Printed 08/03/2018 Page 1 of 1 Project No. 45615-C
DESIGN & CONSTRUCTION GROUP
THE GOVERNOR NELSON A. ROCKEFELLER
EMPIRE STATE PLAZA
ALBANY, NY 12242
ADDENDUM NO. 2 TO PROJECT NO. 45615
CONSTRUCTION WORK
PROVIDE LEAD REMEDIATION
LEEDS READINESS CENTER
2515 ROUTE 23
LEEDS, NY 12451
August 3, 2018
NOTE:This Addendum forms a part of the Contract Documents. Insert it in the Project Manual.
Acknowledge receipt of this Addendum in the space provided on the Bid Form.
SPECIFICATIONS GROUP
1. Page 028303 – 5, Article 1.04, Add the Following Paragraph:
“T. Put Back Work: Replacement of moveable objects into the work area.”
2. Page 028303 – 5, Article 1.04, Add the Following Paragraph:
“U. Finish Work: Installation of finishes, including but not limited to application of paint or
encapsulant, and installation of carpet, floor tile, wall base, ceiling tile, and epoxy floor systems.”
DRAWINGS
1. Drawing Nos. H-104 and H-105:
a. NOTES, Change Note 2 to Read:
“2. PROVIDE CLEANING OF INTERIOR OF ALL DUCTWORK IN ACCORDANCE WITH
SECTION 230130. ASSUME A TOTAL OF 550 L.F. OF 12-IN (OR SMALLER) DUCTS AND
400 L.F. OF GREATER THAN 12-IN DUCTS (RECTANGULAR AND/OR ROUND) FOR
ESTIMATING PURPOSES.”
2. Revised Drawings:
a. Drawing Nos. G-2, G-4, G-5, G-6, H-001, H-002, H-003, H-004, H-101, H-102 and H-103 noted
“ADDENDUM #2 08/02/2018” accompany this Addendum and supersede the same numbered
originally issued drawings.
END OF ADDENDUM
Erik T. Deyoe, P.E.
Director, Division of Design
Design & Construction
DESIGN & CONSTRUCTION
2018 © O'BRIEN & GERE, INC.
O'BRIEN & GERE ENGINEERS, INC
a.
a.
i.
DESIGN & CONSTRUCTION
2018 © O'BRIEN & GERE, INC.
O'BRIEN & GERE ENGINEERS, INC
TRUENORTH
010' 0 10'
SECOND FLOOR PHASING PLANSCALE 1" = 10'
PHASE 1APHASE 1B
EXIT 2
EXIT 3
EXIT 1
“
”
DESIGN & CONSTRUCTION
2018 © O'BRIEN & GERE, INC.
O'BRIEN & GERE ENGINEERS, INC
TRUENORTH
010' 0 10'
FIRST FLOOR PHASING PLANSCALE 1" = 10'
PHASE 2A
PHASE 2D
PHASE 2E
PHASE 2C
PHASE 2F
PHASE 1B
“
”
EXIT 1
EXIT 2
EXIT 3
EXIT 4
EXIT 7
EXIT 6
EXIT 5
EXIT 8
PHASE 2B
TRUENORTH
DESIGN & CONSTRUCTION
2018 © O'BRIEN & GERE, INC.
O'BRIEN & GERE ENGINEERS, INC
010' 0 10'
BASEMENT PHASING PLANSCALE 1" = 10'
PHASE 3A
“
”
EXIT 1
DESIGN & CONSTRUCTION
2018 © O'BRIEN & GERE, INC.
O'BRIEN & GERE ENGINEERS, INC
DESIGN & CONSTRUCTION
2018 © O'BRIEN & GERE, INC.
O'BRIEN & GERE ENGINEERS, INC
DESIGN & CONSTRUCTION
2018 © O'BRIEN & GERE, INC.
O'BRIEN & GERE ENGINEERS, INC
DESIGN & CONSTRUCTION
2018 © O'BRIEN & GERE, INC.
O'BRIEN & GERE ENGINEERS, INC
DESIGN & CONSTRUCTION
2018 © O'BRIEN & GERE, INC.
O'BRIEN & GERE ENGINEERS, INC
TRUENORTH
010' 0 10'
SECOND FLOOR PLANSCALE 1" = 10'
DESIGN & CONSTRUCTION
2018 © O'BRIEN & GERE, INC.
O'BRIEN & GERE ENGINEERS, INC
TRUENORTH
010' 0 10'
FIRST FLOOR PLANSCALE 1" = 10'
TRUENORTH
DESIGN & CONSTRUCTION
2018 © O'BRIEN & GERE, INC.
O'BRIEN & GERE ENGINEERS, INC
010' 0 10'
BASEMENT PLANSCALE 1" = 10'