ABSTRACTThe research topic is aimed at to study the design and consruc
railway tracks ,bridges ,buildings ,platforms and other Civil Eworks regarding in modernisation of railways in our country.
Railway Track Engineering presents conventional methods of
construction, maintenance and monitoring, along with modern
sophisticated track machines. It also comprehensively covers d
details and specifications of important track components.
-
8/18/2019 Design and Construction of Rail Tracks
3/30
INTRODUCTION
•Indian railways is more than 1! years old.
• It is largest railway system in the world under one managem
• It is lifeline of our country.
• It is the biggest employer in the world.
•
1"# 1st
railway train $ourneyed distance of %%miles betweento Thana.
• 'riginally, operated by private companies Englishmen.
• 1(%)1(! *'I took over the all the private railways compa
-
8/18/2019 Design and Construction of Rail Tracks
4/30
THE OLDEST INDIAN TRAIN
-
8/18/2019 Design and Construction of Rail Tracks
5/30
INITIAL RAILWAY TRACKS IN IN
-
8/18/2019 Design and Construction of Rail Tracks
6/30
FAILURES IN OLD TRACKS
-
8/18/2019 Design and Construction of Rail Tracks
7/30
*AYIN+ O NE RAI*AYTRACKS
METHODOLOGY
-
8/18/2019 Design and Construction of Rail Tracks
8/30
-
8/18/2019 Design and Construction of Rail Tracks
9/30
ORMATION
•
FORMATION TOP• TRACK FOUNDATION
• CESS
• BALLAST
•
SUB-BALLAST• BLANKET
-
8/18/2019 Design and Construction of Rail Tracks
10/30
CONTENTS
•
BALLAST• RAILS
• SLEEPERS
• POINTS OF CROSSING
•
POINTS OF SWITCHES
-
8/18/2019 Design and Construction of Rail Tracks
11/30
,A**AST DETAI*S
• It is the gr!"#r $teri# "s"##% &r'(e! st'!e 'si!g#e !* (!(er+ gr,e# !* s!* #)e* !* !* r'"!* the s#eeers t' tr!s$it the #'* .r's#eeer t' .'r$ti'! #%er/
•Si0e123$$ t' 45$$
-
8/18/2019 Design and Construction of Rail Tracks
12/30
RAI*S
•
The r'##e* stee# se)ti'!s #i* e!* t' e!* i! r#',er s#eeers t' .'r$ ri#6% tr)(s re (!'6!Ri#s/
TYPES OF RAILS
7/ DOUBLE HEADED RAILS
2/ FLAT FOOTED RAILS
8/ BULLHEADED RAILS
-
8/18/2019 Design and Construction of Rail Tracks
13/30
-
8/18/2019 Design and Construction of Rail Tracks
14/30
S*EEPERS
• S#eeers re $e$&ers ge!er##% #i* tr!s,erse ri#s+ '! 6hi)h ri#s re 9e* t' tr!s.er the #'*the ri#s t' the &##st !* the s"&gr*e
-
8/18/2019 Design and Construction of Rail Tracks
15/30
TYPES O S*EEPERS
7/ WOODEN SLEEPERS2/ METAL SLEEPERS
8/ CONCRETE SLEEPERS
-
8/18/2019 Design and Construction of Rail Tracks
16/30
IN CONSTRUCTION OF RAIL TRA
SUR;EYING
EARTHWORKS
BRIDGES
TRACKS
-
8/18/2019 Design and Construction of Rail Tracks
17/30
LE;ELLING SUR;EY
-
8/18/2019 Design and Construction of Rail Tracks
18/30
DI;ISIONS IN EARTHWORK
EARTH
WORK
EMBANKMENT
E
-
8/18/2019 Design and Construction of Rail Tracks
19/30
GRADING PERCENTAGE OF BLAMATERIAL
S* IS Se3e Se Per5e'# Pass'6
(78 e6$#)
1. =3 $$ 733
2. 23 $$ >3 - 733
. 73 $$ 48 - >5
4. =/?5 $$ =2 - 4>
:. 2 $$ 2? - 52
. 433 $i)r'! 78 - 85
/. =25 $i)r'! 73 - 82
;. 272 $i)r'! 4 - 22
9. ?5 $i)r'! 8 - 73
-
8/18/2019 Design and Construction of Rail Tracks
20/30
SOIL TYPES
Ideal +oil and oor +oils
Ideal soil properties-
• igh bearing capacity /&C0 in reference to static loads, minor settlement igh &C indynamic loads, due to uneual grain si2e, high structural resistance, and good consol
• Elasticity
•
+table as regards erosion• igh water permeability
• 3ilter criteria w.r.t ballast layer above and sub)soil below
• Cost effectiveness in supply and construction
• 4atural soils are rarely ideal soils.
-
8/18/2019 Design and Construction of Rail Tracks
21/30
Poor Soil properties-
• 4on)cohesive
•5oose Cohesive
• +oft to semi)solid mi6ed soils with various contents of sand,
and water
• It contain solid rocks of irregular si2e, solid rocks with cohes
weathering elements.
-
8/18/2019 Design and Construction of Rail Tracks
22/30
Geometrical requirements for the soil formation
+hould generally meet following reuirements-
• cross fall slope to be atleast 1-#! or #7 with tolerance of !.
• the finished top levels should be within 8 ) #cm
• finished soil surface to be in level in longitudinal direction/ 9
longitudinal base of ;m0, must not show hollow pits, road ve
ruts.• +ide slopes to e6tend in hori2ontal plane, minimum 1! cm be
theoretical finished lines, and later cut and dressed to the spe
dimensions.
-
8/18/2019 Design and Construction of Rail Tracks
23/30
TYPICAL ;ALUES OF SOIL
S!<
T8%e
E32
( N=&&2 )
C,R
>
C
(N=5&)
?%er&
(N=5&2)
S!"#
5 2/5-8/5
Se&s!
-
8/18/2019 Design and Construction of Rail Tracks
24/30
FILLING
COMPACTION
-
8/18/2019 Design and Construction of Rail Tracks
25/30
COMPACTION
-
8/18/2019 Design and Construction of Rail Tracks
26/30
Field Tests :
• ry density &yCalcium Carbide
Core Cutter
-
8/18/2019 Design and Construction of Rail Tracks
27/30
3IE5> TE+T
-
8/18/2019 Design and Construction of Rail Tracks
28/30
QUALITY ASSURAN! T!STS F"R S"ILS
i.
-
8/18/2019 Design and Construction of Rail Tracks
29/30
I4 5?&'@R?T'RA
-
8/18/2019 Design and Construction of Rail Tracks
30/30
THANK YOU