUPLEX BRACKET RZY
H1
H
Bracket Size SelectionSize 300~900 gives the required height to select the combination of 5 sizes of bracket RZM (S/MS/MM/M/L) and 4 sizes of riser RZB (S/M/ML/L).Size 150 has 3 sizes of a single prefabricated bracket (M/L/LL).Select the combination of bracket and riser referring to the height of obstruction, AC outdoor unit, and pipe outlet.
■ Bracket Selector Table : 300(H)・450(H)・600(H)・900(H)●To select the combination of bracket and riser which gives the required height, refer to the list at right.
●If several combinations of bracket and riser give the desired height, the combination found in the column closest to the height will give the most practical selection.
●The combination of S Type RZB Risers and S Type RZM Brackets is only used for vertical wall mounted applications.
■ Bracket Selector Table : 150 Item No.RZ-150-MRZ-150-LRZ-150-LL
Height280mm~480mm480mm~710mm710mm~940mm
Bracket(RZM)
Riser(RZB)
P
Size300450600900
P306456626926
■ Anchor Interval
Bracket
Duct
Pipes
AC outdoor unit
Base
RZM-S Type RZM-MS Type RZM-M Type RZM-L TypeRZM-MM Type
590590590
540540540RZB-L
640640640
540540540
RZB-L
450450450
350350350
RZB-ML400400400
350350350RZB-ML
280280280
230230230RZB-M
180180180
130130130RZB-S
RZB-M
630630630
480480480
RZB-ML
750750750
480480480
RZB-L
940940940
540540540
480480480
530530530RZB-S
RZB-M
480480480
330330330
RZB-ML
600600600
350350350
RZB-L
790790790
540540540
330330330
380380380RZB-S
RZB-M
420420420
270270270
RZB-ML
540540540
350350350
RZB-L
730730730
540540540
270270270
320320320RZB-S
180180RZB-S230230
330330330
RZB-M
230230
950
900
850
800
750
700
650
600
550
500
450
400
350
300
250
200
150
100
Height(mm)
RZB-○
H2H2H2
H1H1
H2
H1Riser (RZB)
Bracket (RZM)
※Notation
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC Outdoor Units
1 Specifications
Caution
2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
5
SLIMDUCT RD Design & Installation Manual
a. Installation Interval
b. Bracket Anchorage Position
Installation Interval and Anchorage Position
The basic installation of bracket is at the interval of 1,010mm or 2,020mm. Adjust the bracket space in accordance with the piping weight.※Take 1,010mm interval for the installation of SLIMDUCT RD Walkway type. Attach brackets to RDWN duct only at cross strut, not at coupler.※For Duct, secure brackets at 2 places. Attach brackets to Coupler (RSJ-A/RFJ-A) in the bracket interval of 2,020mm.
Bracket installation position shown in this catalog is general description.The number and position of brackets is to be changed depending on shape and size of ells or installation methods. Decide the proper bracket spacing referring to the page of each fitting in this catalog.
Bracket can fix with cross strut, duct base, coupler (only with stand fixed plate), supplementary cross struts, and bottom plate. The place of bracket will change depending on duct size or application.
■ Installation on Duct
■ Installation on ELL
W3/8 Hex nut
Bracket
W3/8 Hex bolt
Cross strut
W3/8 Hex nut
Bracket
Stand fixed plateprovided with COUPLER
W3/8 Hex bolt
Caution
※ Refer Walkway type to Installation D.
Attach two brackets on cross strut of FLAT ELL. (Bracket can be attached to the cross strut with a built-in locknut only by tightening screws.)
Attach brackets to the joint of duct and fittings with stand fixed plate provided with couplers. Install a bracket on supplementary cross strut of ells to prevent deflection. RZ-150 can be used for this purpose.
Cross strutSupplementary cross strut
Stand fixed plate
Installation Cross StrutA
AC outdoor unit
Installation on cross strut Installation on duct joint
Installation B Joint / Supplementary Cross Strut
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC O
utdoor Units1 Specifications
Caution2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
6
SLIMDUCT RD Design & Installation Manual
Installation Walkway Type
For Walkway type Ells, REWN, RFWN & RTWN, Attach 3 brackets to all cross struts (including supplementary cross struts).
Installation Baseplate Size 150
For size 150 ells, attach brackets to the included baseplate. Use RZ-150 or other size of RZM & RZB bracket/riser combination.
Supplementary cross strut
C
D
Light & durableLight & durableLight & durableLight & durable Versatile mounting block for pipes,Versatile mounting block for pipes,cables or condenserscables or condensersVersatile mounting block for pipes,Versatile mounting block for pipes,cables or condenserscables or condensers
PB-100PB-100 PB-120PB-120PB-100 PB-120 4 sizes : Length 150~600mm4 sizes : Length 150~600mm4 sizes : Length 150~600mm4 sizes : Length 150~600mm4 sizes : Length 150~600mm
150150 type type 500500 type type150 type 500 type
Multiple Use Support System
Versatile mounting block for pipes,cables or condensersLight & durable
PLABASEPLABASEResin Pocket for Duct BracketsPLABASEPLABASEPLABASE RECYCROCKRECYCROCKRECYCROCKRECYCROCKRECYCROCKRECYCROCKRECYCROCK
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC Outdoor Units
1 Specifications
Caution
2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
7
SLIMDUCT RD Design & Installation Manual
This fitting can be used as 90° FLATT ELL or TEE. Close unused openings with the attached plates.
① Preliminary set brackets RZM & RZB.
② Attach the included baseplate to brackets with W3/8” bolts.
③ Fix corner posts to the included baseplate with M6 hex bolts.
④ Connect duct with more than 10mm insertion into cross base at each end (10mm ~ 40mm).
926 600
Bracket RZ(option)
450
450926
Bracket RZ(option)
Baseplate Baseplate
Baseplate Baseplate
Installation CROSS Size 900 : RX-900(H) & RXWN-900(H)
※Height of stand for RX / RXWN is 30mm lower than ducting.※Seal the gap between cross and duct with caulk or putty.※For duct RD to insert into cross, attach RDH REINFORCEMENT PLATE for DUCT at end.
Baseplate
REDUCER RXR
E
For application to connect the smaller size branch duct to cross, install RXR REDUCER SIZE 900 (option) first.
Caution
※RX-900(H)
Set 2 brackets (RZM + RZB).
※RXWN-900(H)
※RX-900(H) ※RXWN-900(H)
※RX-900(H) ※RXWN-900(H)
※RX-900(H) ※RXWN-900(H)
Set 3 brackets (RZM + RZB).
Corner post Corner post
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC O
utdoor Units1 Specifications
Caution2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
8
SLIMDUCT RD Design & Installation Manual
■ Height of BracketCreating a vertical offset in duct, RZC BRACKET ATTACHMENT PLATE for VERTICAL ELL is attached to bracket.Calculate the height of bracket (H2) to select the bracket size using formula and table below.
Size Size ASize B: with Telescopic Coupler RSSRSS-1 RSS-2 RSS-3
300300H450450H600600H
130250130250130250
430~530550~650430~530550~650430~530550~650
530~630650~750530~630650~750530~630650~750
630~730750~850630~730750~850630~730750~850
300300H450450H600600H
130250130250130250
430550430550430550
■ Table 2
■ Table 1Size Size A Size B : with Coupler RSJ-A
Size 900(H) : 90° VERTICAL ELL
A
H3
P3P2P1 P4
30
H2
H H1
30
Duct RD
Bracket RZ
90° OUTSIDE VERTICAL ELL RCO
90° INSIDE VERTICAL ELL RCI
Duct RD
Size H1 H2 H3900900H
H-30H-30
H-598H-718
H-568H-688
P1
(180)
P2210240
P3190250
P4(210)(240)
※Values shown in the list are for reference purpose only.
● The formula to calculate exact height of bracket is different between 45° and 90° vertical ell.● Table 1 shows the figures using RSJ-A.● When it is difficult to find the accurate level difference between two elbows, use the adjustable TELESCOPIC COUPLER RSS shown in Table 2.
● Refer dimensions of ells on page 9-10.
Size 300~600(H) : 90° VERTICAL ELL
Size Size ASize B: with Telescopic Coupler RSSRSS-1 RSS-2 RSS-3
300300H450450H600600H900H
130250130250130250250
193~263228~298193~263228~298193~263228~298228~298
263~333298~368263~333298~368263~333298~368298~368
333~403368~438333~403368~438333~403368~438368~438
300300H450450H600600H900H
130250130250130250250
193228193228193228228
■ Table 2■ Table 1
Size SizeA
Size B : with Coupler RSJ-A
45° VERTICAL ELL
Installation VERTICAL ELL + RZCF
Caution
Bracket 2 Bracket 1
Bracket 2 Bracket 1
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC Outdoor Units
1 Specifications
Caution
2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
9
5 EllSLIMDUCT RD Design & Installation Manual
Dimension 2 Size 900 Unit : ㎜
900
990
900
980
548
900
900
1217
40
30A
B
C
30A
DimensionsTwo or more consecutive ells connection may raise some deviation.
90° FLAT ELL RE : Top View 45° FLAT ELL RF : Top View
90° VERTICAL ELL RC : Side View 45° VERTICAL ELL RCF : Side View
Size A B C150300300H450450H600600H900H
110130250130250130250250
145193228193228193228228
332444528444528444528528
Size A B C150300300H450450H600600H900900H
150300300450450600600
37072072087087010201020
35070070085085010001000
Refer to Dimension 2
Size A B C150300300H450450H600600H900900H
110130250130250130250
330430550430550430550
310410530410530410530
Refer to Dimension 2
Size A B C150300300H450450H600600H900900H
150300300450450600600
155389389433433484484
3559199191050105011481148
Refer to Dimension 2
Dimension 1 FLAT ELL + RSJ-A Unit : ㎜
Size 900(H) differs in form.Caution Size 900(H) differs in form.Caution
Size 900(H) differs in form.Caution
90° FLAT ELL RX-900(H) : Top View 45° FLAT ELL RF-900(H) : Top View
90° VERTICAL ELL RC-900(H) : Side View
Size A B C900900H
138258
598718
558678
※ Use RX-900(H) as flat ell for size 900(H).
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC O
utdoor Units1 Specifications
Caution2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
10
SLIMDUCT RD Design & Installation Manual
45° FLAT ELL RF : Top View 45° VERTICAL ELL RCF : Side View
W
L
x
H
L
x
Size Formula
x = 2 × W ー 239.7L = W + 200
x = 2 × W ー 570L = W + 530
x = 2 × W ー 632L = W + 617
x = 2 × W ー 704.5L = W + 664
150
300, 300H
450, 450H
600, 600H
x = 2 × W ー 685.9L = W + 705.9
900, 900H
Size Formula
x = 2 × H ー 255L = H + 187
x = 2 × H ー 291.8L = H + 251
x = 2 × H ー 342.4L = H + 300
150
300, 450, 600
300H, 450H, 600H, 900H
Use table below to calculate exact length of diagonal duct required to produce desired offset. x indicates the length of duct which is cut duct RD to suit.
※Size 900 & 900H require an extra 20mm to be added to duct length to allow for 10mm insertion into elbow at each end.
90° VERTICAL ELL RC : Side View 45° VERTICAL ELL RCF : Side View
90° FLAT ELL RE : Top View 45° FLAT ELL RF : Top ViewSize A B C
300
300H
450
450H
600
600H
300
300
450
450
600
600
720~ 820820~ 920920~1020720~ 820820~ 920920~1020870~ 970970~10701070~1170870~ 970970~10701070~11701020~11201120~12201220~13201020~11201120~12201220~1320
700
700
850
850
1000
1000
RSS123123123123123123
Size A B C
300
300H
450
450H
600
600H
130
250
130
250
130
250
430~530530~630630~730550~650650~750750~850430~530530~630630~730550~650650~750750~850430~530530~630630~730550~650650~750750~850
410
530
410
530
410
530
RSS123123123123123123
Size A B
300
300H
450
450H
600
600H
300
300
450
450
600
600
389~459459~529529~599389~459459~529529~599433~503503~573573~643433~503503~573573~643484~554554~624624~694484~554554~624624~694
RSS123123123123123123
C919~ 989989~10591059~1129919~ 989989~10591059~11291050~11201120~11901190~12601050~11201120~11901190~12601148~12181218~12881288~13581148~12181218~12881288~1358
444~514514~584584~654528~598598~668668~738444~514514~584584~654528~598598~668668~738444~514514~584584~654528~598598~668668~738560~598620~668690~738
Size A B
300
300H
450
450H
600
600H
900H
130
250
130
250
130
250
250
193~263263~333333~403228~298298~368368~438193~263263~333333~403228~298298~368368~438193~263263~333333~403228~298298~368368~438250~298320~368390~438
RSS123123123123123123123
C
Size 900(H) can use RSS only with RCF-900H due to the different shape.Caution
Dimension 4 FLAT ELL + RFJ-A/RSJ-A + DUCT Unit : ㎜
Dimension 3 FLAT ELL + RSS Unit : ㎜
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC Outdoor Units
1 Specifications
Caution
2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
11
6 CouplerSLIMDUCT RD Design & Installation Manual
COUPLER RSJ-A
①Attach RSJ base at 20mm space between each duct end.
②To connect RZ brackets on the joint, use RSJ included stand fixed plate. Use stand fixed plate only when bracket is attached at the joint.
③After lineset installation, insert RSJ inner cover into ditch guide and upper part of duct base.
Installation Step
④Place duct cover and fix RSJ outer cover.
Truss screw M6×15L
Bush
M6 Flange nut
20㎜
Outer cover
Truss screw M6×20LResin washer
Every RSJ base is provided with ditch guide which can be aligned with its inner cover to prevent RSJ inner cover from sliding down when it is mounted vertically.
Install ditch guide of RSJ base facing upward.
Stand fixed plate
38W bolt × 25L
Inner cover
Inner coverDitch guide
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC O
utdoor Units1 Specifications
Caution2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
12
SLIMDUCT RD Design & Installation Manual
FREE COUPLER RFJ-A
①Make 20mm space between each duct end and attach 2 pieces of RFJ base to hold from both sides of duct.
②To connect RZ brackets on the joint, use RFJ included stand fixed plate. Use stand fixed plate only when bracket is attached at the joint.
③After lineset installation, insert RSJ inner cover into ditch guide and upper part of duct base.
④Place duct cover and fix RFJ outer cover.
Outer cover
Truss screw M6×20LResin washer
Inner cover
Inner coverDitch guide
Stand fixed plate
38W bolt × 25L
20㎜
Resin washer
Truss screw M6×20L
※For vertical application, use RFJ exclusively with direct to wall.
Every RFJ base is provided with ditch guide which can be aligned with its inner cover to prevent RFJ inner cover from sliding down when it is mounted vertically.
Install ditch guide of RFJ base facing upward.
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC Outdoor Units
1 Specifications
Caution
2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
13
7 Telescopic CouplerSLIMDUCT RD Design & Installation Manual
TELESCOPIC COUPLER RSS
①Place temporarily or install duct / ell. Select the suitable RSS according to the differential level B from pipe shaft (between the inner surface bottom of RWP base flange and bottom of latitudinal duct) or the space L between ducts / ells.
②Attach RSS base to duct or ell base. Set RSS ditch guide at the center of joint opening.
M6 Flange nut
Ditch guide
45° VERTICAL ELL Base
45° VERTICAL ELL Base
20㎜
Truss screw M6×20L
Bush
TELESCOPIC COUPLER RSS BaseCOUPLER Base L
L
TELESCOPIC COUPLER Item No. Space between ductsL (mm)
RSS-300-1/450-1/600-1/900-1
RSS-300-2/450-2/600-2/900-2
RSS-300-3/450-3/600-3/900-3
RSS-300H-1/450H-1/600H-1/900H-1
RSS-300H-2/450H-2/600H-2/900H-2
RSS-300H-3/450H-3/600H-3/900H-3
20~120
120~220
220~320
20~120
120~220
220~320
Space between ducts L (mm)
L
※Refer to page 10 to calculate the size of RSS from the height B of diagonal duct.
Installation Step
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC O
utdoor Units1 Specifications
Caution2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
14
SLIMDUCT RD Design & Installation Manual
③Install RSS baseplate and bracket.
④After lineset installation, insert RSS inner cover into ditch guide and upper part of duct base.
⑤Place duct cover and install RSS outer cover and its splint.
When connecting RSS to 2m or 1m lengths of duct RD or to 45°elbow RCF, the included baseplate can be used. If RSS needs to be connected to any other fitting, RSS baseplate will have to be purpose processed on site. Use bracket to support RSS baseplate.
Cut
Outer cover
45° VETICAL ELL CoverWALL FLANGE Cover
Resin washer Resin washerDuct cover
Truss screw M6×20L
Truss screw M6×20L
Inner cover
38 Hex bolt ×25LW
38 Hex nutW
38 Hex nutW
38 Flat washerW
38 Flat washerW
Stand fixed plate
BRACKET ATTACHMENTPLATE for VETICAL ELL
M6 Hex nut
Flat washerTELESCOPIC COUPLER Baseplate
Hex bolt M6×12LResin washer
※Caution : TELESCOPIC COUPLER Baseplate
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC Outdoor Units
1 Specifications
Caution
2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
15
8 ReducerSLIMDUCT RD Design & Installation Manual
REDUCER RR [Except : RR-300H-150, RR-450H-300, RR-600H-300]
①Install bracket to secure with a corresponding φ12 hole on end of RD bigger duct. Attach RR base to duct base as shown in the right.
②Attach smaller duct to RR base. After lineset installation, insert RR inner cover into ditch guide.
③Place duct cover and fix RR outer cover.
Bush
REDUCER Base
Truss screw M6×15L
Bigger duct
3 8W bolt ×25L
M6 Flange nut
Inner cover
Smaller duct
Ditch guide
Bigger duct
Bush
Truss screw M6×15L
Installation Step
Outer cover
Smaller duct
Ditch guide
Resin washer
Truss screw M6×20L
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC O
utdoor Units1 Specifications
Caution2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
16
SLIMDUCT RD Design & Installation Manual
REDUCER RR : RR-300H-150, RR-450H-300, RR-600H-300
①Install bracket to secure with a corresponding φ12 hole on end of RD bigger duct. Attach RR base to duct base as shown in the right.
②Insert smaller duct into RR base. After lineset installation, place smaller duct cover first.
③Attach RR cover to bigger duct and lock them in place with duct cover to complete the installation.
Smaller duct cover
REDUCER Base
Smaller duct
Bush
Truss screwM6×15L
REDUCER Base (right)
REDUCER Base (left)
Bigger duct
3 8W bolt ×25L
REDUCER cover
Resin washer
Bush
Bigger duct cover
Truss screwM6×15L
Truss screwM6×15L
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC Outdoor Units
1 Specifications
Caution
2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
17
SLIMDUCT RD Design & Installation Manual
CROSS Size 900 : RX(W)-900(H), RCI-900(H), RCO-900(H)
①Place two CROSS RX(W) side by side.
②Fix RXJ between CROSS RX(W).
To waterproof, seal all top surface seams of box-shaped cross with weatherproof sealant or putty.
COUPLER SIZE 900 RXJ
10
RX-900(H)
Connection betwen cross parts
Caution
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC O
utdoor Units1 Specifications
Caution2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
18
9 BaseplateSLIMDUCT RD Design & Installation Manual
RD DUCT BASEPLATE RDB : Before lineset installation
Caution ・ Baseplate B is a directional plate.・ Do not use Coupler Baseplate for applications to mount the end of duct RD on bracket.
1. 1m or 2m DUCTAttach COUPLER RSJ/RFJ base at 20mm space between each duct end. Place Baseplate A, B, and Coupler Baseplate inside the duct and fasten them in order with included bolts as shown below.
Baseplate(B)
Baseplate(A)Baseplate(B)
CouplerBaseplate
Flat washerM6 Hex nut
Hex bolt M6×12LResin washer
Duct base
CouplerBaseplate
Baseplate(B)
CouplerBaseplate
CouplerBaseplate
Baseplate(B)
Flat washer
M6 Hex nut
Duct base
Hex bolt M6×12L
Resin washer
Baseplate(A)
2m Duct
1m Duct
0.5m Duct
Bracket installation at duct end
When connecting brackets to the end of duct, the bracket can be used as a baseplate without Coupler Baseplate.
Installation Step
CouplerBaseplate
Flat washer
M6 Hex nut
Duct base
Hex bolt M6×12L
Resin washer
Baseplate
Stand fixed plate38W bolt × 25L
*Screw bolts at 4 corners of each BASEPLATE; 24 bolts in total.
*Screw bolts at 4 corners of each BASEPLATE; 24 bolts in total.
*Screw bolts at 4 corners of each BASEPLATE; 24 bolts in total.
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC Outdoor Units
1 Specifications
Caution
2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
19
SLIMDUCT RD Design & Installation Manual
Caution ・ When connecting brackets to other than cross strut, follow the installation step on page 18.・ Baseplate B is a directional plate.・ Put Coupler Baseplate inside the duct, install splint under washer from the bottom and fasten with the bolts.
2. 0.5M Duct / FLAT ELL + Bracket to cross strut
Attach COUPLER RSJ/RFJ base at 20mm space between each duct end. Place Baseplate A, B, and Coupler Baseplate inside the duct and fasten them in order with included bolts. Refer to figures on page 18.
Coupler Baseplate
M6 Hex nutFlat washer
Resin washer
Duct base
Hex bolt M6×12L
Splint
SLIMDUCT RD/ FLAT ELL
CouplerBaseplate
M6 Hex nutFlat washer
Coupler Base
SplintResin washerHex bolt M6×12L
Coupler Baseplate
Coupler Baseplate (Side View)
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC O
utdoor Units1 Specifications
Caution2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
20
SLIMDUCT RD Design & Installation Manual
RD DUCT BASEPLATE RDB : After lineset installation
3. 1m or 2m DUCTAttach COUPLER RSJ/RFJ base at 20mm space between each duct end. Place Baseplate A, B, and Coupler Baseblate from the duct bottom and fasten them in order with resin bush for baseplate.
2m Duct
1m Duct
0.5m Duct
Baseplate(B)Baseplate(B)
Duct base
Baseplate(A)
Coupler Baseplate
Coupler Baseplate
Resin bush
Baseplate(B)
Baseplate(A)
Coupler Baseplate
Baseplate(B)
Resin bush
Duct base
Coupler Baseplate
Resin bush
Coupler Baseplate
Duct base
Baseplate
*Fix resin bush in all φ10×12L holes of each baseplate.
*Fix resin bush in all φ10×12L holes of each baseplate.
*Fix resin bush in all φ10×12L holes of each baseplate.
Caution ・ Baseplate B is a directional plate.・ When connecting brackets to the end of duct, the bracket can be used as a baseplate without Coupler Baseplate.・ Size 900(H) cannot be attached baseplate after lineset installation.
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC Outdoor Units
1 Specifications
Caution
2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
21
SLIMDUCT RD Design & Installation Manual
4. 0.5M Duct / FLAT ELL + Bracket to cross strut
Attach COUPLER RSJ/RFJ base at 20mm space between each duct end. Place Baseplate A, B, and Coupler Baseplate from the duct bottom and fasten them in order with resin bush for baseplate.Refer to figures on page 20.
Installation 1 COUPLER BASEPLATE for Aftermarket Add-ons RJB
Installation 2 COUPLER BASEPLATE for Aftermarket Add-ons RJB
Slide
①Attach RJB to duct base bottom as shown below.
②Put the fixed side of duct base between RJB and splint first and push the other side in them. Ensure the splint on the hole provided and tighten the screws.
COUPLER BASEPLATE for Aftermarket Add-ons RJB
Duct base Splint(fixed side)
Splint(sliding side)
Caution ・ When connecting bracket to other than cross strut, follow the installation step on page 20.・ Baseplate B is a directional plate.・ COUPLER BASEPLATE for Aftermarket Add-ons RJB is an optional accessory for all sizes except 900(H).
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC O
utdoor Units1 Specifications
Caution2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
22
SLIMDUCT RD Design & Installation Manual
90° FLAT ELL BASEPLATE REB : Before lineset installation
5. 90° FLAT ELL
①Secure Baseplate R and L from the bottom of duct base with screws provided.
②Place Coupler Baseplate inside the duct and tighten it with screw provided through splint.
Baseplate(R)Coupler Baseplate
Flat washer
M6 Hex nut
Duct base
Hex bolt M6×12LResin washer
Baseplate(L)
Hex bolt M6×12L
SLIMDUCT RD / FLAT ELLCoupler Baseplate
M6 Hex nutFlat washer
SplintResin washer
Coupler Baseplate
M6 Hex nutFlat washer
Resin washer
Duct base
Hex bolt M6×12L
Splint
Coupler Baseplate (Side View)
Caution ・ Baseplate for 90° FLAT ELL cannot not be used after lineset installation.
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC Outdoor Units
1 Specifications
Caution
2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
23
SLIMDUCT RD Design & Installation Manual
NET : Before lineset installation
NET : After lineset installation
6. DUCTUnroll net inside the duct and fix it with resin bush which mates up with a corresponding φ7 holes on duct base.
7. DUCTAfter lineset installation, unroll net from the duct bottom and fix it with resin bush which mates up with a corresponding φ7 holes on duct base. Ensure about 250mm resin bush spacing to prevent net sagging.
Duct base
Net
Resin bush
φ7 Hole
Duct base
φ7 Hole
Net
Resin bush Approximately 250mm
Caution ・ Net cannot be used with Ells, RE, RF & RT.
Caution ・ For size 900(H), net cannot be applied after lineset installation.・ Net cannot be used with Ells, RE, RF & RT.
5 Ell
6 Coupler
7 Telescopic Coupler
8 Reducer
9 Baseplate
10 Connection with AC O
utdoor Units1 Specifications
Caution2 Installation Step / Duct
3 Wall Penetration Construction
4 Bracket
24
10 Connection with AC Outdoor UnitsSLIMDUCT RD Design & Installation Manual
Branching off
Installation Step
Pull out the linesets from the bottom of duct RD to branch off. Baseplate will have to be purpose processed on site.
SLIMDUCT UD is applied to protect the lineset between the condenser and RD ducting system.
Caution ・ Do not install RAH upside down.
①Attach duct bracket at the branching point.
②Install SLIMDUCT UD to protect linesets and secure it with RAH adjusting the height.
Duct RD
Hex screw
Bracket (RAH)
Flat washerSLIMDUCT UD
Resin washer
Hex bolt
Top
Bottom
Item No. C H
RAH-90
RAH-120
69
84.7
46
62
(mm)
C
H
175
63
RAH PIPE HANGER SUPPORT for SLIMDUCT UD (Fixing Clamp + Bracket)
Do not install RAH upside down.
③Use END FITTING UDCN to cover the end of linesets.
SLIMDUCT UD END FITTING UDCN