Project La Farge – Delivering of cement plant equipment to Kaluga region.

Description of the cargo

No. Description of goods Package No.Package Dims. (cm)

Ttl Volume(m3)

Weight (kg)

Qty Type L W H Net Gross

1 Tyre / бандаж 01-316KI02-C-1/4 1 Ba 660 660 163 71,003 77 562 79 200

2 Tyre / бандаж 01-316KI02-C-2/4 1 Ba 660 660 163 71,003 77 562 79 200

3 Tyre / бандаж 01-316KI02-C-3/4 1 Ba 645 645 143 59,492 49 443 51 000

4 Expansion joint / Температурный компенсатор CBMI-FER-M-C-012-8/8 1 Ca 670 660 250 110,550 12 506 14 526

5 Shell of Cement Mill/корпус шаровой мельницы 01-416MB07-1/1 1 T 1 763 443 449 350,673 125 165 126 315

6 Main drive / главный редуктор 1/4 1 Ca 650 375 385 93,844 69 500 74 000

7 Grinding bowl / размольная чаша GP-033 1 Ba 521 521 241 65,417 70 000 70 000

8 Helical gear unit / геликоидальное зубчатое колесо GP-036-FL 1 Ca 583 399 387 90,023 105 000 111 000

ИТОГО 8 912,004 586 738 605 241

Discharging of equipment in the port of Novorossiysk

Reloading of the equipment from sea-river going vessel on board the barge in Dzerzhink.

Reloading of the equipment from sea-river going vessel on board the barge in Dzerzhink.

Discharging of the equipment from the barge on the trucks in Kaluga.

Delivering of the equipment from Kaluga to La Farge job site, Ferzikovo.

Discharging of the equipment from the trucks by hydraulic lifting system of the trailer at La Farge job site, Ferzikovo.