design considerations for abrasive blast rooms recovery ... · report documentation page form...

83
Clemco Industries Corp. presents Design Considerations for Abrasive Blast Rooms & Recovery Systems by Bob Kerr Business Development Manager

Upload: dinhkhanh

Post on 16-Apr-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Clemco Industries Corp.

presents

Design Considerations forAbrasive Blast Rooms

&Recovery Systems

by Bob KerrBusiness Development Manager

Page 2: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Report Documentation Page Form ApprovedOMB No. 0704-0188

Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

1. REPORT DATE FEB 2010 2. REPORT TYPE

3. DATES COVERED 00-00-2010 to 00-00-2010

4. TITLE AND SUBTITLE Design Considerations for Abrasive Blast Rooms & Recovery Systems

5a. CONTRACT NUMBER

5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S) 5d. PROJECT NUMBER

5e. TASK NUMBER

5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Clemco Industries Corp,445 Bush Street,San Francisco,CA,94108-3730

8. PERFORMING ORGANIZATIONREPORT NUMBER

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)

11. SPONSOR/MONITOR’S REPORT NUMBER(S)

12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited

13. SUPPLEMENTARY NOTES 2010 U.S. Army Corrosion Summit, Huntsville, AL, 9-11 Feb. U.S. Government or Federal Rights License

14. ABSTRACT

15. SUBJECT TERMS

16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as

Report (SAR)

18. NUMBEROF PAGES

82

19a. NAME OFRESPONSIBLE PERSON

a. REPORT unclassified

b. ABSTRACT unclassified

c. THIS PAGE unclassified

Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

Page 3: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

PLANNING CONSIDERATIONS

• ENCLOSURE

• LOCATION OF ROOM

• COMPLETELY INSIDE

• ROOM INSIDE, COLLECTOR OUTSIDE

• COMPLETELY OUTSIDE

• PARTIALLY OUTSIDE

• RECOVERY SYSTEM LOCATION

• ON TOP OF EXISTING FLOOR

• FLUSH-MOUNTED (RECOVERY SYSTEM IN PIT)

Page 4: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

TYPES OF ENCLOSURES

• FLANGE BOLT

– ECONOMICAL

– MAXIMUM WIDTH LIMITED TO 16 FEET

• HYBRID FLANGE BOLT

– FLANGE BOLT WITH STIFFENERS

• COLUMN BOLT

– ALLOWS FOR WIDER ENCLOSURES

– STRONG ENOUGH TO SUPPORT MONORAIL

Page 5: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Flange Bolt Room

Page 6: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Column Bolt Room

• Structural steel

framework

• Galvanized steel

panels

Page 7: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

COMMON FEATURES

• GALVANIZED CONSTRUCTION

• FLOOR-TO-CEILING DOORS CAN BE

INSTALLED INTO ONE OR BOTH ENDS

• PERSONNEL DOORS CAN BE

INSTALLED IN ANY WALL PANEL

– REQUIRED EVERY 30 FEET PER O.S.H.A.

• OPTIONS

– EXTERIOR WORK STATIONS

– SPECIAL LIGHTING

Page 8: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Inlet Door Installation

Page 9: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

AIR INLETS

• Baffled inside &

outside

• Filtered

Page 10: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

MANDOOR

• Panic Hardware

• Viewer with cover

Page 11: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

ILLUMINATION

• TYPICALLY, 50-80 FOOT CANDLES IS

SUFFICIENT

• FLUSH-MOUNTED TO CEILING

– PROTECTED FROM INADVERTENT BLASTING

– SEALED TO AVOID DUST INGRESS

• ADDITIONAL WALL-MOUNTED LIGHTS

PROVIDE SHADOW FREE ILLUMINATION

Page 12: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Light Module

Page 13: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

EXTERIOR WORK STATION

Page 14: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

RECOVERY FLOOR TYPES

• SWEEP-IN

– 2x2 AND 3x3 HOPPERS

• MECHANICAL RECOVERY

• FOR DENSE MEDIA, SUCH AS STEEL GRIT AND SHOT

– M-SECTION STRIP

• PNEUMATIC RECOVERY

• FOR LIGHTWEIGHT MEDIA, SUCH AS GLASS BEADS,

ALUMINUM OXIDE, AND PLASTIC

• PARTIAL FLOOR

– MULTIPLE M-SECTIONS

– SCREW

– -BELT

Page 15: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

RECOVERY FLOOR TYPES

continued

• FULL FLOOR

– MECHANICAL RECOVERY

• FLAT-TRAK

• SCREW CONVEYORS

• BELT CONVEYORS

– PNEUMATIC RECOVERY

• M-SECTION

Page 16: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

FULL FLOOR RECOVERY

• COMPLETELY AUTOMATES THE

MEDIA RECOVERY PROCESS

• MECHANICAL RECOVERY

– SCREW CONVEYOR

– -BELT CONVEYOR

– FLAT-TRAK

• PNEUMATIC RECOVERY

– M-SECTION

Page 17: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

PARTIAL FLOOR RECOVERY

• REDUCES MANHOURS SPENT ON

RECOVERY, COMPARED TO SWEEP-IN

• SCREW OR BELT CONVEYOR(S) TO BE

USED WITH DENSE MEDIA SUCH AS

STEEL

• M-SECTION STRIPS TO BE USED WITH

LIGHTWEIGHT MEDIA SUCH AS ALOX

AND GLASS BEADS

Page 18: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

HOPPER RECOVERY SYSTEMS

• SURFACE MOUNTED OR RECESSED

• LOW INITIAL COST

• REQUIRES MANUAL LABOR

– SWEEPING OR SHOVELING

• 120 MESH MEDIA OR COARSER

Page 19: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

3 x 3

HOPPER

RECOVERY

SYSTEM

Page 20: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

3 x 3 HOPPER SWEEP-IN

Page 21: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

BELT RECOVERY

Page 22: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

SCREW RECOVERY

Page 23: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

FLAT-TRAK• LOW PROFILE

– 6-1/2” TALL

– MINIMAL EXCAVATION REQUIRED FOR PIT

– SHORT RAMPS ON SURFACE MOUNTS

• FAST INSTALLATION

– FAST DELIVERY - COMPONENTS SHIPPED

FROM STOCK

– MODULAR FLOOR

– TRACKS WELDED TO STEEL FLOOR

– FRAMES DROP IN PLACE BETWEEN TRACKS

• EASY MAINTENANCE

Page 24: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Flat Trak Drive

• Booted for protection

Page 25: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Flat Trak

Page 26: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

FLAT-TRAK

Page 27: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

FLAT-TRAK

Page 28: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Bucket Elevator

Page 29: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Underspeed

Monitor

• Used on all bucket

elevators

• Prevents belt breakage

Page 30: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

MEDIA CLEANING

MECHANICAL SYSTEMS• ABRASIVE CLEANER

– BEST FOR HEAVIER MEDIA, I.E. STEEL GRIT

– ROTARY SCALPING DRUM

• REMOVES OVERSIZED PARTICLES / DEBRIS

– HIGH VOLUME STREAM OF AIR

• REMOVES DUST --- TO DUST COLLECTOR

– INCLUDES 10 CUBIC FOOT STORAGE HOPPER

– CAN PROCESS UP TO 15 TONS PER HOUR

– CAN FEED 1, 2, 3, OR 4 BLAST MACHINES

• MULTIPLE POT STAND REQUIRED FOR MORE

THAN ONE BLAST MACHINE

Page 31: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

ABRASIVE

CLEANER

Page 32: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

M-Section

• Pneumatically operated channels

• No vibration or screw conveyors

• Handles all light-weight media

Page 33: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

SWEEP-IN M-SECTION

WITH DRY FILTER

Page 34: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

SWEEP-IN M-SECTION WITH

RP COLLECTOR

Page 35: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

M-SECTION

Page 36: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

M-section Floor

• Full recovery system

Page 37: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Crossdraft Transition

Page 38: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

RECLAIMER

PNEUMATIC SYSTEMS• CYCLONE SEPARATOR FOR USE WITH

LIGHTWEIGHT MEDIA

• MEDIA, DUST, AND DEBRIS ENTER

RECLAIMER WHERE THEY SPIN

• DUST, FINES, AND BROKEN MEDIA ARE

DRAWN OUT WITH EXHAUST AIR TO DUST

COLLECTOR

• ONLY CLEAN, REUSABLE MEDIA ENTERS

BLAST MACHINE

• RUBBER-LINED TOP SECTIONS ARE NEEDED

WITH AGGRESSIVE MEDIA

Page 39: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Blast &

Reclaim System

• Reclaim

• Storage Hopper

• Blast Machine

Page 40: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

M-SECTION

RECOVERY & TRANSITION

Page 41: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

M-SECTION FULL-FLOOR(note wall sheeting for improved illumination)

Page 42: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

PRE-ASSEMBLED

BLAST ROOMS

• AVAILABLE FOR ALL TYPES OF

RECYCLABLE MEDIA

– FLAT-TRAK RECOVERY SYSTEM WITH

ABRASIVE CLEANER FOR USE WITH HEAVY

MEDIA, I.E. STEEL GRIT

– M-SECTION RECOVERY SYSTEM WITH

RECLAIMER FOR USE WITH LIGHTWEIGHT

MEDIA, I.E. GLASS BEADS OR ALOX

Page 43: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Preassembled Room

Page 44: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Preassembled Room

Page 45: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1
Page 46: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1
Page 47: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

BLAST MACHINES

• AUTOMATICALLY REFILLED AFTER

MEDIA HAS BEEN CLEANED

• MEDIA VALVE(S) MUST BE SUITABLE

FOR THE ABRASIVE BEING USED

• BOTTOM CONE MUST ACCOMMODATE

ANGLE OF REPOSE OF MEDIA BEING

USED

• MUST BE EQUIPPED WITH REMOTE

CONTROLS

Page 48: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

VENTILATION

• PROVIDED BY DUST COLLECTOR FAN

• INLET VELOCITY: 500 FT/MIN MINIMUM

• CROSSDRAFT VENTILATION RATES

– 50 FEET/MIN FOR STEEL OR GLASS BEADS

– 80 FEET/MIN FOR ALUMINUM OXIDE

– 100 FEET/MIN FOR SAND OR DUSTY MEDIA

Page 49: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

VENTILATION

• REVERSE-PULSE CARTRIDGE – FILTERS 99.85% – EXHAUSTED AIR IS 0.00218 GRAINS/CUBIC FT– AIR TO CLOTH RATIO OF 2:1 OR LESS– COMPACT, MODULAR UNITS

Page 50: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Dust Collector

• 4000 - 300000 CFM

• Sloped roof

• Modular construction

Page 51: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Dust Collector

Page 52: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

DUST COLLECTION

Page 53: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Dust Collector

• Magnehelic

Gauge

• Pressure Gauge

Page 54: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1
Page 55: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

DUST COLLECTION / DUCTING

Page 56: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

VENTILATION• TO DETERMINE THE SIZE OF THE DUST

COLLECTOR, USE THIS FORMULA:

CFM of collector = A

Room Width = W

Room Height = H

Ventilation Rate = V

A = W x H x V

For a room 10’ x 10’ x 20’

with steel grit, we use:

A = 10’ x 10’ x 50’/min

A = 5000 CFM

Page 57: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

WORK-PIECE HANDLING

• FORKLIFTS

• RAIL-MOUNTED WORK CARS

• OVERHEAD MONORAILS

• EXTERIOR WORK STATIONS

• TURNTABLES

• HORIZONTAL ROTATION DEVICES

Page 58: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

OVERHEAD MONORAIL

Page 59: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Workpiece Handling

• Powered

horizontal

rotation

Page 60: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

TURNTABLE/WORKCAR/TRACK

Page 61: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

DROP-DOWN

TURNTABLE

Page 62: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

ELECTRICAL CONTROL PANEL

• INCLUDES MOTOR STARTERS

• AUTOMATED START-UP PROGRAM

– AVOIDS MEDIA JAMMING AND EQUIPMENT

DAMAGE

• HOUR METER MONITORS USAGE

– AIDS IN SCHEDULED MAINTENANCE TASKS

Page 63: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

COMPRESSED AIR SUPPLY

• POWER FOR MANY COMPONENTS

– AUTOMATED FLOORS

– REVERSE PULSE COLLECTORS

– BLASTING OPERATION

• NOZZLE ORIFICE

• NUMBER OF OPERATORS

– SUPPLIED AIR RESPIRATORS

• CONSIDER OTHER DEMANDS ON SHOP AIR

Page 64: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

OPERATOR SAFETY EQUIPMENT

• AIR-FED RESPIRATOR

– APOLLO 60 OR APOLLO 20

• AIR FILTER

– CPF-20 OR CPF-80

• CO MONITOR AND ALARM

– CMS-1

• PROTECTIVE CLOTHING

– BLAST SUITS

• HELMET COMMUNICATION SYSTEMS

– HCS-1

Page 65: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

APOLLO 60 RESPIRATOR

Page 66: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

CPF-20

BREATHING

AIR FILTER

Page 67: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

CARBON MONOXIDE

MONITOR ALARM

Page 68: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

CLEMCO

BLAST

SUIT

Page 69: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

HELMET COMMUNICATIONS

Page 70: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

BLAST & PAINT ROOM

Page 71: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1
Page 72: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1
Page 73: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1
Page 74: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1
Page 75: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

AIRCRAFT STRIP BOOTHS

Page 76: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1
Page 77: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1
Page 78: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1
Page 79: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1
Page 80: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

MEDIUM SIZED &

SMALL BOOTHS

Page 81: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1
Page 82: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

Thank you

Page 83: Design Considerations for Abrasive Blast Rooms Recovery ... · Report Documentation Page Form Approved ... PROVIDE SHADOW FREE ILLUMINATION. ... • CO MONITOR AND ALARM –CMS-1

CLEMCO WORLDWIDEThe demand for abrasive blasting

is extensive. Ship building and

maintenance in Singapore,

construction in Saudi Arabia,

refining in Houston… these are but

a few of the major industries

where abrasive blasting has kept

pace with demand calling for

Clemco specialization and

innovation. Manufacturing and

distribution throughout 6

continents… wherever there is

industry, Clemco is there.