design & construction of heavy industrial projects · 9 electric steel bar scissors 10 electric...

129
TOSEE SILOHA DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS www.Tosee-Siloha.com Design & Construction of Concrete and Steel Silos Construction of Elevated Chimneys Construction of Cement Factories Execution of Power Plant Projects & Cooling Towers for P/P Execution of Oil & Gas Projects

Upload: others

Post on 13-May-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

TOSEE SILOHADESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

www.Tosee-Siloha.com

Design & Construction ofConcrete and Steel Silos

Construction ofElevated Chimneys

Construction ofCement Factories

Execution ofPower Plant Projects &Cooling Towers for P/P

Execution ofOil & Gas Projects

S/N

1

2

3

4

5

6

7

8

9

10

11

12

13

14

www.tosee-siloha.com

OTHER PROJECTS

IN HAND PROJECTS

AWARDS & APPRECIATIONS

EQUIPMENTS & MACHINERY

COMPLETED PROJECTS :

SILO PROJECTS

POWER PLANT PROJECTS

CHIMNEY PROJECTS

CEMENT FACTORY PROJECTS

MANPOWER STATUS

TITLE

INTRODUCTION

ORGANIZATION CHART

CERTIFICATES

MEMBERS OF BOARD

و ی ه و ر

www.tosee-siloha.com

INTRODUCTION

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

Introduction :

Tosee Siloha Co. ( T.S.C ) is one of the International leading

companies for construction of heavy industrial projects, such as

concrete and steel silos (with the range of 30.000 up to 200.000 tones

capacity), chimney & cooling tower for power plants, cement factories,

flour mills, petroleum and petrochemical plants, etc.

T.S.C Obtained Several ISO & OHSAS Certificates as a professional

company for execution of heavy industrial projects briefly mentioned

above. The company is fully capable to offer and do all types of

industrial projects on EPC (Turn – key) basis (including design,

supply, construction, erection & commissioning).

www.tosee-siloha.com

ORGANIZATION

CHART

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

www.tosee-siloha.com

CERTIFICATES

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

PRESIDENTIAL DEPUTY (P.B.O.)

“Certification of Contractor’s Qualification”

www.tosee-siloha.com

ی ه و ور

PRESIDENTIAL DEPUTY (P.B.O.)

“Certification of Contractor’s Gradation”

www.tosee-siloha.com

و ی ه و ر

ASSOCIATION OF HOUSING COMPLEX CONSTRUCTORS

“Certification of Constructor’s Qualification & Gradation”

www.tosee-siloha.com

Membersof

Board

و ی ه و ر

Education :

Position :

Work Resume

DurationPositionWorking PlaceOrganization NameS/N

Since 2013till now

Chairman Of BoardTehranTosee Siloha Co1

1992~ 1995Chairman Of BoardTehranKhadamat Zirbanaei Co2

1987~ 2012Chairman Of Board &Managing Director

TehranTosee Siloha Co3

www.tosee-siloha.com

Chairman of Board

Bord of Directors

Design and Execution of Heavy Industry Projects on EPC Basis

Resume of Board Members :

Saeid SafaeiName & Family Name :

B.S. in Electronic Engineering

kkkkkkنننن

و ی ه و ر

Education :

Position :

Work Resume

DurationPositionWorking PlaceOrganization NameS/N

Since 2013till now

Member Of Board &Managing Director

TehranTosee Siloha Co1

1992~ 2012

Technical & ExecutiveEngineer ,site Manager Project,

, Manager , Technical DirectorDeputy of M.D. in Technical

affairs

TehranTosee Siloha Co2

www.tosee-siloha.com

Managing Director & Member of Board

Bord of Directors

Design and Execution of Heavy Industry Projects on EPC Basis

Resume of Board Members :

Saeid GholamiName & Family Name :

B.S. in Civil Engineering

kkkkkkنننن

و ی ه و ر

Education :

Position :

Work Resume

DurationPositionWorking PlaceOrganization NameS/N

Since 1989till now

Member of the Board & Deputy & of M.D. in Technical AffairsExportation of Technical andEnginering Services

TehranTosee Siloha Co1

1985~ 1989 & Member of Technical Board.Supervisor of Technical Dept

HamedanBou Ali Sina University2

1981Consultant EngineerAhwaz-ShirazShiraz & Imam WaterSecurement Projects

3

www.tosee-siloha.com

M.S. in Civil Engineering

Deputy of Chairman of Board &Deputy of M.D. in Technical affairs and abroadprojects

Name & Family Name :

Bord of Directors

Resume of Board Members :

Design and Execution of Heavy Industry Projects on EPC Basis

Mahmood Davoodi

kkkkkkنننن

و ی ه و ر

www.tosee-siloha.com

MANPOWER

STATUS

و ی ه و ر

0ver 15 10 5 Tentative Permanent60 7 1 2 66 6845 4 1 5 45 50120 80 17 150 67 217

157 178 335

0ver 15 10 5 Tentative Permanent22 0 0 0 22 225 1 1 0 7 743 19 10 20 52 72

20 81 101

www.tosee-siloha.com

Grandtotal

ExpertsOfficersStaff

Engineer

MANPOWER STATUS:

Engineers , Technicians & Craftsmen

Titles Years of Experiences Total Grandtotal

TechnicianCraftsman

Total

Administration , Finance & Commercial

Total

Titles Years of Experiences Total

و ی ه و ر

www.tosee-siloha.com

EQUIPMENT&

MACHINERY

و ی ه و ر

Syria

9Tower Crane1

9Batch Plant2

Mixer Truck3

4Wheel Loader4

4Mobile Crane5

Stationed Concrete Pump6

Dump Truck7

Truck for Trailer8

Concrete Pump Truck9

Mini Loader ( Bobcat)10

Excavator11

Bull Dozer12

3Diesel Generator13

Vibro Roller14

Crashing Plant15

10Air Compressor16

Farming Tractor17

Mini Bus18

Sedan & Vehicle19

Fire Fighting Truck20

Ambulance21

2Building Hoist22

41

Grand Total of Machinary 153

MACHINARY

4

2

13

1

1

QT'Y (unit)PRESCRIPTIONS/N

Iran

Total

1

6

3

www.tosee-siloha.com

14

12

8

5

10

1

5

2

4

2

3

1

11

3

112

و ی ه و ر

Syria

Various types of Saw1

Electric Welding Machine2

Surveying Equipment3

Manual Vibro- Roller4

Plate Compactor5

Statoined Concrete Mixer6

Floating & Chassis Mounted Waterpump 2"~ 4"7

Poly Ethylene Welding 1/2"~ 6"8

Electric Steel Bar Scissors9

Electric Bar Bending M/C10

Cement Silo11

Chain & Rachet Block12

Electric,Gasoline & Diesel Operate Vibrator13

Formwork14

300 tonSlipform's Accessories15

Climbing Formwork16

Slipform17

250 setYuk for Slipform18

170 eaSlipform's Hydro-Jack :3ton19

300 eaSlipform's Hydro-Jack :6ton20

EQUIPMENT

9 unit

30 unit

25 unit

6 unit

S/NQT'Y

PrescriptionsIran

500 m2

250 set

www.tosee-siloha.com

170 ea

22 unit

75 set

1,500 ton

1 Whole set

48 set

300 ea

250 m2

31 unit

12 unit

4 unit

23 unit

7 unit

37 unit

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

completed

projects

www.tosee-siloha.com

پروژه هاي اجــرا شده نیـروگاه، کارخـانه سیمــان، سیــلو، بـرج خنــک کن در اقصی نقـاط ایــران

و ی ه و ر

7

برج خنک کن در کشور سوریه سیلو و 2 ساخت 10

www.tosee-siloha.com

و ی ه و ر

سیلو فلزي در کشور ترکمنستان ساخت 6

www.tosee-siloha.com

و ی ه و ر

1 2011 Syrian G.C.C.S.2 2011 Syrian G.C.C.S.3 2010 Syrian G.C.C.S.4 2010 Syrian G.C.C.S.5 2010 Syrian G.C.C.S.

8 2010 Syrian G.C.C.S.9 2009 Syrian G.C.C.S.

10 2009 Syrian G.C.C.S.11 2008 Syrian G.C.C.S.12 2008 Syrian G.C.C.S.13 2006 Zob ahan Co.14 2004 Ministry of agriculture

16 2001 Cereal Organization17 2001 Ministry of agriculture

18 2001 Ministry of agriculture

20 1998 Cereal Organization21 1998 Ministry of agriculture

22 1998 Cereal Organization23 1998 Ministry of agriculture

24 1998 Cereal Organization

26 1995 P&Shipping Org.27 1994 Ministry of agriculture

28 1993 Ministry of agriculture

29 1992 Ministry of agriculture

30 1992 Ministry of agriculture

32 2010 Mpna Group33 2010 Mpna Group

36 2003 Mapna Group

www.tosee-siloha.com

Gonbad City

Bojnourd Silo Bojnourd City

Teshreen P.P. Piling & Cooliong Tower SyriaJandar P.P.-Cooling Tower Syria

Kashan Silo Kashan CityKermanshah Silo Kermanshah CityNeishabour Silo

Power Plants ProjectsShiraz Silo Shiraz City

Gonbad CityKerman Silo & Flour Mill Kerman City

Mapna Group

Damavand Combine Cycle Power Plant -1st. Phase-Cooling Towers

35 Yazd City Torhan Industries &Behin Saman S.

25 Zahedan , Kermanshah &Ahvaz Cities 1998 Administrative of

Silo Projects

Neishabour City

Abadeh Silo Abadeh CityZahedan Silo Zahedan City

Bijar City

Manufacturing & Erection of Machineryfor Abadeh , Kashan , Neishabour &

Bojnourd Silos19

Abadeh , Kashan ,Neishabour &Bojnourd Cities

2001 CerealOrganization

2001Turkmenistan

Agriculture & FoodIndustries Ministry

15

Gonbad Mechanized Storage

6 Extension Projects of Serrin , Sharakrak&Alia Silos Syria 2010

Sabah Alkheir Silo Syria

Khorramabad Silo

Syrian General Co.for Cereal Silos

7 Extension Projects of Kabaka & Sabah Alkheir Silos

Syria Syrian General Co.for Cereal Silos2010

Honaida Silo Syria

CLIENT

Daraa Silo Syria

TITLE OF PROJECT LOCATIONPROVISION

AL A.C.DATE

SILO PROJECTS

2010 Mapna Group

S/N

Damavand Combine Cycle Power Plant -2nd. Phase-Cooling Towers31 Pakdasht City 2012

Shenshar Silo SyriaSarakeb Silo

SyriaKok sazi zob ahan Silos Isfehan City

Bijar Silo

34 Pakdasht City

Gonbad Silo

Sahriati P.P. - Cooling Tower Mashhad City

2006

Khorramabad City

Turkmenistan Steel Silos( 6 Projects)

Across Turkmenistan

Kabaka Silo

Sharakrak Silo SyriaSerrin Silo

Hamedan Silo Hamedan CityImam Khokeini Silo B.I.K. City

Mechanized buildings of Zahedan ,Kermanshah & Ahvaz Silos

Syria

Syria

Tal Hamis Silo SyriaAia Silo Syria

Yazd P.P. - Cooling Towers

ی ه و ور

CLIENTTITLE OF PROJECT LOCATIONPROVISION

AL A.C.DATE

S/N

ی ه و ور

37 2003 Mapna Group38 2002 Mapna Group39 2002 Mapna Group40 2000 Mapna Group41 2011 Mapna Group42 2009 Mapna Group43 2012 Mapna Co.

46 2004 Mapna Group47 2001 Fajr.Petrochem. Co.48 2014 Mapna Group49 2015 Mapna Group

50 2014 Tehran Cement Co.

53 2009 Abyek Cement Co.54 2009 Abyek Cement Co.

57 2006 Fars No Cement Co.58 2006 Larestan Cement Co.59 2006 Abyek Cement Co.60 2000 Isfehan Cement Co.61 1998 Bushehr Cement Co.62 1995 Ardebil Cement Co.63 1995 Neyriz Cement Co.

65 2008 Qazvin Glazing Co.

67 2001 Mapna Co.68 1992 Tavanir Co.69 1992 Tavanir Co.70 1990 Saveh-Jam Glazing

72 2001 N.A.G. Co.73 2012 Taavoni jahad tosee co.74 Steel Structure works-Asia Housing Complex Tehran City

www.tosee-siloha.com

Behbehan Cement Co.64

51Mond-e- Dashti Cement Factory-Phase 1

Mond-e-DashtiCement Co.2012Khormoj City

44 Pakdasht City 2006 Mapna Co.

45

Kazeroon Gas Turbine Power Plant Kazeroon City

Momtazan KermanCement Co.

Increment Products Loading Capacity ofAbyek Cement Factory56 Abyek City 2006 Abyek Cement Co.

55 Kerman Momtazan Cement Factory Kerman City 2007

Shahid Rajaei P.P.-Cooling Tower Qazvin CityKhoy P.P.- Cooling Tower

Damavand Gas Turbine Power Plant-2nd.Phase

Tehran Cement Factory Tehran CityCement Factory Projects

Damavand Gas Turbine Power Plant-1st.Phase

Pakdasht City 2005 Mapna Co.

52

Neishabour P.P. -Cooling Tower Neishabour City

Isfehan Cement Factory Extension Isfehan City

Fajr Petrochemical Power Plant Mahshahr CityYazd B.O.P Power Plant Yazd City

Bushehr CityArdebil Cement Factory Ardebil City

Clinker Production -Abyek Cement Factory Abyek City

Gilan Sabz 3,400 Ton Cement Factory Deylaman

Abyek Cement Factory Abyek CityAbyek Cement Factory-2nd. Line Abyek City

Shiraz CityLarestan Cement Factory Larestan City

Mahshahr Gas Turbine Power Plant Mahshahr City

Hamedan CitySaveh-Jam Chimney Saveh City

Chimney of Shazand Thermal P.Plant Shazand City

Nyriz Cement Co. Nyriz City

Civil Works of Phase 9 & 10 - South ParsGas Development Projects(SPGD)

Chimney Projects

Chimney & Steel Structure of EvaluationProject66 Isfehan City 2007 Zob ahan Co.

Chimney of Qazvin Glazing Factory Abhar City

Asaluyeh 2005 OEAC Co.71

Other Projects

Chimney of Bistoon P.Plant Kermanshah City

Fars No Cement Factory

2012 Gilan Sabz cementIndustries Co.

Khoy CityMontazer Ghaem P.P.-Cooling Tower Fardis City

Kahnouj Power Plant Kahnouj CityBesat Power Plant-SPGD Asaluyeh

Zanjan Gas Turbine Power Plant Zanjan City

Behbehan CementCompany1992Behbehan City

Bushehr Cement Factory

Civil Works of Optic Utility Project Hashtgerd

Chimney of Gharb P.Plant

CLIENTTITLE OF PROJECT LOCATIONPROVISION

AL A.C.DATE

S/N

ی ه و ور

74 2005 Tosee Siloha Co.

77 2012 Mapna Turbine78 2014 Melli sanaye mes iran Co.

79 2003 Iran Khodro Co.80 1997 Municipality Dis.981 1996 Iran Khodro Co.82 1996 Municipality Dis.9

86 1995 Private Sector

Toga Industrial Turbine-civil works Fardis City

www.tosee-siloha.com

Saadat Abad Housing Complex Tehran City

Civil Works of Haftom Tir Tomb Tehran City

Iran Khodro over Bridge Tehran CityKan Bridge-Old Karaj Road

84 Civil Works of Sari Poulterer Research Center Sari City

Iran Khodro Under Bridge Tehran CityKan Bridge-Special Karaj Road Tehran City

Tehran City

1997 Technical Dept.-JihadConstractive Ministry

75 Jihadgaran Cultural/Sports Complex Tehran City 1997 Jihad ConstructiveMinistry

85 Civil Works of Ahwaz Poulterer ResearchCenter

Ahwaz City 1997 Technical Dept.-JihadConstractive Ministry

83 Civil Works of Karaj Poulterer ResearchCenter

Karaj City 1997 Technical Dept.-JihadConstractive Ministry

76 Jihad ConstructiveMinistry

1993Tehran CityBuilding of Educational & ResearchDeputy-Jihad C9nstructive Ministry

Mes 40 koreh zahedan City

www.tosee-siloha.com

و ی ه و ر

silo

projects

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : GONBAD SILO

CITY : GONBAD

YEAR OF PROVISIONAL ACCEPTANCE : 1992

CLIENT : JAHAD - E - SAZANDEGI

BASIC DATA : Bins : Number : 12 / Capacity : 50,000 tons / Height : 31 m

Diameter : 16 m / Wall thickness : 30 cm

Working - House : Height : 45 m / Length : 25 m / Width : 10.4 m

Slipform :44,000 m2 / Re - bars : 2,650 tons

Concrete : 39,000 m3 / steelwork : 460 tons

Excavation : 251,000 m3 / Formwork : 23,000 m2

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : KERMAN SILO & FLOUR MILL

CITY : KERMAN

YEAR OF PROVISIONAL ACCEPTANCE : 1992

CLIENT : JAHAD - E - SAZANDEGI

BASIC DATA : Bins : Number : 36 / Capacity : 100,000 tons / Height : 52 m

Diameter : 10 m / Wall thickness : 25 cm

Working - House : Height : 63.5 m / Length : 32.6 m / Width : 10 m

Slipform :130,000 m2 / Re - bars : 5,500 tons

Concrete : 54,000 m3 / steelwork : 970 tons

Excavation : 90,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SHIRAZ SILO

CITY : SHIRAZ

YEAR OF PROVISIONAL ACCEPTANCE : 1992

CLIENT : JAHAD - E - SAZANDEGI

BASIC DATA : Bins : Number : 36 / Capacity : 120,000 tons / Height : 50.5 m

Diameter : 9.8 m / Wall thickness : 27.5 cm

Working - House : Height : 68.3 m / Length : 24.15 m / Width : 9 m

Slipform :125,000 m2 / Re - bars : 3,300 tons

Concrete : 37,000 m3 / steelwork : 650 tons

Excavation : 150,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : IMAM KHOMEINI TRANSIT SILO

CITY : BANDAR IMAM KHOMEINI

YEAR OF PROVISIONAL ACCEPTANCE : 1992

CLIENT : PORTS & SHIPPING ORGANIZATION

BASIC DATA : Bins(Small Size) : No. : 30 units / Dia. : 7.25 m /Wall thickness : 18 cm / Height : 31 m

(Large Size) : No. : 5 units/ Dia. : 19.8 m /Wall thickness : 35 cm / Height : 31.5 m

Working - House : Height :60 m / Length : 27 m / Width : 15.5 m

50,000 tonsCapacity

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : HAMEDAN SILO

CITY : HAMEDAN

YEAR OF PROVISIONAL ACCEPTANCE : 1994

CLIENT : JAHAD - E - SAZANDEGI

BASIC DATA : Bins : Number : 18 / Capacity : 80,000 tons / Height : 51.2 m

Diameter : 12 m / Wall thickness : 27.5 cm

Working - House : Height : 64.5 m / Length : 24.9 m / Width : 8.5 m

Slipform :80,000 m2 / Re - bars : 2,545 tons

Concrete : 23,000 m3 / steelwork : 332 tons

Excavation : 39,900 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ZAHEDAN SILO

CITY : ZAHEDAN

YEAR OF PROVISIONAL ACCEPTANCE : 1998

CLIENT : JAHAD - E - SAZANDEGI

BASIC DATA : Bins : Number : 18 / Capacity : 67,000 tons / Height : 48.9 m

Diameter : 12.2 m / Wall thickness : 27.5 cm

Working - House : Height : 56.4 m / Length : 25.5 m / Width : 10.05 m

Slipform :56,000 m2 / Re - bars : 3,000 tons

Concrete : 39,000 m3 / steelwork : 806 tons

Excavation : 50,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : KERMANSHAH SILO

CITY : KERMANSHAH

YEAR OF PROVISIONAL ACCEPTANCE : 1998

CLIENT : JAHAD - E - SAZANDEGI

BASIC DATA : Bins : Number : 27 / Capacity : 100,000 tons / Height : 46.6 m

Diameter : 12.2 m / Wall thickness : 27.5 cm

Working - House : Height : 61.7 m / Length : 25.52 m / Width : 10.05 m

Slipform :130,000 m2 / Re - bars : 4,600 tons

Concrete : 40,000 m3 / steelwork : 520 tons

Excavation : 21,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : KASHAN SILO

CITY : KASHAN

YEAR OF PROVISIONAL ACCEPTANCE : 1998

CLIENT : GRAIN ORGANIZATION

BASIC DATA : Bins : Number : 12 / Capacity : 27,500 tons / Height : 43 m

Diameter : 10 m / Wall thickness : 25 cm

Working - House : Height : 53 m / Length : 27 m / Width : 8 m

Slipform :38,000 m2 / Re - bars : 1,721 tons

Concrete : 18,000 m3 / steelwork : 467 tons

Excavation : 42,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : NEYSHABOOR SILO

CITY : NEYSHABOOR

YEAR OF PROVISIONAL ACCEPTANCE : 1998

CLIENT : GRAIN ORGANIZATION

BASIC DATA : Bins : Number : 12 / Capacity : 27,500 tons / Height : 43 m

Diameter : 10 m / Wall thickness : 25 cm

Working - House : Height : 53 m / Length : 27 m / Width : 8 m

Slipform :38,000 m2 / Re - bars : 1,600 tons

Concrete : 16,000 m3 / steelwork : 455 tons

Excavation : 20,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ABADEH SILO

CITY : ABADEH

YEAR OF PROVISIONAL ACCEPTANCE : 1998

CLIENT : GRAIN ORGANIZATION

BASIC DATA : Bins : Number : 12 / Capacity : 27,500 tons / Height : 43 m

Diameter : 10 m / Wall thickness : 25 cm

Working - House : Height : 53 m / Length : 27 m / Width : 8 m

Slipform :38,000 m2 / Re - bars : 1,675 tons

Concrete : 14,000 m3 / steelwork : 484 tons

Excavation : 34,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : BOJNORD SILO

CITY : BOJNORD

YEAR OF PROVISIONAL ACCEPTANCE : 2001

CLIENT : GRAIN ORGANIZATION

BASIC DATA : Bins : Number : 12 / Capacity : 27,500 tons / Height : 43 m

Diameter : 10 m / Wall thickness : 25 cm

Working - House : Height : 53 m / Length : 27 m / Width : 8 m

Slipform :38,000 m2 / Re - bars : 1,581 tons

Concrete : 13,000 m3 / steelwork : 137 tons

Excavation : 20,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : TURKMENISTAN SILOS ( 6 )

CITY : BAYRAMALI-GOLANLI-YASHLIK-PARAKHAT-GHEZELARVAT-TASHAOZ

YEAR OF PROVISIONAL ACCEPTANCE : 2001

CLIENT : MINISTRY OF AGRICULTURE & FOOD INDUSTRIES OF TURKMENISTAN

BASIC DATA : Bins : Number : 6 / Capacity : 30,000 tons / Height : 16.75 m

Diameter : 21.84 m

Working - House : Height : 31.20 m / Length : 8 m / Width : 8 m

FORMWORK : 21,912 m2 X 6 / Re - bars : 1,671 tons X 6

Concrete : 24,405 m3 X 6 / steelwork : 1,105 tons X 6

Excavation : 92,040 m3 X 6

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SYRIAN 100,000 TONS SILO PROJECTS (10 )

YEAR OF PROVISIONAL ACCEPTANCE : 2010

BASIC DATA ( EVERY SILO ): Bins : Number : 54 / Capacity : 100,000 tons / Height : 37 mDiameter : 9.5 m / Clauster :28.5 m

Working - House : Height : 56 m / Length : 22.8 m / Width : 13.3 m

Concrete : 480,000 m3 / Steelwork : 6,500 tonsGeneral Formwork : 632,000 m2 / Asphalt : 45,000 m3

Excavation : 800,000 m3 /Re-Bars : 58,500 tonsSLIPFORM &CLIMBING FORM : 1,368,000 m2Major Works

TITLES/LOCATIONS : KABAKA-SABAH ALKHEIR-ALIA-TAL HAMIS-HONAIDI-SHARAKRAK-SARAKEB-SERRIN-SHINSHAR-DARAA

CLIENT : GENERAL COMPANY FOR CEREAL SILOS (SYRIAN MINISTRY OF ECONOMY)

TOTAL 10 SILOS

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SYRIAN SILO EXTENSION PROJECTS (5 )

YEAR OF PROVISIONAL ACCEPTANCE : 2012

BASIC DATA ( EVERY SILO ): Bins : Number : 18/ Capacity : 33,300 tons / Height : 37 mDiameter : 9.5 m / Clauster :28.5 m

Concrete : 68,500 m3 / Steelwork : 580 tonsGeneral Formwork : 75,000 m2

GENERAL COMPANY FOR CEREAL SILOS (SYRIAN MINISTRY OF ECONOMY)

Excavation : 24,500 m3 /Re-Bars : 8,000 tons

TITLES/LOCATIONS : KABAKA,SABAH ALKHEIR,ALIA,SHARAKRAK,SERRIN SILOS

CLIENT :

TOTAL 5 SILOS Major Works SLIPFORM : 210,000 m2

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : BIJAR SILO

CITY : BIJAR

YEAR OF PROVISIONAL ACCEPTANCE : 2004

CLIENT : JAHAD - E - SAZANDEGI

BASIC DATA : Bins : Number : 18 / Capacity : 50,000 tons / Height : 48.2 m

Diameter : 9.75 m / Wall thickness : 26 cm

Working - House : Height : 60.2 m / Length : 18.85 m / Width : 10.5 m

Slipform : 60,000 m2 / Re - bars : 2,500 tons

Concrete : 30,000 m3 / steelwork : 700 tons

Excavation : 20,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : KHORAMABAD SILO

CITY : KHORAMABAD

YEAR OF PROVISIONAL ACCEPTANCE : 2001

CLIENT : JAHAD - E - SAZANDEGI

BASIC DATA : Bins : Number : 18 / Capacity : 50,000 tons / Height : 41 m

Diameter : 11 m / Wall thickness : 27.50 cm

Working - House : Height : 52.70 m / Length : 17 m / Width : 9.50 m

Slipform : 53,000 m2 / Re - bars : 1,940 tons

Concrete : 22,800 m3 / steelworks : 405 tons

Excavation : 68,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : GONBAD MECHANIZED WAREHOUSE

CITY : GALIKESH / GONBAD

YEAR OF PROVISIONAL ACCEPTANCE : 2001

CLIENT : JAHAD - E - SAZANDEGI

BASIC DATA : Length : 219.5 m

Width : 64 m

Height : 14.8 m

FORMWORK : 20,000 m2 / Re - bars : 1,300 tons

Concrete : 25,000 m3 / steelwork : 300 tons

Excavation : 70,000 m3 / Capacity : 50,000 tons

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : CONSTRUCTION OF COLLIER PRODUCTION UNITISFEHAN STEEL MILL

LOCATIONS : ISFEHAN CITYYEAR OF PROVISIONAL ACCEPTANCE : 2005CLIENT : ISFEHAN STEEL MILL Co.CONSULTANT : FOULAD TECHNIC Co.

Basic Data

Clausters

Numbers : 18 / Capacity : 50,000 ton/Height:48.2m

Diameter : 9.75 m / Shell tickness : 26 cm

Major Works

Concrete work : 32000 m3Re-bars : 3900 Tons

Formworks : 59000 m2Excavation : 83,000 m3

Sleepform : 82500Steel works :680 Tons

www.tosee-siloha.com

و ی ه و ر

power plant

projects

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : POWER PLANT & UTILITY OF FAJR PETROCHEMICAL COMPLEX

CITY : MAHSHAHR PORT FREE ZONE

YEAR OF PROVISIONAL ACCEPTANCE : 2001

CLIENT : FAJR PETROCHEMICAL CO.

BASIC DATA : Gas turbine 5 UNITS OF 117 MW

Concrete : 22,000 m3 /Re - bars : 2,520 tons

Formwork : 39,000 m2 / Excavation : 30,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ZANJAN GAS TURBINE POWER PLANT

CITY : ZANJAN

YEAR OF PROVISIONAL ACCEPTANCE : 2010

CLIENT : MAPNA CO .

BASIC DATA : Gas turbine 4 X 159 MW UNITS

Concrete :41,663 m3 /Re - bars : 3,062 tons

Formwork : 108,070 m2 / Excavation : 298,679 m3

STEEL WORKS : 2,996 Tons

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

Re-bars : 3,000 Tons Formworks : 125,000 m2Excavation : 130,000 m3

CLIENT : MAPNA GROUPCONSULTANT : MAPNA Co.

Basic Data

MajorSpecifications

Numbers of Turbine : 6Turbine capacity : 156 MW

Major Works

Concrete work : 35,000 m3

PROJECT NAME DAMAVAND GAS TURBINE P.P.-CIVIL WORKSLOCATIONS : PAKDASHT- GARMSAR ROADYEAR OF PROVISIONAL ACCEPTANCE : 2008

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : KAZEROON GAS TURBINE POWER PLANT

CITY : KAZEROON

YEAR OF PROVISIONAL ACCEPTANCE : 2004

CLIENT : MAPNA CO .

BASIC DATA : Gas turbine 4 X 159 MW/ UNITS

Concrete : 12,300 m3 /Re - bars : 972 tons

Steelwork : 71 tons / Excavation : 80,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME :

Concrete : 35,000 m3 / Steelworks : 3,700 tons

CONSULTANT : MAPNA Co.

BASIC DATA :

Specifications Numbers of Turbine : 6Turbine Capacity : 160 MW

Major Works

Excavation : 452,000 m3Formwork : 77,000 m2

Re-Bar : 2,500 tons

CLIENT : MANAGEMENT OF POWER PLANT PROJECT OF IRAN (MAPNA)

SOUTH PARS (BESAT) CERNTERIZED P.P. (CIVIL WORKS)LOCATION : SOUTH PARS PROJECTS (ASALUYEH)YEAR OF PROVISIONAL ACCEPTANCE : 2010

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : TABAN C.C.POWER PLANT- 400 MV SUBSTATIONTITLES/LOCATIONS : YAZD CITYYEAR OF PROVISIONAL ACCEPTANCE : 2016CLIENT : MAPNA GROUP

Basic Data Major Works

Concrete work :4,500 m3Re-bars :333 Tons

Formwork 14,000 m2Excavation :3,800 m3Steel works :300 Tons

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME :CITY :

Concrete : 43,000 m3 / steelworks : 464 tons

CONSULTANT : MAPNA Co.

BASIC DATA :

Specifications Numbers of Turbine : 2Turbine Capacity : 450 MW

Major Works

Excavation : 285,000 m3Formwork : 83,000 m2

Re-Bar : 3,800 tons

YAZD COMBINE CYCLE POWER PLANT- CIVIL WORKSYAZD CITY

YEAR OF PROVISIONAL ACCEPTANCE : 2014CLIENT : MANAGEMENT OF POWER PLANT PROJECT OF IRAN (MAPNA)

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME :

COMMENCEMENT / DURATIONTITLES/LOCATIONS :

CLIENT :

Capacity

BASIC DATAMajor Works

MAPNA GROUP

4 Units of 162 MW

MAHSHAHR GAS TURBINE POWER PLANTBANDAR MAHSHAHR

2015 / 18 MONTHS

Concrete work : 19,000 m3Re-bars : 1,770 Tons

Formwork : 41,000 m2Excavation : 65,000 m3Steel works : 133 Tons

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : DAMAVAND GAS TURBINE POWER PLANT

CITY : VARAMIN

YEAR OF PROVISIONAL ACCEPTANCE : 2010

CLIENT : MAPNA CO .

BASIC DATA : Gas turbine 6 X 159 MW/ UNITS

Concrete : 33,000 m3 /Re - bars : 2,754 tons

Formwork : 100,000 m2 / Excavation : 1,104,500 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : MONTAZER GHAEM POWER PLANT COOLING TOWERS

CITY : KARAJ

YEAR OF PROVISIONAL ACCEPTANCE : 2000

CLIENT : MAPNA CO .

BASIC DATA : Height : 92 m X 3 Cooling Tower

Diameter : Bottom : 66.34 m / top : 48.86 m

Wall thickness Bottom :115 cm / top : 18 cm

Slipform :72,000 m2 / Re - bars : 6,500 tons

Concrete : 22,000 m3 / steelwork : 750 tons

Excavation : 190,000 m3

X-legs : Number : 30 / Height : 19.40 m

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SHAHID RAJAEE POWER PLANT COOLING TOWERS

CITY : QAZVIN

YEAR OF PROVISIONAL ACCEPTANCE : 2002

CLIENT : MAPNA CO .

BASIC DATA : Height : 102 m X 3 Units of Cooling Towers

Diameter : Bottom : 62.42 m / top : 50.77 m

Wall thickness Bottom : 115 cm / top :17 cm

Slipform : 82,000 m2 / Re - bars : 6,000 tons

Concrete : 23,000 m3 /Steelwork : 750 tons

Excavation : 22,000 m3

X-legs : Number : 30 / Height : 19.40 m / Diameter : 1.00 X 0.70 m

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : NEYSHABOOR POWER PLANT COOLING TOWERS

CITY : NEYSHABOOR

YEAR OF PROVISIONAL ACCEPTANCE : 2003

CLIENT : MAPNA CO .

BASIC DATA : Height : 106 m X 3 Cooling Towers

Diameter : Bottom : 62.44 m / top : 51.47 m

Wall thickness Bottom : 115 cm / top :17 cm

Slipform : 87,000 m2 / Re - bars : 5,850 tons

Concrete : 25,000 m3 /Steelworks : 780 tons

Excavation : 140,000 m3

X-legs : Number : 30 / Height : 19.40 m

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : KHOY POWER PLANT COOLING TOWER & AUXILIARY BLDS.

CITY : KHOY

YEAR OF PROVISIONAL ACCEPTANCE : 2002

CLIENT : MAPNA CO .

BASIC DATA : Height : 104 m

Diameter : Bottom : 62.93 m / top : 56.28 m

Wall thickness Bottom : 125 cm / top :16 cm

Slipform :28,500 m2 / Re - bars : 6,000 tons

Concrete : 30,000 m3 /steelwork : 320 tons

Excavation : 25,000 m3

X-legs : Number : 30 / Height : 19.4 m / Diameter : 1.15 * 0.75 m

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SHARIATY POWER PLANT COOLING TOWER & AUXILIARY BLD.

CITY : MASHHAD

YEAR OF PROVISIONAL ACCEPTANCE : 2003

CLIENT : MAPNA CO .

BASIC DATA : Height : 110 m

Diameter : Bottom : 62.44 m / top : 51.24 m

Wall thickness Bottom : 120 cm / top :18 cm

Slipform :29,000 m2 / Re - bars : 1,900 tons

Concrete : 8,000 m3 /steelwork : 250 tons

Excavation : 15,000 m3

X-legs : Number : 30 / Height : 20.38 m

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SYRIAN POWER PLANT'S COOLING TOWERS (2 Projects)TESHREEN & JANDAR

YEAR OF PROVISIONAL ACCEPTANCE : 2010 & 2012CLIENT : MAPNA CO .BASIC DATA : 111 & 123 m

Bottom : 71 & 73 m / top : 59 & 66 mBottom : 125 cm / top :18 cmClimbing form :38,000 & 39,500 m2Re - bars :3,200 tons/EachConcrete:11,000&12,000m3/Steelwork:279&350 tonsExcavation : 26,770 & 20,000 m3General Formwork: 12,480 & 9,500 m2Number : 32/Each / Height : 24.4 m/Each

TITLES/LOCATIONS :

Major Works

X-legs :

Wall thickness:

Height :Diameter :

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME :CITY :YEAR OF PROVISIONAL ACCEPTANCE :CLIENT :

YAZD COMBINE CYCLE POWER PLANT- COOLING TOWERYAZD CITY

2005TURHAN INDUSTRIES & BEHIN SAMAN SARZAMIN

BASIC DATA :

Specifications NumberS of Turbine : 1Turbine Capacity : 160 MW

Major Works

Excavation : 23,080 m3Formwork : 36,200 m2

Re-Bar : 2,560 tonsConcrete : 11,200 m3 / steelworks : 294 tons

www.tosee-siloha.com

و ی ه و ر

chimney

projects

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : BISTOON POWER PLANT CHIMNEY

CITY : KERMANSHAH

YEAR OF PROVISIONAL ACCEPTANCE : 1992

CLIENT : SIKOM CO.

BASIC DATA : Height : 160 m

Diameter : Bottom : 19.8 m / top : 13.5 m

Wall thickness Bottom : 50 cm / top : 25 cm

Slipform :18,500 m2 / Re - bars : 800 tons

Concrete :6,000 m3 / steelwork : 560 tons

Excavation : 5,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SAVEHJAM CHIMNEY

CITY : SAVEH

YEAR OF PROVISIONAL ACCEPTANCE : 1990

CLIENT : SAVEHJAM GLASS CO.

BASIC DATA : Height : 80 m

Diameter : Bottom : 6.25 m / top : 3.75 m

Wall thickness Bottom : 25 cm / top : 25 cm

Slipform :2,200 m2 / Re - bars : 50 tons

Concrete :450 m3 / steelwork : 8 tons

Brickwork : 1,000 m2

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : GHARB POWER PLANT CHIMNEY

CITY : HAMEDAN

YEAR OF PROVISIONAL ACCEPTANCE : 1992

CLIENT : TAVANIR CO.

BASIC DATA : Height : 150 m

Diameter : Bottom : 22.4 m / top : 19.02 m

Wall thickness Bottom : 70 cm / top : 30 cm

Slipform :20,000 m2 / Re - bars : 1,252 tons

Concrete :11,000 m3 / steelwork : 124 tons

Excavation : 17,400 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SHAZAND POWER PLANT CHIMNEYS

CITY : ARAK

YEAR OF PROVISIONAL ACCEPTANCE : 2001

CLIENT : MAPNA CO .

BASIC DATA : Height : 200 m X 2 Chimneys

Diameter : Bottom : 21.6 m / top : 8.21 m

Wall thickness Bottom : 65 cm / top : 20 cm

Slipform :34,400 m2 / Re - bars : 1,363 tons

Concrete :7,680 m3 / steelwork : 57 tons

Brickwork : 17,000 m2 / Excavation : 13,500 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

Concrete work :450 m3 / Steel works : 8 TonsRe-bars :50 Tons

CLIENT/CONSULTANT :

Basic Data

Chimney Spec.

Major Works

ISFEHAN STEEL MILL Co. / FOULAD TECHNIC Co.Height : 80 m / Bottom Diameter : 6.25 m

Top Diameter : 3.75 m/Concrete shell tickness : 25 cmSlipform : 2,200 m2

Formwork : 100 m2 / Excavation :1,900 m3

PROJECT NAME :LOCATION :YEAR OF PROVISIONAL ACCEPTANCE :

ISFEHAN STEEL MILL CHIMNEYS & STEEL STRUCTUREISFEHAN STEEL MILL FACTORY-ISFEHAN CITY

2007

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

Concrete work :2,100 m3 / Steel works : 32 TonsRe-bars : 415 Tons

CLIENT/CONSULTANT :

Basic Data

Chimneys Spec.

Major Works

QAZVIN GLAZING COMPANY / CLIENT'S REPRESENTATIVE

Height : 102 m / Bottom Dia. : 6.85 m /Top Dia. :5.74 mConcrete shell tickness : Bottom : 65 cm / Top : 20 cm

Slipform : 33,200 m2 Formwork : 2,380 m2 / Excavation :1,250 m3

PROJECT NAME :LOCATION :YEAR OF PROVISIONAL ACCEPTANCE :

QAZVIN FLOAT GLAZING FACTORY CHIMNEYQAZVIN , TAKESTAN- ABHAR ROAD

2008

www.tosee-siloha.com

و ی ه و ر

cement

factorys

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ARDEBIL CEMENT FACTORY

CITY : ARDEBIL

YEAR OF PROVISIONAL ACCEPTANCE : 1995

CLIENT : SIMAN ARDEBIL CO .

BASIC DATA : Capacity : 2,300 tons / day

Slipform : 30,000 m2

Concrete : 70,000 m3 /Re - bars : 8,000 tons

Steelwork: 3,000 tons / Excavation : 110,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : NEYRIZ CEMENT FACTORY

CITY : NEYRIZ

YEAR OF PROVISIONAL ACCEPTANCE : 1995

CLIENT : SIMAN NEYRIZ CO .

BASIC DATA : Capacity : 500 tons / day

Slipform : 15,000 m2

Concrete : 55,000 m3 /Re - bars : 700 tons

Steelwork: 500 tons / Excavation : 120,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ISFAHAN CEMENT FACTORY

CITY : ISFAHAN

YEAR OF PROVISIONAL ACCEPTANCE : 2000

CLIENT : ISFAHAN CEMENT CO .

BASIC DATA : Capacity Extention: 900 tons / day up to 2,300 tons / day

Slipform : 12,100 m2

Concrete : 22,000 m3 /Re - bars : 2,558 tons

Steelwork: 421 tons / Excavation : 34,000 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : FARSNO CEMENT FACTORY

CITY : SHIRAZ

YEAR OF PROVISIONAL ACCEPTANCE : 2005

CLIENT : SIMAN FARSNO CO .

BASIC DATA : Capacity : 3,000 tons / day

Slipform : 31,000 m2

Concrete : 71,150 m3 /Re - bars :9,100 tons

Steelwork: 3,150 tons / Excavation : 105,000 m3

General formwork : 131,000

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

Slipform :29,000 m2

PROJECT NAME :LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :

MOMTAZAN 3,300 TON/DAY CEMENT FACTORYKERMAN CITY

2007CLIENT/CONSULTANT :

Basic Data Major Works

KERMAN MOMTAZAN CEMENT Co. / SAZE ANDISHAN Co.Concrete work :105,500 m3

Re-bars : 9,150 Tons Formwork 173,300 m2Excavation :294,044 m3Steel works :3,552 Tons

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : LARESTAN CEMENT FACTORY

CITY : LARESTAN

YEAR OF PROVISIONAL ACCEPTANCE : 2005

CLIENT : SIMAN LARESTAN CO .

BASIC DATA : Capacity : 700 tons / day

Slipform : 15,000 m2

Concrete : 24,200 m3 /Re - bars : 2,306 tons

Steelwork: 1,473 tons / Excavation : 53,500 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME :LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :

ABYEK 7,500 TON/DAY CEMENT FACTORYQAZVIN CITY - ABYEK

2008

Slipform :9,712 m2

CLIENT/CONSULTANT :

Basic Data Major Works

Abyek Cement Company/Pardis Rooz CompanyConcrete work :25,720 m3

Re-bars :4,084 Tons Formwork : 43,813 m2Excavation :18,608 m3

Steel works :3,151 Tons

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME :LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :

GILAN SABZ 3,400 TON/DAY CEMENT FACTORYGILAN PROVINCE - SIAHKAL

2009

Slipform :20,000 m2

CLIENT/CONSULTANT :

Basic Data Major Works

Gilan Sabz Industries Co./Andisheh Sazan Pars Co.

Concrete work :52,000 m3Re-bars :6,400 Tons

Formwork 8,500 m2Excavation :142,500 m3Steel works :6,630 Tons

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

MOND - DASHTI CEMENT Co. JAM PURCHASING AND MANUFACTURING Co.

CLIENT :CONSULTANT :

Basic Data

MajorSpecifications

Major WorksExcavation : 294,044 m3Steel works : 640 Tons

3,300 Ton/DayConcrete work : 11,800 m3

Re-bars : 1,952 Tons Formworks : 27,000 m2

PROJECT NAME :LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :

MOND-DASHTI CEMENT PRODUCTION LINE-PHASE 1BUSHEHR CITY

2013

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME :TITLES/LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :

TEHRAN CEMENT FACTORY-SUBSTITUTE PROJECTTEHRAN CITY

2016

Slipform :15,000 m2

CLIENT :

Basic Data Major Works

Tehran Cement CompanyConcrete work :34,000 m3

Re-bars :9,800 Tons Formwork 44,000 m2Excavation :37,000 m3Steel works :195 Tons

www.tosee-siloha.com

و ی ه و ر

other

projects

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : 7th. TIR MARTYRS MONUMENT

CITY : TEHRAN

YEAR OF PROVISIONAL ACCEPTANCE : 1998

CLIENT : PRIVATE SECTOR

BASIC DATA : Area : 2,000 m2

Concrete : 3,000 m3 /Re - bars : 600 tons

Formwork : 7,000 m2

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

CLIENT / CONSULTANT :

Basic Data

MajorSpecifications

Major Works

CONSTRUCTIVE JIHAD MINISTRY-RESEARCH &EDUCATION DEPUTY

No. of Stoories : 18 / Building Space : 45,000 m2Height of Building : 46 m

Concrete work : 1,500 m3Re-bars : 100 Tons

Formworks : 2,600 m2Excavation : 8,000 m3Steel works : 800 Tons

PROJECT NAME :LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :

NAVVAB ADMINISTRATIVE COMPLEX BUILDINGTEHRAN CITY

1993

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : JAHAD GARAN SPORTS & CULTURAL COMPLEX

CITY : TEHRAN

YEAR OF PROVISIONAL ACCEPTANCE : 1998

CLIENT : AGRICULTURAL JIHAD MINISTRY

BASIC DATA : Area : 20,000 m2

Concrete : 2,549 m3 /Re - bars : 161 tons

Steelwork: 8,352 tons / Excavation : 2,660 m3

General Formwork : 6,613 m2 / Brick work : 996 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

TOSEE SILOHA Co.MAHSA POL Co.

CLIENT :CONSULTANT :

Basic Data

MajorSpecifications

Major Works

Steel works : 7,200 Tons

No. of Stoories : 19 / No. of Phases : 5Building Space : 45,000 m2 / Units per Phase : 64

Concrete work : 3,000 m3

Excavation : 60,000 m3

Re-bars : 600 Tons Formworks : 7,000 m2

PROJECT NAME :LOCATIONS :YEAR OF PROVISIONAL ACCEPTANCE :

SAADAT ABAD HOUSING COMPLEX - CIVIL WORKSTEHRAN CITY

2005

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

Re-bars : 338 Tons Formworks : 2,500 m2Excavation : 27,500 m3Steel works : 22 Tons

CLIENT : IRAN KHODRO Co.CONSULTANT : SAZEH PARDAZI IRAN Co.

Basic Data

MajorSpecifications

Length of Bridge : 147 mWidth of Bridge : 6.55 m m

Major Works

Concrete work : 3,200 m3

PROJECT NAME : CIVIL CONSTRUCTION OF IRAN-KHODRO UNDER BRIDGELOCATIONS : TEHRAN CITY- Km 8th. OF KARAJ SPECIAL Rd.YEAR OF PROVISIONAL ACCEPTANCE : 1996

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : PHASE 9 & 10 ONSHORE FACILITIES( CIVIL & BUILDING PORTION)

CITY : ASALOYE

YEAR OF PROVISIONAL ACCEPTANCE : 2006

CLIENT : OIEC

BASIC DATA : 50 000 000 M3/DAY SWEET GAS REFINERY

400 TONS SULFUR/DAY

1 000 000 TONS LPG/YEAR

Concrete : 110,000 m3 /Re - bars : 13 000 tons

Steelwork:0 tons / Excavation :669,000 m3

General Formwork : 269,000 m2 / Brick work :0 m3

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME :

Concrete : 16,000 m3 / Steelworks : 200 tons

CONSULTANT : NOHOW Co.

BASIC DATA :

Specifications Numbers of Turbine : 5Turbine Capacity : 117 MW

Major Works

Excavation : 25,000 m3Formwork : 8,500 m2

Re-Bar : 1,200 tons

CLIENT : MAPNA ENGINEERING AND TURBINE MANUFACTURING Co.

TOGA INDUSTRIAL TURBINE PROJECT - CIVIL WORKSLOCATION : KARAJ CITYYEAR OF PROVISIONAL ACCEPTANCE : 2012

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ASIA HOUSING COMPLEX STEEL STRUCTURELOCATION : TEHRAN - ASIA BOULEVARDYEAR OF PROVISIONAL ACCEPTANCE : 2011

Concrete work : 4,600 m3 / Re-bars : 646 TonsSteel Works : 1,200 tons

CLIENT : JIHAD TOSEE RESIDENCY COOPERATIVE Co.CONSULTANT : ABNIEH NO ANDISH Co.

Basic Data

Major Spec. No. of Stories : 12 / No. of Phses : 3Building space : 20,000 m2 / No, of Units in Phase:153

Major Works Formwork : 24,000 m2 / Excavation :20,000 m3

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

Re-bars : 57 Tons Formworks : 2,000 m2Excavation : 30000 m3Steel works : 105 Tons

CLIENT : NATIONAL IRANIAN COPPER Co.CONSULTANT : KAAN AZIN Co.

Basic Data

MajorSpecifications

Mine Inlet Height : 27 mMine Inlet Width : 28 m

Major Works

Concrete work : 2,800 m3

PROJECT NAME : CONSTRUCTION , MOBILIZATION AND MACHINERYPROCUREMENT OF CHEHEL KOUREH COPPER MINE

LOCATIONS : ZAHEDAN CITYYEAR OF PROVISIONAL ACCEPTANCE : 2015

www.tosee-siloha.com

و ی ه و ر

inhand

projects

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME :CITY :

Concrete : 26,000 m3 / steelworks : 237 tons

CONSULTANT : MESINAN Co.

BASIC DATA :

Specifications Numbers of Turbine :1Turbine Capacity :500 MW

Major Works

Excavation : 82,000 m3Formwork :54,000 m2

Re-Bar : 3,700 tons

HERIS POWER PLANTHERIS

YEAR OF PROVISIONAL ACCEPTANCE : 2016/36 MONTHSCLIENT : TANA ENERGY

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME :CITY :

ASALOYE POWER PLANTASALOYE

YEAR OF PROVISIONAL ACCEPTANCE : 2016/12 MONTHSCLIENT : MAPNA GROUP

Concrete : 22,000 m3 / steelworks : 133 tons

CONSULTANT : MAPNA Co.

BASIC DATA :

Specifications Numbers of Turbine : 4Turbine Capacity :162 MW

Major Works

Excavation : 65,000 m3Formwork :41,000 m2

Re-Bar : 1,800 tons

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SHIRVAN C.C.POWER PLANT- COOLING TOWERS

Steel works :680 Tons

BASIC DATA

Height 118 mDiameter Bottom:72m / Top: 62 m

Wall Thickness Bottom:125 cm / Top: 18 cmX-legs Q'ty:64 ea / Height : 24.4 m

Major Works

Concrete work : 18,200 m3Re-bars :5,300 Tons

Normal Formwork 10,500 m2Climbing Formwork : 101,000 m2

Excavation :29,000 m3

CLIENT : MAPNA GROUP

TITLES/LOCATIONS : SHIRVAN CITYCOMMENCEMENT / DURATION 2015 / 17 MONTHS

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME :

Excavation :36,000 m3 /Re-Bars : 6,400 tons

EAST TEHRAN 100,000 M/T SILO PROJECT

COMMENCEMENT / DURATION :

BASIC DATA

Number : 36 / Total Capacity : 100,000 tons / Height : 45 mDiameter :11.5 m/ea

Height :37m / Length : 15 m / Width : 67 m

Concrete : 39,000 m3 / Steelwork : 760 tons

TITLES/LOCATIONS : GARMSAR / TEHRAN

CLIENT : MINISTRY OF AGRICULTURAL JIHAD

Slipform: 110,000 m2 / General Formwork :29,000 m2

Bins

Working - House

2014 / 36 MONTHS

Major Works

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : TABAN C.C.POWER PLANT- COOLING TOWERS

Steel works :340 Tons

BASIC DATA

Height 120 mDiameter Bottom:72m / Top: 62 m

Wall Thickness Bottom:125 cm / Top: 18 cmX-legs Q'ty:32 ea / Height : 24.4 m

Major Works

Concrete work :12300 m3Re-bars :3000 Tons

Normal Formwork 11000 m2Climbing Formwork : 38,000 m2

Excavation 14000 m3

CLIENT : MAPNA GROUP

TITLES/LOCATIONS : YAZD CITYCOMMENCEMENT / DURATION 2015 / 11 MONTHS

TOSSEE SILOHA CO .DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME :LOCATIONS :PROJECT STATUS :

HAMEDAN C.C. POWER PLANT-STEEL COOLING TOWERHAMEDAN CITY

UNDER CONSTRUCTIONELECTRICITY DEVELOPMENT ORGANIZATION

GHODS NIROO CONSULTANT ENGINEERSHeight: 123m / Bottom Dia. : 99m / Top Dia. : 68m

CLIENT :CONSULTANT :

BASIC DATA

SPECIFICATIONS

Major Works

Steel shell cooling TowerExcavation : 13,340 m3Formwork : 4,692 m2Concrete : 6,014 m3

Re-Bar : 470 tons / Steel works : 1,816 ton

www.tosee-siloha.com

awards&

appreciations

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

www.tosee-siloha.com

و ی ه و ر

TOSEE SILOHACOMPANY

www.tosee-siloha.com

No. 3, 50th. st. , Seid Jamaleddin Asadabadi(Yousef Abad) Ave., Tehran- Iran

P.O.Box :14367 54819

Established on : Dec.8,1986

Tel. : +98 21 88063891

Facsimile : +98 21 88031340

Web site : www.tosee-siloha.com

E-Mail : [email protected]

و ی ه و ر