description - civil engineering
TRANSCRIPT
-
8/18/2019 Description - Civil Engineering
1/28
Tripod
-
8/18/2019 Description - Civil Engineering
2/28
Description 2015
II.-OBJECTIVES:
1) To give the students techniques to identify the types of description.
2) To provide the students techniques to identify the parts of an object or
structure considered as a whole.
III.-OVERVIEW:
1.-Definition of Description2.-Types of description
3.-Physical description Parts and the whole!.
".-#ar$ers or connectors of physical description
IV.-DEVELOPMENT:
1.-Description !De"inition)
% technical description rarely stands alone. &t is usually part of a longer docu'ent
such as a for'al report( user)s 'anual( or service 'anual. &n any case( it has a distinct purpose* to help the reader picture the object being described and understand its
functioning in so'e detail.
The reader 'ay need this understanding for various reasons. The description 'ay
help orient the technician before service or repair activity. The description 'ay help the
non-technical reader who needs to use the object. +r it 'ay help a reader understand the
object well enough to judge its practicability( as in the case of an operations 'anager debating whether her,his co'pany should 'anufacture a newly designed device.
% good approach to a for'al technical description is to first provide a definition of the object lin$ed to an eplanation of its function. ut before you begin( decide how 'uch
your audience already $nows.
%fter an introduction to the object and its functions( go on to describe the overall
appearance of the object. /onsider the factors involved in visuali0ing it* shape( si0e(
weight( 'aterials used( spatial relationships( and the li$e.
To develop the reader)s understanding of the object( brea$ it down into a list of
co'ponent parts net. These 'ay be parts that go into actual asse'bly of the object( such
as the engine( trans'ission( and fra'e of a car they 'ay also be 'aterials the object is
co'posed of( such as the inner and outer 'aterials of a resistor or a silicon chip.
ollowing is a suggested general approach for writing the technical description
• Definition in ter's of function!
• +verall description di'ensions and appearance!
• % list of co'ponent parts
• Description of parts
2
-
8/18/2019 Description - Civil Engineering
3/28
Description 2015
• elation of parts to the whole
2.-T#PES O$ DESCRIPTION:
There are two types*
a.-Physical description b.-Process description
%.- PSIC%L OR STR'CT'RE DESCRIPTION:
&t eplains the arrange'ent and shape of an object or 'echanis' in space. 4uch a
description 'ay involve 'ove'ent co'ple 'otions are better handled with the process
description.
The 'ain purpose of describing a 'echanis' is to 'a$e the audience see or
visuali0e the object and to give an i'pression of the appearance of the 'echanis'. The
appearance of the object is epressed by describing its shape( si0e( weight( color( tetureand 'aterial fro' which it is 'ade.
&n describing a 'echanis'( the writer should be fa'iliar with 'echanis' itself sothat he can easily convey his 'essage to the reader. 5is can use visual aids to help hi'
co''unicate his 'essage.
Typically( the parts of 'echanis' description answer the following questions in order*
• 6hat is it7
• 6hat is its function7
• 6hat does it loo$ li$e7• 5ow does it wor$7
• 6hat are its principal parts7
M(rers:
- consist of - located within - is disconnected fro'- contain - 'ounted on - is re'oved fro'
is 'ade up of - is divided into - is ta$e out of
- is 'ade of - is co'posed of - is constituted of, by
- is , are attached to - detached fro' - is separated- is, are supported by - 'ade of - is , are the parts in
- attached - is joined to - co'pose
- &nterloc$ - is connected to - constitute- is , are joined together by - are co'ponents of - wound around *
wired to
E*(+p,e %:
3
-
8/18/2019 Description - Civil Engineering
4/28
-
8/18/2019 Description - Civil Engineering
5/28
Description 2015
E3ERCISE I: WRITE T&E N%ME $OR E%C& IVEN P%RTS IN $OLLOWIN
$I'RES.
%.-The illustration shown on the right represents the essential ele'ents of a 'odern
uilding.
Parts*
$on/(tions* This is a structure 'ade(
'ainly( of ce'ent( iron and gravel ! that
transfers loads to the earth. The pri'ary designconcerns are settle'ent and bearing capacity
Strctre: This is co'prised of pillars( bea'sand tie-bea's 'ade of reinforced concrete or
iron
$,oors (n/ cei,in4: 5ollow tile are placed
between two tie-bea's( later it is covered by a
layer of concrete. loors are finished with floor
tiles or floorboard.
E*teriors 0(,,s: These are usually 'ade by
two bric$ walls and an insulator layer to avoidthe heat loss!.
Win/o0s: These provide a visual lin$ betweeninternal space and the outside world. They are
very i'portant to the 'ental health of the
people in the house. % s'all tie-bea' is placed
above the window to bear the load of all bric$ssituated over the window fra'e.
Roo". &ts functions are to protect a buildingfro' the weather and to retain the heat
generated inside. &t is co'prised of a wood or
iron structure( a ther'al 'aterial such as
fiberglass and the last layer( the tiles or slates.
Intern(, 0(,,s. The pri'ary function of internal wall is to divide the overall space
within the house into s'aller spaces. They are
'ade of bric$( wood or plaster .
E3ERCISE II: CONCRETE
$R%ME STR'CT'RES
-
8/18/2019 Description - Civil Engineering
6/28
Description 2015
/oncrete fra'e structures are a very co''on - or perhaps the 'ost co''on- typeof 'odern building. %s the na'e suggests( this type of building consists of a fra'e or
s$eleton of concrete.
5ori0ontal 'e'bers of this fra'e are called beams( and vertical 'e'bers arecalled columns. 5u'ans wal$ on flat planes of concrete called slabs. +f these( the colu'n
is the 'ost i'portant( as it is the pri'ary load-carrying ele'ent of the building. &f you
da'age a bea' in a building( it will usually affect only one floor( but da'age to a colu'ncould bring down the entire building.
The concrete fra'e rests on foundations( which transfer the forces - fro' the building and on the building - to the ground. 4o'e other i'portant co'ponents of concrete
fra'e structures are*
Shear Walls are i'portant structural ele'ents in high-rise buildings. 4hear walls areessentially very large colu'ns - they could easily 'easure "=='' thic$ by 3' long -
'a$ing the' appear li$e walls rather than colu'ns. Their function in a building is to help
ta$e care of horizontal forces on buildings li$e wind and earthqua$e loads. >or'ally( buildings are subject to vertical loads - gravity. 4hear walls also carry vertical loads. &t is
i'portant to understand that they only wor$ for hori0ontal loads in one direction - the ais
of the long di'ension of the wall. These are usually not required in low-rise structures.
Elevator Shafts are vertical boes in which the elevators 'ove up and down - nor'ally
each elevator is enclosed in its own concrete bo. These shafts are also very good structuralele'ents( helping to resist hori0ontal loads( and also carrying vertical loads
E3ERCISE I: Write in te o*es te n(+es o" te /i""erent t5pes o" concrete "r(+e
strctres.
?
http://www.understandconstruction.com/introduction-to-foundations.htmlhttp://www.understandconstruction.com/introduction-to-foundations.html
-
8/18/2019 Description - Civil Engineering
7/28
Description 2015
@
-
8/18/2019 Description - Civil Engineering
8/28
Description 2015
A
-
8/18/2019 Description - Civil Engineering
9/28
Description 2015
O6ecti7e: To i/enti"5 te 0o,e
(n/ its p(rts o" ( strctre.
P%RTS O$ % DOOR
1.->ot all doors are 'ade equally and the parts of a door tell the tale. 2.-&nterior doorsserve a purpose of dividing roo's or providing privacy in so'e cases. 3.-Bntry doors( also
C
-
8/18/2019 Description - Civil Engineering
10/28
Description 2015
called eterior doors( have a dual purpose. ".-irst( they provide insulation against the
outside ele'ents( and second( they help $eep dust and debris out of the house.
-
8/18/2019 Description - Civil Engineering
11/28
Description 2015
Te Door P(ne,
2".-+f course( there is the actual door itself. 23.-The door panel has a door $nob hole
already cut into it so installing the door latch 'echanis' is a snap. 2".-The $nob hole is
lined up with the spot in the ja'b where the latch will co'ethrough. 2
-
8/18/2019 Description - Civil Engineering
12/28
Description 2015
".-ea's are characteri0ed by their profile the shape of their cross-section!( their
length( and their 'aterial.
-
8/18/2019 Description - Civil Engineering
13/28
Description 2015
MOD%L %'3ILI%RIES
13
-
8/18/2019 Description - Civil Engineering
14/28
Description 2015
OBJECTIVES:
1.-To recogni0e the use and applications of #odal %uiliaries through reading
co'prehension.
2. -To write sentences using #odal %uiliaries correctly
CONTENT:
1.-The #odal %uiliaries. &ntroduction 1.1. 9sage
1.2. +ffers,equests with #odal Eerbs
1.3. %lternative or's 2.-Ba'ples and Bercises
DEVELOPMENT:
Mo/(, %*i,i(r5 Vers
#odal verbs are verbs such as can, could, may, might, must, need not, shall!ill, shouldought to. They indicate ability( per'ission( etc. #odal verbs cannot be used in all
the tenses in Bnglish( so we need to $now their alternative for's as well.
#a is 12 years old and wants to beco'e a 'echanic. 5e is going to ta$e over his father)s
garage( so nee/ not worry about his future.
#a)s father tells hi' every day that he +st do what he is told and +st not touch any
dangerous equip'ent.
#a c(n already change tyres( but he has to learn a lot 'ore about cars. 5e so,/ wor$ in
the garage 'ore often if he wants to be a good 'echanic.
1.1. 's(4e
• #odal verbs are generally only used in the present tense
in Bnglish. &n the third person singular( we don)t add
an s.
E"ample#
5e 'ust do what he is told.
not# he 'usts!
• or negation( we don)t need to add a helping verb.
E"ample#
#a need not worry about his future.
1"
-
8/18/2019 Description - Civil Engineering
15/28
Description 2015
#a 'ust not touch any dangerous equip'ent.
need not F do not have to
'ust not F be not allowed to
•#odal verbs are always used along with a full verb ecept for shortanswers and question tags!. The full verb is added without to.
E"ample#
#a can change tyres. not# #a can to change tyres.!
1.2. O""ers;Reor'al or' Polite or' Ba'ple
can ability! could/an you repair this flat tyre7
/ould you repair this flat tyre7
can per'ission! 'ay/an we co'e in7
#ay we co'e in7
shallG should4hall he pic$ the car up to'orrow7
4hould he pic$ the car up to'orrow7
willG would 6ill the car be ready to'orrow76ould the car be ready to'orrow7
'ay 'ight#ay & as$ how 'uch this costs7
#ight & as$ how 'uch this costs7
=Wi,,;S(,,
6e use !ill to 'a$e requests,as$ so'ebody to do so'ething. 6hen we want to 'a$e a
suggestion using the interrogative for' in the 1st person $%, !e&( we use shall .
E"ample#
•
#a( will you change that tyre7• /hange the tyre( will you7
• 4hall & change that tyre7
1.> %,tern(ti7e $or+s
&f we want to indicate a situation in the past( we have to use the alternative for's instead ofthe regular 'odal verbs.
1
-
8/18/2019 Description - Civil Engineering
16/28
Description 2015
Hist I #odal Eerbs and %lternative or's
'odal verb alternative for' ea'ple sentence
'ust to have to#a 'ust do what he is told.5is father also had to do what he was told.
'ust not not to be allowed to
#a 'ust not touch anything dangerous.
5is father was not allowed to touch
anything dangerous.
can ability! to be able to#a can already change tyres.
5is father was not able to change tyres.
canper'ission!
to be allowed to
#a can help in the garage at the age of
12.#a)s father was allowed to help at the
age of 13.
need not not to have to
#a need not worry about his future.
#a)s father did not have to worry about
his future either.
should,
ought to
to be supposed to,to be epected to,to be
to
#a should wor$ in the garage 'ore
often.#a)s father also was supposed to,was
epected to,was to wor$ in the garage
often.
+f course( we can also use the alternative for's in the present tense.
E"ample#
#a can change tyres. F #a is able to change tyres.
PR%CTIC%L CL%SS
E3ERCISE I: $irst in te e*ercise ?SIDE %@ coose te correct +o/(, 7er in te
present tense in or/er to constrct ( te*t t(t +(es sense. Ten rep,(ce te +o/(,
7er in te sentences on te ? SIDE B@ 0it te correct (,tern(ti7e "or+ in te p(st
tense.
#a)s father too$ over the garage fro' his father. 5e /i/ not (7e to worry about his feither. #a)s father also had to learn a lot and (/ to do what he was told. 5e 0(s
(,,o0e/ to touch dangerous equip'ent. 5e 0(s e*pecte/ to wor$ in the garage o
5owever( #a)s father was not as talented as #a and 0(s not (,e to change tyres un
was 1< ears old.
1?
-
8/18/2019 Description - Civil Engineering
17/28
Description 2015
SIDE ?%@
1.- To' JJJJJJJJJJJ tidy his office today because he JJJJJJJJJ find anything
any'ore.
a.- can a.-cannot b.- need to b.-need to
c.- 'ust c.- 'ustnot
2.-5is boss tells Ton that he JJJJJJJJJJbe tidier.
a.-need to
b.-ought c.-can
3.-+therwide he JJJJJJJJ wor$ in his depart'ent any'ore.
a.-cannot b.-shall
c.-'ust
".-6hen custo'ers want infor'ation( he JJJJJJJJJJ be able to help the' i''ediately.
a.-need not
b.-should c.-can
-
8/18/2019 Description - Civil Engineering
18/28
Description 2015
3. +therwise( he JJJJJJJJJJJJJJ wor$ in his depart'ent in the future.
". 6hen custo'ers wanted infor'ation( he JJJJJJJJJJJJJJJ be able to help the'
i''ediately.
-
8/18/2019 Description - Civil Engineering
19/28
Description 2015
1.-JJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ 2.-JJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ
3.-JJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ ".-JJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ
-
8/18/2019 Description - Civil Engineering
20/28
Description 2015
2.-To identify the steps of a process.
OVERVIEW:
1.-Description of Process Definition!
2.-/onnectors and epressions of process description 'ar$ers!3.-Ba'ple I Bercise.
1.-DESCRIPTION O$ PROCESS:
% 9process /escription9 is /e"ine/ (s ( 4ener(, /escription of how a process
happens( step by step. &t does not tell the reader what to do rather( it describes how
something happens. Ba'ples of process descriptions are any $ind of 'anual( pa'phlet(
or sheet describing how a type of 'achine wor$s( how to conduct an epe ri'en t ( how
to construc t a da'( how to operate a 'achine how a hu'an process wor$s( or how
a type of event wor$s. Process descriptions avoid giving co''ands( avoid using the
pronoun you( and 'a$e use of the present tense.
4o'e $ey questions are*
• 6hat is it7
• 6hat is its function7
• 6here and when does it ta$e place7
• 6ho or what perfor's it7
• 5ow does it wor$7
• 6hat are its principal steps7
Process description includes sequence( instructions and procedure however( only
instruct if you epect your reader to perfor' the process you describe. Try to $eep separate
these two concepts* :how to do so'ething; and :5ow so'ething occurs;. The first calls
for instructions or procedures the second for sequence
E*(+p,e %: M%N'$%CT'RIN PROCESS O$ CEMENT
Hi'estone and clay are first crushed separately. They are then 'ied together in the
required quantities and ground together finely. This grinding can be done either by the dry
or the wet process. 6et process is suitable if li'estone and clay are soft. &f the raw
'aterials are hard( dry process is preferred. Dry process is cost effective because fuelconsu'ption is less when the raw 'aterials are burnt in a rotary $iln.
2=
-
8/18/2019 Description - Civil Engineering
21/28
Description 2015
Process
• The clay is first washed with water in wash 'ill to re'ove the foreign 'aterials.
• Powdered li'e is added to clay and the 'iture is finely ground and ho'ogeni0ed.
• The clay-li'e slurry "=K water present! or the dry pulveri0ed 'iture in the case
of dry process! is introduced into the upper end of the rotary $iln.
• The rotary $iln is a bric$-lined( inclined( steel rotating cylinder( 1
-
8/18/2019 Description - Civil Engineering
22/28
Description 2015
The Hafarge 'anufacturing process starts at the quarry 'ining and transporting the roc$ to
a crusher. This crusher brea$s the roc$ into wor$able si0es for 'oving through thesecondary crushers. Properly si0ed 'aterial is separated by screens( while oversi0ed roc$s
ta$e another run through the crusher. This 'aterial can then be shipped to the appropriate
plant for either concrete or asphalt production. eady 'i concrete 'aterial is stored in bins until ready for shipping( then is quic$ly 'ied and loaded into a ce'ent truc$. %sphalt
plants si'ilarly ta$e the 'aterial into te'porary storage( then once ready for shipping 'i
the' and hot pu'p the 'iture into truc$s.
2.-CONNECTORS %ND E3PRESSIONS O$ PROCESS DESCRIPTION
!M%R8ERS).
- efore* antes - lastly* ulti'a'ente - while* 'ientras- first* pri'ero -second* 4egundo - then* luego
- as soon as* tan pronto co'o - during* durante - third* tercero
- finally* final'ente - following* siguiente - when* cuando- as* 'ientras( a 'edida - to conclude* concluir - later* despuLs
- eventually eventual'ente - net* proi'o - after* despuLs
at this stage* en esta etapa - #ar$ the end of - afterwards -
Third place( etc. - secondly - 'eanwhile- subsequently*subsecuente'ente - firstly - at this point
PR%CTIC%L CL%SS
22
-
8/18/2019 Description - Civil Engineering
23/28
Description 2015
LIFE CYCLE OF NATURAL WOOD
JJJJJJJJJJJThe rough sawn boards are seasoned( a process whereby a large proportion of
the water content is re'oved. &f the process called Mair seasoning) is used( it can ta$e
'onths before the boards are ready for the net stage. %lternatively( the boards can be M$ilndried). This requires energy and heat and is 'ore epensive( although it ta$es a couple of
days.
JJJJJJJJJJJJThe tree is harvested fro' a sustainable forest. #echani0ation has led to the
develop'ent of equip'ent capable of cutting down hundreds of trees in a day.
JJJJJJJJJJJJ#%>9%/T9B - The seasoned boards( are used by 'anufacturers andfurniture 'a$ers( to construct products. Products range fro' windows and furniture to
electric guitars and boats.
JJJJJJJJJJJJThe Mlogs) are transported to a saw'ill and are Mbro$en down) sawn! into
boards. Bvery effort is 'ade to reduce waste. 4aw dust produced during this process is used
in the 'anufacture of chipboard and #D.
E3ERCISE I: RE%D %ND %RR%NE T&E SEA'ENCE
O$ T&E $OLLOWIN PROCESS T&EN L%BEL E%C&
$I'RE.
23
-
8/18/2019 Description - Civil Engineering
24/28
Description 2015
RE%DIN COMPRE&ENSION
RE%DIN NO. 1
OBJECTIVE: To i/enti"5 te /i""erent steps or st(4es o" te process 4i7en in (
p(ss(4e.
&OW TO B'ILD % STR%I&T $ORM $OR CONCRETE
1.-uilding a straight for' for concrete is fairly si'ple as long as the correcttechniques are used. 2.-The depth and width of the concrete place'ent deter'ine the
bracing and for'ing 'aterial required.
3a.-Hay out the corner positions of the slab using sta$es and string lines. ".-%
builderNs level is ideal for establishing the grade of the top of concrete( but an inepensive
line level will give decent results on short spans.
ail the for's to the sta$es level with and al'ost touching thestring line
1"e.-Pac$ the soil around the sta$es to lean the for' in or out if needed to align itwith the string line( and if it is necessary( place a gauge bloc$ to hold the string clear of the
for' and gauge the for' at frequent intervals to assure the for' is straight.
2"
http://www.wikihow.com/Build-a-Straight-Form-for-Concretehttp://www.wikihow.com/Build-a-Straight-Form-for-Concrete
-
8/18/2019 Description - Civil Engineering
25/28
Description 2015
1)
IN E%C& PICT'RE %CCORDIN TO T&E SEA'ENCE O$ T&E RE%DIN.
2
-
8/18/2019 Description - Civil Engineering
26/28
Description 2015
RE%DIN NO. 2
CONCRETE COL'MN
1.-/oncrete colu'ns are used for carrying loads of a building. 2.-They transfer the
sa'e to a suitable soil bearing capacity. 3.-They carry loads hori0ontally( vertically andlaterally. ".-They can be erected as free standing( used for hanging gates.
-
8/18/2019 Description - Civil Engineering
27/28
Description 2015
E3ERCISE II: $IND IN T&E RE%DIN $O'R DI$$ERENT DESCRIPTION
M%R8ERS O$ PROCESS %ND TR%NSL%TE T&EM INTO
SP%NIS&
M%R8ER TR%NSL%TION
1.- JJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ JJJJJJJJJJJJJJJJJJJJJJJJJJ
2.- JJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ JJJJJJJJJJJJJJJJJJJJJJJJJJ
3.- JJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ JJJJJJJJJJJJJJJJJJJJJJJJJ
".-JJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ JJJJJJJJJJJJJJJJJJJJJJJJJJ
E3ERCISE III: %$TER RE%DIN T&E TE3T. COMPLETE T&E C&%RT 'SIN
N'MBER O$ STEP %ND ITS DESCRIPTION. IN SP%NIS&.
STEP DESCRIPTION
2@
-
8/18/2019 Description - Civil Engineering
28/28
Description 2015