15
Item Description Unit Qty Rate Amount FITTINGS AND INSTALLATION OF A NEW 3.000 LITRE WATER TANK Carefully remove existing damaged seating No 3 480,000 1,440,000 W.C pans complete with low level ceramic cisterns and any other connecting accessories. B Carefully dig out existing squatting WC No 3 380,000 1,140,000 squatting WC pans complete with cisterns and any other connecting accessories. C Carefully remove existing shower systems No 6 120,000 720,000 with heavy duty shower roses, taps and any other connecting accessories. 0 Carefully remove existing wash hand No 8 180,000 1,440,000 basins complete with plastic bottle traps and taps and any other connecting accessories. Check existing water pipes, repair or Item 1 1,000,000 1,000,000 water system in good working condition. Construct steel structural stand support for No 1 3,500,000 3,500,000 complete with concrete foundation, steel supports and 3,000 litre plastic tank including all pipe work to existing new dormitory. 9,240,000

Upload: others

Post on 15-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

ItemDescription UnitQtyRateAmount

REHABILITATION OF SANITARYFITTINGS AND INSTALLATION OF ANEW 3.000 LITRE WATER TANK

A

Carefully remove existing damaged seatingNo3480,000 1,440,000W.C pans, supply and fix Vitreous China W.C pans complete with low level ceramiccisterns and any other connectingaccessories.

B

Carefully dig out existing squatting WCNo3380,000 1,140,000pans, prepare floor, supply and fix squatting WC pans complete with cisternsand any other connecting accessories.

C

Carefully remove existing shower systemsNo6120,000 720,000and supply and fix shower rizers complete with heavy duty shower roses, taps andany other connecting accessories.

0

Carefully remove existing wash handNo8180,000 1,440,000basins, supply and fix new wash hand basins complete with plastic bottle trapsand taps and any other connectingaccessories.E

Check existing water pipes, repair orItem11,000,000 1,000,000replace as necessary and leave the whole water system in good working condition.

F

Construct steel structural stand support forNo13,500,000 3,500,0003,000 litre plastic tank as per drawings complete with concrete foundation, steelsupports and 3,000 litre plastic tankincluding all pipe work to existing newdormitory.

9,240,000

Page 2: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

- ~2---

1--

I Elevation C (1:25)A

Water Tank Stand Detail

J

ooU"l

ooN

ooN

o

o'"

.~

3000 L Plastic tank asCrestTanks.

SOOmm protrusion of cat ladderframe above base of tank

SOmmx3mm thick m.s c.h.shorizontal bracer welded to m.svertical frame

SOxSOmm m.s angle frame welded

to edges of r.h.s supports

25mm thick m.s C.h.S diagonalbracer welded to vertical frame and

horizontal bracer. (One diagonalbracer per panel)

Position of 2Smm 0 m.s c.h.s. 2No.

horizon!al diagonal bracers weldedto 38/6Smm frames.

,.

2SxSOx3mm thick painted m.s r.h.scat ladder frame at 300mm clc

spacing and welded onto 38mm 0m,s horizontal bracers

20mm 0 m.s c.h.s ladder weldedonto vertical m.s cat ladder frame

6Smm 0 x 4mm thick m.S c.h.sframe at 1000mm c/e set in300x300mm concrete base and

finished with gloss paint (Peanut)

38mm 0 m.s horizontal bracers at

1000mm c/c

1No. 2Smm 0 m.s c.h.s diagonal

bracer at rear panel.

Concrete footing to protrude 100m

above ground level with top at S'fall

300x300x800mm deep grade 20concrete base.

Weld slagsfor anchoring.

6mm thick m.S base plate weldedto base of 6Smm 0 steel frame.

GENERAL NOTESAll m.s sections to be finished with

primer and two coats of gloss paintPeanut - 06 C 33 (Sadolin)

3---

2---

I

A

Elevation D (1 :25)I

B ~,~\~

Page 3: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

________·4.4- Ii

25x50mm cat ladder frame

1No. 25mm 0 m,s bracerper pa

50mm 0 top horizontal bracer torecieve 25x50mm m.s r.h.s base

pieces

20mm 0 ladders at 250mmc/c

65mm 0 m.s c.h.s frame

1No, 25mm 0 m,s bracerper pane

Detail: Section A (1:10)

:ti

IF

/ ..•.

"

.47"'~""

~'.

:I'

.}:.- >~'"

,l!

"'-,

Plan A (1:20) 0

Plan B (1 :20)

~

Panel II

Panel IV

Panel I

Panel III

Schematic layout for 25mm '"

diagonal bracings ~rids 1·2

[2J[S]

[S][2J~

..PI

~C_tJ

::>.

~-I-//' I-1--tJ

~

1520

~-I-~II~

®>

Lo-

t-,t:t5Q.1 ~ -tJ 1095

Water Tank Stand Detail

Page 4: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

8L5-D1- O=R

; ~,------,1 09 I

UNIT RATEAMOUNT

~-

I~tfl~ , C2 ecJ, OO(J::~,~.

N6

~O,~>?() D .Cf!1),-

, I

/////I///////1/'4~.ffiQ'IQTY

Accounts are due on demand

KAMPALA TECHNICIANS CO-OPERATIVESOCIETY LIMITED

Dealers in: All types of carpentry & jonery work all electronical & welding work, andbuilding including renovation.

P.O.Box 8377 Tel: 077-432763/077-605974

Reg. No. 3366 E-mail:[email protected].

TOTAL

MIs

ITEM

) >

:Jt1

~

E&OE

\

Page 5: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

tD2.~ih

1

1

ITEM

\

Accounts are due on demand

KAMPALA TECHNICIANS CO-OPERATIVESOCIETY LIMITED

Dealers in: All types of carpentry & jonery work all electronical & welding work, andbuilding including renovation.

P.O.Box 8377 Tel: 077-432763/077-605974

Reg. No. 3366 E-mail:[email protected].

MIs knvvv\_hl1 POI <;0,2, A'.~ ~ ~~JJh-4'J'~ ~ffl X ~ I~AV~ eab~o . J ~1/S"-(}1-0+1

+~'S~,l~~~~ l1t:r~~~~~~~Hf'1N~\ ~I lOi I" .~ I _I U T

I DESCRIPTION QTY UNIT RATE AMOUNT

rf-) -Jf\ YAl r" 2 A ItlA ~/aJ2'-' ~:I'/ l1J ~~ / t~~eQ

\1\' WI -k.¥.J;: '1< ..-to~v£).JL.. AjQ U. ~ fl. r~ ill~0 /

ri)l .PJ~A. - ~v..... ~~-7;; ~(l J ~ n I c: .~/,ll\ j

JJ-t>~t\!~c~<h~, )1::> L1N1 J~

6l ~ ~Q.li(JU IJ)AAI1 ~.lP

'.:/ 1<00 ~ ~ri.Qo..A../ 'v'V\ ~~'I[' 19

I~ri~~ ~rU< PO_"ifV~ \

~1'K'lA~/ W~~<:- IS{ L'rYI

.-.. I" ~ WAnA vr+- ct.\ '11+.~If'~ 1 f\A ~J..() 0t A Ad <:;(tJY. p J.. 'I ,

-- ,l~~=l1}O .l D-1l.rc~0;(1) b~L(i/(j QP"JJ~

~ 'fi;\ ~'l/l>iJp 0 ?M ~ -(4-) 7d~~7'SG 11\ ~O£?J

~ h Ar:.J./O s: 1 f>h I~~fAlttlf fu1vl--S ~~ iJA CJ.147./ < JJ I" LI ,A (~+t-e_:'~ --Le ~ / __ I CJ.\::l-J IV\~ ~l ,;.p-i ~ ,.,

--- h:Q~~_1At? ~J~()/~MV~ -1 fi\b.~ N4r-.~

J-J././v '--'I v~\..I f-=-l)

E&OE TOTAL ~ .-/

Page 6: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

SENGA SEW CO.For All your Sewing Machines and Spare requirements

Plot 2/1 Burton StreetP. O. Box 24901

Tel: 041 235832/077 411002

Kampala(U)E-mail: [email protected]

MIS N.f!:.€.0:f?f..r.g.~ f)~f..~~ ..... ..~~.~P~~.9.~ .

No. G55

QtyParticularsRateShs

J

S,~~ 2:,G\ %~ CZr<1gQ() , bl£ '1J r{.D1/\ (~Q IfTt...

r{')r(/rl. ,4r()a.J) >A..

~tOV\ LZS 1U~ - l1{ooO\)Is~o dA'O

7A..z&Q(f'A-k

I IJ

J

JJ-r{)~,~CPrQ(L, V GtA~M£'~

I

(;;)f.

I '1VT« I

.••. ~OVtb~

w,'":'r/~escuelfS~

0Aa;- ffi Io,.Jd~ .1)~ .solYwJ

NON

lABLt

~

~

r--.() 0 \Z->l.ld~

\/"'\

.n ( \U1

\S../' /

\

./ /', \ JVE 8t O.E.

TOTAL, 3-so 1)00I

All accounts are due on demand

. ~SIgnature: .

Page 7: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

ENABLING SERVICES (!D LTDP.O. Box 26179

Kampala-UgandaPlot 5 Essex Gardens

Kyambogo Lower Estate

Attn: Mr Francis Kinubi

Phone: 256-041-289151Fax: 256-041-289151

E-mail: [email protected]

Invoice Date: 10/01107To: Salama School for the Blind

Mpumu -Mukono

No. EOOSO

Qty DescriptionRateAmountRemarksUShs

UShs

10

Standard Perkins Braillers 1,300,00013,000,000

50

White Canes,collapsible type40,0002,000,000

Total

15,000,000

In words: Fifteen Million Shillings only

We require a local purchase Order plus a 50% commitment fee.

Page 8: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

~nni(FURNITURE

CONSTRUCTION AND

TECHNICAL SERVICES

SAINT AlBAN DEROCHE - 38300-93 BOURGOIN, FRANCESWORKSHOP: Nalukolongo Industrjal Area, Kabowa, Simbwa Zone, 800m ofNdeeba Trading Centre DINNAJUNCTION

PRO-INVOICE

P.O. Box 483/554

Tel: 270145

Mob: 077 - 415141

SHOW ROOM

Mob: 077 - 656040

KAMPALA - UGANDA

~~ ~-//~ ' Date:....?>!.....~ O.07

TO: ..~.!..f..(lE:.l'4:····~·······~·r·~····ft2·tJ-rt/.M7t.RJ:T(/ .

Our ReI

NO. AS

Qty Particulars Rate Shs.

TOTAL

Accounts are due on demand

Signature: .

Page 9: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

STRATAGEM LTDP.O. BOX 23051 KAMPALA

QUOTATION FOR DRILLING OF 1 BOREHOLEIN MUKONO DISTRICT

(Average 60m depth)Client THE NABAGEREKA DEVELOPMENT FOUNDATION

C/O SYLVIA N. NAITALA 0772 504469

ITEMDESCRIPTION UNITQTYRATEAMOUNT

Ushs

Ushs

1.0

PRELIMINARIES AND GENERAL

1.1

Mobilisation of personnel, equipment and materials SumLS 1,600,000

1.2

Hydrogeological Survey (Siting) LS1,500,000

1.2

Preparation and Submission of Completion Report SumLS 100,000

Sub Total

3,200,000

2.0

BILL NO 2. BOREHOLE CONSTRUCTION

2.1

Setting up and dismantling at every site No1800,000 800,000

2.2

Shifting between sites Km020000 02.3

Drilling in overburden at 105/8" diameter including M25110,000 2,750,000installation and removal of 8" temporary casing both using DTH/Mud rotarv2.4

Drilling in consolidated formation (fractured zone)

at 7-8" diameter

M10100,000 1,000,000

2.5

Drilling in hard rock at 4.5" diameter M2590,0002,250,000

2.6

Sampling and storing of drill cuttings at 3m interval

or as instructed by the Engineer

No150000 50,0002.7

Supply and Installation of uPVC casing (5"ND) includingcentralisers and bottom cap

M2550,0001,250,000

2.8

Supply and Installation of uPVC screens (5"ND) M1065,000 650,000

2.9

Supply and Installation of cement grouting LS0100,000 0

2.10Supply and Installation of gravel pack 50 kg bag

2530,000 750,000

2.11

Installation of inert backfill No180,000 80,000

2.12

Casting of sanitary seal No1120,000 120,000

2.13

Well Development No1230,000 230,000

2.14

Test pumping

Movement between sites

km05,000 0

Test pumping installation and removal

No1200,000 200,000

Pumping time

Hrs350,000 150,000

Recovery time

Hrs130,000 30,0002.15

Water samplingNo15,000 5,000

Water Quality analysis

No1150,000 150,0002.16

Well capping No1100,000 100,000

2.17

Clearing site No185,000 85,000

2.18

Standing time Hr0200,000 0

Sub Total

. 10,650,000

~'?-

.;(.,<'/~ '.

,~\ \9~l

~-:":; ~.e..,

(f"I•d

,•-0 0

. o'o~'. 0- '<:"'. . .....'

<?. ~~

O-ri]057~o

Page 10: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

BILL NO.3: HAND PUMP PLATFORM CASTING AND PUMP INSTALLATIONItem Descrition UnitQtyRateAmount

fUshs)3.1.1Construction of U2 hand pump super structure

including installation of pedestal, water tank, pump headand platform (concrete mix 1:2:4), drain channel andsoak-away pit filled with hard core

No1800,000 800,0003.2.1

Supply and installation of riser pipes m3020,000 600,0003.3

Supply and installation of connecting rods m305,000 150,0003.4.1

Supply and installation of U2 cylinder No1100,000 100,000Sub Total

1,650,000

SUMMARY1.00

Preliminaries and General 3,200,0002.00

Borehole Construction 10,650,0003.00

Hand pump Platform CastinQ and installation 1 650,000Grand Total

15,500,000

Page 11: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

001574ZM·I('-----PUBLISHERS-~

I.K. PUBLISHERS (0) LTD.CAPITAL AUTO BUILDINGPLOT 557, KAMPALA-ENTEBBE ROADP.O.BOX 12385, KAMPALATEL: 041-271615/031-262584/5 D2teFAX: 041-271615/031-262584/5

Fage

QuotationCJ

.J

SETTING A NEW TREND IN SCHOOL BOOK PUBLISHING

Dr to:

ST POfoJS!·A..NO NGOND':"'lE

Your R ef2rence Tax EXEmp Tax ~:efere:1ce

01

Expiry

.-..-. ./..-••..•.'."....:c

PEf·.j7F

C'E\l:::­PEf:3T

FSG4PP::;C5PPSG6f='

PSC"7P'>:-.,-.;'t'""...:'\.:! I

FSC3T

PSC5Tpse:!

!vII{ PR; /l;L6..f'. \[ Et·.]GUSH PSl{ .I

f".,i}i~ F'nn12)' EngU;h FB}": t"MK ;::rimar1 Engifst1 PSK 6

Mi' Primar1 Eng'lsh PEW 7:"iK t=IF~U.A.C:·.R·y· ENGUSH TfS 8j{:2i'..~KFF~if;;1.;\f.~--{ENGllS~ TPS Bt< .:i

MK PRIM!".J:'.'! EIJGU:'OH ~F:::;EW 4

f"lf·: Pnrfiary EngH-si1T·'; B~ 5

r,~i': Prlmar:¥ Engilsil Trs 81{ 6

~.1K Frimar~ English Trs 8y. 7j.,U<:II\JTEGR."TED F":I\.t6R'{ SCIENCE PElF: 2

MI< lNTEGRPTED PRU •.\PRY SCiENCE P8l<: 4

M!{ i1'JTEGRPTEO FRIf..,.iARY SCIENCE P8K5

fvlK iNTEGf.: ..'::·.iEO PF: f'vt.~·.F:"'{ SG I Ei\j G E F 8~: 6

l'ill<; INTEGRATED PR·M".F:·Y· SCIENCE PSt.; 7

MI{ !NTEGR,",TEO PRI[·...1.."RY SCIENCE TF:S 8i<1MI'; If,JTEGRA.TEO PRIMA.RY SGIENCE TRS EW.:i

j",1!{ INTEGRATED PRIMA.RY SCIENCE TRS 81<.i

fiiH< ntegrate;j Pr. Sc:!eoc:e irs 8K 5

rvw ntegr3te,j Fe SciEnce Trs S,': 6

i',"'ib:~ ntegratE:G Pr!maqi Sclenc:e Tf::; 8 .~7 .

(~u;;ntl;y Unrt

1.1.)0

'·.je,,;

1400Pc

14.C.:;Fc

14.(0

p.~, 00 NosIi.OO

Nosi.G}

No,;

1.00fcjoo

100 t~r)&

i.00P~c·

~4.C'ONo:;

14.mNo,;

14.DO

j',Jos

14.00No:=.

14.I)Ji'l'l':l::;

1.00

r',jos

1.Cu)

Nos

1.00

No';

1.00

Pc1.00

r",~r-'_,

1oe! fo'Jo;

9l:'-ajJJO9,000.00

i2DOO.C¥J

12.000.C')12,000.00

9.000.1))11 }J1JO.OO

i2,(1)J.0012,000.00

9,000,00

9,030.00

13 .2C~).Cfi)

;.;: ,200.0(;13,200.((i

5:3DO(: OC

E.e,C(IO.OO

c3,OGO.C:;

8,OOO,')J

12,OC;J].OJ

12,OOO.OC

i2,000.(I;J25,0(:0.0054,000.00

5;:;,0(10,00

6;3,000.00

;:;4,;300.00

9,000.00

9,OOO,CO

\. ".I

"........

03t2 _

3 ,971.6((:.OC

o,oe

3- ,97 i ,6Cu). 00

Page 12: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

M.K. PUBliSHERS (UJ lTD.CAPITAL AUTO BUILDINGPLOT 557, KAMPALA-ENTEBBE ROADP.O.BOX 12385, KAMPALATEL: 041-271615/031-262584/5FAX: 041-271615/031-262584/5

~'-.+,--J;n:::

Quotation

SETTING A NEW TREND IN SCHOOL BOOK PUBLISHING

Dr to:

Dellve; Ie;

De.;cnptIOf1 t:iUantlty Un:t

s::oo.oc

;; ,i_,_ii_',. __

= :..:.: CO

lO,cac,aoiO)G,:.OC

- 26 ,e-:;Ci.J:ii :::~:;CD.;:::!

, 2::::{;;:' J:;

'l ::: ,C)::. ::',:;

i4C ,ClCle ,':(!

13.2CC ')C

l::, ~:(:.,:{,J.C DOC OC

14C .::00.':::'

9'oOO.OG

9.oDO.0':

;tGOD,OO

9.:)00 ':5:'

iC C;C{;,CO

1 ;:1 ,CC{;. CD

1(; ,::((:,0::

i-3.200.00

iDf;JO,OO

'1,(((1.00i2;(((;,C(1;; ,2')].':'09,,»):..00

10,OOD,OO

ii ,OOG,OO

12,000.001~ ":f:":; ::'

;'.; ,~,.­\.,.,-'.:,

No:;

\j '::.;

-;;-'

.(,; ,.•.•. -"-

f'"C:;f-" -.,-

j'" '."=

i.OG

~.001.00

i4JJO

i4.00

140C f'·jG·::

14.CO

i.OO

14.(.)14.c(

H{ S;~~·.k[L~'.ll:t.DSOC,~L:,L STUGiES PB:<

"'),;t~~:~T~J:~Q:.:,r;:aS-:-;C' c_ ·:S-:-UD1::S C'at:r"i< ::;-,~.J-~O..t.=D SC:':;L4.L S'i.JDiES TRS Ef{ 2~',/F ,;;T..£:.-.i\lGt:;::'D ·3;)C.,'::·._ :~T'JJ~E?T~:S 8fi- 3

~'~KS""/t:.J~G'::.p: C .:;·::"Cl ~L ~:;""'jCjE';P8F"~H{ S- ..6.J'.~Si:'..fi.C ·:;C::: ·:::·L ::·-L;J;E·~P8r<

r,:~l-( ST:::::.NDA.90 SCCL~:_;TJOiE::; i='SF

!VH< ST ..i;,..f"lD.':'j:~.OSO'::!.-':'.:", ST _'DiES F8~~~

f':·H< ST..~..f~lDfr.F0 SOGLt-.,L ::;-UGiES PBt<

;vW~ST.~.j'1[Lt·.RG·:;OGi~.::-i..STLD!::S TF.S 81< 4­~',1~<ST 6,.;-"JD..6PC~OCL'::'.L :~-~_'::E::;T~:S EV::r)t< S T >:'..f'.J O,c~F 0 SCiG L6,L S-:- _! 0 ~L:S r;:;:: s E''!~ is

MK PRif",.hF i-i.~.T+iS TRS 81<.:;:'

fif'"~' PF'!f.AAfi f,t.~·.THS .•..R~ 8K .::;

r,,·U.zPR:!f~-t~._F-: f,,·~t:..T:1·~Tf ~ 9~~ J.

fii{ FRI~./~..F.· r,i..~-i-jSiFS EW'5

f/K PR!f,"';..='..F·-·""f"~..'1'"HS TRS 8}(.6r'J'H<PRH::,Lt,f. y f.•i'·6...•..HS -RS EH<7"

fvlV PR!i·,!t~..i'·{ M"THS P8;{ ;:,h,1~~~PR n·,;t'::,Fy f:tt:::' ..TH S P8f< .::;

,. Hi: PF.:I~tt..RY f·.,1.-6THSF8.i~.4Mf< PR'MAJ:'.Y M"THS PBi' S

"':-"';'"-=­r- ,.:,..:',,-.'

r'::;:::::':;-"

P'-:/7:-:­

C\,iT=:T

C",'74~'

Page 13: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

001574ZM·I('-----PUBLISHERS-~

I.K. PUBLISHERS (0) LTD.CAPITAL AUTO BUILDINGPLOT 557, KAMPALA-ENTEBBE ROADP.O.BOX 12385, KAMPALATEL: 041-271615/031-262584/5 D2teFAX: 041-271615/031-262584/5

Fage

QuotationCJ

.J

SETTING A NEW TREND IN SCHOOL BOOK PUBLISHING

Dr to:

ST POfoJS!·A..NO NGOND':"'lE

Your R ef2rence Tax EXEmp Tax ~:efere:1ce

01

Expiry

.-..-. ./..-••..•.'."....:c

PEf·.j7F

C'E\l:::­PEf:3T

FSG4PP::;C5PPSG6f='

PSC"7P'>:-.,-.;'t'""...:'\.:! I

FSC3T

PSC5Tpse:!

!vII{ PR; /l;L6..f'. \[ Et·.]GUSH PSl{ .I

f".,i}i~ F'nn12)' EngU;h FB}": t"MK ;::rimar1 Engifst1 PSK 6

Mi' Primar1 Eng'lsh PEW 7:"iK t=IF~U.A.C:·.R·y· ENGUSH TfS 8j{:2i'..~KFF~if;;1.;\f.~--{ENGllS~ TPS Bt< .:i

MK PRIM!".J:'.'! EIJGU:'OH ~F:::;EW 4

f"lf·: Pnrfiary EngH-si1T·'; B~ 5

r,~i': Prlmar:¥ Engilsil Trs 81{ 6

~.1K Frimar~ English Trs 8y. 7j.,U<:II\JTEGR."TED F":I\.t6R'{ SCIENCE PElF: 2

MI< lNTEGRPTED PRU •.\PRY SCiENCE P8l<: 4

M!{ i1'JTEGRPTEO FRIf..,.iARY SCIENCE P8K5

fvlK iNTEGf.: ..'::·.iEO PF: f'vt.~·.F:"'{ SG I Ei\j G E F 8~: 6

l'ill<; INTEGRATED PR·M".F:·Y· SCIENCE PSt.; 7

MI{ !NTEGR,",TEO PRI[·...1.."RY SCIENCE TF:S 8i<1MI'; If,JTEGRA.TEO PRIMA.RY SGIENCE TRS EW.:i

j",1!{ INTEGRATED PRIMA.RY SCIENCE TRS 81<.i

fiiH< ntegrate;j Pr. Sc:!eoc:e irs 8K 5

rvw ntegr3te,j Fe SciEnce Trs S,': 6

i',"'ib:~ ntegratE:G Pr!maqi Sclenc:e Tf::; 8 .~7 .

(~u;;ntl;y Unrt

1.1.)0

'·.je,,;

1400Pc

14.C.:;Fc

14.(0

p.~, 00 NosIi.OO

Nosi.G}

No,;

1.00fcjoo

100 t~r)&

i.00P~c·

~4.C'ONo:;

14.mNo,;

14.DO

j',Jos

14.00No:=.

14.I)Ji'l'l':l::;

1.00

r',jos

1.Cu)

Nos

1.00

No';

1.00

Pc1.00

r",~r-'_,

1oe! fo'Jo;

9l:'-ajJJO9,000.00

i2DOO.C¥J

12.000.C')12,000.00

9.000.1))11 }J1JO.OO

i2,(1)J.0012,000.00

9,000,00

9,030.00

13 .2C~).Cfi)

;.;: ,200.0(;13,200.((i

5:3DO(: OC

E.e,C(IO.OO

c3,OGO.C:;

8,OOO,')J

12,OC;J].OJ

12,OOO.OC

i2,000.(I;J25,0(:0.0054,000.00

5;:;,0(10,00

6;3,000.00

;:;4,;300.00

9,000.00

9,OOO,CO

\. ".I

"........

03t2 _

3 ,971.6((:.OC

o,oe

3- ,97 i ,6Cu). 00

Page 14: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION

~nni(FURNITURE

CONSTRUCTION AND

TECHNICAL SERVICES

SAINT AIBAN DEROCHE - 38300-93 BOURGOIN, FRANCESWORKSHOP: Nalukolongo Industrial Area, Kabowa, Simbwa Zone, 800m ofNdeeba Trading Centre DINIYA JUNCTION

PRO;.INVOICE

P.O. Box 483/554

Tel: 270145

Mob: 077 -415141

SHOWROOM

Mob: 077 - 656040

KAMPALA - UGANDA

Your Ref . ~/" Date:....S(..rl!/7.'!. ..Z<Jo

TO:·····N~a.~··········~f>.·~·i f.0.U... .., r:::t

Our Ref

NO. AS

Qty Particulars . Rate Shs.

TOTAL

Accounts are due on demand

Signature: ,..~ .

Page 15: DescriptionQty RateAmount Unit 180,000 8 1,440,000 wash ...In words: Fifteen Million Shillings only We require a local purchase Order plus a 50% commitment fee. ~nni(FURNITURE CONSTRUCTION