PROJECT ABSTRACTS Design Engineering, Hydrology/Hydraulics, Surveying Apple Valley Plaza Development, Apple Valley, CA I:\Marketing\JBA\Marketing Materials\Statement of Qualifications\Project Abstracts\Industrial & Commercial Development\Apple Valley Plaza.doc Joseph E. Bonadiman & Associates, Inc. Client Apple Valley Plaza, LLC Project Location Apple Valley, CA Contact Robert Shockley 909 / 563-0635 Completion Date 2008 JBA worked closely with Miller Architects to provide topographic services, boundary surveying and planning services on the 17- acre shopping center in Apple Valley. We prepared preliminary drainage and grading plans to obtain the entitlements of the project, which included a Cinema Star Theatre. During engineering design we prepared substantial offsite improvement plans including water, a sewer lift station and street improvements on Bear Valley Road. We also provided construction staking with an aggressive schedule to open the theatre on time and within budget. Key Project Staff_________________________________________________ Edward J. Bonadiman, P.L.S. – Project Manager J.T. Stanton, P.E. – Design Engineer

Upload: others

Post on 29-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Design Engineering, Hydrology/Hydraulics, Surveying › wp-content › uploads › JBA... · Design Engineering, Hydrology/Hydraulics, Surveying ABS Auto Auctions, Colton, CA I:\Marketing\JBA\Marketing

PROJECT ABSTRACTS

Design Engineering, Hydrology/Hydraulics, Surveying Apple Valley Plaza Development, Apple Valley, CA

I:\Marketing\JBA\Marketing Materials\Statement of Qualifications\Project Abstracts\Industrial & Commercial Development\Apple Valley Plaza.doc

Joseph E. Bonadiman & Associates, Inc.

Client Apple Valley Plaza, LLC Project Location Apple Valley, CA Contact Robert Shockley 909 / 563-0635 Completion Date 2008

JBA worked closely with Miller Architects to provide topographic services, boundary surveying and planning services on the 17-acre shopping center in Apple Valley. We prepared preliminary drainage and grading plans to obtain the entitlements of the project, which included a Cinema Star Theatre.

During engineering design we prepared substantial offsite improvement plans including water, a sewer lift station and street improvements on Bear Valley Road. We also provided construction staking with an aggressive schedule to open the theatre on time and within budget.

Key Project Staff_________________________________________________

Edward J. Bonadiman, P.L.S. – Project Manager J.T. Stanton, P.E. – Design Engineer

Page 2: Design Engineering, Hydrology/Hydraulics, Surveying › wp-content › uploads › JBA... · Design Engineering, Hydrology/Hydraulics, Surveying ABS Auto Auctions, Colton, CA I:\Marketing\JBA\Marketing

PROJECT ABSTRACTS

Project Management, Engineering, & Surveying Brier Business Center, San Bernardino, CA

I:\Marketing\JBA\Marketing Materials\Statement of Qualifications\Project Abstracts\Industrial & Commercial Development\Brier Business Center.doc

Joseph E. Bonadiman & Associates, Inc.

Client Dan Carlone Construction 234 North “D” Street San Bernardino, CA 92401 Project Location San Bernardino, CA Contact Dan Carlone 909 / 386-1828 Completion Date 2006

JBA worked closely with Carlone Construction to provide all planning, lot line adjustments, design and construction staking services for the Brier Business Center in San Bernardino. The Brier Business Center is made up of six buildings along the Zanja Channel in the Hospitality District of San Bernardino.

JBA worked closely with City staff and Flood Control to provide the necessary set backs for the buildings from the Zanja Channel. We provided all design engineering and construction staking for the building and improvements.

Key Project Staff_________________________________________________

Joseph S.C. Bonadiman, P.E. – Project Engineer Edward J. Bonadiman – Survey Manager

Page 3: Design Engineering, Hydrology/Hydraulics, Surveying › wp-content › uploads › JBA... · Design Engineering, Hydrology/Hydraulics, Surveying ABS Auto Auctions, Colton, CA I:\Marketing\JBA\Marketing

PROJECT ABSTRACTS

Design Engineering, Hydrology/Hydraulics, Surveying ABS Auto Auctions, Colton, CA

I:\Marketing\JBA\Marketing Materials\Statement of Qualifications\Project Abstracts\Industrial & Commercial Development\ABS Auto Auctions.doc

Joseph E. Bonadiman & Associates, Inc.

Client ABS Auto Auctions 1620 Fairway Drive Colton, CA 92324 Project Location Colton, CA Contact Tom Harmon 530 / 858-7507 Completion Date 2007

JBA provided topographic and boundary surveying and all planning services to entitle the expansion of ABS Auto Auctions in Colton CA. We also prepared all onsite grading, drainage, WQMP and SWPPP plans.

JBA also designed offsite street improvements and a sewer line extension to the project.

Key Project Staff_________________________________________________

Edward J. Bonadiman, P.L.S. – Project Manager

Page 4: Design Engineering, Hydrology/Hydraulics, Surveying › wp-content › uploads › JBA... · Design Engineering, Hydrology/Hydraulics, Surveying ABS Auto Auctions, Colton, CA I:\Marketing\JBA\Marketing

PROJECT ABSTRACTS

Bear Valley Road Street Improvements Apple Valley Plaza Development, Apple Valley, CA

I:\Marketing\JBA\Marketing Materials\Statement of Qualifications\Project Abstracts\Industrial & Commercial Development\Apple Valley Plaza Street Improvements.doc

Joseph E. Bonadiman & Associates, Inc.

Client Apple Valley Plaza, LLC Project Location Apple Valley, CA Contact Robert Shockley 909 / 563-0635 Completion Date 2008

JBA worked closely with the Town of Apple Valley to provide Street Improvements on Bear Valley Road adjacent to the Apple Valley Plaza. Street Improvement Plans included a signalized intersection at Bear Valley Road and Central.

JBA worked closely with Hall & Foreman to provide design of the intersection and signalized at that point.

Key Project Staff_________________________________________________

Edward J. Bonadiman, P.L.S. – Project Manager J.T. Stanton, P.E. – Design Engineer

Page 5: Design Engineering, Hydrology/Hydraulics, Surveying › wp-content › uploads › JBA... · Design Engineering, Hydrology/Hydraulics, Surveying ABS Auto Auctions, Colton, CA I:\Marketing\JBA\Marketing

PROJECT ABSTRACTS

Project Management, Engineering, & Surveying Chaparral Motorsports, San Bernardino, CA

I:\Marketing\JBA\Marketing Materials\Statement of Qualifications\Project Abstracts\Industrial & Commercial Development\Chaparral Motorsports.doc

Joseph E. Bonadiman & Associates, Inc.

Client Dan Carlone Construction 234 North “D” Street San Bernardino, CA 92401 Project Location San Bernardino, CA Contact Dan Carlone 909 / 386-1828 Completion Date 1996-Present

Since 1996 JBA has provided all Civil Engineering services for the Chaparral Motorsports facility in San Bernardino. Chaparral grew very quickly between 1996 to present expanding four times with parking improvements, additional buildings and service centers.

JBA worked closely with Carlone Construction to provide improvement plans, legal descriptions and land surveying serices for Chaparral Motorsports.

Key Project Staff_________________________________________________

Joseph S.C. Bonadiman, P.E. – Project Engineer Edward J. Bonadiman, P.L.S. – Survey Manager

Page 6: Design Engineering, Hydrology/Hydraulics, Surveying › wp-content › uploads › JBA... · Design Engineering, Hydrology/Hydraulics, Surveying ABS Auto Auctions, Colton, CA I:\Marketing\JBA\Marketing

PROJECT ABSTRACTS

Project Management, Engineering, & Surveying Harlow’s Kitchen Concepts, San Bernardino, CA

I:\Marketing\JBA\Marketing Materials\Statement of Qualifications\Project Abstracts\Industrial & Commercial Development\Harlows.doc

Joseph E. Bonadiman & Associates, Inc.

Client Dan Carlone Construction , Inc. 234 North “D” Street San Bernardino, CA 92401 Project Location San Bernardino, CA Contact Dan Carlone (909) 386-1828 Completion Date 2001

JBA provided all topographic and surveying work for Dan Carlone Construction. We prepared preliminary grading and drainage and assisted in the project entitlement through the planning department.

We moved on to all the improvement plans for this project including a truck well with sump pumps. Also provided all construction staking services for this project.

Key Project Staff_________________________________________________

Edward J. Bonadiman, P.L.S. – Project Manager Joseph S.C. Bonadiman, P.E. – Project Engineer

Page 7: Design Engineering, Hydrology/Hydraulics, Surveying › wp-content › uploads › JBA... · Design Engineering, Hydrology/Hydraulics, Surveying ABS Auto Auctions, Colton, CA I:\Marketing\JBA\Marketing

PROJECT ABSTRACTS

Project Management, Engineering, & Surveying Humane Society of San Bernardino Valley, San Bernardino, CA

I:\Marketing\JBA\Marketing Materials\Statement of Qualifications\Project Abstracts\Industrial & Commercial Development\Humane Society.doc

Joseph E. Bonadiman & Associates, Inc.

Client Miller Architects 1177 Idaho Street, Ste.200 Redlands, CA 92374 Project Location San Bernardino, CA Contact Gary Miller (909) 335-7400 Completion Date 2006

JBA provided the original ALTA survey and topographic manuscript to Gary Miller Architects. We assisted in the planning portion of this project including, preliminary grading and drainage.

JBA prepared all improvement plans including street improvement and water quality water management plans and SWPPP. JBA assisted during construction to answer request for information (RFI) for the contractor to make sure the project was built per plan and on schedule.

Key Project Staff_________________________________________________

Edward J. Bonadiman, P.L.S. – Project Manager Joseph S.C. Bonadiman, P.E. – Project Engineer

Page 8: Design Engineering, Hydrology/Hydraulics, Surveying › wp-content › uploads › JBA... · Design Engineering, Hydrology/Hydraulics, Surveying ABS Auto Auctions, Colton, CA I:\Marketing\JBA\Marketing

PROJECT ABSTRACTS

Project Management, Engineering, & Surveying K-Mart Distribution Center, Ontario, CA

I:\Marketing\JBA\Marketing Materials\Statement of Qualifications\Project Abstracts\Industrial & Commercial Development\K-Mart.doc

Joseph E. Bonadiman & Associates, Inc.

Client CCC, Inc. Reno, NV Project Location Ontario, CA Completion Date 2000

JBA provided field engineering and construction staking on the K-Mart Distribution Center in Ontario.

JBA worked closely with CCC, Inc out of Reno, Nevada to adjust engineering issues in the field to facilitate the opening of the facility on time and under budget.

Key Project Staff_________________________________________________

Edward J. Bonadiman, P.L.S. – Project Manager Joseph S.C. Bonadiman, P.E. – Project Engineer

Page 9: Design Engineering, Hydrology/Hydraulics, Surveying › wp-content › uploads › JBA... · Design Engineering, Hydrology/Hydraulics, Surveying ABS Auto Auctions, Colton, CA I:\Marketing\JBA\Marketing

PROJECT ABSTRACTS

Construction Management, Engineering, & Surveying Lorton’s Juice Facility, San Bernardino, CA

I:\Marketing\JBA\Marketing Materials\Statement of Qualifications\Project Abstracts\Industrial & Commercial Development\Lortons Juice Facility.doc

Joseph E. Bonadiman & Associates, Inc.

Client Norton’s Fresh Squeezed Juices, Inc. 735 E. Base Line Street San Bernardino, CA 92410 Project Location San Bernardino, CA Contact John Norris 909 / 386-7933 Completion Date 2006

JBA provided surveying services and legal descriptions to prepare site for a modern cooled warehouse structure for this juicing operation.

We worked closely with the owner and contractor. We provided the necessary access and circulation to maintain operation levels for the existing facility.

Key Project Staff_________________________________________________

Joseph S.C. Bonadiman, P.E. – Project Engineer Edward J. Bonadiman – Project Manager

Page 10: Design Engineering, Hydrology/Hydraulics, Surveying › wp-content › uploads › JBA... · Design Engineering, Hydrology/Hydraulics, Surveying ABS Auto Auctions, Colton, CA I:\Marketing\JBA\Marketing

PROJECT ABSTRACTS

Project Management, Engineering, & Surveying Preciado Mortuary & Cemetery, San Bernardino, CA

I:\Marketing\JBA\Marketing Materials\Statement of Qualifications\Project Abstracts\Industrial & Commercial Development\Preciado Mortuary.doc

Joseph E. Bonadiman & Associates, Inc.

Client Dan Carlone Construction 234 North “D” Street San Bernardino, CA 92401 Project Location San Bernardino, CA Contact Dan Carlone (909) 386-1828 Completion Date 2001

JBA provided planning assistance including preliminary grading and drainage on this mortuary and cemetery in San Bernardino.

We prepared street improvement plans, onsite grading and drainage, water quality management plans and SWPPP for this unique project of underground krypts for the internment of cremated remains.

Key Project Staff_________________________________________________

Edward J. Bonadiman, P.L.S. – Project Manager Joseph S.C. Bonadiman, P.E. – Project Engineer

Page 11: Design Engineering, Hydrology/Hydraulics, Surveying › wp-content › uploads › JBA... · Design Engineering, Hydrology/Hydraulics, Surveying ABS Auto Auctions, Colton, CA I:\Marketing\JBA\Marketing

PROJECT ABSTRACTS

Project Management, Engineering, & Surveying Rancho Mirage Professional Plaza, Rancho Mirage, CA

I:\Marketing\JBA\Marketing Materials\Statement of Qualifications\Project Abstracts\Industrial & Commercial Development\Rancho Mirage Professional Plaza.doc

Joseph E. Bonadiman & Associates, Inc.

Client American Medical Project Location Rancho Mirage, CA Completion Date 2004

JBA provided base topographic and boundary survey we assisted in the planning of the projects and acquiring the tentative parcel map and conditions of approval for a medical condominium plan.

JBA prepared all improvement plans including under ground utilities for this project that included two-story parking garages and two-story full service medical condominiums.

Key Project Staff_________________________________________________

Joseph S.C. Bonadiman, P.E. – Project Engineer Edward J. Bonadiman – Project Manager

Page 12: Design Engineering, Hydrology/Hydraulics, Surveying › wp-content › uploads › JBA... · Design Engineering, Hydrology/Hydraulics, Surveying ABS Auto Auctions, Colton, CA I:\Marketing\JBA\Marketing

PROJECT ABSTRACTS

Construction Management, Engineering & Surveying Trinity Church Parking Lot Addition/Expansion, Redlands, CA

I:\Marketing\JBA\Marketing Materials\Statement of Qualifications\Project Abstracts\Industrial & Commercial Development\Trinity Church.doc

Joseph E. Bonadiman & Associates, Inc.

Client Trinity Church 1551 Reservoir Road Redlands, CA 92374 Project Location Redlands, CA Contact Tom Fort (909) 335-7333 Completion Date 2008

JBA worked closely with the Pastor at Trinity Church in Redlands CA to provide planning, engineering and construction services for Trinity Church. JBA prepared all onsite grading, drainage, WQMP, SWPPP and Basin Plans. Because of the project Steep terrain and existing restrictions, close attention was paid to ADA requirements and street access.

JBA acted as the construction manager on this project with grading, paving and lighting contractors to provide the services in a timely manner for the church.

Key Project Staff_________________________________________________

Joseph S.C. Bonadiman, P.E. – Project Engineer Edward J. Bonadiman, P.L.S. – Survey Manager Charlie Hinz – Project Designer