TOSEE SILOHADESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
www.Tosee-Siloha.com
Design & Construction ofConcrete and Steel Silos
Construction ofElevated Chimneys
Construction ofCement Factories
Execution ofPower Plant Projects &Cooling Towers for P/P
Execution ofOil & Gas Projects
S/N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
www.tosee-siloha.com
OTHER PROJECTS
IN HAND PROJECTS
AWARDS & APPRECIATIONS
EQUIPMENTS & MACHINERY
COMPLETED PROJECTS :
SILO PROJECTS
POWER PLANT PROJECTS
CHIMNEY PROJECTS
CEMENT FACTORY PROJECTS
MANPOWER STATUS
TITLE
INTRODUCTION
ORGANIZATION CHART
CERTIFICATES
MEMBERS OF BOARD
و ی ه و ر
www.tosee-siloha.com
و ی ه و ر
Introduction :
Tosee Siloha Co. ( T.S.C ) is one of the International leading
companies for construction of heavy industrial projects, such as
concrete and steel silos (with the range of 30.000 up to 200.000 tones
capacity), chimney & cooling tower for power plants, cement factories,
flour mills, petroleum and petrochemical plants, etc.
T.S.C Obtained Several ISO & OHSAS Certificates as a professional
company for execution of heavy industrial projects briefly mentioned
above. The company is fully capable to offer and do all types of
industrial projects on EPC (Turn – key) basis (including design,
supply, construction, erection & commissioning).
www.tosee-siloha.com
و ی ه و ر
PRESIDENTIAL DEPUTY (P.B.O.)
“Certification of Contractor’s Qualification”
www.tosee-siloha.com
ی ه و ور
PRESIDENTIAL DEPUTY (P.B.O.)
“Certification of Contractor’s Gradation”
www.tosee-siloha.com
و ی ه و ر
ASSOCIATION OF HOUSING COMPLEX CONSTRUCTORS
“Certification of Constructor’s Qualification & Gradation”
Education :
Position :
Work Resume
DurationPositionWorking PlaceOrganization NameS/N
Since 2013till now
Chairman Of BoardTehranTosee Siloha Co1
1992~ 1995Chairman Of BoardTehranKhadamat Zirbanaei Co2
1987~ 2012Chairman Of Board &Managing Director
TehranTosee Siloha Co3
www.tosee-siloha.com
Chairman of Board
Bord of Directors
Design and Execution of Heavy Industry Projects on EPC Basis
Resume of Board Members :
Saeid SafaeiName & Family Name :
B.S. in Electronic Engineering
kkkkkkنننن
و ی ه و ر
Education :
Position :
Work Resume
DurationPositionWorking PlaceOrganization NameS/N
Since 2013till now
Member Of Board &Managing Director
TehranTosee Siloha Co1
1992~ 2012
Technical & ExecutiveEngineer ,site Manager Project,
, Manager , Technical DirectorDeputy of M.D. in Technical
affairs
TehranTosee Siloha Co2
www.tosee-siloha.com
Managing Director & Member of Board
Bord of Directors
Design and Execution of Heavy Industry Projects on EPC Basis
Resume of Board Members :
Saeid GholamiName & Family Name :
B.S. in Civil Engineering
kkkkkkنننن
و ی ه و ر
Education :
Position :
Work Resume
DurationPositionWorking PlaceOrganization NameS/N
Since 1989till now
Member of the Board & Deputy & of M.D. in Technical AffairsExportation of Technical andEnginering Services
TehranTosee Siloha Co1
1985~ 1989 & Member of Technical Board.Supervisor of Technical Dept
HamedanBou Ali Sina University2
1981Consultant EngineerAhwaz-ShirazShiraz & Imam WaterSecurement Projects
3
www.tosee-siloha.com
M.S. in Civil Engineering
Deputy of Chairman of Board &Deputy of M.D. in Technical affairs and abroadprojects
Name & Family Name :
Bord of Directors
Resume of Board Members :
Design and Execution of Heavy Industry Projects on EPC Basis
Mahmood Davoodi
kkkkkkنننن
و ی ه و ر
0ver 15 10 5 Tentative Permanent60 7 1 2 66 6845 4 1 5 45 50120 80 17 150 67 217
157 178 335
0ver 15 10 5 Tentative Permanent22 0 0 0 22 225 1 1 0 7 743 19 10 20 52 72
20 81 101
www.tosee-siloha.com
Grandtotal
ExpertsOfficersStaff
Engineer
MANPOWER STATUS:
Engineers , Technicians & Craftsmen
Titles Years of Experiences Total Grandtotal
TechnicianCraftsman
Total
Administration , Finance & Commercial
Total
Titles Years of Experiences Total
و ی ه و ر
Syria
9Tower Crane1
9Batch Plant2
Mixer Truck3
4Wheel Loader4
4Mobile Crane5
Stationed Concrete Pump6
Dump Truck7
Truck for Trailer8
Concrete Pump Truck9
Mini Loader ( Bobcat)10
Excavator11
Bull Dozer12
3Diesel Generator13
Vibro Roller14
Crashing Plant15
10Air Compressor16
Farming Tractor17
Mini Bus18
Sedan & Vehicle19
Fire Fighting Truck20
Ambulance21
2Building Hoist22
41
Grand Total of Machinary 153
MACHINARY
4
2
13
1
1
QT'Y (unit)PRESCRIPTIONS/N
Iran
Total
1
6
3
www.tosee-siloha.com
14
12
8
5
10
1
5
2
4
2
3
1
11
3
112
و ی ه و ر
Syria
Various types of Saw1
Electric Welding Machine2
Surveying Equipment3
Manual Vibro- Roller4
Plate Compactor5
Statoined Concrete Mixer6
Floating & Chassis Mounted Waterpump 2"~ 4"7
Poly Ethylene Welding 1/2"~ 6"8
Electric Steel Bar Scissors9
Electric Bar Bending M/C10
Cement Silo11
Chain & Rachet Block12
Electric,Gasoline & Diesel Operate Vibrator13
Formwork14
300 tonSlipform's Accessories15
Climbing Formwork16
Slipform17
250 setYuk for Slipform18
170 eaSlipform's Hydro-Jack :3ton19
300 eaSlipform's Hydro-Jack :6ton20
EQUIPMENT
9 unit
30 unit
25 unit
6 unit
S/NQT'Y
PrescriptionsIran
500 m2
250 set
www.tosee-siloha.com
170 ea
22 unit
75 set
1,500 ton
1 Whole set
48 set
300 ea
250 m2
31 unit
12 unit
4 unit
23 unit
7 unit
37 unit
و ی ه و ر
www.tosee-siloha.com
پروژه هاي اجــرا شده نیـروگاه، کارخـانه سیمــان، سیــلو، بـرج خنــک کن در اقصی نقـاط ایــران
و ی ه و ر
1 2011 Syrian G.C.C.S.2 2011 Syrian G.C.C.S.3 2010 Syrian G.C.C.S.4 2010 Syrian G.C.C.S.5 2010 Syrian G.C.C.S.
8 2010 Syrian G.C.C.S.9 2009 Syrian G.C.C.S.
10 2009 Syrian G.C.C.S.11 2008 Syrian G.C.C.S.12 2008 Syrian G.C.C.S.13 2006 Zob ahan Co.14 2004 Ministry of agriculture
16 2001 Cereal Organization17 2001 Ministry of agriculture
18 2001 Ministry of agriculture
20 1998 Cereal Organization21 1998 Ministry of agriculture
22 1998 Cereal Organization23 1998 Ministry of agriculture
24 1998 Cereal Organization
26 1995 P&Shipping Org.27 1994 Ministry of agriculture
28 1993 Ministry of agriculture
29 1992 Ministry of agriculture
30 1992 Ministry of agriculture
32 2010 Mpna Group33 2010 Mpna Group
36 2003 Mapna Group
www.tosee-siloha.com
Gonbad City
Bojnourd Silo Bojnourd City
Teshreen P.P. Piling & Cooliong Tower SyriaJandar P.P.-Cooling Tower Syria
Kashan Silo Kashan CityKermanshah Silo Kermanshah CityNeishabour Silo
Power Plants ProjectsShiraz Silo Shiraz City
Gonbad CityKerman Silo & Flour Mill Kerman City
Mapna Group
Damavand Combine Cycle Power Plant -1st. Phase-Cooling Towers
35 Yazd City Torhan Industries &Behin Saman S.
25 Zahedan , Kermanshah &Ahvaz Cities 1998 Administrative of
Silo Projects
Neishabour City
Abadeh Silo Abadeh CityZahedan Silo Zahedan City
Bijar City
Manufacturing & Erection of Machineryfor Abadeh , Kashan , Neishabour &
Bojnourd Silos19
Abadeh , Kashan ,Neishabour &Bojnourd Cities
2001 CerealOrganization
2001Turkmenistan
Agriculture & FoodIndustries Ministry
15
Gonbad Mechanized Storage
6 Extension Projects of Serrin , Sharakrak&Alia Silos Syria 2010
Sabah Alkheir Silo Syria
Khorramabad Silo
Syrian General Co.for Cereal Silos
7 Extension Projects of Kabaka & Sabah Alkheir Silos
Syria Syrian General Co.for Cereal Silos2010
Honaida Silo Syria
CLIENT
Daraa Silo Syria
TITLE OF PROJECT LOCATIONPROVISION
AL A.C.DATE
SILO PROJECTS
2010 Mapna Group
S/N
Damavand Combine Cycle Power Plant -2nd. Phase-Cooling Towers31 Pakdasht City 2012
Shenshar Silo SyriaSarakeb Silo
SyriaKok sazi zob ahan Silos Isfehan City
Bijar Silo
34 Pakdasht City
Gonbad Silo
Sahriati P.P. - Cooling Tower Mashhad City
2006
Khorramabad City
Turkmenistan Steel Silos( 6 Projects)
Across Turkmenistan
Kabaka Silo
Sharakrak Silo SyriaSerrin Silo
Hamedan Silo Hamedan CityImam Khokeini Silo B.I.K. City
Mechanized buildings of Zahedan ,Kermanshah & Ahvaz Silos
Syria
Syria
Tal Hamis Silo SyriaAia Silo Syria
Yazd P.P. - Cooling Towers
ی ه و ور
CLIENTTITLE OF PROJECT LOCATIONPROVISION
AL A.C.DATE
S/N
ی ه و ور
37 2003 Mapna Group38 2002 Mapna Group39 2002 Mapna Group40 2000 Mapna Group41 2011 Mapna Group42 2009 Mapna Group43 2012 Mapna Co.
46 2004 Mapna Group47 2001 Fajr.Petrochem. Co.48 2014 Mapna Group49 2015 Mapna Group
50 2014 Tehran Cement Co.
53 2009 Abyek Cement Co.54 2009 Abyek Cement Co.
57 2006 Fars No Cement Co.58 2006 Larestan Cement Co.59 2006 Abyek Cement Co.60 2000 Isfehan Cement Co.61 1998 Bushehr Cement Co.62 1995 Ardebil Cement Co.63 1995 Neyriz Cement Co.
65 2008 Qazvin Glazing Co.
67 2001 Mapna Co.68 1992 Tavanir Co.69 1992 Tavanir Co.70 1990 Saveh-Jam Glazing
72 2001 N.A.G. Co.73 2012 Taavoni jahad tosee co.74 Steel Structure works-Asia Housing Complex Tehran City
www.tosee-siloha.com
Behbehan Cement Co.64
51Mond-e- Dashti Cement Factory-Phase 1
Mond-e-DashtiCement Co.2012Khormoj City
44 Pakdasht City 2006 Mapna Co.
45
Kazeroon Gas Turbine Power Plant Kazeroon City
Momtazan KermanCement Co.
Increment Products Loading Capacity ofAbyek Cement Factory56 Abyek City 2006 Abyek Cement Co.
55 Kerman Momtazan Cement Factory Kerman City 2007
Shahid Rajaei P.P.-Cooling Tower Qazvin CityKhoy P.P.- Cooling Tower
Damavand Gas Turbine Power Plant-2nd.Phase
Tehran Cement Factory Tehran CityCement Factory Projects
Damavand Gas Turbine Power Plant-1st.Phase
Pakdasht City 2005 Mapna Co.
52
Neishabour P.P. -Cooling Tower Neishabour City
Isfehan Cement Factory Extension Isfehan City
Fajr Petrochemical Power Plant Mahshahr CityYazd B.O.P Power Plant Yazd City
Bushehr CityArdebil Cement Factory Ardebil City
Clinker Production -Abyek Cement Factory Abyek City
Gilan Sabz 3,400 Ton Cement Factory Deylaman
Abyek Cement Factory Abyek CityAbyek Cement Factory-2nd. Line Abyek City
Shiraz CityLarestan Cement Factory Larestan City
Mahshahr Gas Turbine Power Plant Mahshahr City
Hamedan CitySaveh-Jam Chimney Saveh City
Chimney of Shazand Thermal P.Plant Shazand City
Nyriz Cement Co. Nyriz City
Civil Works of Phase 9 & 10 - South ParsGas Development Projects(SPGD)
Chimney Projects
Chimney & Steel Structure of EvaluationProject66 Isfehan City 2007 Zob ahan Co.
Chimney of Qazvin Glazing Factory Abhar City
Asaluyeh 2005 OEAC Co.71
Other Projects
Chimney of Bistoon P.Plant Kermanshah City
Fars No Cement Factory
2012 Gilan Sabz cementIndustries Co.
Khoy CityMontazer Ghaem P.P.-Cooling Tower Fardis City
Kahnouj Power Plant Kahnouj CityBesat Power Plant-SPGD Asaluyeh
Zanjan Gas Turbine Power Plant Zanjan City
Behbehan CementCompany1992Behbehan City
Bushehr Cement Factory
Civil Works of Optic Utility Project Hashtgerd
Chimney of Gharb P.Plant
CLIENTTITLE OF PROJECT LOCATIONPROVISION
AL A.C.DATE
S/N
ی ه و ور
74 2005 Tosee Siloha Co.
77 2012 Mapna Turbine78 2014 Melli sanaye mes iran Co.
79 2003 Iran Khodro Co.80 1997 Municipality Dis.981 1996 Iran Khodro Co.82 1996 Municipality Dis.9
86 1995 Private Sector
Toga Industrial Turbine-civil works Fardis City
www.tosee-siloha.com
Saadat Abad Housing Complex Tehran City
Civil Works of Haftom Tir Tomb Tehran City
Iran Khodro over Bridge Tehran CityKan Bridge-Old Karaj Road
84 Civil Works of Sari Poulterer Research Center Sari City
Iran Khodro Under Bridge Tehran CityKan Bridge-Special Karaj Road Tehran City
Tehran City
1997 Technical Dept.-JihadConstractive Ministry
75 Jihadgaran Cultural/Sports Complex Tehran City 1997 Jihad ConstructiveMinistry
85 Civil Works of Ahwaz Poulterer ResearchCenter
Ahwaz City 1997 Technical Dept.-JihadConstractive Ministry
83 Civil Works of Karaj Poulterer ResearchCenter
Karaj City 1997 Technical Dept.-JihadConstractive Ministry
76 Jihad ConstructiveMinistry
1993Tehran CityBuilding of Educational & ResearchDeputy-Jihad C9nstructive Ministry
Mes 40 koreh zahedan City
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : GONBAD SILO
CITY : GONBAD
YEAR OF PROVISIONAL ACCEPTANCE : 1992
CLIENT : JAHAD - E - SAZANDEGI
BASIC DATA : Bins : Number : 12 / Capacity : 50,000 tons / Height : 31 m
Diameter : 16 m / Wall thickness : 30 cm
Working - House : Height : 45 m / Length : 25 m / Width : 10.4 m
Slipform :44,000 m2 / Re - bars : 2,650 tons
Concrete : 39,000 m3 / steelwork : 460 tons
Excavation : 251,000 m3 / Formwork : 23,000 m2
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : KERMAN SILO & FLOUR MILL
CITY : KERMAN
YEAR OF PROVISIONAL ACCEPTANCE : 1992
CLIENT : JAHAD - E - SAZANDEGI
BASIC DATA : Bins : Number : 36 / Capacity : 100,000 tons / Height : 52 m
Diameter : 10 m / Wall thickness : 25 cm
Working - House : Height : 63.5 m / Length : 32.6 m / Width : 10 m
Slipform :130,000 m2 / Re - bars : 5,500 tons
Concrete : 54,000 m3 / steelwork : 970 tons
Excavation : 90,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : SHIRAZ SILO
CITY : SHIRAZ
YEAR OF PROVISIONAL ACCEPTANCE : 1992
CLIENT : JAHAD - E - SAZANDEGI
BASIC DATA : Bins : Number : 36 / Capacity : 120,000 tons / Height : 50.5 m
Diameter : 9.8 m / Wall thickness : 27.5 cm
Working - House : Height : 68.3 m / Length : 24.15 m / Width : 9 m
Slipform :125,000 m2 / Re - bars : 3,300 tons
Concrete : 37,000 m3 / steelwork : 650 tons
Excavation : 150,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : IMAM KHOMEINI TRANSIT SILO
CITY : BANDAR IMAM KHOMEINI
YEAR OF PROVISIONAL ACCEPTANCE : 1992
CLIENT : PORTS & SHIPPING ORGANIZATION
BASIC DATA : Bins(Small Size) : No. : 30 units / Dia. : 7.25 m /Wall thickness : 18 cm / Height : 31 m
(Large Size) : No. : 5 units/ Dia. : 19.8 m /Wall thickness : 35 cm / Height : 31.5 m
Working - House : Height :60 m / Length : 27 m / Width : 15.5 m
50,000 tonsCapacity
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : HAMEDAN SILO
CITY : HAMEDAN
YEAR OF PROVISIONAL ACCEPTANCE : 1994
CLIENT : JAHAD - E - SAZANDEGI
BASIC DATA : Bins : Number : 18 / Capacity : 80,000 tons / Height : 51.2 m
Diameter : 12 m / Wall thickness : 27.5 cm
Working - House : Height : 64.5 m / Length : 24.9 m / Width : 8.5 m
Slipform :80,000 m2 / Re - bars : 2,545 tons
Concrete : 23,000 m3 / steelwork : 332 tons
Excavation : 39,900 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : ZAHEDAN SILO
CITY : ZAHEDAN
YEAR OF PROVISIONAL ACCEPTANCE : 1998
CLIENT : JAHAD - E - SAZANDEGI
BASIC DATA : Bins : Number : 18 / Capacity : 67,000 tons / Height : 48.9 m
Diameter : 12.2 m / Wall thickness : 27.5 cm
Working - House : Height : 56.4 m / Length : 25.5 m / Width : 10.05 m
Slipform :56,000 m2 / Re - bars : 3,000 tons
Concrete : 39,000 m3 / steelwork : 806 tons
Excavation : 50,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : KERMANSHAH SILO
CITY : KERMANSHAH
YEAR OF PROVISIONAL ACCEPTANCE : 1998
CLIENT : JAHAD - E - SAZANDEGI
BASIC DATA : Bins : Number : 27 / Capacity : 100,000 tons / Height : 46.6 m
Diameter : 12.2 m / Wall thickness : 27.5 cm
Working - House : Height : 61.7 m / Length : 25.52 m / Width : 10.05 m
Slipform :130,000 m2 / Re - bars : 4,600 tons
Concrete : 40,000 m3 / steelwork : 520 tons
Excavation : 21,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : KASHAN SILO
CITY : KASHAN
YEAR OF PROVISIONAL ACCEPTANCE : 1998
CLIENT : GRAIN ORGANIZATION
BASIC DATA : Bins : Number : 12 / Capacity : 27,500 tons / Height : 43 m
Diameter : 10 m / Wall thickness : 25 cm
Working - House : Height : 53 m / Length : 27 m / Width : 8 m
Slipform :38,000 m2 / Re - bars : 1,721 tons
Concrete : 18,000 m3 / steelwork : 467 tons
Excavation : 42,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : NEYSHABOOR SILO
CITY : NEYSHABOOR
YEAR OF PROVISIONAL ACCEPTANCE : 1998
CLIENT : GRAIN ORGANIZATION
BASIC DATA : Bins : Number : 12 / Capacity : 27,500 tons / Height : 43 m
Diameter : 10 m / Wall thickness : 25 cm
Working - House : Height : 53 m / Length : 27 m / Width : 8 m
Slipform :38,000 m2 / Re - bars : 1,600 tons
Concrete : 16,000 m3 / steelwork : 455 tons
Excavation : 20,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : ABADEH SILO
CITY : ABADEH
YEAR OF PROVISIONAL ACCEPTANCE : 1998
CLIENT : GRAIN ORGANIZATION
BASIC DATA : Bins : Number : 12 / Capacity : 27,500 tons / Height : 43 m
Diameter : 10 m / Wall thickness : 25 cm
Working - House : Height : 53 m / Length : 27 m / Width : 8 m
Slipform :38,000 m2 / Re - bars : 1,675 tons
Concrete : 14,000 m3 / steelwork : 484 tons
Excavation : 34,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : BOJNORD SILO
CITY : BOJNORD
YEAR OF PROVISIONAL ACCEPTANCE : 2001
CLIENT : GRAIN ORGANIZATION
BASIC DATA : Bins : Number : 12 / Capacity : 27,500 tons / Height : 43 m
Diameter : 10 m / Wall thickness : 25 cm
Working - House : Height : 53 m / Length : 27 m / Width : 8 m
Slipform :38,000 m2 / Re - bars : 1,581 tons
Concrete : 13,000 m3 / steelwork : 137 tons
Excavation : 20,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : TURKMENISTAN SILOS ( 6 )
CITY : BAYRAMALI-GOLANLI-YASHLIK-PARAKHAT-GHEZELARVAT-TASHAOZ
YEAR OF PROVISIONAL ACCEPTANCE : 2001
CLIENT : MINISTRY OF AGRICULTURE & FOOD INDUSTRIES OF TURKMENISTAN
BASIC DATA : Bins : Number : 6 / Capacity : 30,000 tons / Height : 16.75 m
Diameter : 21.84 m
Working - House : Height : 31.20 m / Length : 8 m / Width : 8 m
FORMWORK : 21,912 m2 X 6 / Re - bars : 1,671 tons X 6
Concrete : 24,405 m3 X 6 / steelwork : 1,105 tons X 6
Excavation : 92,040 m3 X 6
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : SYRIAN 100,000 TONS SILO PROJECTS (10 )
YEAR OF PROVISIONAL ACCEPTANCE : 2010
BASIC DATA ( EVERY SILO ): Bins : Number : 54 / Capacity : 100,000 tons / Height : 37 mDiameter : 9.5 m / Clauster :28.5 m
Working - House : Height : 56 m / Length : 22.8 m / Width : 13.3 m
Concrete : 480,000 m3 / Steelwork : 6,500 tonsGeneral Formwork : 632,000 m2 / Asphalt : 45,000 m3
Excavation : 800,000 m3 /Re-Bars : 58,500 tonsSLIPFORM &CLIMBING FORM : 1,368,000 m2Major Works
TITLES/LOCATIONS : KABAKA-SABAH ALKHEIR-ALIA-TAL HAMIS-HONAIDI-SHARAKRAK-SARAKEB-SERRIN-SHINSHAR-DARAA
CLIENT : GENERAL COMPANY FOR CEREAL SILOS (SYRIAN MINISTRY OF ECONOMY)
TOTAL 10 SILOS
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : SYRIAN SILO EXTENSION PROJECTS (5 )
YEAR OF PROVISIONAL ACCEPTANCE : 2012
BASIC DATA ( EVERY SILO ): Bins : Number : 18/ Capacity : 33,300 tons / Height : 37 mDiameter : 9.5 m / Clauster :28.5 m
Concrete : 68,500 m3 / Steelwork : 580 tonsGeneral Formwork : 75,000 m2
GENERAL COMPANY FOR CEREAL SILOS (SYRIAN MINISTRY OF ECONOMY)
Excavation : 24,500 m3 /Re-Bars : 8,000 tons
TITLES/LOCATIONS : KABAKA,SABAH ALKHEIR,ALIA,SHARAKRAK,SERRIN SILOS
CLIENT :
TOTAL 5 SILOS Major Works SLIPFORM : 210,000 m2
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : BIJAR SILO
CITY : BIJAR
YEAR OF PROVISIONAL ACCEPTANCE : 2004
CLIENT : JAHAD - E - SAZANDEGI
BASIC DATA : Bins : Number : 18 / Capacity : 50,000 tons / Height : 48.2 m
Diameter : 9.75 m / Wall thickness : 26 cm
Working - House : Height : 60.2 m / Length : 18.85 m / Width : 10.5 m
Slipform : 60,000 m2 / Re - bars : 2,500 tons
Concrete : 30,000 m3 / steelwork : 700 tons
Excavation : 20,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : KHORAMABAD SILO
CITY : KHORAMABAD
YEAR OF PROVISIONAL ACCEPTANCE : 2001
CLIENT : JAHAD - E - SAZANDEGI
BASIC DATA : Bins : Number : 18 / Capacity : 50,000 tons / Height : 41 m
Diameter : 11 m / Wall thickness : 27.50 cm
Working - House : Height : 52.70 m / Length : 17 m / Width : 9.50 m
Slipform : 53,000 m2 / Re - bars : 1,940 tons
Concrete : 22,800 m3 / steelworks : 405 tons
Excavation : 68,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : GONBAD MECHANIZED WAREHOUSE
CITY : GALIKESH / GONBAD
YEAR OF PROVISIONAL ACCEPTANCE : 2001
CLIENT : JAHAD - E - SAZANDEGI
BASIC DATA : Length : 219.5 m
Width : 64 m
Height : 14.8 m
FORMWORK : 20,000 m2 / Re - bars : 1,300 tons
Concrete : 25,000 m3 / steelwork : 300 tons
Excavation : 70,000 m3 / Capacity : 50,000 tons
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : CONSTRUCTION OF COLLIER PRODUCTION UNITISFEHAN STEEL MILL
LOCATIONS : ISFEHAN CITYYEAR OF PROVISIONAL ACCEPTANCE : 2005CLIENT : ISFEHAN STEEL MILL Co.CONSULTANT : FOULAD TECHNIC Co.
Basic Data
Clausters
Numbers : 18 / Capacity : 50,000 ton/Height:48.2m
Diameter : 9.75 m / Shell tickness : 26 cm
Major Works
Concrete work : 32000 m3Re-bars : 3900 Tons
Formworks : 59000 m2Excavation : 83,000 m3
Sleepform : 82500Steel works :680 Tons
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : POWER PLANT & UTILITY OF FAJR PETROCHEMICAL COMPLEX
CITY : MAHSHAHR PORT FREE ZONE
YEAR OF PROVISIONAL ACCEPTANCE : 2001
CLIENT : FAJR PETROCHEMICAL CO.
BASIC DATA : Gas turbine 5 UNITS OF 117 MW
Concrete : 22,000 m3 /Re - bars : 2,520 tons
Formwork : 39,000 m2 / Excavation : 30,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : ZANJAN GAS TURBINE POWER PLANT
CITY : ZANJAN
YEAR OF PROVISIONAL ACCEPTANCE : 2010
CLIENT : MAPNA CO .
BASIC DATA : Gas turbine 4 X 159 MW UNITS
Concrete :41,663 m3 /Re - bars : 3,062 tons
Formwork : 108,070 m2 / Excavation : 298,679 m3
STEEL WORKS : 2,996 Tons
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
Re-bars : 3,000 Tons Formworks : 125,000 m2Excavation : 130,000 m3
CLIENT : MAPNA GROUPCONSULTANT : MAPNA Co.
Basic Data
MajorSpecifications
Numbers of Turbine : 6Turbine capacity : 156 MW
Major Works
Concrete work : 35,000 m3
PROJECT NAME DAMAVAND GAS TURBINE P.P.-CIVIL WORKSLOCATIONS : PAKDASHT- GARMSAR ROADYEAR OF PROVISIONAL ACCEPTANCE : 2008
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : KAZEROON GAS TURBINE POWER PLANT
CITY : KAZEROON
YEAR OF PROVISIONAL ACCEPTANCE : 2004
CLIENT : MAPNA CO .
BASIC DATA : Gas turbine 4 X 159 MW/ UNITS
Concrete : 12,300 m3 /Re - bars : 972 tons
Steelwork : 71 tons / Excavation : 80,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME :
Concrete : 35,000 m3 / Steelworks : 3,700 tons
CONSULTANT : MAPNA Co.
BASIC DATA :
Specifications Numbers of Turbine : 6Turbine Capacity : 160 MW
Major Works
Excavation : 452,000 m3Formwork : 77,000 m2
Re-Bar : 2,500 tons
CLIENT : MANAGEMENT OF POWER PLANT PROJECT OF IRAN (MAPNA)
SOUTH PARS (BESAT) CERNTERIZED P.P. (CIVIL WORKS)LOCATION : SOUTH PARS PROJECTS (ASALUYEH)YEAR OF PROVISIONAL ACCEPTANCE : 2010
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : TABAN C.C.POWER PLANT- 400 MV SUBSTATIONTITLES/LOCATIONS : YAZD CITYYEAR OF PROVISIONAL ACCEPTANCE : 2016CLIENT : MAPNA GROUP
Basic Data Major Works
Concrete work :4,500 m3Re-bars :333 Tons
Formwork 14,000 m2Excavation :3,800 m3Steel works :300 Tons
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME :CITY :
Concrete : 43,000 m3 / steelworks : 464 tons
CONSULTANT : MAPNA Co.
BASIC DATA :
Specifications Numbers of Turbine : 2Turbine Capacity : 450 MW
Major Works
Excavation : 285,000 m3Formwork : 83,000 m2
Re-Bar : 3,800 tons
YAZD COMBINE CYCLE POWER PLANT- CIVIL WORKSYAZD CITY
YEAR OF PROVISIONAL ACCEPTANCE : 2014CLIENT : MANAGEMENT OF POWER PLANT PROJECT OF IRAN (MAPNA)
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME :
COMMENCEMENT / DURATIONTITLES/LOCATIONS :
CLIENT :
Capacity
BASIC DATAMajor Works
MAPNA GROUP
4 Units of 162 MW
MAHSHAHR GAS TURBINE POWER PLANTBANDAR MAHSHAHR
2015 / 18 MONTHS
Concrete work : 19,000 m3Re-bars : 1,770 Tons
Formwork : 41,000 m2Excavation : 65,000 m3Steel works : 133 Tons
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : DAMAVAND GAS TURBINE POWER PLANT
CITY : VARAMIN
YEAR OF PROVISIONAL ACCEPTANCE : 2010
CLIENT : MAPNA CO .
BASIC DATA : Gas turbine 6 X 159 MW/ UNITS
Concrete : 33,000 m3 /Re - bars : 2,754 tons
Formwork : 100,000 m2 / Excavation : 1,104,500 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : MONTAZER GHAEM POWER PLANT COOLING TOWERS
CITY : KARAJ
YEAR OF PROVISIONAL ACCEPTANCE : 2000
CLIENT : MAPNA CO .
BASIC DATA : Height : 92 m X 3 Cooling Tower
Diameter : Bottom : 66.34 m / top : 48.86 m
Wall thickness Bottom :115 cm / top : 18 cm
Slipform :72,000 m2 / Re - bars : 6,500 tons
Concrete : 22,000 m3 / steelwork : 750 tons
Excavation : 190,000 m3
X-legs : Number : 30 / Height : 19.40 m
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : SHAHID RAJAEE POWER PLANT COOLING TOWERS
CITY : QAZVIN
YEAR OF PROVISIONAL ACCEPTANCE : 2002
CLIENT : MAPNA CO .
BASIC DATA : Height : 102 m X 3 Units of Cooling Towers
Diameter : Bottom : 62.42 m / top : 50.77 m
Wall thickness Bottom : 115 cm / top :17 cm
Slipform : 82,000 m2 / Re - bars : 6,000 tons
Concrete : 23,000 m3 /Steelwork : 750 tons
Excavation : 22,000 m3
X-legs : Number : 30 / Height : 19.40 m / Diameter : 1.00 X 0.70 m
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : NEYSHABOOR POWER PLANT COOLING TOWERS
CITY : NEYSHABOOR
YEAR OF PROVISIONAL ACCEPTANCE : 2003
CLIENT : MAPNA CO .
BASIC DATA : Height : 106 m X 3 Cooling Towers
Diameter : Bottom : 62.44 m / top : 51.47 m
Wall thickness Bottom : 115 cm / top :17 cm
Slipform : 87,000 m2 / Re - bars : 5,850 tons
Concrete : 25,000 m3 /Steelworks : 780 tons
Excavation : 140,000 m3
X-legs : Number : 30 / Height : 19.40 m
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : KHOY POWER PLANT COOLING TOWER & AUXILIARY BLDS.
CITY : KHOY
YEAR OF PROVISIONAL ACCEPTANCE : 2002
CLIENT : MAPNA CO .
BASIC DATA : Height : 104 m
Diameter : Bottom : 62.93 m / top : 56.28 m
Wall thickness Bottom : 125 cm / top :16 cm
Slipform :28,500 m2 / Re - bars : 6,000 tons
Concrete : 30,000 m3 /steelwork : 320 tons
Excavation : 25,000 m3
X-legs : Number : 30 / Height : 19.4 m / Diameter : 1.15 * 0.75 m
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : SHARIATY POWER PLANT COOLING TOWER & AUXILIARY BLD.
CITY : MASHHAD
YEAR OF PROVISIONAL ACCEPTANCE : 2003
CLIENT : MAPNA CO .
BASIC DATA : Height : 110 m
Diameter : Bottom : 62.44 m / top : 51.24 m
Wall thickness Bottom : 120 cm / top :18 cm
Slipform :29,000 m2 / Re - bars : 1,900 tons
Concrete : 8,000 m3 /steelwork : 250 tons
Excavation : 15,000 m3
X-legs : Number : 30 / Height : 20.38 m
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : SYRIAN POWER PLANT'S COOLING TOWERS (2 Projects)TESHREEN & JANDAR
YEAR OF PROVISIONAL ACCEPTANCE : 2010 & 2012CLIENT : MAPNA CO .BASIC DATA : 111 & 123 m
Bottom : 71 & 73 m / top : 59 & 66 mBottom : 125 cm / top :18 cmClimbing form :38,000 & 39,500 m2Re - bars :3,200 tons/EachConcrete:11,000&12,000m3/Steelwork:279&350 tonsExcavation : 26,770 & 20,000 m3General Formwork: 12,480 & 9,500 m2Number : 32/Each / Height : 24.4 m/Each
TITLES/LOCATIONS :
Major Works
X-legs :
Wall thickness:
Height :Diameter :
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME :CITY :YEAR OF PROVISIONAL ACCEPTANCE :CLIENT :
YAZD COMBINE CYCLE POWER PLANT- COOLING TOWERYAZD CITY
2005TURHAN INDUSTRIES & BEHIN SAMAN SARZAMIN
BASIC DATA :
Specifications NumberS of Turbine : 1Turbine Capacity : 160 MW
Major Works
Excavation : 23,080 m3Formwork : 36,200 m2
Re-Bar : 2,560 tonsConcrete : 11,200 m3 / steelworks : 294 tons
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : BISTOON POWER PLANT CHIMNEY
CITY : KERMANSHAH
YEAR OF PROVISIONAL ACCEPTANCE : 1992
CLIENT : SIKOM CO.
BASIC DATA : Height : 160 m
Diameter : Bottom : 19.8 m / top : 13.5 m
Wall thickness Bottom : 50 cm / top : 25 cm
Slipform :18,500 m2 / Re - bars : 800 tons
Concrete :6,000 m3 / steelwork : 560 tons
Excavation : 5,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : SAVEHJAM CHIMNEY
CITY : SAVEH
YEAR OF PROVISIONAL ACCEPTANCE : 1990
CLIENT : SAVEHJAM GLASS CO.
BASIC DATA : Height : 80 m
Diameter : Bottom : 6.25 m / top : 3.75 m
Wall thickness Bottom : 25 cm / top : 25 cm
Slipform :2,200 m2 / Re - bars : 50 tons
Concrete :450 m3 / steelwork : 8 tons
Brickwork : 1,000 m2
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : GHARB POWER PLANT CHIMNEY
CITY : HAMEDAN
YEAR OF PROVISIONAL ACCEPTANCE : 1992
CLIENT : TAVANIR CO.
BASIC DATA : Height : 150 m
Diameter : Bottom : 22.4 m / top : 19.02 m
Wall thickness Bottom : 70 cm / top : 30 cm
Slipform :20,000 m2 / Re - bars : 1,252 tons
Concrete :11,000 m3 / steelwork : 124 tons
Excavation : 17,400 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : SHAZAND POWER PLANT CHIMNEYS
CITY : ARAK
YEAR OF PROVISIONAL ACCEPTANCE : 2001
CLIENT : MAPNA CO .
BASIC DATA : Height : 200 m X 2 Chimneys
Diameter : Bottom : 21.6 m / top : 8.21 m
Wall thickness Bottom : 65 cm / top : 20 cm
Slipform :34,400 m2 / Re - bars : 1,363 tons
Concrete :7,680 m3 / steelwork : 57 tons
Brickwork : 17,000 m2 / Excavation : 13,500 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
Concrete work :450 m3 / Steel works : 8 TonsRe-bars :50 Tons
CLIENT/CONSULTANT :
Basic Data
Chimney Spec.
Major Works
ISFEHAN STEEL MILL Co. / FOULAD TECHNIC Co.Height : 80 m / Bottom Diameter : 6.25 m
Top Diameter : 3.75 m/Concrete shell tickness : 25 cmSlipform : 2,200 m2
Formwork : 100 m2 / Excavation :1,900 m3
PROJECT NAME :LOCATION :YEAR OF PROVISIONAL ACCEPTANCE :
ISFEHAN STEEL MILL CHIMNEYS & STEEL STRUCTUREISFEHAN STEEL MILL FACTORY-ISFEHAN CITY
2007
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
Concrete work :2,100 m3 / Steel works : 32 TonsRe-bars : 415 Tons
CLIENT/CONSULTANT :
Basic Data
Chimneys Spec.
Major Works
QAZVIN GLAZING COMPANY / CLIENT'S REPRESENTATIVE
Height : 102 m / Bottom Dia. : 6.85 m /Top Dia. :5.74 mConcrete shell tickness : Bottom : 65 cm / Top : 20 cm
Slipform : 33,200 m2 Formwork : 2,380 m2 / Excavation :1,250 m3
PROJECT NAME :LOCATION :YEAR OF PROVISIONAL ACCEPTANCE :
QAZVIN FLOAT GLAZING FACTORY CHIMNEYQAZVIN , TAKESTAN- ABHAR ROAD
2008
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : ARDEBIL CEMENT FACTORY
CITY : ARDEBIL
YEAR OF PROVISIONAL ACCEPTANCE : 1995
CLIENT : SIMAN ARDEBIL CO .
BASIC DATA : Capacity : 2,300 tons / day
Slipform : 30,000 m2
Concrete : 70,000 m3 /Re - bars : 8,000 tons
Steelwork: 3,000 tons / Excavation : 110,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : NEYRIZ CEMENT FACTORY
CITY : NEYRIZ
YEAR OF PROVISIONAL ACCEPTANCE : 1995
CLIENT : SIMAN NEYRIZ CO .
BASIC DATA : Capacity : 500 tons / day
Slipform : 15,000 m2
Concrete : 55,000 m3 /Re - bars : 700 tons
Steelwork: 500 tons / Excavation : 120,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : ISFAHAN CEMENT FACTORY
CITY : ISFAHAN
YEAR OF PROVISIONAL ACCEPTANCE : 2000
CLIENT : ISFAHAN CEMENT CO .
BASIC DATA : Capacity Extention: 900 tons / day up to 2,300 tons / day
Slipform : 12,100 m2
Concrete : 22,000 m3 /Re - bars : 2,558 tons
Steelwork: 421 tons / Excavation : 34,000 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : FARSNO CEMENT FACTORY
CITY : SHIRAZ
YEAR OF PROVISIONAL ACCEPTANCE : 2005
CLIENT : SIMAN FARSNO CO .
BASIC DATA : Capacity : 3,000 tons / day
Slipform : 31,000 m2
Concrete : 71,150 m3 /Re - bars :9,100 tons
Steelwork: 3,150 tons / Excavation : 105,000 m3
General formwork : 131,000
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
Slipform :29,000 m2
PROJECT NAME :LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :
MOMTAZAN 3,300 TON/DAY CEMENT FACTORYKERMAN CITY
2007CLIENT/CONSULTANT :
Basic Data Major Works
KERMAN MOMTAZAN CEMENT Co. / SAZE ANDISHAN Co.Concrete work :105,500 m3
Re-bars : 9,150 Tons Formwork 173,300 m2Excavation :294,044 m3Steel works :3,552 Tons
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : LARESTAN CEMENT FACTORY
CITY : LARESTAN
YEAR OF PROVISIONAL ACCEPTANCE : 2005
CLIENT : SIMAN LARESTAN CO .
BASIC DATA : Capacity : 700 tons / day
Slipform : 15,000 m2
Concrete : 24,200 m3 /Re - bars : 2,306 tons
Steelwork: 1,473 tons / Excavation : 53,500 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME :LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :
ABYEK 7,500 TON/DAY CEMENT FACTORYQAZVIN CITY - ABYEK
2008
Slipform :9,712 m2
CLIENT/CONSULTANT :
Basic Data Major Works
Abyek Cement Company/Pardis Rooz CompanyConcrete work :25,720 m3
Re-bars :4,084 Tons Formwork : 43,813 m2Excavation :18,608 m3
Steel works :3,151 Tons
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME :LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :
GILAN SABZ 3,400 TON/DAY CEMENT FACTORYGILAN PROVINCE - SIAHKAL
2009
Slipform :20,000 m2
CLIENT/CONSULTANT :
Basic Data Major Works
Gilan Sabz Industries Co./Andisheh Sazan Pars Co.
Concrete work :52,000 m3Re-bars :6,400 Tons
Formwork 8,500 m2Excavation :142,500 m3Steel works :6,630 Tons
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
MOND - DASHTI CEMENT Co. JAM PURCHASING AND MANUFACTURING Co.
CLIENT :CONSULTANT :
Basic Data
MajorSpecifications
Major WorksExcavation : 294,044 m3Steel works : 640 Tons
3,300 Ton/DayConcrete work : 11,800 m3
Re-bars : 1,952 Tons Formworks : 27,000 m2
PROJECT NAME :LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :
MOND-DASHTI CEMENT PRODUCTION LINE-PHASE 1BUSHEHR CITY
2013
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME :TITLES/LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :
TEHRAN CEMENT FACTORY-SUBSTITUTE PROJECTTEHRAN CITY
2016
Slipform :15,000 m2
CLIENT :
Basic Data Major Works
Tehran Cement CompanyConcrete work :34,000 m3
Re-bars :9,800 Tons Formwork 44,000 m2Excavation :37,000 m3Steel works :195 Tons
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : 7th. TIR MARTYRS MONUMENT
CITY : TEHRAN
YEAR OF PROVISIONAL ACCEPTANCE : 1998
CLIENT : PRIVATE SECTOR
BASIC DATA : Area : 2,000 m2
Concrete : 3,000 m3 /Re - bars : 600 tons
Formwork : 7,000 m2
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
CLIENT / CONSULTANT :
Basic Data
MajorSpecifications
Major Works
CONSTRUCTIVE JIHAD MINISTRY-RESEARCH &EDUCATION DEPUTY
No. of Stoories : 18 / Building Space : 45,000 m2Height of Building : 46 m
Concrete work : 1,500 m3Re-bars : 100 Tons
Formworks : 2,600 m2Excavation : 8,000 m3Steel works : 800 Tons
PROJECT NAME :LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :
NAVVAB ADMINISTRATIVE COMPLEX BUILDINGTEHRAN CITY
1993
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : JAHAD GARAN SPORTS & CULTURAL COMPLEX
CITY : TEHRAN
YEAR OF PROVISIONAL ACCEPTANCE : 1998
CLIENT : AGRICULTURAL JIHAD MINISTRY
BASIC DATA : Area : 20,000 m2
Concrete : 2,549 m3 /Re - bars : 161 tons
Steelwork: 8,352 tons / Excavation : 2,660 m3
General Formwork : 6,613 m2 / Brick work : 996 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
TOSEE SILOHA Co.MAHSA POL Co.
CLIENT :CONSULTANT :
Basic Data
MajorSpecifications
Major Works
Steel works : 7,200 Tons
No. of Stoories : 19 / No. of Phases : 5Building Space : 45,000 m2 / Units per Phase : 64
Concrete work : 3,000 m3
Excavation : 60,000 m3
Re-bars : 600 Tons Formworks : 7,000 m2
PROJECT NAME :LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :
SAADAT ABAD HOUSING COMPLEX - CIVIL WORKSTEHRAN CITY
2005
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
Re-bars : 338 Tons Formworks : 2,500 m2Excavation : 27,500 m3Steel works : 22 Tons
CLIENT : IRAN KHODRO Co.CONSULTANT : SAZEH PARDAZI IRAN Co.
Basic Data
MajorSpecifications
Length of Bridge : 147 mWidth of Bridge : 6.55 m m
Major Works
Concrete work : 3,200 m3
PROJECT NAME : CIVIL CONSTRUCTION OF IRAN-KHODRO UNDER BRIDGELOCATIONS : TEHRAN CITY- Km 8th. OF KARAJ SPECIAL Rd.YEAR OF PROVISIONAL ACCEPTANCE : 1996
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : PHASE 9 & 10 ONSHORE FACILITIES( CIVIL & BUILDING PORTION)
CITY : ASALOYE
YEAR OF PROVISIONAL ACCEPTANCE : 2006
CLIENT : OIEC
BASIC DATA : 50 000 000 M3/DAY SWEET GAS REFINERY
400 TONS SULFUR/DAY
1 000 000 TONS LPG/YEAR
Concrete : 110,000 m3 /Re - bars : 13 000 tons
Steelwork:0 tons / Excavation :669,000 m3
General Formwork : 269,000 m2 / Brick work :0 m3
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME :
Concrete : 16,000 m3 / Steelworks : 200 tons
CONSULTANT : NOHOW Co.
BASIC DATA :
Specifications Numbers of Turbine : 5Turbine Capacity : 117 MW
Major Works
Excavation : 25,000 m3Formwork : 8,500 m2
Re-Bar : 1,200 tons
CLIENT : MAPNA ENGINEERING AND TURBINE MANUFACTURING Co.
TOGA INDUSTRIAL TURBINE PROJECT - CIVIL WORKSLOCATION : KARAJ CITYYEAR OF PROVISIONAL ACCEPTANCE : 2012
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : ASIA HOUSING COMPLEX STEEL STRUCTURELOCATION : TEHRAN - ASIA BOULEVARDYEAR OF PROVISIONAL ACCEPTANCE : 2011
Concrete work : 4,600 m3 / Re-bars : 646 TonsSteel Works : 1,200 tons
CLIENT : JIHAD TOSEE RESIDENCY COOPERATIVE Co.CONSULTANT : ABNIEH NO ANDISH Co.
Basic Data
Major Spec. No. of Stories : 12 / No. of Phses : 3Building space : 20,000 m2 / No, of Units in Phase:153
Major Works Formwork : 24,000 m2 / Excavation :20,000 m3
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
Re-bars : 57 Tons Formworks : 2,000 m2Excavation : 30000 m3Steel works : 105 Tons
CLIENT : NATIONAL IRANIAN COPPER Co.CONSULTANT : KAAN AZIN Co.
Basic Data
MajorSpecifications
Mine Inlet Height : 27 mMine Inlet Width : 28 m
Major Works
Concrete work : 2,800 m3
PROJECT NAME : CONSTRUCTION , MOBILIZATION AND MACHINERYPROCUREMENT OF CHEHEL KOUREH COPPER MINE
LOCATIONS : ZAHEDAN CITYYEAR OF PROVISIONAL ACCEPTANCE : 2015
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME :CITY :
Concrete : 26,000 m3 / steelworks : 237 tons
CONSULTANT : MESINAN Co.
BASIC DATA :
Specifications Numbers of Turbine :1Turbine Capacity :500 MW
Major Works
Excavation : 82,000 m3Formwork :54,000 m2
Re-Bar : 3,700 tons
HERIS POWER PLANTHERIS
YEAR OF PROVISIONAL ACCEPTANCE : 2016/36 MONTHSCLIENT : TANA ENERGY
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME :CITY :
ASALOYE POWER PLANTASALOYE
YEAR OF PROVISIONAL ACCEPTANCE : 2016/12 MONTHSCLIENT : MAPNA GROUP
Concrete : 22,000 m3 / steelworks : 133 tons
CONSULTANT : MAPNA Co.
BASIC DATA :
Specifications Numbers of Turbine : 4Turbine Capacity :162 MW
Major Works
Excavation : 65,000 m3Formwork :41,000 m2
Re-Bar : 1,800 tons
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : SHIRVAN C.C.POWER PLANT- COOLING TOWERS
Steel works :680 Tons
BASIC DATA
Height 118 mDiameter Bottom:72m / Top: 62 m
Wall Thickness Bottom:125 cm / Top: 18 cmX-legs Q'ty:64 ea / Height : 24.4 m
Major Works
Concrete work : 18,200 m3Re-bars :5,300 Tons
Normal Formwork 10,500 m2Climbing Formwork : 101,000 m2
Excavation :29,000 m3
CLIENT : MAPNA GROUP
TITLES/LOCATIONS : SHIRVAN CITYCOMMENCEMENT / DURATION 2015 / 17 MONTHS
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME :
Excavation :36,000 m3 /Re-Bars : 6,400 tons
EAST TEHRAN 100,000 M/T SILO PROJECT
COMMENCEMENT / DURATION :
BASIC DATA
Number : 36 / Total Capacity : 100,000 tons / Height : 45 mDiameter :11.5 m/ea
Height :37m / Length : 15 m / Width : 67 m
Concrete : 39,000 m3 / Steelwork : 760 tons
TITLES/LOCATIONS : GARMSAR / TEHRAN
CLIENT : MINISTRY OF AGRICULTURAL JIHAD
Slipform: 110,000 m2 / General Formwork :29,000 m2
Bins
Working - House
2014 / 36 MONTHS
Major Works
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME : TABAN C.C.POWER PLANT- COOLING TOWERS
Steel works :340 Tons
BASIC DATA
Height 120 mDiameter Bottom:72m / Top: 62 m
Wall Thickness Bottom:125 cm / Top: 18 cmX-legs Q'ty:32 ea / Height : 24.4 m
Major Works
Concrete work :12300 m3Re-bars :3000 Tons
Normal Formwork 11000 m2Climbing Formwork : 38,000 m2
Excavation 14000 m3
CLIENT : MAPNA GROUP
TITLES/LOCATIONS : YAZD CITYCOMMENCEMENT / DURATION 2015 / 11 MONTHS
TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS
PROJECT NAME :LOCATIONS :PROJECT STATUS :
HAMEDAN C.C. POWER PLANT-STEEL COOLING TOWERHAMEDAN CITY
UNDER CONSTRUCTIONELECTRICITY DEVELOPMENT ORGANIZATION
GHODS NIROO CONSULTANT ENGINEERSHeight: 123m / Bottom Dia. : 99m / Top Dia. : 68m
CLIENT :CONSULTANT :
BASIC DATA
SPECIFICATIONS
Major Works
Steel shell cooling TowerExcavation : 13,340 m3Formwork : 4,692 m2Concrete : 6,014 m3
Re-Bar : 470 tons / Steel works : 1,816 ton
TOSEE SILOHACOMPANY
www.tosee-siloha.com
No. 3, 50th. st. , Seid Jamaleddin Asadabadi(Yousef Abad) Ave., Tehran- Iran
P.O.Box :14367 54819
Established on : Dec.8,1986
Tel. : +98 21 88063891
Facsimile : +98 21 88031340
Web site : www.tosee-siloha.com
E-Mail : [email protected]
و ی ه و ر