Council Minutes 28 April 2015
Council Meeting 26 May 2015
DEPARTMENTAL PROGRAMS 2015-2016
Office of the CEO p3 Corporate Services Division p15 Finance p27 Information Systems p37 People and Culture p45 Procurement and Contracts p54 Community and Development Services p65 City Development and Safety p71 Community Connections p83 Customer Service p109 Urban Services p115 Asset Services p121 Engineering Services p131 Operations Services p139
1
2
Departmental Program Report 2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
Office of the CEO 2015-16Manager Name: Paul Deb
1. Program Value Proposition
The Office of the Chief Executive Officer provides a strategic and coordinated approach to Council
business including relationship management for Council staff, Elected Members, Ratepayers and
external partners. The Department provides assurance, advisory and communication services on the full
range of issues across the Council.
2. Strategic Plan Strategic Directions
1 - Our Integrated Urban Form and Living Spaces
2 - Our Protected and Valued Environment
3 - Our Diverse Supportive, Happy and Healthy People
4 - Our Leading Inclusive and Connected Council
3. Program Functions
Civic Leadership
Develop productive and strategic relationships with all spheres of government and other key stakeholders. Build internal relationships and collaboration between Elected Members, Executive and staff through regular information exchange.
Elected Member Liaison and CEO Support
Provide support to the Mayor, Chief Executive Officer (CEO), and Elected Members. This includes management and coordination of CEO and Mayoral correspondence.
Citizenship Ceremonies and Mayoral Receptions
Coordinating and managing the staging of events including citizenship ceremonies and Mayoral receptions.
Community Engagement
Provides a channel by which residents and ratepayers can have a say on the decision making of Council and allows Council to gauge the wishes, aspirations and priorities of the electorate. This function coordinates and supports community consultation and engagement functions across Council.
Strategic Communications
Disseminates information about Council and its works into the public sphere using both traditional and new media channels. Key activities include quarterly resident newsletter, fortnightly messenger column, advertising, media management as well as the provision of strategic communication advice to Mayor, CEO and Executive.
3
4. KPIs
Function/Action KPI Units Target Value Target Date
Civic Leadership All staff briefings undertaken on a quarterly basis (minimum of four All Staff Briefings undertaken by June 2016).
number 4 30/06/2016
Undertake Leadership Development Forums on a quarterly basis.
number 4 30/06/2016
Undertake regular catch ups with Elected Members as requested.
percentage request met
100% request met
30/06/2016
Completion of Performance Development Reviews for Office of the CEO
percentage complete
90% complete 30/06/2016
Elected Member Liaison ... Provide support to Elected Members
percentage request met
100% request met
Citizenship Ceremonies ... Undertake citizenship ceremonies in response from Department of Immigration and Border Protection and community member requests.
number of ceremonies
trending number of ceremonies
30/06/2016
Undertake Mayoral Receptions as needed at the request of the Mayor.
number of receptions
trending number of receptions
30/06/2016
Community Engagement Number of community engagements to support Council policy and programs.
number trending number of community engagements
30/06/2015
100% of community engagements undertaken by Community Engagement Function open for 21 days (as per Community Engagement Policy).
percentage compliance
100% compliance
30/06/2016
Number of Burnside Twitter activities
number trending number of twitter activities
30/06/2016
Strategic Communications Distribution of 35 good news opportunities by June 2016.
number 35 30/06/2016
20% increase in balanced news stories in media benchmarked from 2013/14 financial period.
percentage increase
20% 30/06/2016
Four editions of Burnside number 4 30/06/2016
4
Focus distributed by June 2016
Implementation of all actions within the Strategic Communications Plan by June 2016.
percentage complete
100% complete 30/06/2016
Complete a community information publications audit (addressing branding, content and community relevance) by February 2016.
percentage complete by deadline
100% by deadline
29/02/2016
Coordinate delivery of Annual Community Survey results to Council.
Results delivered by deadline
Timeframe met 29/02/2016
Complete the Final Annual Report by December 2015.
percentage complete
100% by deadline
31/12/2015
Complete the Final Draft Annual Business Plan and Budget Document by May ready for Council adoption.
percentage complete by deadline
100% complete by deadline
31/05/2015
Development of city branded brochures
number 100% complete by deadline
30/06/2016
5. Strategic Risk Summary
Function: Civic Leadership
Risk: Divisions may not have the capability or capacity to implement decisions from the office
of ceo or council
Risk Rating: Moderate
Risk: Deliverable from divisions are not received by the Office of CEO in a timely manner
Risk Rating: Moderate
Function: Elected Member Liaison and CEO Support
Risk: Not being able to manage community expectations
Risk Rating: Moderate
Function: Citizenship Ceremonies and Mayoral Receptions
Risk: Not being able to manage community expectations
Risk Rating: Moderate
Risk:
Risk Rating:
Function: Community Engagement
Risk: Poor consultation or engagement processes including poorly timed consultation
Risk Rating: Moderate
5
Function: Strategic Communications
Risk: Communications Team not informed of issues or incidents that could attract media
attention
Risk Rating: Low
6. Our People
Position FTE Amount
Chief Executive Officer 1
Executive Officer (CEO and Mayor) 1
Strategic Community Engagement Officer 1.0
Corporate Communications Advisor 0.8
Community Engagement Administration Officer 1.0
7. Stakeholders
Internal Stakeholders
The Council
City of Burnside Elected Members
Employees, Staff & Volunteers of the City of Burnside
Independent Members of Committees
External Stakeholders
Community
State, Federal and Local Government Authorities
Boards of Incorporated Bodies
Subsidiaries (Eastern Health Authority, East Waste, Highbury Landfill Authority)
Local Government Association of SA
Office for State / Local Government Relations
Ombudsman
State Records
Media
Electoral Commission of SA
Freedom of Information Applicants
Department of Immigration and Border Protection
Office of Public Integrity
Independent Commissioner Against Corruption (ICAC)
8. Program Plan Actions
Action
6
Action: Work with stakeholders, community, Elected Members and employees to communicate and implement ‘Be the Future of Burnside’.
Implementation Officer/s:
Paul Deb
Louise Miller-Frost
Nigel Morris
Program Function: Civic Leadership
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative in meeting community needs
Approach: 4.7.2 - Develop strong partnerships with our community, stakeholders and all levels of government to achieve our vision
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business Need
Action Type: Operating
KPI: Clearly communicate and implement ‘Be the Future of Burnside’ in all Council correspondence, actions and initiatives
Action
Action: Work with all spheres of government and other organisations for the betterment of the local community, city and region.
Implementation Officer/s:
Paul Deb
Louise Miller-Frost
Nigel Morris
Program Function: Civic Leadership
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative in meeting community needs
Approach: 4.7.2 - Develop strong partnerships with our community, stakeholders and all levels of government to achieve our vision
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business Need
Action Type: Operating
KPI: Ensure that the Administration works with Federal, State and other local government organisations to achieve Council’s objectives.
Action
Action: Support Council’s involvement in regional and local government associations, networks and alliances.
Implementation Officer/s:
Paul Deb
Louise Miller-Frost
Nigel Morris
Program Function: Civic Leadership
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative in meeting community needs
Approach: 4.7.2 - Develop strong partnerships with our community, stakeholders and all
7
levels of government to achieve our vision
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Strategic
Action Type: Operating
KPI: Ensure that the Administration works with organisations such as the Eastern Region Alliance to achieve Council’s objectives.
Action
Action: Communicate regularly with staff on a range of issues.
Implementation Officer/s:
Paul Deb
Louise Miller-Frost
Nigel Morris
Program Function: Civic Leadership
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative in meeting community needs
Approach: 4.7.2 - Develop strong partnerships with our community, stakeholders and all levels of government to achieve our vision
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business Need
Action Type: Operating
KPI: All staff briefings undertaken on a quarterly basis (minimum of four All Staff Briefings undertaken by June 2016).
Action
Action: Elected Member Liaison and Administrative Support.
Implementation Officer/s:
Jo Biskup
Helen Bortoluzzi
Program Function: Council and Executive Support
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.3 - Delivery of good governance in Council business
Approach: 4.3.1 - Regularly review, update and adopt leading governance, risk management and administrative practices
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business Need
Action Type: Operating
KPI: Executive and Elected Member correspondence responded to within 10 working days as per Customer Service Policy.
Action
Action: Provide Administrative Support to the CEO and Executive Team.
Implementation Jo Biskup
8
Officer/s: Helen Bortoluzzi
Program Function: Council and Executive Support
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.3 - Delivery of good governance in Council business
Approach: 4.3.1 - Regularly review, update and adopt leading governance, risk management and administrative practices
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business Need
Action Type: Operating
KPI: Executive and Elected Member correspondence responded to within 10 working days as per Customer Service Policy.
Action
Action: Coordinate Citizenship Ceremonies.
Implementation Officer/s:
Program Function: Citizenship Ceremonies and Mayoral Receptions
Strategic Direction: 3 - Our Diverse Supportive, Happy and Healthy People
Desired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belonging
Approach: 3.2.2 - Encourage and support the sharing and celebration of cultural and social diversity through local events and programs
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business Need
Action Type: Operating
KPI: Undertake citizenship ceremonies to meet Department of Immigration and Border Protection and community demand..
Action
Action: Coordinate Mayoral Receptions.
Implementation Officer/s:
Program Function: Citizenship Ceremonies and Mayoral Receptions
Strategic Direction: 3 - Our Diverse Supportive, Happy and Healthy People
Desired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belonging
Approach: 3.2.2 - Encourage and support the sharing and celebration of cultural and social diversity through local events and programs
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business Need
Action Type: Operating
KPI: Meet the requests of the Mayor / community for Mayoral receptions
Action
Action: Provide advice and support to Elected Members
9
Implementation Officer/s:
Paul Deb
Louise Miller-Frost
Nigel Morris
Jo Biskup
Helen Bortoluzzi
Program Function: Civic Leadership
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative in meeting community needs
Approach: 4.7.2 - Develop strong partnerships with our community, stakeholders and all levels of government to achieve our vision
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business Need
Action Type: Operating
KPI: Provide advice and support to Elected Members as requested.
Action
Action: Implement framework for Community Engagement and Consultation
Implementation Officer/s:
Bernie Auricht
Program Function: Strategic Communications
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.1 - Our community is actively engaged and involved in shaping the City ’s future
Approach: 4.1.2 - Improve Council’s understanding of community views and our performance as rated by the Burnside community
Is this Action a control or risk mitigation activity for an identified risk?
Yes
Not being able to manage community expectations
Action Category: Strategic
Action Type: Operating
KPI: Timely and concise consultations conducted
Action
Action: Provide continuity in consultation and engagements to community
Implementation Officer/s:
Bernie Auricht
Program Function: Strategic Communications
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.1 - Our community is actively engaged and involved in shaping the City ’s future
Approach: 4.1.1 - Provide a range of opportunities for the community to actively engage and participate in Council’s decision making activities
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service Improvement
Action Type: Operating
10
KPI: Timely and concise consultations conducted
Action
Action: Provide Elected Members and Administration with information on community perceptions of the service delivery of Council
Implementation Officer/s:
Bernie Auricht
Program Function: Strategic Communications
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.1 - Our community is actively engaged and involved in shaping the City ’s future
Approach: 4.1.2 - Improve Council’s understanding of community views and our performance as rated by the Burnside community
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service Improvement
Action Type: Operating
KPI: Maintenance and delivery of community survey results to track effectiveness of consultation and engagement
Action
Action: Increase positive media and public profile of City of Burnside
Implementation Officer/s:
Bernie Auricht
Program Function: Strategic Communications
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.1 - Our community is actively engaged and involved in shaping the City ’s future
Approach: 4.1.1 - Provide a range of opportunities for the community to actively engage and participate in Council’s decision making activities
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Strategic
Action Type: Operating
KPI: Distribution of 35 good news opportunities by June 2016.
Action
Action: Increase knowledge and understanding of the work and services of Council throughout the Community
Implementation Officer/s:
Bernie Auricht
Program Function: Strategic Communications
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative in meeting community needs
Approach: 4.7.1 - Communicate our achievements
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Strategic
11
Action Type: Operating
KPI: 20% increase in balanced news stories in media benchmarked from 2013/14 financial period.
Action
Action: Provide a consistent proactive direct news source to residents and ratepayers on Council's work
Implementation Officer/s:
Bernie Auricht
Program Function: Strategic Communications
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.1 - Our community is actively engaged and involved in shaping the City ’s future
Approach: 4.1.1 - Provide a range of opportunities for the community to actively engage and participate in Council’s decision making activities
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Strategic
Action Type: Operating
KPI: Four editions of Burnside Focus distributed by June 2016
Action
Action: Present Council information in a strategic manner that reaches the right people through the right communication channels at the right time
Implementation Officer/s:
Bernie Auricht
Program Function: Community Engagement
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.1 - Our community is actively engaged and involved in shaping the City ’s future
Approach: 4.1.2 - Improve Council’s understanding of community views and our performance as rated by the Burnside community
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Strategic
Action Type: Operating
KPI: Number of community engagements to support Council policy and programs.
Action
Action: Present Council information and material in a clear, easy to read and consistent manner using the brand refresh style
Implementation Officer/s:
Bernie Auricht
Program Function: Strategic Communications
Strategic Direction: 4 - Our Leading Inclusive and Connected Council
Desired Outcome: 4.1 - Our community is actively engaged and involved in shaping the City ’s future
Approach: 4.1.1 - Provide a range of opportunities for the community to actively engage and participate in Council’s decision making activities
Is this Action a control or risk mitigation activity for an identified
No
12
risk?
Action Category: Strategic
Action Type: Operating
KPI: Development of city branded brochures
13
14
2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
2015-16Manager Name: Martin Cooper
The General Manager Corporate Services provides leadership and management oversight of the Corporate Services Division (Finance, Procurement & Contracts, Information Systems and People & Culture) and also has functional responsibility for Council's Governance, Strategic and Corporate Planning, Internal Audit and Business Improvement that provides key services both internally and externally in accordance with Council's strategic directions.
1 - Our Integrated Urban Form and Living Spaces
2 - Our Protected and Valued Environment
3 - Our Diverse Supportive, Happy and Healthy People
4 - Our Leading Inclusive and Connected Council
Management Oversight
This function coordinates the delivery of the divisional services in order to achieve the relevant community and strategic plan directions including the monitoring, progress reporting against key performance indicators and budgets. Work collaboratively with the department managers and Principal Governance Officer and Strategic/Corporate Planner to plan and deliver key Council services and strategies. Manage the resolution of service complaints escalated from within divisional business.
Leadership
This function provides effective leadership, management and oversight to the division and in particular the direct reports. The function enhances the skills of and mentors key personnel within the division to develop and maintain an ethos of best practice leadership management and service delivery including succession planning and the development of effective personnel.
Strategic and Corporate Planning
This function coordinates the development and implementation of Council’s strategic directions including the monitoring, progress reporting against key performance indicators and influencing the implementation of the Corporate Planning Framework to ensure consistency with the Strategic Community Plan.
Governance
The function of Governance is to implement, manage and coordinate corporate governance systems to ensure Council operates effectively and in compliance with legislative requirements.
Business Improvement
15
Leads and assists Council staff in adopting an efficiency and effectiveness / continuous improvement process. Develops and implements a program to be more efficient and effective to reduce operating costs to improve financial performance, but also undertakes Service Delivery Reviews and Process Improvement initiatives.
General Manager and Governance Support
Provide support to General Manager Corporate Services and Governance function. This includes management of Council and Committee meeting documents and managing the administrative needs of the General Manager, ensuring correspondence is processed, responded too and/or acknowledged.
Internal Audit
Internal audit strives to bridge gaps and strengthen internal controls, risk management and governance of the key business processes of each department. The Internal Audit function is outsourced.
Function/Action KPI Units Target Value Target Date
Management Oversight Corporate Performance Reports are prepared and issued on time (quarterly KPI reporting, Departmental Programs and Departmental Achievement Reports).
Percentage completed by due date
100 30/06/2016
Corporate Services capital and operating projects are delivered on time and within budget guidelines.
Percentage complete
90 30/06/2016
Leadership Divisional workforce reviews are undertaken including the completion of Performance Development Reviews.
Percentage completion
90 30/06/2016
Staff turnover rate within Division
Percentage 8-12 30/06/2016
Regular Corporate Services leadership meetings are undertaken
Number 12 30/06/2016
Strategic and CorporatePlanning
Quarterly Corporate Performance Reports are prepared and issued on time.
number of reports prepared
4 30/06/2016
Develop a Corporate Planning Framework by June 2016.
Timeframe 100% 30/06/2016
Develop service definitions and descriptions for all services provided by the City of Burnside
Timeframe 100% 30/06/2016
Governance Confidential register to be available on the website as per ombudsman's report.
Percentage completion
100 30/06/2016
Ensure all staff and Percentage 100 30/06/2016
16
Elected Members comply with requirements of the register of interests.
compliance
All delegations are reviewed on an annual basis.
Percentage completion
100 30/06/2016
Status report on progress of Departmental policy review developed and distributed.
Percentage completion
100 30/06/2016
Management of Freedom of Information (FOI) applications in accordance with legislative timeframes
number trending number of FOI requests
30/06/2016
Maintain and provide exception reporting against Local Government Key Dates Table for each Audit Committee meeting
Percentage completion
100 30/06/2016
Business Improvement Undertake Service Reviews
Percentage completion
30 30/06/2016
General Manager and Governance Support
Council and Committee meetings Agenda's provided to Members three clear days of meeting and Minutes provided within five days after meeting
Percentage compliance
100 30/06/2016
All Council and Committee meeting Agenda's and Minutes are available in hard copy in the Library and Customer Desk and on Burnside Website three clear days of meeting and within five days after meeting
Percentage compliance
100 30/06/2016
Correspondence is managed in line with Council's Customer Service policy.
Percentage compliance
100 30/06/2016
Internal Audit Complete planned Internal Audit Reviews for all Council functions
Percentage completion
90 30/06/2016
Function: Management Oversight
Risk: Internal Department advice is not sought, accepted or followed Risk Rating: Moderate
17
Function: Leadership
Risk: Failure to adequately engage with Manager in the shared responsibility of business improvement
Risk Rating: Low
Function: Strategic and Corporate Planning
Risk: New Council may desired to change the strategic direction of the organisation impacting upon previously published planning documents
Risk Rating:
Risk: Strategic and corporate planning documents and process does not comply with Local Government Act requirements
Risk Rating: Low
Function: Governance
Risk: Compliance with legislative changes at state or federal level Risk Rating: Moderate
Function: Business Improvement
Risk: Failure to adequately engage with Manager in the shared responsibility of business improvement
Risk Rating: Low
Function: General Manager and Governance Support
Risk: No strategic risk identified for this functionRisk Rating: Low
Function: Internal Audit
Risk: Internal Department advice is not sought, accepted or followed Risk Rating: Moderate
Position FTE Amount
General Manager Corporate Services 1.0
Strategic and Corporate Planner 1.0
Principal Governance Officer 1.0
Business Improvement Officer 1.0
Executive Assistant - General Manager and Governance 1.0
Internal Stakeholders
18
The CouncilCity of Burnside Elected MembersEmployees, Staff & Volunteers of the City of Burnside
External Stakeholders
Residents and Community
Service related consultants and contractors
Federal and State Government Departments
Freedom of Information applicants
Independent Commission Against Corruption (South Australia)
Ombudsman South Australia
Action
Action: Provide periodic reports to the CEO and/or Council on the Division's progress towards achieving relevant section of Council's Strategic Community Plan
Implementation Officer/s:
Martin Cooper
Program Function: Management Oversight Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.2 - Ensure the long-term sustainability of Council operations by monitoring
and comparing to peak body indicatorsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Corporate Performance Reports are prepared and issued on time (quarterly KPI reporting, Departmental Programs and Departmental Achievement Reports).
Action
Action: Work with direct reports to continually develop their skill sets and mentor them in order to enhance their performance
Implementation Officer/s:
Martin Cooper
Program Function: LeadershipStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.4 - Foster a robust and dynamic workforce that promotes a supportive culture
that recognises our corporate valuesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category:
19
Business NeedAction Type: Operating
KPI: Divisional workforce reviews are undertaken including the completion of Performance Development Reviews.
Action
Action: Ongoing enhancement of Corporate Performance System – Burnside Business Central (BBC) and support Executive, Managers and Team Leaders in its effective use.
Implementation Officer/s:
Belinda Portelli
Program Function: Strategic and Corporate PlanningStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.2 - Representation that is ethical, respectful, transparent, and instils confidence,
reflecting the best interests and values of the communityApproach: 4.2.3 - Ensure the necessary resources are provided to achieve the Strategic
PlanIs this Action a control or risk mitigation activity for an identified risk?Action Category: StrategicAction Type: Operating
KPI: 100% of Departmental Programs and discretionary capital and discretionary operating budget bids are prepared and issued on time.
Action
Action: Undertake Corporate reporting to support planning and decision makingImplementation Officer/s:
Belinda Portelli
Program Function: Strategic and Corporate PlanningStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.2 - Representation that is ethical, respectful, transparent, and instils confidence,
reflecting the best interests and values of the communityApproach: 4.2.3 - Ensure the necessary resources are provided to achieve the Strategic
PlanIs this Action a control or risk mitigation activity for an identified risk?Action Category: StrategicAction Type: Operating
KPI: Strategic and Corporate Performance Reports relating to progress and achievement of Community Plan (Strategic Plan) Success Indicators (objectives) are prepared and issued on time.
Action
Action: Work to align plans, budgets and performance measurement with Council’s corporate planning framework
Implementation Officer/s:
Belinda Portelli
Program Function: Strategic and Corporate PlanningStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.1 - Our community is actively engaged and involved in shaping the City’s future
20
Approach: 4.1.2 - Improve Council’s understanding of community views and our performance as rated by the Burnside community
Is this Action a control or risk mitigation activity for an identified risk?Action Category: StrategicAction Type: Operating
KPI: Develop a Corporate Planning Framework by June 2016.
Action
Action: Prepare, coordinate and support the organisation in the Annual Business Planning and Budget process.
Implementation Officer/s:
Belinda Portelli
Program Function: Strategic and Corporate PlanningStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.2 - Representation that is ethical, respectful, transparent, and instils confidence,
reflecting the best interests and values of the communityApproach: 4.2.3 - Ensure the necessary resources are provided to achieve the Strategic
PlanIs this Action a control or risk mitigation activity for an identified risk?Action Category: StrategicAction Type: Operating
KPI:
Action
Action: Start the review process of the Strategic Community PlanImplementation Officer/s:
Belinda Portelli
Program Function: Strategic and Corporate PlanningStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.1 - Our community is actively engaged and involved in shaping the City’s futureApproach: 4.1.2 - Improve Council’s understanding of community views and our
performance as rated by the Burnside communityIs this Action a control or risk mitigation activity for an identified risk?Action Category: StrategicAction Type: Operating
KPI:
Action
Action: Consolidation of and ongoing management of confidential items registers Implementation Officer/s:
Mark Asclipenos
Program Function: GovernanceStrategic Direction: 4 - Our Leading Inclusive and Connected Council
21
Desired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: Confidential register to be available on the website as per ombudsman's report.
Action
Action: Management of Freedom of Information applications Implementation Officer/s:
Mark Asclipenos
Program Function: GovernanceStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?Action Category: LegislativeAction Type: Operating
KPI: Management of Freedom of Information (FOI) applications in accordance with legislative timeframes
Action
Action: Provide relevant governance induction training to employees which address legislative and business requirements.
Implementation Officer/s:
Mark Asclipenos
Program Function: GovernanceStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.1 - Provide career development and learning opportunitiesIs this Action a control or risk mitigation activity for an identified risk?Action Category: Business NeedAction Type: Operating
KPI: Ensure all staff and Elected Members comply with requirements of the register of interests.
Action
Action: Ongoing compliance and monitoring register of interest for all staff and elected members
Implementation Officer/s:
Mark Asclipenos
22
Program Function: GovernanceStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?Action Category: LegislativeAction Type: Operating
KPI: Ensure all staff comply with requirements of the register of interests
Action
Action: Undertake Service Delivery ReviewsImplementation Officer/s:Program Function: Business Improvement Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.1 - Enable effective and efficient Council businessIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI:
Action
Action: Undertake Process Improvement InitiativesImplementation Officer/s:Program Function: Business Improvement Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.2 - Provide convenient and flexible service deliveryIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI:
Action
Action: Compile Minutes, Agenda's and associated documents for Council and Committee meetings
Implementation Officer/s:
Jo Biskup
23
Program Function: General Manager and Governance SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: Council and Committee meetings Agenda's provided to Members three clear days of meeting and Minutes provided within five days after meeting
Action
Action: Make available Council and Committee Minutes and Agenda's to the publicImplementation Officer/s:
Jo Biskup
Program Function: General Manager and Governance SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: All Council and Committee meeting Agenda's and Minutes are available in hard copy in the Library and Customer Desk and on Burnside Website three clear days of meeting and within five days after meeting
Action
Action: Manage all General Manager, Corporate Services correspondence Implementation Officer/s:
Jo Biskup
Program Function: General Manager and Governance SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Correspondence is managed in line with Council's Customer Service policy.
Action
Action: Engage consultancy to undertake Internal Audit function
24
Implementation Officer/s:
Martin Cooper
Program Function: Internal AuditStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.3 - Ensure internal structures and systems are continually reviewed
facilitating efficient and effective outcomes of the Strategic Plan.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Complete Internal Audit Reviews for all Council functions
25
26
2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
2015-16Manager Name: Marc Sodomka
The finance program will support Council to achieve a sustainable financial platform through managing
financial transactions in a manner which supports both short and long term financial sustainability and
accountability and transparency of public expenditure.
4 - Our Leading Inclusive and Connected Council
Accounts Payable
Suppliers invoices are received, processed, approved and paid in accordance with agreed terms and conditions
Accounts Receivable
Creation of invoices for goods and services provided to various organisations, individuals and local, state and federal government. The follow up of outstanding debts is also included in this function.
Strategic Finance
This function includes assisting departments manage the Annual Budget, produce annual and monthly financial statements as well as the Annual Business Plan. This function also undertakes integration of Asset Management Plans with the Fixed Assets Register. The accurate recording of the financial details and descriptions of fixed assets together with assessment of residual life, depreciation and revaluations to enable better planning and management of fixed assets, in particular infrastructure assets.
Payroll
Creation and maintenance of payroll records and documentation or all employees. In addition this includes calculation of payroll and leave entitlements. Payment of employees on a fortnightly basis.
Rates
Generation, processing and maintenance of the Rating System. This includes timely collection of all rates in accordance with legislation and agreed Council policies and resolutions.
Function/Action KPI Units Target Value Target Date
Accounts Payable Creditors paid within agreed payment terms
percentage paid
90 30/06/2016
27
Invoices received and scanned within 5 working days.
percentage 100 30/06/2016
Accounts Receivable Debt recovered within 90 days.
percentage recovered
100 30/06/2016
Invoices raised within 5 working days of request.
percentage 90 30/06/2016
Month end debtor statement issued within 5 working days of the end of the month.
percentage 100 30/06/2016
Strategic Finance Long Term Financial Plan adopted by Council as part of Annual Business Plan and Budget
percentage completed
100 30/06/2016
Statutory budget reporting and financial reports prepared and submitted within statutory timeframes.
percentage 100 30/06/2016
Annual Business Plan and Budget adopted by Council by 30 June.
percentage 100 30/06/2016
Monthly financial reports provided to Council.
number 12 30/06/2016
Compliance with External Audit Requirements and Audit Management Letter.
percentage compliance
100 30/06/2016
Operating Surplus by 2015/16 (within a 5 year average).
dollars Surplus Dollars 30/06/2016
Operating Surplus / (Deficit) Ratio 0% by 2015/16 (within a 5 year average).
percentage 0 30/06/2016
Net Financial Liabilities less than total budgeted Annual Operating Revenue.
dollars < total budgeted annual operating revenue
30/06/2016
Net Financial Liabilities Ratio less than 100%.
percentage <100 30/06/2016
Asset Sustainability Ratio greater than 90% but less than 100% of depreciation over a 3 year period
percentage > 90 & <100 30/06/2016
Payroll Payroll payments accurately processed on a fortnightly basis.
percentage 100 30/06/2016
Meet all External Audit requirements for the payroll function.
percentage 100 30/06/2015
28
Rates Rates notices issued on time within legislative requirements.
percentage 100 30/06/2016
Review of Annual Rating Policy completed by end of 1st quarter.
percentage completed
100 30/09/2015
Rates debt recovery completed in accordance with the Annual Rating Policy.
percentage completed
100 30/06/2016
Function: Accounts Payable
Risk: No strategic risk identified for this function
Risk Rating: Low
Function: Accounts Receivable
Risk: No strategic risk identified for this function
Risk Rating: Low
Function: Strategic Finance
Risk: Non achievement of long term financial indicators in accordance with the long term
financial plan
Risk Rating: Low
Function: Payroll
Risk: No strategic risk identified for this function
Risk Rating: Low
Function: Rates
Risk: No strategic risk identified for this function
Risk Rating: Low
Position FTE Amount
Chief Financial Officer 1.0
Finance Manager 1.0
Finance Business Partner 1.0
Finance Graduate 1.0
Payroll Officer 1
Rates & Finance Coordinator 1.0
Accounts Payable Officer 0.4
29
Finance Officer 1.0
Rates Officer 1.0
Internal Stakeholders
The Council
City of Burnside Elected Members
Employees, Staff & Volunteers of the City of Burnside
External Stakeholders
State and Federal Governments including the Grants Commission
Ratepayers and Residents
Suppliers
Action
Action: Receive and pay invoicesImplementation Officer/s:
Janice van der Pennen
Program Function: Accounts PayableStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.2 - Ensure the long-term sustainability of Council operations by monitoring
and comparing to peak body indicatorsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Invoices received and scanned within 5 working days.
Action
Action: Raise invoicesImplementation Officer/s:
Janice van der Pennen
Program Function: Accounts ReceivableStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.2 - Ensure the long-term sustainability of Council operations by monitoring
and comparing to peak body indicatorsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business Need
30
Action Type: OperatingKPI: Invoices raised within 5 working days of request.
Action
Action: Undertake debt recovery and controlImplementation Officer/s:
Janice van der Pennen
Program Function: Accounts ReceivableStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.2 - Ensure the long-term sustainability of Council operations by monitoring
and comparing to peak body indicatorsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Debt recovered within 90 days.
Action
Action: Issue end of month debtor statementsImplementation Officer/s:
Janice van der Pennen
Program Function: Accounts ReceivableStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.2 - Ensure the long-term sustainability of Council operations by monitoring
and comparing to peak body indicatorsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Month end debtor statement issued within 5 working days of the end of the month.
Action
Action: Undertake fortnightly payment of staffImplementation Officer/s:
Amanda MacFarlane
Program Function: PayrollStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.2 - Ensure the long-term sustainability of Council operations by monitoring
and comparing to peak body indicatorsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business Need
31
Action Type: OperatingKPI: Payroll payments accurately processed on a fortnightly basis.
Action
Action: Maintain accurate and confidential records of employee dataImplementation Officer/s:
Amanda MacFarlane
Program Function: PayrollStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.2 - Ensure the long-term sustainability of Council operations by monitoring
and comparing to peak body indicatorsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Meet all External Audit requirements for the payroll function.
Action
Action: Generate rate income as per Council resolutionImplementation Officer/s:
Janice van der Pennen
Program Function: RatesStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.3 - Ensure the rating system takes into account the range of financial
circumstances of the people in our communityIs this Action a control or risk mitigation activity for an identified risk?
YesNon achievement of long term financial indicators in accordance with the long term financial plan
Action Category: Resolution of CouncilAction Type: Operating
KPI: Rates notices issued on time within legislative requirements.
Action
Action: Undertake rates debt recoveryImplementation Officer/s:
Janice van der Pennen
Program Function: RatesStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.3 - Ensure the rating system takes into account the range of financial
circumstances of the people in our communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Resolution of CouncilAction Type: Operating
32
KPI: Rates debt recovery completed in accordance with the Annual Rating Policy.
Action
Action: Review the annual rating policyImplementation Officer/s:
Janice van der Pennen
Program Function: RatesStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.3 - Ensure the rating system takes into account the range of financial
circumstances of the people in our communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Review of Annual Rating Policy completed by end of 1st quarter.
Action
Action: Develop plans to define and achieve the long term financial objectives of Council through review of the long term financial plan
Implementation Officer/s:
Martin Cooper
Program Function: Strategic Finance Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.1 - Engage the community in Council’s financial governance processIs this Action a control or risk mitigation activity for an identified risk?
Yes
Non achievement of long term financial indicators in accordance with the long term financial plan
Action Category: Business NeedAction Type: Operating
KPI: Long Term Financial Plan adopted by Council annually by April.
Action
Action: Develop the draft budget through provision of quality advice and addressing the Strategic Plan, demonstrating sound management and efficient use of Council resources and revenue and outline potential risks and consequences.
Implementation Officer/s:
Martin Cooper
Program Function: Strategic Finance Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.2 - Ensure the long-term sustainability of Council operations by monitoring
and comparing to peak body indicatorsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type:
33
OperatingKPI: Annual Business Plan and Budget adopted by Council by 30 June.
Action
Action: Undertake regular financial reporting to CouncilImplementation Officer/s:
Martin Cooper
Program Function: Strategic Finance Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.2 - Ensure the long-term sustainability of Council operations by monitoring
and comparing to peak body indicatorsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Monthly financial reports provided to Council.
Action
Action: Draft the 2016/2017 Budget including elected member workshops and public meeting
Implementation Officer/s:
Martin Cooper
Program Function: Strategic Finance Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.2 - Ensure the long-term sustainability of Council operations by monitoring
and comparing to peak body indicatorsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Annual Business Plan and Budget adopted by Council by 30 June.
Action
Action: Provide all relevant information and assist external auditors with External auditImplementation Officer/s:
Martin Cooper
Program Function: Strategic Finance Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.2 - Ensure the long-term sustainability of Council operations by monitoring
and comparing to peak body indicatorsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Legislative
34
Action Type: OperatingKPI: Compliance with External Audit Requirements and Audit Management Letter.
Action
Action: Develop a risk management based Internal Controls Framework (including implementation of best practice suite of financial policies and protocols).
Implementation Officer/s:
Martin Cooper
Program Function: Strategic Finance Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Compliance with External Audit Requirements and Audit Management Letter.
35
36
2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
2015-16Manager Name: Matthew Spearman
Ensure outstanding systems and records management support to provide efficient service delivery and information dissemination to the organisation and greater community. The Department will play a lead role in providing innovative and best practice solutions to improve the way Council performs business.
1 - Our Integrated Urban Form and Living Spaces
2 - Our Protected and Valued Environment
3 - Our Diverse Supportive, Happy and Healthy People
4 - Our Leading Inclusive and Connected Council
GIS and Mobile Computing
Develop and maintain Council’s Geographical Information System (GIS) to ensure the accurate, relevant and timely provision of spatial information. More recently this function also serves the organisation by developing efficient mobile solutions to streamline complex administrative processes.
Information Technology Projects and Support
Information Technology (IT) Projects staff lead the City of Burnside through innovation and change management in scoping, planning and implementing IT Projects which are prioritised on an Information Systems Roadmap. IT Projects are focused on continuous improvement and the reduction of administrative overhead. Helpdesk staff provide support and troubleshooting for a large range of corporate applications and end user devices and peripherals. Support requests are created and managed through an electronic request management system though phone and email support is also provided.
Information Management
The Records Team is responsible for the correct distribution, disposal, archiving and retrieval of all of Council’s electronic and paper based records as well as producing policy and providing corporate training in Records Management Awareness and the use of the Electronic Document and Records Management System.
Telecommunications
This function ensures the development, support and maintenance of Councils IP telephone system, mobile phone fleet and contact centre infrastructure.
Business Analysis
37
In line with LEAN thinking, this function serves Council by analysing business processes from a technical perspective and recommending business process improvements for inclusion on the Information Systems Roadmap, ultimately resulting in significant efficiency gains and reduced costs.
Website Development and Maintenance
This function is closely tied to the Community Engagement Department and is responsible for the development and maintenance of Council’s website as well as alternative use sites such as social media controls. The website function assists Council to provide up-to-date and accessible information to the community.
Intranet Administration and Application Development
The corporate intranet is a key focus area responsible for development of custom applications and internal communications. Initiatives developed on the corporate intranet continue to assist Council in cost avoidance providing the flexibility to meet legislative changes and meeting corporate requirements.
Network Infrastructure and Security
This function ensures the reliability, stability and security of Council’s network and data. This is achieved through a variety of system administration tasks including hardware configuration changes, software upgrades and a security program outsourced to information security specialists.
Creative Design
The Creative Design function serves Council through the centralisation of consistent branding while providing professional graphic design support to reduce Council’s reliance on expensive consultancy. This function also supports Council’s community consultations through the creation of consultation materials, brochures, online surveys and administering the Engage Burnside software platform.
Function/Action KPI Units Target Value Target Date
GIS and Mobile Computing Property Updates – To maintain Council’s property layer within 0.1% of Property System.
Percentage 99.9 30/06/2016
Mobile Solutions –Completing 90% of Mobile Solutions adopted in the information systems roadmap within the financial year providing weekly updates to stakeholders during development
Percentage 90 30/06/2016
Information Technology Projects and Support
Complete 95% of high priority IT projects outlined in the Information Systems financial year roadmap.
Percentage 95 30/06/2016
Respond to all logged IT requests within specified Request timeframes.
Percentage 100 30/06/2016
Information Management Score an average of 4.5 of 5 on the annual State Records survey.
Number 4.5 30/06/2016
Disseminate all incoming correspondence within one business day.
Percentage 100 30/06/2016
Telecommunications Ensure 99.99% uptime percentage 99.99 30/06/2016
38
of Council’s phone and contact centre systems during business hours.
Business Analysis Improve business processes by implementing 3 time or cost saving initiatives
Number 3 30/06/2016
Website Development an... Provide up to date information to the public with a 99% uptime.
Percentage 99 30/06/2016
Intranet Administration and Application Development
Improve business processes by implementing 3 time or cost saving intranet initiatives
Number 2500 30/06/2016
Network Infrastructure and security
Maintain 99.99% uptime of all services during business hours.
percentage 99.99 30/06/2016
Creative Design Complete 100% of all online engagement and strategic design projects within prescribed timelines.
percentage 100 30/06/2016
Function: GIS and Mobile Computing
Risk: Threat of unauthorised access to IT assets or information contained in themRisk Rating: Low
Function: Information Technology Projects and Support
Risk: Lack of established power users in key departments and for key applications resulting in less than optimal use of applications.
Risk Rating: Moderate
Function: Information Management
Risk: Threat of unauthorised access to IT assets or information contained in themRisk Rating: Low
Function: Telecommunications
Risk: Lack of mobile computing technologies Risk Rating: Low
Function: Business Analysis
Risk: Lack of established power users in key departments and for key applications resulting in less than optimal use of applications.
39
Risk Rating: Moderate
Function: Website Development and Maintenance
Risk: Declining vendor support for IT applicationsRisk Rating: Moderate
Function: Intranet Administration and Application Development
Risk: loss of corporate knowledgeRisk Rating:
Function: Network Infrastructure and Security
Risk: IT system failure Risk Rating: Moderate
Function: Creative Design
Risk: Lack of established power users in key departments and for key applications resulting in less than optimal use of applications.
Risk Rating: Moderate
Position FTE Amount
Manager, Information Systems 1.0
IT Projects Coordinator 1.0
Network Administrator 1.0
GIS and Mobility Coordinator 1.0
Information Systems Officer (Helpdesk) 0.6
Team Leader Records 1.0
Information Management Compliance Officer 1.0
Information Management Officer 2.0
Creative and Digital Design 1.0
Internal Stakeholders
The Council
City of Burnside Elected MembersEmployees, Staff & Volunteers of the City of Burnside
External Stakeholders
Vendors
40
ConsultantsAll visitors to Council’s website
Eastern Region Alliance Councils
Local Government IT Group
Various Records and IT User Groups
State Records
Action
Action: Complete all GIS and Mobile Solution projects as outlined in the Information Systems Roadmap
Implementation Officer/s:
Tom Davey
Program Function: GIS and Mobile ComputingStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.2 - Plan, maintain and deliver Council infrastructure and assets to the
required level of service and condition that meets the needs of the community now and into the future.
Is this Action a control or risk mitigation activity for an identified risk?
YesLack of mobile computing technologies
Action Category: Business NeedAction Type: Operating
KPI: Mobile Solutions – Completing 90% of Mobile Solutions adopted in the information systems roadmap within the financial year providing weekly updates to stakeholders during development
Action
Action: Complete all Information Management projects as outlined in the Information Systems Roadmap
Implementation Officer/s:
Kate Staples
Program Function: Information ManagementStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.1 - Enable effective and efficient Council businessIs this Action a control or risk mitigation activity for an identified risk?
Yesloss of corporate knowledge
Action Category: Business NeedAction Type: Operating
KPI: Maintain or improve upon the State Records Survey results.
Action
Action: Complete all Telecommunications projects as outlined in the Information Systems Roadmap
41
Implementation Officer/s:
Matthew Spearman
Program Function: TelecommunicationsStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.1 - Enable effective and efficient Council businessIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Decrease in overall annual phone bill expenditure.
Action
Action: Complete all Intranet Administration and Application Development projects as outlined in the Information Systems Roadmap
Implementation Officer/s:
Keshia Filipsons
Program Function: Intranet Administration and Application DevelopmentStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.2 - Provide convenient and flexible service deliveryIs this Action a control or risk mitigation activity for an identified risk?
Yesloss of corporate knowledge
Action Category: Business NeedAction Type: Operating
KPI: Develop solutions to save 2500 minutes per annum of employee time.
Action
Action: Complete all Website Development and Maintenance projects as outlined in the Information Systems Roadmap
Implementation Officer/s:
Keshia Filipsons
Program Function: Website Development and MaintenanceStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.4 - A community that can access a range of information, services and
opportunities that enhance their livesApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Provide up to date information to the public with a 99% uptime.
Action
42
Action: Complete all Network Infrastructure and Security projects as outlined in the Information Systems Roadmap
Implementation Officer/s:
Clinton Schmerl
Program Function: Network Infrastructure and SecurityStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.1 - Enable effective and efficient Council businessIs this Action a control or risk mitigation activity for an identified risk?
YesThreat of unauthorised access to IT assets or information contained in them
Action Category: Business NeedAction Type: Operating
KPI: Maintain 99.99% uptime of all services during business hours.
Action
Action: Provide Information Technology Support to Council's internal stakeholdersImplementation Officer/s:
Suzanne Freebairn
Program Function: Information Technology SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.2 - Provide convenient and flexible service deliveryIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Respond to all logged IT requests within specified Request timeframes.
Action
Action: Complete all Business Improvement projects as outlined in the Information Systems Roadmap
Implementation Officer/s:
James Roberts
Program Function: Business AnalysisStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.4 - Develop collaborative leadership and strong interdepartmental
relationshipsIs this Action a control or risk mitigation activity for an identified risk?
YesLack of established power users in key departments and for key applications resulting in less than optimal use of applications.
Action Category: Business NeedAction Type: Operating
KPI: Improve business processes to save 2500 minutes per annum of employee time.
43
ActionAction: Complete all core IT applications projects as outlined in the Information Systems
RoadmapImplementation Officer/s:
James Roberts
Program Function: Information Technology ProjectsStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.1 - Enable effective and efficient Council businessIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Complete 95% of high priority IT projects outlined in the Information Systems financial year roadmap.
Action
Action: Complete all Information Systems administrative, strategic and policy projects as outlined in the Information Systems Roadmap
Implementation Officer/s:
Matthew Spearman
Program Function: Information Technology ProjectsStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.3 - Ensure internal structures and systems are continually reviewed
facilitating efficient and effective outcomes of the Strategic Plan.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Complete 95% of high priority IT projects outlined in the Information Systems financial year roadmap.
44
2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
2015-16Manager Name: Nicola Anning
Build organisational capacity and capability to enable the delivery of Council’s strategic directions through employing a disciplined approach that fosters a culture of accountability, achievement and a safe work environment.
4 - Our Leading Inclusive and Connected Council
Human Resource Management
The function of Human Resources is to provide consultancy and services to staff and Managers of Departments relating to policy and procedure, employee and industrial relations and recruitment.
Learning and Development
Develop, implement, conduct and monitor staff training programs including training needs analysis and compliance based training.This also includes the provision for leadership development.
Workforce Management and Operations
Develop and implementation of Council's Workforce Management Plan. Management of Council's legislative obligations and risk mitigation in relation to industrial and employee relations.
Change Management and Strategic Organisational Development
Implementation of cultural and organisational change within a framework of agreed change management.
Insurance
Management of Council’s insurance portfolio and any subsequent claims in order to cover all reasonably foreseeable insurable risks.
Work Health Safety and Risk Management
This function strives to implement and provide consultancy on best practice risk management through an integrated and systematic approach (inclusive of Work Health Safety) in liaison with key stakeholders.
Volunteer Coordination
The City of Burnside hosts a range of varied programs and services utilising the skills and talents of 462 volunteers.
45
Function/Action KPI Units Target Value Target Date
Human Resource Management
Maintain an annual staff turnover rate between 8% to 15% of the Full-time Equivalent (FTE) position count.
percentage staff turnover
8 to 15 30/06/2016
All internally run recruitment and selection campaigns, as a result of staff turnover, to be filled within 12-weeks of vacancy advertisement.
percentage compliance
100% 30/06/2016
All People and Culture policies and protocols to be reviewed and updated by their respective review dates
percentage compliance
100% 30/06/2016
That PDR system is reviewed and updated and rolled out to all staff
percentage completed
100% 30/06/2016
Learning and Development
Staff attending organisational development training
percentage compliance
80% 30/06/2016
That 100% of training budget is used and targeted for approved training
percentage compliance
100% 30/06/2016
Workforce Managementand Operations
That all managers engage in the creation of a workforce plan and adhere to agreed structures
Completed workforce plan
100% 30/06/2016
Change Management and Strategic Organisational Development
Staff Climate Survey to be replaced by OCI/OEI to measure cultural change. Visual and measured improvement over the next 5 years can be seen
Measured improvement towards constructive styles are visually displayed
60% 30/06/2020
Organisational Change and restructure projects are implemented in line with agreed project objectives and deadlines
percentage compliance
85% 30/06/2016
Organisational projects are implemented in line with Burnside Strategic Framework (People) 2014 - 2017
percentage compliance
100% 30/06/2016
Insurance Annually review insurable risks to ensure appropriate coverage.
ongoing yes 30/06/2016
Work Health Safety and Risk Management
All Work Health Safety percentage 100 30/06/2016
46
protocols and procedures to be reviewed and updated by their respective review date.
complete
Number of Work Health Safety and Injury Management Performance Standards for Self Insurers areas of non-compliance identified through audit to be less than 10%
percentage less than 10% 30/06/2016
Number of Risk Management Review Sections identified through audit at or above the Local Government metropolitan average
number 5 30/06/2016
Lost time injury frequency rates
number of claims per 250,000hours worked
4 30/06/2016
Volunteer Coordination All recommendations from the Volunteer Strategy/Baby Boomer Strategy are implemented by 2016.
Percentage implemented
100% 31/12/2016
Maintain the number of engaged volunteers at City of Burnside for 2015/16.
Number of volunteers
More than 400 30/06/2016
Function: Human Resource Management
Risk: Inability to recruit and retain appropriatel qualified staff and manage staff performanceRisk Rating: Moderate
Function: Learning and Development
Risk: Insufficient funds for training and development across BurnsideRisk Rating: Low
Function: Workforce Management and Operations
Risk: Internal Department advice is not sought, accepted or followed Risk Rating: Moderate
Function: Change Management and Strategic Organisational Development
Risk: Injury to WorkersRisk Rating:
Risk:
47
A significant, unplanned, adverse event presenting a threat to continuity of Councils critical functions or assets
Risk Rating: Moderate
Function: Insurance
Risk: A significant, unplanned, adverse event presenting a threat to continuity of Councils critical functions or assets
Risk Rating: Moderate
Function: Work Health Safety and Risk Management
Risk: A significant, unplanned, adverse event presenting a threat to continuity of Councils critical functions or assets
Risk Rating: Moderate
Risk:
Risk Rating:
Function: Volunteer Coordination
Risk: Compliance with legislative changes at state or federal levelRisk Rating: Low
Position FTE Amount
Manager, People and Culture 1
People and Culture Consultant 1
WHS and Risk Management Coordinator 1.0
Volunteer Coordinator 1.0
People and Culture Officer 0.8
Internal Stakeholders
The Council
City of Burnside Elected MembersEmployees, Staff & Volunteers of the City of Burnside
External Stakeholders
Community
Unions
Local Government Association of SA
Office for State / Local Government Relations
48
Action
Action: All People and Culture Policies and Management Protocols (policies and procedures) to be reviewed and updated by their respective review dates.
Implementation Officer/s:
Sandra GazzolaNicola Anning
Program Function: Human Resources Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
YesCompliance with legislative changes at state or federal level
Action Category: LegislativeAction Type: Operating
KPI: All People and Culture protocols and procedures to be reviewed and updated by their respective review dates
Action
Action: Identify and provide relevant and timely training and development to employees which address legislative and business requirements.
Implementation Officer/s:
Sandra GazzolaNicola Anning
Program Function: Learning and DevelopmentStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.1 - Provide career development and learning opportunitiesIs this Action a control or risk mitigation activity for an identified risk?
YesInsufficient funds for training and development across Burnside
Action Category: Business NeedAction Type: Operating
KPI: % target of staff attending organisational development training
Action
Action: PDR system is reviewed and updated and rolled out to all staff Implementation Officer/s:
Sandra GazzolaNicola Anning
Program Function: Human Resources Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.4 - Foster a robust and dynamic workforce that promotes a supportive culture
that recognises our corporate valuesIs this Action a control or risk mitigation activity
Yes
49
for an identified risk?Action Category: Business NeedAction Type: Operating
KPI: That PDRs are completed for all staff
Action
Action: Support managers with recruitment and induction processesImplementation Officer/s:
Sandra GazzolaNicola Anning
Program Function: Human Resources Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.1 - Provide career development and learning opportunitiesIs this Action a control or risk mitigation activity for an identified risk?
YesInability to recruit and retain appropriatel qualified staff and manage staff performance
Action Category: Business NeedAction Type: Operating
KPI: All recruitment and selection campaigns, as a result of staff turnover, to be filled within 12-weeks of vacancy notification.
Action
Action: Implement OCI/OEI to measure cultural change and staff acceptance of this change
Implementation Officer/s:
Nicola AnningSandra Gazzola
Program Function: Change Management and Strategic Organisational DevelopmentStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.4 - Foster a robust and dynamic workforce that promotes a supportive culture
that recognises our corporate valuesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Staff Climate Survey to be replaced by OCI/OEI to measure cultural change and staff acceptance of this change. Visual and measured improvement over the next 5 years can be seen
Action
Action: Develop and implement Workforce PlanImplementation Officer/s:
Nicola AnningSandra Gazzola
Program Function: Workforce Management and Operations Strategic Direction: 4 - Our Leading Inclusive and Connected Council
50
Desired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a culture that encourages well-being, learning and development
Approach: 4.4.4 - Foster a robust and dynamic workforce that promotes a supportive culture that recognises our corporate values
Is this Action a control or risk mitigation activity for an identified risk?
Yes
Action Category: StrategicAction Type: Operating
KPI: That all managers engage in the creation of a workforce plan and adhere to agreed structures
Action
Action: Review Council's insurance coverage in order to cover all reasonably foreseeable insurable risks
Implementation Officer/s:
Stephen Smith
Program Function: Insurance Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
YesA significant, unplanned, adverse event presenting a threat to continuity of Councils critical functions or assets
Action Category: LegislativeAction Type: Operating
KPI: Annually review insurable risks to ensure appropriate coverage.
Action
Action: Oversee implementation, monitoring and review of Business Continuity arrangements
Implementation Officer/s:
Stephen SmithNicola Anning
Program Function: WHS and Risk ManagementStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
YesA significant, unplanned, adverse event presenting a threat to continuity of Councils critical functions or assets
Action Category: Business NeedAction Type: Operating
KPI: Development of risk management framework and strategic directions plan
Action
Action: Develop, obtain approval for and implement Work Health and Safety and Injury Management Plan
51
Implementation Officer/s:
Stephen SmithNicola Anning
Program Function: WHS and Risk ManagementStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
YesInjury to Workers
Action Category: Business NeedAction Type: Operating
KPI: Number of Work Health Safety and Injury Management Performance Standards for Self Insurers areas of non-compliance identified through audit to be less than 10%
Action
Action: Undertake Change Management and Strategic Organisational DevelopmentImplementation Officer/s:
Nicola AnningSandra Gazzola
Program Function: Change Management and Strategic Organisational DevelopmentStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.4 - Foster a robust and dynamic workforce that promotes a supportive culture
that recognises our corporate valuesIs this Action a control or risk mitigation activity for an identified risk?Action Category: StrategicAction Type: Operating
KPI: Organisational projects are implemented in line with Burnside Strategic Framework (People) 2014 - 2017
Action
Action: Recognise the value of volunteer contributions through local awards, programs and recognition
Implementation Officer/s:
Lisette BrunoNicola Anning
Program Function: Volunteer CoordinationStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.4 - Provide opportunities for people to connect and interact locallyIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
52
KPI: Maintain the number of engaged volunteers at City of Burnside for 2015/16.
Action
Action: Implement the Volunteer Strategy/Baby Boomer StrategyImplementation Officer/s:
Lisette BrunoNicola Anning
Program Function: Volunteer CoordinationStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.3 - A safe community that values and supports its peopleApproach: 3.3.1 - Encourage volunteerism in the communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: All recommendations from the Volunteer Strategy/Baby Boomer Strategy are implemented by 2016.
53
2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
2015-16Manager Name: Samantha Atkins
Provide high-level, quality, reliable Procurement and Fleet Management Services and support across Council, thereby ensuring value for money is achieved while the principles of probity, transparency, accountability and risk management are embraced and maintained.
4 - Our Leading Inclusive and Connected Council
Tendering and Quoting Services
Develop tender, quote and contract documentation. Provide resources and tools to internal customers to create quality specifications. Liaise with Contractors during tender and quote processes. Conduct tendering and quoting processes including maintaining evidence of processes and reasons for decisions.
Procurement and Contract Advice and Support
Provision of advice and support in all aspects of Procurement and Contracting activities including approaching the market and the appropriate procurement strategy for a good, work or service. Liaison with internal staff, legal providers, contractors and other stakeholders to minimise risk in procurement and contracting activities.
Procurement Framework
Evaluate and revise current documentation, including policies, management protocols, procedures, templates and resources.
Procurement Training and Education
Develop and source awareness and education resources. Deliver training and awareness for Council staff and Contractors. Provide resources and information to Contractors including education, where appropriate.
Implementation of Procurement Efficiencies and Industry Trends
Keep abreast of relevant innovations and apply where suitable. Identify efficiencies in procurement practices and related administrative processes to capture the most effective method of undertaking procurement activities.
Management of Light Fleet vehicles for Civic Centre
Maintain Light Fleet policies, protocols, procedures and templates, to strategically mange this asset. Conduct reviews of use and suitability of the Civic Centre light fleet to manage and maximise the deliverable service life of these assets, minimising risk and costs to Council.
54
Strategic Procurement
Identify opportunities for strategic alliances and introduction of innovations in procurement practices. Conduct analysis of category and spend information to maximise benefit of procurement activities.
Function/Action KPI Units Target Value Target Date
Tendering and QuotingServices
Deliver savings of 1% of annual Council budget by the end of the 2015/16 financial year
percentage savings
1% 30/06/2016
Maintain 100% compliance for Procurement and Contracts staff with contract and process contract activities.
percentage 100 30/06/2016
Procurement and Contract Advice and Support
Respond to requests for advice and support within expected timeframes.
percentage 95 30/06/2016
Procurement Framework Review and/or update all relevant Procurement documentation by their respective review dates.
percentage 100 30/06/2016
Undertake 6 monthly reviews of all non-review dated templates and resources.
percentage reviewed
100 30/06/2016
Undertake annual review of procurement and contracting structures.
percentage completed
100 30/06/2016
Procurement Training and Education
Develop and deliver Probity and Process training to relevant Council staff.
percentage of staff trained
100 31/12/2016
Identify and respond to training and education needs in a timely manner.
percentage 95 30/06/2016
Implementation of Procur... Identify efficiencies in procurement processes and activities in a timely manner.
number 30/06/2016
Management of Light Fleet Vehicles for CivicCentre
Change over of Civic Centre light fleet vehicles by date on designated schedule to maximise the useful life and minimise costs.
percentage 100 30/06/2016
Review and/or update relevant light fleet documentation by their respective review dates.
percentage 100 30/06/2016
55
Respond to requests for advice and support within expected timeframes.
percentage 95 30/06/2016
Strategic Procurement Complete a benchmarking project for major spend categories.
percentage 100 30/06/2016
Conduct periodic spend analysis activities.
number 3 30/06/2016
Function: Tendering and Quoting Services
Risk: Unco-ordinated or insufficient tendering and quoting services resulting in incorrect process, not obtaining good value for money, exposure to investigations or complaints, and damages claims or purchasing Goods/Works/Services not fit for purpose
Risk Rating: Low
Function: Procurement and Contract Advice and Support
Risk: Inaccurate or insufficient advice resulting in incorrect processes or decisions leading to challenges to the process and decisions, incorrect purchases, value for money not being obtained, and possible investigations.
Risk Rating: Low
Function: Procurement Framework
Risk: Procurement Framework isn't kept up to date resulting in out of date practices, and procedures
Risk Rating: Low
Function: Procurement Training and Education
Risk: Non-existant, inaccurate, or insufficient training resulting in staff who are not aware of appropriate procurement or contract management practices
Risk Rating: Low
Function: Implementation of Procurement Efficiencies and Industry Trends
Risk: Efficiencies and Industry Trends are not identified or implementedRisk Rating: Low
Function: Management of Light Fleet vehicles for Civic Centre
Risk: Poorly managed Civic Centre vehicle assets resulting in increased costs, decreased utilisation of assets, vehicles not fir for purpose, and possible safety issues if factory recalls are not communicated.
Risk Rating: Low
Function: Strategic Procurement
Risk: Efficiencies and Industry Trends are not identified or implemented
56
Risk Rating: Low
Position FTE Amount
Manager Procurement and Contracts 1
Procurement Officer 2
Internal Stakeholders
The Council
City of Burnside Elected MembersEmployees, Staff & Volunteers of the City of Burnside
External Stakeholders
Contractors
Council Solutions
LGA Procurement
Procurement Australia
Industry Network Bodies
Legal Providers
Professional Association (Chartered Institute of Purchasing and Supply Australasia – CIPSA)
CIPSA Members
Other Local Government Procurement staff
ERA Councils
Local business
Various State Government Agencies
Action
Action: Conduct tendering and quoting processes for procurements over $15,000. This includes provision of an up to date suite of documentation, administration of online tendering and quoting systems, and maintaining all evidentiary records.
Implementation Officer/s:
Samantha AtkinsDarren CampbellFrances Doyle
Program Function: Tendering and Quoting ServicesStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practices
57
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Deliver savings of 1% of annual Council budget by the end of the 2015/16 financial year
Action
Action: Provide advice to staff on the most appropriate market approach to obtain best value for money, and provide resources and tools which enable staff to create specifications which accurately reflect the Goods, Works or Services required for Contracting.
Implementation Officer/s:
Samantha AtkinsDarren CampbellFrances Doyle
Program Function: Procurement and Contract Advice and SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.4 - Provide sufficient resources to meet current and future needs of the
communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: Respond to requests for advice and support within expected timeframes.
Action
Action: Provision of advice and support to internal staff on procurement and contracting activities including fostering and developing strong interdepartmental relationships.
Implementation Officer/s:
Samantha AtkinsDarren CampbellFrances Doyle
Program Function: Procurement and Contract Advice and SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.4 - Develop collaborative leadership and strong interdepartmental
relationshipsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: Respond to requests for advice and support in a timely manner.
Action
58
Action: Maintain industry intelligence and knowledge of business markets applicable to Local Government and City of Burnside in particular.
Implementation Officer/s:
Samantha AtkinsDarren CampbellFrances Doyle
Program Function: Procurement and Contract Advice and SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: Respond to requests for advice and support in a timely manner.
Action
Action: Liaise with Contractors and other stakeholders to obtain information about procurement and contracting activities.
Implementation Officer/s:
Samantha AtkinsDarren CampbellFrances Doyle
Program Function: Procurement and Contract Advice and SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.2 - Develop strong partnerships with our community, stakeholders and all
levels of government to achieve our visionIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: Respond to requests for advice and support in a timely manner.
Action
Action: Provide reports to the Leadership team on Procurement activities throughout Council.
Implementation Officer/s:
Samantha AtkinsFrances Doyle
Program Function: Procurement and Contract Advice and SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.2 - Ensure the long-term sustainability of Council operations by monitoring
and comparing to peak body indicatorsIs this Action a control or risk mitigation activity for an identified
No
59
risk?Action Category: Business NeedAction Type: Operating
KPI: Respond to requests for advice and support in a timely manner.
Action
Action: Review and update the Council policy and Management Protocol documents, content of current resources for internal staff, Contractors, and other stakeholders for currency and applicability of information.
Implementation Officer/s:
Samantha AtkinsDarren CampbellFrances Doyle
Program Function: Maintain and Revise the Procurement FrameworkStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.4 - Provide sufficient resources to meet current and future needs of the
communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: Undertake 6 monthly reviews of all non-review dated templates and resources.
Action
Action: Work with all areas of Council to ensure that the structures are in place to support all procurement and contracting activities, and source and/or develop awareness and education resources for procurement and contracting activities.
Implementation Officer/s:
Samantha AtkinsDarren CampbellFrances Doyle
Program Function: Procurement Training and EducationStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.4 - Provide sufficient resources to meet current and future needs of the
communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Undertake annual review of procurement and contracting structures.
Action
Action: Undertake gap analysis of training needs for procurement and contracting activities for internal staff.
Implementation Officer/s:
Samantha AtkinsDarren CampbellFrances Doyle
60
Program Function: Procurement Training and EducationStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.4 - Provide sufficient resources to meet current and future needs of the
communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Identify and respond to training and education needs in a timely manner.
Action
Action: Facilitate or Deliver Procurement and Contract Management, and Probity and Process training programs to internal staff
Implementation Officer/s:
Samantha AtkinsDarren CampbellFrances Doyle
Program Function: Procurement Training and EducationStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.4 - Provide sufficient resources to meet current and future needs of the
communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Identify and respond to training and education needs in a timely manner.
Action
Action: Maintain membership of and participate in professional activities of industry professional association to receive updates within industry, and maintain membership of industry networks, both formal and informal..
Implementation Officer/s:
Samantha AtkinsDarren CampbellFrances Doyle
Program Function: Identify and Implement Procurement Efficiencies and Industry TrendsStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.2 - Develop strong partnerships with our community, stakeholders and all
levels of government to achieve our visionIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
61
KPI: Maintain membership of formal and informal networks to enable awareness of changes and innovations in Procurement.
Action
Action: Identify and implement procurement industry trends and efficiencies, while maintaining the integrity of the procurement process for Council.
Implementation Officer/s:
Samantha AtkinsDarren CampbellFrances Doyle
Program Function: Identify and Implement Procurement Efficiencies and Industry TrendsStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.2 - Develop strong partnerships with our community, stakeholders and all
levels of government to achieve our visionIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Maintain membership of formal and informal networks to enable awareness of changes and innovations in Procurement.
Action
Action: Evaluate and revise current light fleet documentation and resources, and maintain records for Civic Centre light fleet vehicles.
Implementation Officer/s:
Darren CampbellSamantha Atkins
Program Function: Management of Light Fleet vehicles for Civic CentreStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Review and/or update relevant light fleet documentation by their respective review dates.
Action
Action: Order, organise delivery of and disposal of light fleet vehicles at appropriate timeframes.
Implementation Officer/s:
Darren Campbell
Program Function: Management of Light Fleet vehicles for Civic CentreStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.4 - Provide sufficient resources to meet current and future needs of the
community
62
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Capital
KPI: Change over of Civic Centre light fleet vehicles by date on designated schedule to maximise the useful life and minimise costs.
Action
Action: Liaise with Contractors/Suppliers to maintain knowledge of new and/or advantageous technologies in the light fleet industry.
Implementation Officer/s:
Darren CampbellSamantha Atkins
Program Function: Management of Light Fleet vehicles for Civic CentreStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.2 - Develop strong partnerships with our community, stakeholders and all
levels of government to achieve our visionIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Respond to requests for advice and support within expected timeframes.
Action
Action: Collaborate with IT to develop a Procurement Request System on the IntranetImplementation Officer/s:
Samantha AtkinsMatthew Spearman
Program Function: Procurement and Contract Advice and SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.1 - Enable effective and efficient Council businessIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Respond to requests for advice and support within expected timeframes.
Action
Action: Conduct suitability review of Civic Centre light fleet vehiclesImplementation Officer/s:
Samantha AtkinsDarren Campbell
Program Function: Management of Light Fleet vehicles for Civic CentreStrategic Direction:
63
4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.4 - Provide sufficient resources to meet current and future needs of the
communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI:
64
2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
2015-16Manager Name: Louise Miller-Frost
The General Manager Community and Development Services provides leadership and management
oversight of community and development services and ensure that services and actions
are achieving delivery of Council's strategic directions. The Department also has functional responsibility
for Economic Development.
1 - Our Integrated Urban Form and Living Spaces
2 - Our Protected and Valued Environment
3 - Our Diverse Supportive, Happy and Healthy People
4 - Our Leading Inclusive and Connected Council
Management Oversight
This function coordinates the delivery of the Divisional services in order to achieve the relevant Community Plan strategic directions including the monitoring, and progress reporting against key performance indicators and budgets. Manage the resolution of divisional service complaints as required.
Leadership
This function enhances the skills of and mentors key personnel within the Departments across the Division to facilitate development of personnel and succession planning.
Economic Development
Works with regional stakeholders to identify needs of the business community.
General Manager Support
Provide support to the General Manager, Community and Development Services through managing correspondence, administration and coordinating meetings within the division.
Function/Action KPI Units Target Value Target Date
Management Oversight Strategic and Corporate Performance Reports relating to progress and
Percentage completed by due date
100 30/06/2016
65
achievement of Community Plan (Strategic Plan) Success Indicators (objectives) are prepared and issued on time.
Community & Development Services capital and operating projects are delivered on time and within budget guidelines.
Percentage completed
90 30/06/2016
Leadership Completion of Performance Development Reviews within Division.
Percentage completed
90 30/06/2016
CEO/GM PDR outcome reflects satisfactory or above performance.
Percentage 100 30/06/2016
Staff turnover rate within the Division.
Percentage 8-12 30/06/2016
Regular Community & Development Services leadership meeting undertaken.
Number 10-12 30/06/2016
Economic Development % of programmed initiatives completed.
Percentage 100 30/06/2016
General Manager Support Correspondence is managed in line with Council's Customer Service Policy
Percentage compliance
100 30/06/2016
Function: Management Oversight
Risk: No strategic risk identified for this function
Risk Rating: Low
Function: Leadership
Risk: No strategic risk identified for this function
Risk Rating: Low
Function: Economic Development
Risk: Increase in ratepayer demand for economic services or programs greater than capacity
or ability to respond.
Risk Rating: Low
Function: General Manager Support
Risk: No strategic risks identified for this function
66
Risk Rating: Low
Position FTE Amount
General Manager Community and Development Services 1
Executive Officer - General Manager Support 0.4
Internal Stakeholders
The Council
City of Burnside Elected Members
Employees, Staff & Volunteers of the City of Burnside
External Stakeholders
Community
ERA Councils
State and Federal departments
Action
Action: Provide periodic reports to the CEO and/or Council on the Division's progress towards achieving relevant section of Council's Community Plan
Implementation Officer/s:
Louise Miller-Frost
Program Function: Management Oversight Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.4 - Develop collaborative leadership and strong interdepartmental
relationshipsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Strategic and Corporate Performance Reports relating to progress and achievement of Community Plan (Strategic Plan) Success Indicators (objectives) are prepared and issued on time.
Action
Action: Work with Department Managers to continually develop their skill sets and mentor them in order to enhance their performance
Implementation Officer/s:
Louise Miller-Frost
Program Function: Leadership
67
Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.4 - Foster a robust and dynamic workforce that promotes a supportive culture
that recognises our corporate valuesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: satisfaction rating from staff survey about management
Action
Action: Undertake Economic Development initiativesImplementation Officer/s:
Louise Miller-Frost
Program Function: Economic DevelopmentStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.1 - A range of businesses and organisations that increase vitality and wealth in
the City.Approach: 3.1.1 - Encourage the establishment of support networks for local businesses,
organisations and low-impact home based employmentIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: % of programmed initiatives completed.
Action
Action: Provide and manage timely and concise correspondence (written, phone, etc) for General Manager, Community and Development Services
Implementation Officer/s:
Helen Bortoluzzi
Program Function: General Manager SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Correspondence is managed in line with Council's Customer Service Policy
Action
Action: Provide all administrative support to General Manager, Community and Development Services
Implementation
68
Officer/s: Helen Bortoluzzi
Program Function: General Manager SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Correspondence is managed in line with Council's Customer Service Policy
69
70
2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
2015-16Manager Name: Jason Cattonar
Development Assessment and Compliance Services are undertaken in a consistent, professional and transparent manner and that our Development Plan is consistent with Council’s Strategic Plan and the 30 Year Plan. Ranger Services provide effective and professional parking control, animal management, bushfire management and other regulatory compliance services to the community.
1 - Our Integrated Urban Form and Living Spaces
2 - Our Protected and Valued Environment
3 - Our Diverse Supportive, Happy and Healthy People
4 - Our Leading Inclusive and Connected Council
Planning Assessment and Development Compliance
Town planners undertake professional, objective and consistent planning assessments leading to decisions, or recommendations to the Development Assessment Panel, and provide consistent and accurate advice to the community in relation to the Development Plan and the Development Act and Regulations.This function is also concerned with ensuring that development within the Council area is approved development, and that approved development is undertaken in accordance with all relevant approvals.
Building Assessment
Professional, objective and consistent building assessments, and provide consistent and accurate advice to the community in relation to the Building Code of Australia. The Building function is also responsible for regular inspection of building work and meeting various legislative compliance obligations.
Planning Policy
This function is concerned with ensuring that our Development Policy is consistent with the aspirations of our Strategic Plan and the 30 Year Plan.
Heritage
Provide professional, consistent and objective advice to the community and to planning staff in relation to planning applications of a heritage nature.
Development Administration
This function is concerned with ensuring the Department operates in a professional and efficient manner, and with providing professional, consistent and objective advice to the community about the development
71
assessment process.
Eastern Health Authority
Seeks to ensure a safe and healthy community under the Public Health Act. This work is undertaken through the Eastern Health Authority. They are responsible for monitoring food safety and community health and provide immunisation and enforces sanitary conditions.
Ranger Services
Administer regulatory functions and ensure compliance in minimising bushfire risk, administer the Dog and Cat Management Act through the Animal Management Plan, and enhance the safety and amenity of the community through enforcement of parking regulations. Ranger Services also administer Council by-laws and compliance by making Orders under the Local Government Act.
Function/Action KPI Units Target Value Target Date
Planning Assessment and DevelopmentCompliance
Applications decided within statutory timeframes
Percentage 85 30/06/2016
satisfaction rate via customer feedback surveys
Percentage 90 30/06/2016
Building Assessment Applications decided within statutory timeframes
Percentage 85 30/06/2016
Inspect 100% of new pools (80% within 2 weeks of notification, and 20% within 2 months)
Percentage 100 30/06/2016
Planning Policy Commencement of at least one Development Plan Amendment
Percentage completed
100 1/04/2016
Heritage Referral reports for development applications made within 10 business days
Percentage 85 30/06/2016
Development Administrat... satisfaction rate via customer feedback surveys
Percentage 90 30/06/2016
Searches provided within statutory timeframes
Percentage 95 30/06/2016
Eastern Health Authority EHA produce an annual report on its activities
Number 1 30/06/2016
Ranger Services Bushfire management undertaken in accordance with the requirements of the Adelaide Mount Lofty Rangers Interim Bushfire Management Action Plan
Percentage 100 30/06/2016
72
Function: Planning Assessment and Development Compliance
Risk: Change in legislation requiring increase inspection to legislative targets which are not able to be meet with existing resources
Risk Rating: Low
Function: Building Assessment
Risk: Change in legislation requiring increase inspection to legislative targets which are not able to be meet with existing resources
Risk Rating: Low
Function: Planning Policy
Risk: Negative community sentimment about draft development plan amendments leading to non endorsement by Council
Risk Rating: Moderate
Function: Heritage
Risk: Change in legislation requiring increase inspection to legislative targets which are not able to be meet with existing resources
Risk Rating: Low
Function: Development Administration
Risk: No strategic risk identified for this function Risk Rating:
Function: Eastern Health Authority
Risk: Failure to deliver public health plan within agreed timeframeRisk Rating: Moderate
Function: Ranger Services
Risk: Change in legislation requiring increase inspection to legislative targets which are not able to be meet with existing resources
Risk Rating: Low
Position FTE Amount
Manager, City Development and Safety 1
Team Leader Development Administration 1
Team Leader Compliance 1
Team Leader Planning 1
Team Leader Building 1
Development Officer Planning 4
Development Officer Building 2
73
Development Officer Building Compliance 1
Administration Officer – Planning 1.0
Administration Officer – Building 0.8
Planning and Development Liaison Officer 1
Planner – Policy and Projects 1.4
Development Officer Compliance 1.0
Team Leader Ranger Services 1.0
Rangers 2.0
Rangers Administration 1.8
Internal Stakeholders
The Council
City of Burnside Elected MembersEmployees, Staff & Volunteers of the City of Burnside
Engineering ServicesInformation ServicesFinanceOrganisational Development and GovernanceGovernance Procurement and ContractsCommunity EngagementOperations Services
External Stakeholders
Community
Ombudsman
Department of Planning Transport and Infrastructure
Department of Environment, Water and Natural Resources
Engineering consultants
Arborist consultants
Heritage Adviser
ERA Councils
Health Department
Eastern Health Authority
EPA
Dog and Cat Management Board
Local Government Association
All Pets
Animal Welfare League
74
RSPCA
Country Fire Service
NRM Board
Action
Action: Undertake Development Plan AssessmentsImplementation Officer/s:
Jason CattonarTheresa James
Program Function: Planning AssessmentStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.3 - Environmentally sustainable development which complements the City’s
characterApproach: 1.3.2 - Enhance the character, amenity, safety, and accessibility of the City
through promoting sympathetic and sustainable development.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: Applications decided within statutory timeframes
Action
Action: Provide advice and assistance to the community in relation to planning assessment
Implementation Officer/s:
Jason CattonarTheresa James
Program Function: Planning AssessmentStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.3 - Environmentally sustainable development which complements the City’s
characterApproach: 1.3.2 - Enhance the character, amenity, safety, and accessibility of the City
through promoting sympathetic and sustainable development.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: satisfaction rate via customer feedback surveys
Action
Action: Undertake Building Rules AssessmentsImplementation Officer/s:
Anthony Silvestri
Program Function: Building AssessmentStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.3 - Environmentally sustainable development which complements the City’s
character
75
Approach: 1.3.2 - Enhance the character, amenity, safety, and accessibility of the City through promoting sympathetic and sustainable development.
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: Applications decided within statutory timeframes
Action
Action: Undertake the Building Inspection program (in accordance with Council’s Building Inspection Policy).
Implementation Officer/s:
Anthony Silvestri
Program Function: Building AssessmentStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.3 - Environmentally sustainable development which complements the City’s
characterApproach: 1.3.2 - Enhance the character, amenity, safety, and accessibility of the City
through promoting sympathetic and sustainable development.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: Building inspection rate 90% of statutory requirements
Action
Action: Undertake compliance action in accordance with the (draft) Compliance/Enforcement Policy
Implementation Officer/s:
Michael Walmesley
Program Function: Development ComplianceStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.3 - Environmentally sustainable development which complements the City’s
characterApproach: 1.3.2 - Enhance the character, amenity, safety, and accessibility of the City
through promoting sympathetic and sustainable development.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: Undertake compliance in accordance with Compliance/Enforcement Policy.
Action
Action: Enhance functionality of the Planning and Building compliance register and ensure its maintenance
Implementation Officer/s:
Michael Walmesley
76
Program Function: Development ComplianceStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.3 - Environmentally sustainable development which complements the City’s
characterApproach: 1.3.2 - Enhance the character, amenity, safety, and accessibility of the City
through promoting sympathetic and sustainable development.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: Establishment of long-term compliance register by December 2013
Action
Action: Commencement of a Development Plan AmendmentImplementation Officer/s:
Jason CattonarWendy Hoare
Program Function: Planning PolicyStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.2 - A range of housing that meets the varying needs of the communityApproach: 1.2.1 - Encourage housing options to meet changing community needs, in
particular housing for the agedIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Commencement of at least one Development Plan Amendment
Action
Action: Maintain the Heritage Advisory Service.Implementation Officer/s:
Wendy Hoare
Program Function: HeritageStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.1 - Conservation and enhancement of the historic character of the CityApproach: 1.1.1 - Support the protection of the City's built and natural heritage, including
trees of significanceIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: Referral reports for development applications made within 10 business days
Action
Action: Provide administrative support to the Development Assessment functionImplementation Lara Jones
77
Officer/s:Program Function: Development AdministrationStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.3 - Environmentally sustainable development which complements the City’s
characterApproach: 1.3.2 - Enhance the character, amenity, safety, and accessibility of the City
through promoting sympathetic and sustainable development.Is this Action a control or risk mitigation activity for an identified risk?Action Category: LegislativeAction Type: Operating
KPI: Applications decided within statutory timeframes
Action
Action: Implementation of electronic DAP agendasImplementation Officer/s:
Jason Cattonar
Program Function: Process ImprovementStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.2 - Provide convenient and flexible service deliveryIs this Action a control or risk mitigation activity for an identified risk?Action Category: Service ImprovementAction Type: Capital
KPI: Full implementation of electronic DAP agendas
Action
Action: Progress action plan to proceed with electronic development records and archiving
Implementation Officer/s:
Jason Cattonar
Program Function: Process ImprovementStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.2 - Provide convenient and flexible service deliveryIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Capital
KPI: Progress action plan to proceed with electronic development records and archiving.
Action
78
Action: Develop action plan to allow for electronic DA lodgementImplementation Officer/s:
Jason Cattonar
Program Function: Process ImprovementStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.2 - Provide convenient and flexible service deliveryIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Capital
KPI: Action plan developed to allow for electronic DA lodgement
Action
Action: Develop a Compliance/Enforcement Policy.Implementation Officer/s:
Michael WalmesleyJason Cattonar
Program Function: Development ComplianceStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.3 - Environmentally sustainable development which complements the City’s
characterApproach: 1.3.2 - Enhance the character, amenity, safety, and accessibility of the City
through promoting sympathetic and sustainable development.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: Completion of Compliance/Enforcement Policy (including adoption by Council).
Action
Action: Monitor Eastern Health Authority services for City of Burnside contractImplementation Officer/s:
Jason Cattonar
Program Function: Environmental Health Strategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.3 - A safe community that values and supports its peopleApproach: 3.3.3 - Maintain quality public and environmental health services to maximise
public safety and healthIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Report quarterly on EHA activities, producing four reports by June 2014..
Action
79
Action: Enlarge focus of the team to include educational approaches to complianceImplementation Officer/s:
Brenton Thomass
Program Function: Ranger Services Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.4 - Foster a robust and dynamic workforce that promotes a supportive culture
that recognises our corporate valuesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Develop and distribute advisory information on animal management, parking and bushfire prevention by June 2014.
Action
Action: Develop a partnership approach with schools to maximise safe parking in school zones
Implementation Officer/s:
Brenton Thomass
Program Function: Ranger Services Strategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.3 - A safe community that values and supports its peopleApproach: 3.3.3 - Maintain quality public and environmental health services to maximise
public safety and healthIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Provide schools with material for their newsletter once per term on safe parking
Action
Action: Undertake parking patrols and police parking restrictions Implementation Officer/s:
Brenton Thomass
Program Function: Regulatory Services Strategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.3 - A safe community that values and supports its peopleApproach: 3.3.3 - Maintain quality public and environmental health services to maximise
public safety and healthIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Reduce complaints by 20% over 2012/13 figures by June 2014.
80
Action
Action: Regulate private property to comply with clearance notices to minimise bushfire load.
Implementation Officer/s:
Troy MartinBrenton Thomass
Program Function: Regulatory Services Strategic Direction: 2 - Our Protected and Valued EnvironmentDesired Outcome: 2.1 - Natural environments and watercourses protected and conserved in both
the Hills Face and the PlainsApproach: 2.1.1 - Undertake responsible bushfire management strategies to protect and
enhance the natural environment and propertyIs this Action a control or risk mitigation activity for an identified risk?
Yes
Action Category: Business NeedAction Type: Operating
KPI: Ensure all relevant properties slashed and assessed prior to Fire Danger season (normally 1 December – varies dependent on CFS declaration of Fire Danger Season).
Action
Action: Administer Council’s regulatory responsibilities regarding dog and cat management
Implementation Officer/s:
Brenton Thomass
Program Function: Regulatory Services Strategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.3 - A safe community that values and supports its peopleApproach: 3.3.3 - Maintain quality public and environmental health services to maximise
public safety and healthIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: Collect all due dog registrations
Action
Action: Administer Parking Permit System for residents and commercial propertiesImplementation Officer/s:
Brenton Thomass
Program Function: Regulatory Services Strategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.3 - A safe community that values and supports its peopleApproach: 3.3.3 - Maintain quality public and environmental health services to maximise
public safety and healthIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business Need
81
Action Type: Operating
KPI: Review the Residential Parking Permit system by June 2014 to ensure that Council has a contemporary policy in place.
82
2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
2015-16Manager Name: Leonie Scriven
The newly formed Community Connections Department delivers services and programs which enhance and foster community learning and development and provide targeted community wellness and lifestyle choice support services to the City of Burnside community. Community Learning provides a relaxed environment, in which our community can discover a world of informative and interesting information and have opportunities for interaction and life long learning through access to a diverse subject range and form of lendable materials, themed collections and special events and programs.Community Services delivers high quality support services and develops innovative programs in response to community needs, to support the wellness and lifestyle choices of Burnside's older and disabled community, in conjunction with the Federal Government MyAgedCare initiative. Community Development fosters the creation of community spirit, skills and resilience through providing accessible community facilities, community event support and other community programs and events, with local community organisations and the youth of the City being key focus groups.
1 - Our Integrated Urban Form and Living Spaces
2 - Our Protected and Valued Environment
3 - Our Diverse Supportive, Happy and Healthy People
4 - Our Leading Inclusive and Connected Council
Library Lending Services
The Burnside Library provides a comprehensive range of materials such as books, DVDS, Blu-rays, CDs, magazines, materials for the print disabled, newspapers, e-books, downloadable formats and for loan to provide for the recreational and informational needs of the community. The Library is part of the Public Libraries of South Australia One Card Library Management System and intends to join other public libraries in being able to provide a self service lending system through the implementation of RFID during this year.
Community Outreach Library Service
The Community Outreach Library Service visits members of the Library who are housebound or unable to access the Library for a variety of reasons and delivers materials to these people for their learning,
83
reading and general enjoyment.
Lifelong Learning Program
The Library provides life long learning training through the provision of relevant courses and materials to meet the needs of the community.
Local History Service
The Library provides a range of information in various formats on the history of the City of Burnside. Genealogy and family history groups are also active in a purpose built local history room where key resources can be freely accessed.
Early Childhood Development Program
The Early Childhood Development Program provides a range of high quality programs for young children, including "Storytime" and "Babychat". These programs are held in the Library to promote early literacy and encourage a culture of reading. The Library also offers school holiday and after-school programs for school aged children.
Toy Lending Service
The Burnside Toy Lending Library, provides toys of various styles for lending to the community to encourage early childhood learning and skills development.
Home Assist Service
Home Assist is funded by a Commonwealth Home Support Program Grant (CHSP) through the MyAgedCare initiative. It delivers services to eligible older residents and younger residents with a disability to support them to remain living safely in their homes. Services include home help, shopping, personal care, respite, minor home maintenance and modification and safety and security in and around the home. Home Assist also offers a range of broad range of social, fitness and educational activities and monthly community information sessions.
Eastern Region Men's Shed Program
The Eastern Region Men’s Shed Program is funded by CHSP and supported by City of Burnside. It is a socially inclusive centre based program which meets the individual needs of older men, including those with memory loss, living in three eastern region Councils. It provides, within a group setting, a meeting place for older men to socialise and work on projects either individually or as a group.
3Rs (Respite, Recreation & Revitalisation Program)
3Rs (Respite, Recreation & Revitalisation) Program is a flexible and innovative centre and community based program that assists participants to maintain or learn new skills that will give them confidence to remain active in, and connected to, their community. 3Rs is funded by CHSP and supported by the City of Burnside. It operates eight groups that meet weekly at locations across the eastern region of Adelaide.
Pepper Street Arts Centre and Community Arts
The PSAC is a major cultural hub of the City of Burnside. Supported by approximately 30 volunteers, it enables broad community involvement in and contact with, arts and cultural opportunities in a varied program of exhibitions and arts related activities. The Burnside Civic Centre Atrium space supports community groups, schools, cultural organisations and artists with the provision of a low cost central venue for arts and community showcases, with a community development focus.Local arts appreciation and support, community participation and development, positive local identity, social health and wellbeing, are key outcomes of these community arts based programs.
Community Events
The City of Burnside provides a range of high quality, entertaining, engaging and informative programs and events for the community such as cultural days, literacy author events, language classes, support for community events, youth focused events and other theme events that celebrate community diversity and social development. The program also provides assistance for community organisations using Burnside's community facilities.
Community Centres
Community Centres are hubs of activity, providing opportunities for people of all ages to enjoy diverse activities, meet new people and learn new skills. Over 40 volunteers provide a valuable service and support the community programs held in the various community centres managed by the City of Burnside.
Burnside Ballroom
84
The Burnside Ballroom is a state heritage listed hire venue providing a unique atmosphere for a variety of events and private functions.
Community Grants and Sponsorships
The City of Burnside has a competitive Community Grants Scheme, for worthy community projects and provides financial, subsidy and in-kind support sponsorships to suitable local community groups which can demonstrate that their event contributes to the community development and wellbeing of our community in Burnside.
Youth Development Program
The Youth Development Program provides opportunities for young people aged between 12-25 years to participate in and contribute to their local community, to increase their knowledge and develop important skills. Youth Advisory Committee is a committee of local young people dedicated to representing young people’s voice on matters that affect them and planning events and program
Community Transport Program
Over 30 volunteers provide a convenient, regular and affordable method of shopping transport to vulnerable community members, through the provision and operation of a fleet of small buses. Buses are available for hire for social outings for both Burnside Community run programs and local not for profit groups.A volunteer based car service provides one-way transport, within a 10km radius of Civic Centre, to both hospital and medical appointments and some social activities.
Justice of the Peace Service
The City of Burnside provides a Justice of the Peace service for the community, which is staffed through the support of volunteer Justice of the Peace.
Community Connections Management and Service Delivery
The leadership team of Community Connections foster and promote community development, community services and community learning through development and enactment of key strategic initiatives, good governance, professional organisation management and leadership and continuous service improvement programs, as well as providing personalised support for key community initiatives.
Function/Action KPI Units Target Value Target Date
Library Lending Services Operate in accordance with the Public Library Management System requirements
Percentage compliance
100% 30/06/2016
Maintain minimum of 1,000 Library visitors per day
Number of visits per day
1,000 30/06/2016
Maintain minimum of 600,000 loans per year
Number of loans per year
600,000 30/06/2016
Increase the number of registered borrowers per year from 25,000
Number of borrowers per year
More than 25,000
30/06/2016
Achieve 80% of positive feedback from members
Percentage achieved
80% 30/06/2016
Community Outreach Library Service
Maintain the number of residents serviced by the Community Outreach Library Service
Number of residents
340 residents 30/06/2016
Achieve 80% of positive feedback from clients
Percentage achieved
80% 30/06/2016
Lifelong Learning Program Achieve 80% of positive Percentage 80% of 30/06/2016
85
feedback from customers who attended training sessions.
achieved feedback is positive
Local History Service Maintain local history collection to the required curatorial standard
Percentage of collection
100% 30/06/2016
Early Childhood Development Program
Maintain number of residents attending Babychat sessions
Number of residents
1,800 per year 30/06/2016
Achieve 80% of positive feedback from carers
Percentage achieved
80% 30/06/2016
Maintain the number of residents attending Story Time sessions
Number of residents
7,000 per year 30/06/2016
Achieve 80% of positive feedback from carers
Percentage achieved
80% 30/06/2016
Maintain the number of residents attending the School Holiday Program sessions
Number of residents
1,000 30/06/2016
Achieve 80% of positive feedback
Percentage achieved
80% 30/06/2016
Toy Lending Service Increase current Toy Lending Service membership from 660
Number of new members
More than 660 30/06/2016
Achieve 80% of positive feedback from clients
Percentage achieved
80% 30/06/2016
Home Assist Service Meet CHSP minimum requirements for service outputs as per Funding Agreements
Percentage 100% 30/06/2016
Achieve 80% of positive feedback from clients
Percentage achieved
80% 30/06/2016
Eastern Region Men's Shed Program
Meet CHSP minimum requirements for service outputs as per Funding Agreements
Percentage achieved
100% 30/06/2016
Achieve 80% of positive feedback from clients
Percentage achieved
80% 30/06/2016
3Rs (Respite, Recreation... Meet CHSP minimum requirements for service outputs as per Funding Agreements
Percentage achieved
100% 30/06/2016
Achieve 80% of positive feedback from clients
Percentage achieved
80% 30/06/2016
Pepper Street Arts Centre and Community Arts
Maintain volunteer staffing hours to a minimum of 38 hours/week.
Average hours per week
38 30/06/2016
Undertake a minimum of 20 exhibitions at Pepper
Number of exhibitions
20 30/06/2016
86
St and Civic Centre Atrium per year.Achieve 80% of positive feedback from participants
Percentage achieved
80% 30/06/2016
Continue to deliver a variety of active learning arts based programs that meet community needs
Customer Satisfaction
Increase 30/06/2016
Community Events Number of community events and programs held
Number of events
Trending number
30/06/2016
Deliver a minimum of 30 events held in the library through the year
Number of events
30 30/06/2016
Community Centres Trend in community events and programs held in Burnside Community Centres
Number of events
Trending number
30/06/2016
Improve the service delivery and customer satisfaction with the Community Centres, as measured by 80% positive feedback
Percentage achieved
80% 30/06/2016
Trend in Community Centres booked / utilised
Percentage trend
Trending number
30/06/2016
Burnside Ballroom Number of community events and programs held in the Burnside Ballroom
Number of events
Trending number
30/06/2016
Community Grants andSponsorships
Develop a process by which sponsorship requests are considered
Percentage completion
100% 30/06/2016
Develop a process by which Community Facility Room Hire Subsidy requests are considered
Percentage completion
100% 30/06/2016
The Community Grants Scheme successfully delivered.
Scheme delivered on time and under budget
Delivered 30/06/2016
Youth Development Program
Number of activities for the youth focused programs in school holiday periods.
Number of participants
Trending number
30/06/2016
Achieve 80% of positive feedback from participants
Percentage achieved
80% 30/06/2016
Number of participants in the youth development programs
Number of participants
Trending number
30/06/2016
87
Achieve 80% of positive feedback from the Youth Advisory Committee members
Percentage achieved
80% 30/06/2016
Facilitate and develop a youth action plan, including broad community engagement, for integration into the Community Development Plan
Percentage completion
100% 30/06/2016
Community Transport Program
Trend in usage of the Community Transport Bus Service programs
Number of users
Trending number
30/06/2016
Patronage of Volunteer Based Car Community Transport Service
Number of users
Trending number
30/06/2016
Achieve 80% of positive feedback from clients
Percentage achieved
80% 30/06/2016
Justice of the Peace Service
Achieve 80% of positive feedback from customers
Percentage achieved
80% 30/06/2016
Community Connections ... Completion of Community Connections restructure and change management process
Percentage achieved
100% 30/06/2016
Achieve 85% of positive feedback from staff of Community Connections
Percentage achieved
85% 30/06/2016
Achieve 85% of positive feedback from Volunteers working with Community Connections
Percentage achieved
85% 30/06/2016
100% of Community Connections Services documented
Percentage achieved
100% 30/06/2016
Council adoption of the Community Development Strategy
Adoption achieved
100% 30/06/2016
100% of Community Connections forms and templates reviewed and current
Percentage achieved
100% 30/06/2016
100% of Community Connections Council Policies reviewed and current
Percentage achieved
100% 30/06/2016
Reduction in the number of workplace heath and safety related incidents reported
Percentage achieved
Reduced 30/06/2016
Complete Capital Projects by 30 June 2016 within 2.5% of the overall quarter 3 revised budget
Percentage achieved
Within 2.5% variance range
30/06/2016
88
Achieve 80% customer satisfaction for relevant services and programs delivered by Community Connections
Percentage achieved
80% 30/06/2016
Function: Library Lending Services
Risk: Changes to State Government Public Library Service funding model resulting in potential cost shifting from state to local government
Risk Rating: Low
Risk: Abusive customers threatening or harming staff members, resulting in upset staff, workcover claims, trauma or injury
Risk Rating: Low
Risk: After hours support mechanisms unavailable for staff creating situations where staff and/or patrons are unable to resolve issues including building management problems, technology failure, and security issues.
Risk Rating: Low
Risk: Failure to maintain library lending collection to desired community levelsRisk Rating: Low
Risk: High reliance on volunteers to ensure ongoing service or program deliveryRisk Rating: Moderate
Risk: Injury to a member of the public during event or visitRisk Rating: Low
Risk: Not implementing RFID as desired by the PLSARisk Rating: Moderate
Function: Community Outreach Library Service
Risk: Changes to State Government Public Library Service funding model resulting in potential cost shifting from state to local government
Risk Rating: Low
Risk: Ageing Community Library Service Vehicle resulting in increased maintenance costs through to inability to service customers.
Risk Rating: Low
Function: Lifelong Learning Program
Risk: Changes to State Government Public Library Service funding model resulting in potential cost shifting from state to local government
Risk Rating: Low
Risk: Courses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Risk Rating: Low
89
Function: Local History Service
Risk: Hard copy local history documents deteriotating or being lost resulting in a failure to maintain a historical record or becoming in breach of the State Records Act 1997
Risk Rating: Low
Risk: Courses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Risk Rating: Low
Function: Early Childhood Development Program
Risk: Changes to State Government Public Library Service funding model resulting in potential cost shifting from state to local government
Risk Rating: Low
Risk: Courses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Risk Rating: Low
Function: Toy Lending Service
Risk: Courses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Risk Rating: Low
Risk: Failure to maintain library lending collection to desired community levelsRisk Rating: Low
Function: Home Assist Service
Risk: Reduction in future Federal CHSP funding and the impact on staffing and services.Risk Rating: Moderate
Risk: Courses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Risk Rating: Low
Function: Eastern Region Men's Shed Program
Risk: Reduction in future Federal CHSP funding and the impact on staffing and services.Risk Rating: Moderate
Risk: Courses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Risk Rating: Low
Function: 3Rs (Respite, Recreation & Revitalisation Program)
Risk: Reduction in future Federal CHSP funding and the impact on staffing and services.Risk Rating: Moderate
Risk: Courses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Risk Rating: Low
90
Function: Pepper Street Arts Centre and Community Arts
Risk: Failure to explore and/or secure additional grant fundingRisk Rating: Moderate
Risk: Limited opportunities for program expansion (Youth and Pepper St / Community Arts)Risk Rating: Moderate
Risk: Injury to a member of the public during event or visitRisk Rating: Low
Risk: High reliance on volunteers to ensure ongoing service or program deliveryRisk Rating: Moderate
Function: Community Events
Risk: After hours support mechanisms unavailable for staff creating situations where staff and/or patrons are unable to resolve issues including building management problems, technology failure, and security issues.
Risk Rating: Low
Risk: High reliance on volunteers to ensure ongoing service or program deliveryRisk Rating: Moderate
Risk: Providing sponsorships and subsidies with no formal budget Risk Rating: Moderate
Risk: Injury to a member of the public during event or visitRisk Rating: Low
Risk: Failure to explore and/or secure additional grant fundingRisk Rating: Moderate
Function: Community Centres
Risk: After hours support mechanisms unavailable for staff creating situations where staff and/or patrons are unable to resolve issues including building management problems, technology failure, and security issues.
Risk Rating: Low
Risk: High reliance on volunteers to ensure ongoing service or program deliveryRisk Rating: Moderate
Risk: Providing sponsorships and subsidies with no formal budget Risk Rating: Moderate
Risk: Injury to a member of the public during event or visitRisk Rating: Low
Risk: Courses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Risk Rating: Low
Function: Burnside Ballroom
Risk: After hours support mechanisms unavailable for staff creating situations where staff
91
and/or patrons are unable to resolve issues including building management problems, technology failure, and security issues.
Risk Rating: Low
Risk: Providing sponsorships and subsidies with no formal budget Risk Rating: Moderate
Risk: Injury to a member of the public during event or visitRisk Rating: Low
Risk: Courses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Risk Rating: Low
Function: Community Grants and Sponsorships
Risk: Providing sponsorships and subsidies with no formal budget Risk Rating: Moderate
Function: Youth Development Program
Risk: Courses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Risk Rating: Low
Risk: Failure to explore and/or secure additional grant fundingRisk Rating: Moderate
Risk: Limited opportunities for program expansion (Youth and Pepper St / Community Arts)Risk Rating: Moderate
Function: Community Transport Program
Risk: Failure to explore and/or secure additional grant fundingRisk Rating: Moderate
Risk: High reliance on volunteers to ensure ongoing service or program deliveryRisk Rating: Moderate
Function: Justice of the Peace Service
Risk: High reliance on volunteers to ensure ongoing service or program deliveryRisk Rating: Moderate
Function: Community Connections Management and Service Delivery
Position FTE Amount
Manager Community Connections 1
92
Team Leader Community Learning 1.0
Customer Experience Services Coordinator 1.0
Programming Services Coordinator 1.0
Collections and Acquisition Services Coordinator 1.0
Library Support 1.0
Library Officers 8.73
Library Events Officer 1.0
Toy Library Officer 0.5
Family Network Library Officer 0.7
Community Outreach Library Officers 1.47
Team Leader Community Services 1.0
CHSP Facilitator - In Home Support (externally funded) 1.0
CHSP Facilitator - Group Social Support (externally funded) 1.0
CHSP Program Administration Officers (externally funded) 3.0
Team Leader, Community Development 1
Community Centres Coordinator 1
Community Centres Officer 1
Youth Development Officer 1.0
Team Coordinator Pepper Street Arts and Youth 0.8
Exhibitions and Community Arts Coordination Officer 0.8
Community Arts Officer 0.6
Internal Stakeholders
The Council
City of Burnside Elected MembersEmployees, Staff & Volunteers of the City of Burnside
Casual and Brokered Service Delivery Staff
External Stakeholders
Public Library Services
South Australian Public Library Network
Libraries Board of South Australia
Australian Library Information Association
Library Patrons
City of Burnside Residents
Residents families and carers
Visitors to the City of Burnside
93
Government Departments (State and Federal)Local Government Councils
Local Kindergartens, Primary and High Schools both public and private
Not for profit and charitable organisations
Suppliers and Contractors
Service Clubs and Community Groups
Local Commercial Businesses
Other Community Centres
Action
Action: Provide a relaxing, welcoming, helpful, supportive environment for people of all ages, with easy to find and use library facilities.
Implementation Officer/s:
Lindy Burford
Program Function: Library Lending ServicesStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.3 - Encourage residents to participate in artistic, creative and lifelong learning
pursuitsIs this Action a control or risk mitigation activity for an identified risk?
YesHigh reliance on volunteers to ensure ongoing service or program delivery
Action Category: Business NeedAction Type: Operating
KPI: Maintain 1000 Library visitors per day
Action
Action: Provide a dynamic and relevant collection of Library materialsImplementation Officer/s:
Lindy Burford
Program Function: Library Lending ServicesStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.3 - Encourage residents to participate in artistic, creative and lifelong learning
pursuitsIs this Action a control or risk mitigation activity for an identified risk?
YesFailure to maintain library lending collection to desired community levels
Action Category: Business NeedAction Type: Operating
KPI: Maintain the number of loans per year
Action
Action: Create a service and market the library service so as to increase the number of registered borrowers per year
94
Implementation Officer/s:
Lindy Burford
Program Function: Library Lending ServicesStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.3 - Encourage residents to participate in artistic, creative and lifelong learning
pursuitsIs this Action a control or risk mitigation activity for an identified risk?
YesFailure to maintain library lending collection to desired community levels
Action Category: Business NeedAction Type: Operating
KPI: Increase the number of registered borrowers per year
Action
Action: Measure customer satisfaction through customer satisfaction survey forms, letters, compliment and complaints
Implementation Officer/s:
Lindy Burford
Program Function: Library Lending ServicesStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.3 - Encourage residents to participate in artistic, creative and lifelong learning
pursuitsIs this Action a control or risk mitigation activity for an identified risk?
YesCourses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Action Category: Service ImprovementAction Type: Operating
KPI: Achieve 80% of positive feedback from members
Action
Action: Support and operate in accordance with the Public Libraries Association Consortium including delivering the One Card Library Management System
Implementation Officer/s:
Lindy Burford
Program Function: Library Lending ServicesStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.2 - Provide convenient and flexible service deliveryIs this Action a control or risk mitigation activity for an identified risk?
YesChanges to State Government Public Library Service funding model resulting in potential cost shifting from state to local government
Action Category: Grant ApprovalAction Type: Capital - New or Upgrade
KPI: Operate in accordance with the Public Library Management System requirements
Action
95
Action: Provide a Community Outreach Library Service to residents of the City of Burnside.
Implementation Officer/s:
Lindy Burford
Program Function: Community Outreach Library ServiceStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.3 - Encourage residents to participate in artistic, creative and lifelong learning
pursuitsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Maintain the number of residents serviced by the Community Outreach Library Service
Action
Action: Deliver and evaluate appropriate community training courses.Implementation Officer/s:
Lindy Burford
Program Function: Lifelong Learning ProgramStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.3 - Encourage residents to participate in artistic, creative and lifelong learning
pursuitsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: Achieve 80% of positive feedback from customers who attended training sessions.
Action
Action: Facilitate the preservation of local history material and provide opportunities for the community to learn about Burnside's local history using this material
Implementation Officer/s:
Lindy Burford
Program Function: Local History ServiceStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.2 - Encourage and support the sharing and celebration of cultural and social
diversity through local events and programsIs this Action a control or risk mitigation activity for an identified risk?
YesHard copy local history documents deteriotating or being lost resulting in a failure to maintain a historical record or becoming in breach of the State Records Act 1997
Action Category: Business NeedAction Type: Operating
KPI: Maintain local history collection to the required curatorial standard
96
Action
Action: Deliver interesting Babychat sessions that meet the needs of the target client group
Implementation Officer/s:
Lindy Burford
Program Function: Early Childhood Development ProgramStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.1 - Enhance the use of our community and cultural hubs as resource and
leisure centres to meet local needs and enliven activity, supporting all age groupsIs this Action a control or risk mitigation activity for an identified risk?
YesCourses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Action Category: Business NeedAction Type: Operating
KPI: Maintain number of residents attending Babychat sessions
Action
Action: Deliver interesting Storytime sessions that meet the needs of the target client group
Implementation Officer/s:
Lindy Burford
Program Function: Early Childhood Development ProgramStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.4 - Provide opportunities for people to connect and interact locallyIs this Action a control or risk mitigation activity for an identified risk?
YesCourses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Action Category: Business NeedAction Type: Operating
KPI: Maintain the number of residents attending Story Time sessions
Action
Action: Deliver a exciting and appropriate the School Holiday Program that meets the needs of the client group
Implementation Officer/s:
Lindy Burford
Program Function: Early Childhood Development ProgramStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.1 - Enhance the use of our community and cultural hubs as resource and
leisure centres to meet local needs and enliven activity, supporting all age groupsIs this Action a control or risk mitigation activity for an identified risk?
YesCourses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Action Category: Business NeedAction Type: Operating
KPI: Maintain the number of residents attending the School Holiday Program sessions
97
Action
Action: Provide the Toy Library ServiceImplementation Officer/s:
Lindy Burford
Program Function: Toy Lending ServiceStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.1 - Enhance the use of our community and cultural hubs as resource and
leisure centres to meet local needs and enliven activity, supporting all age groupsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Increase current Toy Lending Service membership
Action
Action: Provide innovative and desired Home Assist programs that meets the grant agreement requirements
Implementation Officer/s:
Angela Morrison
Program Function: Home Assist ServiceStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.4 - A community that can access a range of information, services and
opportunities that enhance their livesApproach: 3.4.1 - Facilitate and advocate for the provision of education, health and other
support services and resources to residents, particularly those most in need.Is this Action a control or risk mitigation activity for an identified risk?
YesReduction in future Federal CHSP funding and the impact on staffing and services.
Action Category: Grant ApprovalAction Type: Operating
KPI: Meet CHSP minimum requirements for service outputs as per Funding Agreements
Action
Action: Provide innovative and utilised Eastern Region Men's Shed program that meets the grant agreement requirements
Implementation Officer/s:
Angela Morrison
Program Function: Eastern Region Men's Shed ProgramStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.4 - A community that can access a range of information, services and
opportunities that enhance their livesApproach: 3.4.2 - Deliver and support integrated community services and programs to
create opportunities for all ages to participate in community life.Is this Action a control or risk mitigation activity for an identified risk?
YesReduction in future Federal CHSP funding and the impact on staffing and services.
Action Category: Grant Approval
98
Action Type: OperatingKPI: Meet CHSP minimum requirements for service outputs as per Funding
Agreements
Action
Action: Deliver a flexible, participant-led program that assists participants to form friendships, increase social networks and maintain or learn new skills that will
Implementation Officer/s:
Angela Morrison
Program Function: 3R's (Respite, Recreation & Revitalisation Program)Strategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.4 - A community that can access a range of information, services and
opportunities that enhance their livesApproach: 3.4.2 - Deliver and support integrated community services and programs to
create opportunities for all ages to participate in community life.Is this Action a control or risk mitigation activity for an identified risk?
YesReduction in future Federal CHSP funding and the impact on staffing and services.
Action Category: Grant ApprovalAction Type: Operating
KPI: Meet CHSP minimum requirements for service outputs as per Funding Agreements
Action
Action: Ensure Pepper Street Arts Centre provides appropriate programs to the community and is viewed as a respected arts hub in the local community.
Implementation Officer/s:
Theresa Brown
Program Function: Pepper Street Arts Centre and Community ArtsStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.3 - Encourage residents to participate in artistic, creative and lifelong learning
pursuitsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Maintain volunteer staffing hours to a minimum of 38 hours/week.
Action
Action: Provide opportunities for artists and community organisations to exhibit their work.
Implementation Officer/s:
Theresa Brown
Program Function: Pepper Street Arts Centre and Community ArtsStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.3 - Encourage residents to participate in artistic, creative and lifelong learning
pursuitsIs this Action a control or risk
No
99
mitigation activity for an identified risk?Action Category: Business NeedAction Type: Operating
KPI: Minimum of 20 exhibitions undertaken at Pepper St and Civic Centre Atrium per year.
Action
Action: Support community interest in artistic pursuits and works though events and programs
Implementation Officer/s:
Theresa Brown
Program Function: Pepper Street Arts Centre and Community ArtsStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.3 - Encourage residents to participate in artistic, creative and lifelong learning
pursuitsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Increase in community interest and participation in art through the staging of various events and programs.
Action
Action: Deliver and assist with the delivery of community events Implementation Officer/s:
Theresa Brown
Program Function: Community EventsStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.2 - Encourage and support the sharing and celebration of cultural and social
diversity through local events and programsIs this Action a control or risk mitigation activity for an identified risk?
YesCourses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Action Category: Business NeedAction Type: Operating
KPI: Increase the number of community events and programs held
Action
Action: Create a community connections events coordination group and support the library based events
Implementation Officer/s:
Theresa Brown
Program Function: Community EventsStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.2 - Encourage and support the sharing and celebration of cultural and social
100
diversity through local events and programsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Deliver a minimum of 30 events held in the library through the year
Action
Action: Create a community connections events coordination group and support the community centre events to encourage more users
Implementation Officer/s:
Theresa Brown
Program Function: Community EventsStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.2 - Encourage and support the sharing and celebration of cultural and social
diversity through local events and programsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Increase the number of community events and programs held
Action
Action: Seek to improve on customer and service delivery for bookings in the community centres.
Implementation Officer/s:
Theresa Brown
Program Function: Community Centres Strategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.2 - Encourage and support the sharing and celebration of cultural and social
diversity through local events and programsIs this Action a control or risk mitigation activity for an identified risk?
YesCourses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Action Category: Business NeedAction Type: Operating
KPI: Improve on customer and service delivery for bookings in the community centres.
Action
Action: Provide a process for requests for sponsorships to be considered and for appropriate events and programs granted.
Implementation Officer/s:
Theresa Brown
Program Function: Community Grants and SponsorshipsStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy People
101
Desired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.2 - Encourage and support the sharing and celebration of cultural and social
diversity through local events and programsIs this Action a control or risk mitigation activity for an identified risk?
Yes
Action Category: Business NeedAction Type: Operating
KPI: Provide a process by which sponsorship requests are considered and where appropriate are granted.
Action
Action: Provide a process for requests for community room hire subsidy to be considered and for appropriate events and programs granted.
Implementation Officer/s:
Theresa Brown
Program Function: Community Grants and SponsorshipsStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.2 - Encourage and support the sharing and celebration of cultural and social
diversity through local events and programsIs this Action a control or risk mitigation activity for an identified risk?
Yes
Action Category: Business NeedAction Type: Operating
KPI: Provide a process by which Community Facility Room Hire Subsidy requests are considered and where appropriate are granted.
Action
Action: Administer a Community Grants Scheme to encourage community development outcomes
Implementation Officer/s:
Theresa Brown
Program Function: Community Grants and SponsorshipsStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.2 - Encourage and support the sharing and celebration of cultural and social
diversity through local events and programsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Resolution of CouncilAction Type: Operating
KPI: The Community Grants Scheme successfully delivered.
Action
Action: Deliver Youth Focused Programs including the Youth School Holiday ProgramImplementation Officer/s:
Theresa Brown
102
Program Function: Youth Development ProgramStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.1 - Enhance the use of our community and cultural hubs as resource and
leisure centres to meet local needs and enliven activity, supporting all age groupsIs this Action a control or risk mitigation activity for an identified risk?
YesHigh reliance on volunteers to ensure ongoing service or program delivery
Action Category: Business NeedAction Type: Operating
KPI: Deliver activities for the youth focused programs in school holiday periods.
Action
Action: Review and increase the youth focused programs to meet desired needsImplementation Officer/s:
Theresa Brown
Program Function: Youth Development ProgramStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.2 - Encourage and support the sharing and celebration of cultural and social
diversity through local events and programsIs this Action a control or risk mitigation activity for an identified risk?
YesCourses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Action Category: Business NeedAction Type: Operating
KPI: Increase the number of participants in the youth development programs
Action
Action: Facilitate a Youth Advisory CommitteeImplementation Officer/s:
Theresa Brown
Program Function: Youth Development ProgramStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.4 - Provide opportunities for people to connect and interact locallyIs this Action a control or risk mitigation activity for an identified risk?
YesHigh reliance on volunteers to ensure ongoing service or program delivery
Action Category: Business NeedAction Type: Operating
KPI: Achieve 80% of positive feedback from the Youth Advisory Committee members
Action
Action: Provide vulnerable community members with a convenient and affordable method of shopping transport through the provision and operation of small buses, driven by Volunteers.
Implementation
103
Officer/s: Theresa BrownProgram Function: Community Transport ProgramStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.4 - A community that can access a range of information, services and
opportunities that enhance their livesApproach: 3.4.2 - Deliver and support integrated community services and programs to
create opportunities for all ages to participate in community life.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Increase usage of the Community Transport Bus service programs
Action
Action: Provide vulnerable community members with affordable and convenient car transport to medical appointments and social activities, supported by a small team of volunteer
Implementation Officer/s:
Theresa Brown
Program Function: Community Transport ProgramStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.4 - A community that can access a range of information, services and
opportunities that enhance their livesApproach: 3.4.2 - Deliver and support integrated community services and programs to
create opportunities for all ages to participate in community life.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Increase patronage of Volunteer Based Car Community Transport Service
Action
Action: Facilitate the hire of The City of Burnside Ballroom for appropriate community events and programs
Implementation Officer/s:
Theresa Brown
Program Function: Burnside BallroomStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.2 - A vibrant and diverse community that has a strong sense of belongingApproach: 3.2.1 - Enhance the use of our community and cultural hubs as resource and
leisure centres to meet local needs and enliven activity, supporting all age groupsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Increase the number of community events and programs held in the Burnside Ballroom
104
Action
Action: Provide a Justice of the Peace ServiceImplementation Officer/s:
Theresa Brown
Program Function: Justice of the Peace ServiceStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.4 - A community that can access a range of information, services and
opportunities that enhance their livesApproach: 3.4.1 - Facilitate and advocate for the provision of education, health and other
support services and resources to residents, particularly those most in need.Is this Action a control or risk mitigation activity for an identified risk?
YesHigh reliance on volunteers to ensure ongoing service or program delivery
Action Category: Business NeedAction Type: Operating
KPI: Achieve 80% of positive feedback from customers
Action
Action: Develop the Community Development StrategyImplementation Officer/s:
Leonie Scriven
Program Function: Community Connections Management and Service DeliveryStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.2 - Review services to ensure they meet community needs facilitating efficient
and effective outcomes of the Strategic PlanIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Council adoption of the Community Development Strategy
Action
Action: Deliver a successful restructure of the newly created Community Connections Department
Implementation Officer/s:
Leonie Scriven
Program Function: Community Connections Management and Service DeliveryStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.3 - Ensure internal structures and systems are continually reviewed
facilitating efficient and effective outcomes of the Strategic Plan.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Completion of Community Connections restructure and change management
105
process
Action
Action: Foster a harmonious, safe, collaborative and communicative workplace environment and culture in the Community Connections Department
Implementation Officer/s:
Leonie ScrivenLindy BurfordTheresa BrownAngela Morrison
Program Function: Community Connections Management and Service DeliveryStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.4 - Foster a robust and dynamic workforce that promotes a supportive culture
that recognises our corporate valuesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Achieve 85% of positive feedback from staff of Community Connections
Action
Action: Foster a harmonious, safe, collaborative and communicative workplace environment and culture in the Community Connections Department
Implementation Officer/s:
Leonie ScrivenLindy BurfordTheresa BrownAngela Morrison
Program Function: Community Connections Management and Service DeliveryStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.4 - Foster a robust and dynamic workforce that promotes a supportive culture
that recognises our corporate valuesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Achieve 85% of positive feedback from Volunteers working with Community Connections
Action
Action: Foster a safe workplace environment and culture in the Community Connections Department
Implementation Officer/s:
Leonie ScrivenLindy BurfordTheresa BrownAngela Morrison
106
Program Function: Community Connections Management and Service DeliveryStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.4 - Foster a robust and dynamic workforce that promotes a supportive culture
that recognises our corporate valuesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Reduction in the number of workplace heath and safety related incidents reported
Action
Action: Ensure Service Efficiency and Good Governance with appropriate Council Reports, Policy, Protocols, Procedures and Forms as relevant for Community Connections
Implementation Officer/s:
Leonie Scriven
Program Function: Community Connections Management and Service DeliveryStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: 100% of Community Connections forms and templates reviewed and current
Action
Action: Document all Community Connections servicesImplementation Officer/s:
Leonie Scriven
Program Function: Community Connections Management and Service DeliveryStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.2 - Review services to ensure they meet community needs facilitating efficient
and effective outcomes of the Strategic PlanIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: 100% of Community Connections Services documented and costed
Action
Action: Manage the Community Connections Annual Operating Budget.
107
Implementation Officer/s:
Leonie Scriven
Program Function: Community Connections Management and Service DeliveryStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.6 - A financially sound Council that is accountable, responsible and sustainableApproach: 4.6.4 - Provide sufficient resources to meet current and future needs of the
communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Complete Capital Projects by 30 June 2016 within 2.5% of the overall quarter 3 revised budget
Action
Action: Undertake customer satisfaction surveys for relevant services and programs delivered by Community Connections.
Implementation Officer/s:
Leonie ScrivenTheresa BrownLindy BurfordAngela Morrison
Program Function: Community Connections Management and Service DeliveryStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.1 - Our community is actively engaged and involved in shaping the City’s futureApproach: 4.1.2 - Improve Council’s understanding of community views and our
performance as rated by the Burnside communityIs this Action a control or risk mitigation activity for an identified risk?
YesCourses, Programs or Services may not meet the needs desired by the community resulting in reduced attendance or requested service
Action Category: Business NeedAction Type: Operating
KPI: Achieve 80% customer satisfaction for relevant services and programs delivered by Community Connections
108
2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
2015-16Manager Name: Mary McDade
The Customer Service Department is the face and voice of Council and has a strong commitment to the delivery of exceptional service. The Customer Service Department provide the first point of contact for our customers which leads to a first and overall impression of Council. Being the starting point of the customer experience sets the scene for any further communication for the customer with Council.To improve the consistence and management of information. To foster and develop a strategic approach to the provision of customer service policies, programs and activities across the organisation.
2 - Our Protected and Valued Environment
3 - Our Diverse Supportive, Happy and Healthy People
4 - Our Leading Inclusive and Connected Council
Strategic 'B' CustomerWise Program
This program is designed to take the organisation on the journey of fostering a culture delivering excellence in service to our community and customers.
Customer Service
Delivers high quality responsive interactions with our residents and the general public through the customer service desk, call centre and cashiering roles.
Function/Action KPI Units Target Value Target Date
Strategic 'B' CustomerWiseProgram
Review of Customer Request System
Percentage 100 31/12/2015
Customer Service Module Level 2 Completed
Percentage 100 30/06/2016
Customer Service Module Level 3 Completed
Percentage 100 1/12/2017
Customer Service Percentage 100 31/01/2019
109
Module Level 4 CompletedCustomer Service strategy integrated in Burnside Culture
Percentage 100 31/03/2020
Customer Service Number of calls answered in Call Centre
Number Trending Data 30/06/2016
80% Grade of Service achieved on a daily basis
Percentage Trending Data 30/06/2016
Number of transactions at the Front Desk
Number Trending Data 30/06/2016
Number Customer Requests entered
Number Trending Data 30/06/2016
Number of Centaman bookings for Parks, tennis courts etc.,
Number Trending Data 30/06/2016
Function: Strategic 'B' CustomerWise Program
Risk: Organisations vision of fostering a culture delivering excellence in service not achieved Risk Rating: Moderate
Function: Customer Service
Risk: A focus on reactive communication rather than strategic communication Risk Rating: Moderate
Position FTE Amount
Manager Customer Service 1
Senior Customer Service Officer 1.0
Customer Service Officer 1.0
Customer Service Officer 1.0
Customer Service Officer 1.0
Customer Service Officer 0.6
Customer Service Officer 0.2
Internal Stakeholders
The Council
City of Burnside Elected MembersEmployees, Staff & Volunteers of the City of Burnside
110
External Stakeholders
Residents, ratepayers and visitors
Media
Relevant SA Government Departments and Authorities
Other SA Councils
Local Government Association of SA
Community Groups
Regular hirers of Community Centre
Well Done after hours service
East Waste
Zero Waste SA
Jet Couriers
Action
Action: Drive and influence review of Customer Request Categories and associated workflows
Implementation Officer/s:
Mary McDade
Program Function: Strategic 'B' CustomerWise ProgramStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.4 - Develop collaborative leadership and strong interdepartmental
relationshipsIs this Action a control or risk mitigation activity for an identified risk?
YesOrganisations vision of fostering a culture delivering excellence in service not achieved
Action Category: Service ImprovementAction Type: Operating
KPI: Review of Customer Request System
Action
Action: Support Departments to continue to work through various levels of the 'B' CustomerWise Program over the next 5 years
Implementation Officer/s:
Mary McDade
Program Function: Strategic 'B' CustomerWise ProgramStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.4 - Develop collaborative leadership and strong interdepartmental
relationshipsIs this Action a control or risk mitigation activity for an identified
YesOrganisations vision of fostering a culture delivering excellence in service not achieved
111
risk?Action Category: Service ImprovementAction Type: Operating
KPI: Customer Service strategy integrated in Burnside Culture
Action
Action: Accurate daily, weekly, monthly and quarterly reporting on how many calls received in the Call Centre
Implementation Officer/s:
Mary McDade
Program Function: Customer Service Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.5 - Encourage initiative and ownership for the Vision and Values of the
organisationIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: Number of calls answered in Call Centre
Action
Action: Team to answer all incoming calls within 3 rings to achieve 80% Grade of ServiceImplementation Officer/s:
Vena FolinoMegha PandyaLyndall KennedyJoanna Hall
Program Function: Customer Service Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.5 - Encourage initiative and ownership for the Vision and Values of the
organisationIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: 80% Grade of Service achieved on daily basis
Action
Action: Create accurate reporting that shows the number of transactions undertaken at the front desk.
Implementation Officer/s:
Mary McDade
Program Function: Customer Service Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
112
in meeting community needsApproach: 4.7.5 - Encourage initiative and ownership for the Vision and Values of the
organisationIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: Number of transactions at the Front Desk
Action
Action: Implement a buddying schedule and program for staff throughout organisation.Implementation Officer/s:
Vena Folino
Program Function: Strategic 'B' CustomerWise ProgramStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.5 - Encourage initiative and ownership for the Vision and Values of the
organisationIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: Customer Service strategy integrated in Burnside Culture
Action
Action: Customer Service team to provide accurate, consistent, friendly and courteous at the front desk and in the call centre to both internal and external customers.
Implementation Officer/s:
Vena FolinoMegha PandyaLyndall KennedyJoanna Hall
Program Function: Customer Service Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.5 - Encourage initiative and ownership for the Vision and Values of the
organisationIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Number of transactions at the Front Desk
113
114
2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
2015-16Manager Name: Nigel Morris
The General Manager Urban Services provides leadership and management oversight of Urban Services (Asset, Engineering and Operations Services) that provides key services to the community in accordance with Council's strategic directions.The Department also undertakes the management of major capital strategic projects and proposals for Council, particularly those of high strategic risk and likely to involve significant Council investment. The department also formulates strategic policy and plans working across other Council business departments to effectively manage Council's open space, property, assets and infrastructure.
1 - Our Integrated Urban Form and Living Spaces
2 - Our Protected and Valued Environment
3 - Our Diverse Supportive, Happy and Healthy People
4 - Our Leading Inclusive and Connected Council
Management Oversight
This function coordinates the delivery of divisional services in order to achieve relevant community and strategic plan directions including the monitoring, progress reporting against key performance indicators and budgets. Work collaboratively with the department managers and senior officers to plan and deliver key Council services. Manage the resolution of service complaints escalated from within divisional business.
Leadership
To provide effective leadership to the division and in particular the direct reports. This function enhances the skills of / and mentors key personnel within the division to develop and maintain an ethos of best practice leadership management and service delivery including the development of effective personnel and succession planning.
Strategic Project Management
This function involves providing effective leadership, management and oversight of a number of key major strategic projects and proposals as resolved by Council. The position is responsible for providing leadership to Council's project teams within resource constraints and in accordance with identified goals and objectives.
Urban Services Policy
115
This function involves preparing and delivering Council policy and plans in accordance with the Council strategic direction, in particular open space, waste management, property, asset and infrastructure management functions and services.
General Manager Support
Provide support to General Manager, Urban Services through managing correspondence, administration and coordinating meetings within the division.
Function/Action KPI Units Target Value Target Date
Management Oversight Corporate Performance Reports are prepared and issued on time (Quarterly KPI Reporting, Departmental Programs and Departmental Achievement Reports) .
Percentage completed by due date
100 30/06/2016
Urban Services capital and operating projects are delivered on time and within budget guidelines.
Percentage completed
90 30/06/2016
Leadership Divisional workforce reviews are undertaken including the completion of Performance Development Reviews.
Percentage completion
90 30/06/2016
Regular Urban Services leadership meetings are undertaken.
Number 12 30/06/2016
Strategic Project Management
Delivery of Glenunga Reserve Community Hub within program.
Percentage completed by due date
100 31/12/2015
Progress to Council the Conyngham Street Depot Site Review by June 2016.
Timeframe Due date 30/06/2016
Develop the Civic Centre Master Plan to present to Council by June 2016.
Timeframe Due date 30/06/2016
Delivery of Glenunga Reserve Community Hub within 2.5% of Council approved budget.
Percentage Within 2.5% 31/12/2015
Urban Services Policy Progress to Council the Public Domain Streetscape Strategy by June 2016.
Timeframe Due date 30/06/2016
Develop a Property Acquisition and Disposal Plan by June 2016.
Timeframe Due date 30/06/2016
Contribute to developing service definitions and descriptions for Urban
Timeframe Due date 30/06/2016
116
Services Division.
General Manager Support Correspondence is managed in line with Council's Customer Service Policy
Percentage compliance
100 30/06/2016
Function: Management Oversight
Risk: No Strategic Risks identified for this functionRisk Rating: Low
Function: Leadership
Risk: No Strategic Risks identified for this functionRisk Rating: Low
Function: Strategic Project Management
Risk: Failure to deliver infrastructure that is safe and adequately fits the needs of users.Risk Rating: Moderate
Function: Urban Services Policy
Risk: No Strategic Risks identified for this functionRisk Rating: Low
Function: General Manager Support
Risk: No Strategic Risks identified for this functionRisk Rating: Low
Position FTE Amount
General Manager Urban Services 1.0
Strategic Project Officer 1
Executive Officer - General Manager Support 0.4
Internal Stakeholders
The Council
City of Burnside Elected MembersEmployees, Staff & Volunteers of the City of Burnside
117
External Stakeholders
Service related consultants and contractors
Commonwealth and SA Government departments
Residents and Community Groups - users of all property, assets and infrastructure
Action
Action: Provide periodic reports to the CEO and/or Council on the Division's progress towards achieving relevant section of Council's Strategic Community Plan
Implementation Officer/s:
Nigel Morris
Program Function: Management Oversight Strategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.7 - An empowered Council and Administration that is visionary and innovative
in meeting community needsApproach: 4.7.4 - Develop collaborative leadership and strong interdepartmental
relationshipsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Corporate Performance Reports are prepared and issued on time (Quarterly KPI Reporting, Departmental Programs and Departmental Achievement Reports) .
Action
Action: Work with Department Managers to continual develop their skill sets and mentor them in order to enhance their performance.
Implementation Officer/s:
Nigel Morris
Program Function: LeadershipStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.4 - Foster a robust and dynamic workforce that promotes a supportive culture
that recognises our corporate valuesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Divisional workforce reviews are undertaken including the completion of Performance Development Reviews.
Action
Action: Progress to Council the Conyngham Street Depot Site Review.Implementation Officer/s:
Barry Cant
118
Program Function: Strategic Project ManagementStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.2 - Plan, maintain and deliver Council infrastructure and assets to the
required level of service and condition that meets the needs of the community now and into the future.
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Progress to Council the Conyngham Street Depot Site Review by June 2016.
Action
Action: Develop a Civic Centre Master Plan and present to CouncilImplementation Officer/s:
Barry Cant
Program Function: Strategic Project ManagementStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.4 - A range of high quality leisure and recreational opportunities and facilities
that foster healthy lifestyle pursuitsApproach: 1.4.1 - Ensure public spaces meet the future needs of our community and provide
for a variety of vibrant and inspirational opportunities, encouraging participation by the community.
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Develop the Civic Centre Master Plan to present to Council by June 2016.
Action
Action: Develop a Property Acquisition and Disposal PlanImplementation Officer/s:
Barry Cant
Program Function: Urban Services Policy Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.1 - Determine the social, economic and environmental infrastructure needs of
the communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Develop a Property Acquisition and Disposal Plan by June 2016.
Action
Action: Progress to Council to Public Domain Streetscape Strategy
119
Implementation Officer/s:
Barry Cant
Program Function: Urban Services Policy Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.5 - Sustainable, engaging and functional community public spaces and
streetscapes.Approach: 1.5.2 - Maintain and enhance streetscapes for improved amenity, character and
environmental outcomesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Progress to Council the Public Domain Streetscape Strategy by June 2016.
Action
Action: Provide and manage timely and concise General Manager, Urban Services correspondence (written, phone, etc)
Implementation Officer/s:
Helen Bortoluzzi
Program Function: General Manager SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Correspondence is managed in line with Council's Customer Service Policy
Action
Action: Provide all administrative support to General Manager, Urban ServicesImplementation Officer/s:
Helen Bortoluzzi
Program Function: General Manager SupportStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.1 - Regularly review, update and adopt leading governance, risk management
and administrative practicesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Correspondence is managed in line with Council's Customer Service Policy
120
2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
2015-16Manager Name: Magnus Heinrich
The City’s open space, recreational facilities including the George Bolton Swimming Centre, buildings and waste management services are fit for purpose and cost effectively managed in an environmentally sustainable manner.
1 - Our Integrated Urban Form and Living Spaces
2 - Our Protected and Valued Environment
3 - Our Diverse Supportive, Happy and Healthy People
4 - Our Leading Inclusive and Connected Council
Environmental Sustainability
The aim of this function is to achieve greater environmental sustainability of the City by increasing awareness of staff and community members; supporting the organisation to integrate best practice environmental and sustainability principles into all areas of business operations; enabling improved environmental outcomes across Council and the community.
Open Space Planning
The City’s open space forms part of our Urban Forest, open space planning includes managing the sporting and recreational needs of the community whilst preserving the environmental benefits offered by the retention of remnant vegetation and revegetation of degraded land. This planning activity is a continuing challenge in the context of changing climatic conditions and increasing demands by the community for structured use (sporting and community use) of the land.
Open Space and Landscape Projects
An outcome of the planning process is the delivery of projects to create new spaces or renew aging infrastructure to improve our open space for passive and recreational purposes. The Department undertakes landscape architecture and urban design activities to plan and design spaces that create functional and interesting environments to meet the needs of our community. They are involved with the concept of 'place', design quality, amenity and sustainability of built and natural outdoor environments.
George Bolton Swimming Centre
The administration and operations of this centre are managed through the Department.
The Department liaises closely with schools, community groups and residents to provide aquatic facilities
121
suitable to all.
Recreation and Sport Planning
The City will continue to review the future demand of sporting and recreational activities though consultation with a broad range of stakeholders with the aim of providing cost effective functional facilities. Working with neighbouring Councils, Burnside will continue to minimise the duplication or over supply of facilities to ensure a mix of facilities within the region. Council will continue to pursue and develop opportunities for grant funding applications that assist and support sports and recreation activities and associated infrastructure developments.
Building and Property Management
This function strives for cost effective management of Council’s buildings and facilities including those that are leased or licensed to community and sporting groups. In order to maintain fit for purpose and efficient assets, a proactive maintenance program is undertaken as well as reactive or as needs maintenance and repairs.
Waste Management
The Department is primarily responsible for assisting in the management of domestic waste removal (green, recycling and refuse) contract and overseeing the hard waste collection program including education programs and development of promotional information to encourage reuse, recycling and to reduce waste going to landfill.
Function/Action KPI Units Target Value Target Date
Environmental Sustainability
Partner with ERA Councils on Resilient East Program to complete the vulnerability assessment.
Percentage Complete
100 30/06/2016
Open Space Planning Complete Master Planning for Hazelwood Park and Kensington Gardens Reserve
Percentage Complete
100 30/01/2016
Open Space and Landscape Projects
Annual capital works program complete by 30 June 2016 within 2.5% of the budget.
Percentage 100 30/06/2016
George Bolton Swimming Centre
Monitor pool user numbers following the pool redevelopment.
Number Trending Data 30/06/2016
Recreation and Sport Planning
Annual capital works program complete by 30 June 2016 within 2.5% of the budget.
Percentage 100 30/06/2016
Building and Property Management
Complete all community land revocations commenced in the previous year in accordance with Council resolutions and Ministerial approval.
Percentage Complete
100 30/06/2016
Ensure all buildings have detailed Asset Management Plans by the end of financial year.
Percentage complete
100 30/06/2016
122
Develop and implement a new Property Acquisition and Disposal Strategy and gain approval from Council.
Percentage complete
100 31/12/2016
Waste Management Increase the diversion of hard waste from landfill from 5% to 35%.
Percentage Diverted
50 30/06/2016
Increase diversion of general kerbside waste collection from landfill from 57% to 62%.
Percentage Diverted
62 30/06/2016
Decrease the contamination rate of kerbside collected recyclables from 36% to 20%.
Percentage Contaminated
50 30/06/2016
Increase food organics recycling through kerbside organics collection from 5% to 7%.
Percentage Diverted
40 30/06/2016
Ensure waste service levels (as documented in service level agreement -SLA) meet Council's needs by annually reviewing service standards.
Percentage Complete
100 30/06/2016
Function: Environmental Sustainability
Risk: Not proactively adpating to climate change impacts Risk Rating: Moderate
Function: Open Space Planning
Risk: Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Risk Rating: Moderate
Function: Open Space and Landscape Projects
Risk: Council fails to maintain or improve the environment through the undertaking of its activities or operations
Risk Rating: Moderate
Function: George Bolton Swimming Centre
Risk: Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Risk Rating: Moderate
Risk:
123
Loss of trust, faith or confidence in the services impacting upon customer relations Risk Rating: Moderate
Function: Recreation and Sport Planning
Risk: Loss of trust, faith or confidence in the services impacting upon customer relations Risk Rating: Moderate
Risk: Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Risk Rating: Moderate
Function: Building and Property Management
Risk: Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Risk Rating: Moderate
Function: Waste Management
Risk: Council fails to maintain or improve the environment through the undertaking of its activities or operations
Risk Rating: Moderate
Position FTE Amount
Manager Asset Services 1
Senior Project Officer 1
Projects Officer 1
Project Officer (Landscape) 1.0
Assets Officer 0.7
Senior Facilities Officer 1
Senior Property Officer 1.0
Building Management Officer 1
Team Leader Swimming Centre 1
Operations Coordinator Swimming Centre 1
Assistant Coordinator Swimming Centre 1
Customer Service Officer Swimming Centre 0.5
Internal Stakeholders
The Council
City of Burnside Elected MembersEmployees, Staff & Volunteers of the City of Burnside
124
External Stakeholders
Local, State and Federal Government Agencies as appropriate
Ratepayers and Residents Groups
Suppliers
Adelaide and Mount Lofty Ranges Natural Resources Management Board
Sporting Clubs
Businesses
Schools
Contractors
Community Groups
Eastern Region Alliance Councils
Service Groups
South Australian Local Government Association
Eastern Waste Management Authority
Highbury Landfill Regional Subsidiary
Action
Action: Implement the relevant Actions from the Environment and Biodiversity Strategy. Implementation Officer/s:
Melanie Spurling
Program Function: Environmental Sustainability Strategic Direction: 2 - Our Protected and Valued EnvironmentDesired Outcome: 2.2 - Sustainable use of natural resources, and minimisation of waste to address
climate changeApproach: 2.2.2 - Respond to the challenges of climate change and reduce our carbon
footprintIs this Action a control or risk mitigation activity for an identified risk?
YesCouncil fails to maintain or improve the environment through the undertaking of its activities or operations
Action Category: StrategicAction Type: Operating
KPI: Partner with ERA Councils on Resilient East Program to complete the vulnerability assessment.
Action
Action: Review the Community Land Management plans.Implementation Officer/s:
Magnus HeinrichJohn Draper
Program Function:
125
Open Space Planning Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.4 - A range of high quality leisure and recreational opportunities and facilities
that foster healthy lifestyle pursuitsApproach: 1.4.2 - Create and facilitate access to diverse leisure, recreation and sporting
facilities and programs that are safe for people of all ages and abilities.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI:
Action
Action: Complete the Master Plan for Hazelwood Park and Kensington Gardens ReserveImplementation Officer/s:
Barry CantMelanie SpurlingClaire Bottrall
Program Function: Open Space Planning Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.4 - A range of high quality leisure and recreational opportunities and facilities
that foster healthy lifestyle pursuitsApproach: 1.4.2 - Create and facilitate access to diverse leisure, recreation and sporting
facilities and programs that are safe for people of all ages and abilities.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Complete Master Planning for Hazelwood Park and Kensington Gardens Reserve
Action
Action: Maintain Swimming Centre OperationsImplementation Officer/s:
Ben Grant
Program Function: George Bolton Swimming Centre Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.4 - A range of high quality leisure and recreational opportunities and facilities
that foster healthy lifestyle pursuitsApproach: 1.4.2 - Create and facilitate access to diverse leisure, recreation and sporting
facilities and programs that are safe for people of all ages and abilities.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Monitor pool user numbers following the pool redevelopment.
126
ActionAction: Undertake a review of terms and conditions of all leases and licencesImplementation Officer/s:
James Brennan
Program Function: Building and Property Management Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.2 - Plan, maintain and deliver Council infrastructure and assets to the
required level of service and condition that meets the needs of the community now and into the future.
Is this Action a control or risk mitigation activity for an identified risk?
YesLoss of trust, faith or confidence in the services impacting upon customer relations
Action Category: Business NeedAction Type: Operating
KPI: Renew all leases and licences prior to expiration as appropriate.
Action
Action: Review of relevant Asset Management PlansImplementation Officer/s:
Magnus HeinrichScott Read
Program Function: Building and Property Management Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.2 - Plan, maintain and deliver Council infrastructure and assets to the
required level of service and condition that meets the needs of the community now and into the future.
Is this Action a control or risk mitigation activity for an identified risk?
YesFailure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Action Category: Business NeedAction Type: Operating
KPI: Ensure all buildings have detailed Asset Management Plans by the end of financial year.
Action
Action: Produce a Property Acquisition and Disposal Strategy by 30 June 2016.Implementation Officer/s:
Magnus HeinrichBarry Cant
Program Function: Building and Property Management Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.2 - Plan, maintain and deliver Council infrastructure and assets to the
required level of service and condition that meets the needs of the community now and into the future.
Is this Action a control or risk mitigation activity for an identified risk?
YesFailure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Action Category: Business Need
127
Action Type: OperatingKPI: Develop and implement a new Property Acquisition and Disposal Strategy by
Council by 31 December 2014.
Action
Action: Facilitate trial of at call Hard Waste Collection ServiceImplementation Officer/s:
John Draper
Program Function: Waste Management Strategic Direction: 2 - Our Protected and Valued EnvironmentDesired Outcome: 2.2 - Sustainable use of natural resources, and minimisation of waste to address
climate changeApproach: 2.2.3 - Minimise the amount of waste to landfill and encourage reuse and
recyclingIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Increase the diversion of hard waste from landfill from 5% to 20%.
Action
Action: Undertake annual maintenance schedule for Council buildings Implementation Officer/s:
Scott Read
Program Function: Building and Property Management Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.2 - Plan, maintain and deliver Council infrastructure and assets to the
required level of service and condition that meets the needs of the community now and into the future.
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Ensure all buildings have detailed Asset Management Plans by the end of financial year.
Action
Action: Foster relationships with sports and community clubsImplementation Officer/s:
Magnus Heinrich
Program Function: Recreation and Sport Planning Strategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.4 - A community that can access a range of information, services and
opportunities that enhance their livesApproach: 3.4.2 - Deliver and support integrated community services and programs to
create opportunities for all ages to participate in community life.Is this Action a control or risk mitigation activity
No
128
for an identified risk?Action Category: StrategicAction Type: Operating
KPI: Annual capital works program complete by 30 June 2016 within 2.5% of the budget.
129
130
2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
2015-16Manager Name: Kevan Delaney
The City’s engineering assets and infrastructure including, retaining walls, transportation and drainage
infrastructure, is fit for purpose and cost effectively managed in an environmentally sustainable manner.
1 - Our Integrated Urban Form and Living Spaces
2 - Our Protected and Valued Environment
Asset Planning
The Asset Planning function involves collecting, collating, storing and retrieving information and data on the capacity and condition of Council assets to formulate works plans and programs.
This function also works with the Finance Department on depreciation and asset valuation for assets and infrastructure within the Department’s responsibility and also assists with infrastructure information controlled by other Departments. In addition to maintaining the database, the team also maintains the Transportation and Drainage Infrastructure Asset Management Plans and coordinates or undertakes the collection of data for these asset classes.
Assistance is provided to other Departments for their asset groups.
Traffic Engineering
The Traffic Engineering section provides engineering expertise to inspect, identify and address parking, and traffic related safety and neighbourhood amenity issues. This function also manages strategic traffic analysis and traffic related issues, Transportation Planning, advocates for improved transit services, and driveway permits.
Civil Engineering Services
The Civil Engineering Services function provides engineering services primarily focussed on providing Transportation and Drainage infrastructure to meet Council’s strategic directions. The main activities include the following:
* Drainage Infrastructure and Watercourses Strategic planning, and design of Council’s underground drainage system, providing for sustainable and environmentally appropriate solutions wherever possible and practical. In addition the Department plans for local and regional flood mitigation issues, erosion management, and water sensitive urban design including potential stormwater harvesting. Typical activities not directly associated with delivering capital works include:- Reviewing watercourses for early erosion sites
131
- Liaising with residents on nuisance flooding issues- Reminding residents of, and helping them mitigate, nuisance and major flood risk
* Transportation Infrastructure The Transportation infrastructure is generally kerb and gutter, the road surface, the road pavement (the gravel under the sealed surface) and footpath assets. The Department will plan for and undertake construction as required to provide a transportation network.
* Easements and Road Reserve Land Management Engineering Services manages the City’s easements including the purchase or sale of land and road reserves either directly or through consultants or Council’s property officer. Council has accepted responsibility for numerous pipes within private property where easements do not exist and is proactively prioritising acquiring easements as needed to manage the risk.
*Public Lighting The Department plans, coordinates and delivers the public lighting infrastructure in reserves and on roads. Typical activities would include: - Coordinating repairs, assessing light spillage and insufficient light requests
* Development Assessment CommentsAnalyse internal referrals from an engineering perspective and provide comments and recommended conditions.
Capital Project delivery
Drainage, Transportation and Traffic Infrastructure program construction projects are typically undertaken through private sector contractors. The department plans and delivers the projects including specifying and assessing tenders, and contractor inductions and monitoring. Each year the team delivers approximately 200 discrete projects across five program areas with an approximate combined value of Six Million.
Function/Action KPI Units Target Value Target Date
Asset Planning Review Asset Management Plans for Transport and Drainage by November 2016.
Percentage completion
50 30/06/2016
Footpath defect data for major roads is collected annually (as per Footpath Policy).
Percentage completion
100 30/06/2016
Footpath defect data for minor roads is collected by March 2017 (as per Footpath Policy).
Percentage completion
100 30/03/2017
Future Capital works programs are prepared for the annual budget process
Date Due Date 18/12/2015
Traffic Engineering Complete community consultation for the Traffic Calming Program.
Percentage completion
100 30/06/2016
Complete design for the current year's Traffic Calming capital works program.
Percentage completion
100 28/04/2016
Civil Engineering Services Actively participate in the Eastern Region
Number of meetings
4 30/06/2016
132
Alliance's Aquifer Storage and Recovery project meetings.
Review 25% of the City’s easements annually over 4 years.
Percentage completion
25 30/06/2018
Capital Project delivery Complete the capital works program by 30 June 2016 within 2.5% of the overall quarter 3 revised budget
Percentage Within 2.5% variance range
30/06/2016
Function: Asset Planning
Risk: Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of
users
Risk Rating: Moderate
Risk: Not securing sufficient funding to meet the operational and capital replacement costs of
assets
Risk Rating: Moderate
Function: Traffic Engineering
Risk: Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of
users
Risk Rating: Moderate
Function: Civil Engineering Services
Risk: Council successfully sued for a footpath trip due to lack of due diligence
Risk Rating: Low
Risk: Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of
users
Risk Rating: Moderate
Function: Capital Project delivery
Risk: Not securing sufficient funding to meet the operational and capital replacement costs of
assets
Risk Rating: Moderate
Position FTE Amount
Manager, Engineering Services 1.0
Principal Traffic Engineering Officer 1.0
Senior Asset Engineer 1.0
Engineering Technical Officer 1.0
133
Senior Civil Technical Officer 1.0
Technical Officer Traffic and Assets 0.8
Principal Civil Engineer 1.0
Civil Technical Officer 0.8
Internal Stakeholders
The Council
City of Burnside Elected Members
Employees, Staff & Volunteers of the City of Burnside
External Stakeholders
Local, State and Federal Government organisations particularly the Department of Planning, Transport, and Infrastructure
Residents
Developers
Action
Action: Undertake an in-depth review of Council's Transportation and Drainage Asset Management Plans to ensure they add value to the service provision
Implementation Officer/s:
Kevan Delaney
Anthony Kalogerinis
Shaun Smith
Program Function: Asset Planning Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.1 - Determine the social, economic and environmental infrastructure needs of
the communityIs this Action a control or risk mitigation activity for an identified risk?
Yes
Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Action Category: StrategicAction Type: Operating
KPI: Review Asset Management Plans for Transport and Drainage by November 2016.
Action
Action: Undertake regular footpath defect and condition inspections and informing the maintenance service providers
Implementation Officer/s:
Anthony Kalogerinis
Shaun Smith
Program Function: Asset Planning Strategic Direction: 1 - Our Integrated Urban Form and Living Spaces
134
Desired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.2 - Plan, maintain and deliver Council infrastructure and assets to the
required level of service and condition that meets the needs of the community now and into the future.
Is this Action a control or risk mitigation activity for an identified risk?
YesCouncil successfully sued for a footpath trip due to lack of due diligence
Action Category: StrategicAction Type: Operating
KPI: Footpath defect data for major roads is collected annually (as per Footpath Policy).
Action
Action: Assess and issue Section 221 Authorisations as required, especially access (driveway) construction
Implementation Officer/s:
Shaun Smith
David Hayes
Program Function: Traffic Engineering Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.2 - Plan, maintain and deliver Council infrastructure and assets to the
required level of service and condition that meets the needs of the community now and into the future.
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Section 221 Authorisations are issued as required and within appropriate response times.
Action
Action: Develop robust, defensible and integrated future works programs that represent good value and low life cycle cost
Implementation Officer/s:
Kevan Delaney
Anthony Kalogerinis
Program Function: Asset Planning Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.2 - Plan, maintain and deliver Council infrastructure and assets to the
required level of service and condition that meets the needs of the community now and into the future.
Is this Action a control or risk mitigation activity for an identified risk?
Yes
Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Action Category: StrategicAction Type: Operating
KPI: Future Capital works programs are prepared for the annual budget process
135
ActionAction: Customer enquiries and requests are addressed in a timely and professional
manner.Implementation Officer/s:
David Hayes
Shaun Smith
Andrew Strauss
David Kenworthy
Jagath Pathirana
Program Function: Traffic Engineering Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.7 - An effective transport network that supports safe and efficient movement,
connecting people and places.Approach: 1.7.1 - Plan and implement appropriate local traffic management to enhance
safety and neighbourhood amenityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: Complete community consultation for the Traffic Calming Program.
Action
Action: Local Area Traffic Management plans are developed and implemented for Beulah Park and Kensington Park.
Implementation Officer/s:
David Hayes
Program Function: Traffic Engineering Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.7 - An effective transport network that supports safe and efficient movement,
connecting people and places.Approach: 1.7.3 - Advocate for safe and reliable public and community transport linkages to
local shopping, health providers and service clubsIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Complete community consultation for the Traffic Calming Program.
Action
Action: Plan for and provide a functional and efficient Local and Regional Transportation Network.
Implementation Officer/s:
David Hayes
Program Function: Traffic Engineering Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.7 - An effective transport network that supports safe and efficient movement,
connecting people and places.Approach: 1.7.1 - Plan and implement appropriate local traffic management to enhance
safety and neighbourhood amenityIs this Action a Yes
136
control or risk mitigation activity for an identified risk?
Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Action Category: StrategicAction Type: Operating
KPI: Complete design for the current year's Traffic Calming capital works program.
Action
Action: Assess and address traffic safety and amenity, parking, and Transportation issues as they arise in a holistic and city wide manner
Implementation Officer/s:
David Hayes
Kevan Delaney
Program Function: Traffic Engineering Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.7 - An effective transport network that supports safe and efficient movement,
connecting people and places.Approach: 1.7.1 - Plan and implement appropriate local traffic management to enhance
safety and neighbourhood amenityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Complete design for the current year's Traffic Calming capital works program.
Action
Action: Work with other Councils to provide cost effective services for Burnside, including the ASR project and the Eastern Region Urban Stormwater Plan
Implementation Officer/s:
Kevan Delaney
Program Function: Civil Engineering Services Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.2 - Plan, maintain and deliver Council infrastructure and assets to the
required level of service and condition that meets the needs of the community now and into the future.
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Actively participate in the Eastern Region Alliance's Aquifer Storage and Recovery project meetings.
Action
Action: Provide a risk managed, functional and effective rainwater drainage network to service levels.
Implementation Officer/s:
David Kenworthy
Jagath Pathirana
Program Function: Civil Engineering Services
137
Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.2 - Plan, maintain and deliver Council infrastructure and assets to the
required level of service and condition that meets the needs of the community now and into the future.
Is this Action a control or risk mitigation activity for an identified risk?
Yes
Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Action Category: StrategicAction Type: Operating
KPI: Review 25% of the City’s easements annually over 4 years.
Action
Action: Ensure Council’s infrastructure assets are fit for purpose, guided by Council's Strategic Plans and relevant information
Implementation Officer/s:
Kevan Delaney
David Hayes
David Kenworthy
Shaun Smith
Program Function: Civil Engineering Services Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.2 - Plan, maintain and deliver Council infrastructure and assets to the
required level of service and condition that meets the needs of the community now and into the future.
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI:
138
2015-16
For the renewed ability to manage departmental plans, report on strategic departmental outcomes and to highlight synergies across the organisation.
2015-16Manager Name: Mario Catalano
Ensure that the City’s urban spaces including; assets, parks, reserves and roadways, are fit for purpose and appropriately maintained for the use and benefit of the community.
1 - Our Integrated Urban Form and Living Spaces
2 - Our Protected and Valued Environment
3 - Our Diverse Supportive, Happy and Healthy People
4 - Our Leading Inclusive and Connected Council
Arboriculture Maintenance Program
Ensure the City’s street and reserve trees are maintained cost effectively utilising best practice arboriculture techniques to maximise their full potential whilst providing a safe and vibrant environment.Core activities for the management of the City’s trees include the planting, maintenance and removal of trees in accordance with the Urban Tree Management Strategy, which includes the management of the City’s vast remnant, Regulated and Significant Tree stock.
City Clean Program
Ensure the City’s streetscapes and open spaces are cleaned cost effectively in order to promote an environment free from litter and debris as far as practical whilst also responding to emergency and risk issues. Core activities associated with this function include the following:- Road and footpath sweeping. - Cleaning of public spaces including reserves, parks, walkways / laneways / car parks.- Seasonal leaf litter removal programs.- Side entry pit cleaning. - Storm damage response, silt and gross pollutant trap maintenance, trash rack cleaning, and water
sandbagging.- Drainpipe and creek clearance.- Council’s litterbin collection service, including bin installation and repair.- Graffiti removal. - Quick response for emergency cleaning needs. - Illegal rubbish removal.- Letter box drops – residents.- Bus shelters – cleaning.- Deceased animals - collection and disposal.
139
- Civic Centre deliveries and other miscellaneous tasks.
Parks Maintenance Services
Ensure the City’s parks and reserves are maintained cost effectively for Community use. This function provides for the maintenance of the City’s parks, reserves, sports grounds and landscape traffic devices including roundabouts and street verges. These activities include:- General horticultural duties.- Mulching, pruning, mowing, fertilising and general gardening duties.- Weed spraying, turf management.- Maintaining park furniture, barbeques, and playgrounds.- Sportsground renovation work; coring, fertilising and topdressing.- Irrigation maintenance and water consumption management.- Tusmore Park wading pool operation and maintenance.
Civil Maintenance Program
Ensure the City’s footpaths and roads are maintained cost effectively to a safe and acceptable Council standard. This function ensures that the City’s road and footpath infrastructure is maintained through minimising risk issues and prolonging asset life. The core activities include:- Footpath network repair and maintenance. - Road network maintenance and minor upgrade. - Kerb and water table network maintenance and repair.- Stormwater network maintenance and repair.- Privately funded works and work for other Council departments.- Verge upgrades (providing loam for grass verges).Traffic control devices minor repair and maintenance.- Assist with street furniture installation and maintenance. - Maintenance of bus shelters.- Storm damage response; sandbagging; bleeding bitumen roads.The majority of work plans are reactive, generated through inspection, community notifications, and footpath audits.
City Safe Maintenance Program
Ensure the City’s streets and reserves signage is in accordance with appropriate regulations and Council requirements.
The core activities for this function include:- The maintenance, repair and replacement of all Council signs including regulatory, directional, informative and name / street signs. - Community event support (e.g. Australia Day, Christmas Carols in the Park).- Street and park furniture maintenance (repair and replacement).- Asset repair (e.g. footbridges).- Tennis courts nets, fencing and other structures (repair and replacement).- Traffic signal alert trailer placement around City.- Temporary traffic signage. - General light steel fabrication. - Depot store management and safety equipment.- Work for other departments as required.
Conservation and Land Management
Ensure the City’s vegetation is environmentally sustainable by introducing and maintaining local indigenous flora throughout Council’s established open space reserve network. The aim is to expand and promote local indigenous flora and fauna to the broader community, contractors and other staff. This function also includes the remediation of Council’s Hills Face reserves network and identifying opportunities to link Hills Face reserve trails. The core activities of the Conservation and Land Management program are:- To improve and maintain the species diversity, habitat value and aesthetics of urban biodiversity sites. - Conserve and improve vegetation and habitat quality in hills face reserves and manage to achieve agreed fire fuel load objectives.- Develop and maintain management access trails and recreational walking trails in hills face reserves.- To advise parks staff, contractors, community groups and residents on the use of local plants in landscapes.- To propagate local plants for local projects, ensuring that locally rare and endangered species are secured.- The Urban Biodiversity field team manages 15ha of urban sites including restored creek, woodland and grassland and diverse planted sites. They also manage the council nursery and propagate up to 25,000
140
plants per year for council and community projects.- Vegetation works over approximately 150ha of reserve land in the hills face areas is undertaken by contract.
Workshop
Ensure the maintenance, including servicing and mechanical repair, of Council’s Operations Services Light Fleet, Major and Minor Plant is managed cost effectively. Other activities associated with this function include overseeing / assisting: - Mechanical related contractors and contract work. - Warranty claims. - Procurement of plant including parts and accessories
Contract Management
Ensure the effective contract management of various contracts supporting Operations Services maintenance plans including:- Weed spraying contract.- Tall tree maintenance and removal contract.- Tree stump removal contract.- Line marking contract.- Rural road maintenance contract.- Playground inspections contract.- Sports field audits contract.- Vegetation management and urban biodiversity contract.
Operations Management and Administration
Ensure the efficient and effective management of Depot Operations that meet Council’s strategic directions and are in accordance with all relevant legislation and regulations. This function includes:- Customer service.- Depot and office administration.- Records management.- Work Health and Safety management.- Technical compliance management of Council infrastructure.
Graffiti Program
Thirteen dedicated volunteers work in small teams to reduce the number of graffiti incidences in the community. Their rapid removal response to identified graffiti reports discourages further graffiti activity.
Function/Action KPI Units Target Value Target Date
Arboriculture Maintenance Program
Responding to Customer Requests – achieving 90% completion of Arboriculture customer requests by the end of the financial year.
percentage 90 30/06/2016
High Risk Trees Program – 100% completed.
percentage 100 30/06/2016
Moderate Risk Program –25 % completed
percentage 25 30/06/2016
Tree Planting Program –program completed within the financial year.
percentage 100 30/06/2016
Footpath and Road Vegetation Clearance Program
percentage 100 30/06/2016
Water sprouts (Suckers) removal Program
percentage 100 30/06/2016
141
City Clean Program Responding to Customer Requests - achieve 90% completion target within response times.
percentage 90 30/06/2016
Street Sweeping –program completed within financial year
percentage 100 30/06/2016
Footpath Sweeping –program completed within financial year Illegal Rubbish Collection
percentage 100 30/06/2016
Illegal Rubbish Collection – All illegal dumping removed within response times.
percentage 100 30/06/2016
Drainage Pit Clearance Program
percentage 100 30/06/2016
Leaf Litter Programs percentage 100 30/06/2016
Parks Maintenance Services
Responding to Customer Requests - achieve 90% completion target within the financial year.
percentage 90 30/06/2015
Water consumption –maintain (IPOS) Irrigation Efficiency Index (between 0.8 – 1.2)
number 0.8-1.2 30/06/2016
Verge Grass Cutting –program completed within financial year
number of cycles
5 30/06/2016
Weed Spraying –program completed within financial year.
percentage 100 30/06/2016
Oval Maintenance – less than 20% monthly high risk notifications from monthly oval inspections.
percentage less 20% 30/06/2016
Tusmore Wading Pool –meets relevant Standards
percentage compliance
100 30/06/2016
Civil Maintenance Program Responding to Customer Request - achieving 90% completion within response times
percentage 90 30/06/2016
City Safe Maintenance Program
Responding to Customer Request – achieve 90% completion within response times
percentage 90 30/06/2016
Conservation and Land Management
Nursery Program – At least 10,000 plants propagated for local projects and for distribution to residents by end of financial year.
number 10000 30/06/2016
Urban Biodiversity percentage 90 30/06/2016
142
Program – Maintain 10ha of core urban biodiversity site area meeting 90% of Conservation and Land Management audit standards.Hills Face Conservation and Land Management Program – Overall fire fuel loadings maintained at levels determined by Fire Prevention Officer.
percentage 100 30/06/2016
Indigenous Vegetation Conservation Programs –Maintain 90 local species in secure populations at urban biodiversity sites
number 90 30/06/2016
Walking Trails Maintenance Program –Trails maintained to Conservation and Land Management audit standards.
percentage 100 30/06/2016
Volunteer Conservation and Land Management Program - maintain all Volunteer contribution to at least 1000 hours per year.
hours completed
at least 1000 30/06/2016
Workshop Major Plant Maintenance Program – All major plant serviced cost effectively in accordance with service standards.
percentage 100 30/06/2016
Light Fleet Maintenance Program – All vehicles serviced cost effectively in accordance with service standards.
percentage 100 30/06/2016
Minor Plant Maintenance Programs – All minor plant serviced cost effectively in accordance with service standards.
percentage 100 30/06/2016
Contract Management Responding to Customer Request – achieving 90% completion within the financial year..
percentage 90 30/06/2016
Contract renewal - 100% contracts requiring renewal renewed.
percentage 100 30/06/2016
Major, Light and Minor Plant Replacement Program – 100% complete within 2.5 % of budget
percentage 100 30/06/2016
143
Operations Managementand Administration
Operations Service’s functions managed within budget parameters and to Council and service standards.
percentage +/- 5% 30/06/2016
All Operations Service’s policies and strategies requiring review completed within required timeframes.
percentage 100 30/06/2016
Work Health and Safety risk assessments of new and existing tasks –100% completion by end of financial year..
percentage 100 30/06/2016
SOP’s and SWM’s Reviews – 100% completion of those requiring review.
percentage 100 30/06/2016
Corrective and Preventative Actions –95% completion rate
percentage 95 30/06/2016
Continuous Improvement – at least 2 new initiatives that result in administration productivity improvement.
number at least 2 30/06/2016
Positive recognition from external customers –number received.
number at least 20 30/06/2016
Response to After Hours Call Out – 100% completion.
percentage 100 30/06/2016
Private overhanging vegetation – 95% compliance after second letter.
percentage 95 30/06/2016
Builders damage to council infrastructure –95% compliance after second letter.
percentage 95 30/06/2016
Graffiti Program Maintain average numbers of volunteers on the Graffiti Removal team.
number of volunteers
10 30/06/2016
Function: Arboriculture Maintenance Program
Risk: Storm events which require significant unplanned maintenance will impact on planned maintenance
Risk Rating: Low
Function: City Clean Program
144
Risk: Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Risk Rating: Moderate
Function: Parks Maintenance Services
Risk: Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Risk Rating: Moderate
Function: Civil Maintenance Program
Risk: Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Risk Rating: Moderate
Function: City Safe Maintenance Program
Risk: Failure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Risk Rating: Moderate
Function: Conservation and Land Management
Risk: Council fails to maintain or improve the environment through the undertaking of its activities or operations
Risk Rating: Moderate
Function: Workshop
Risk: No strategic risk identified for this function Risk Rating:
Function: Contract Management
Risk: No strategic risk identified for this function Risk Rating:
Function: Operations Management and Administration
Risk: No strategic risk identified for this function Risk Rating:
Function: Graffiti Program
Risk: Loss of trust, faith or confidence in the services impacting upon customer relationsRisk Rating: Moderate
Position FTE Amount
Manager Operations Services 1
145
Technical Officer Parks 1
Technical Officer Contracts Civil 1
Asset & Compliance Officer 1
Technical Officer Arboriculture 1
Technical Officer Conservation Land Management 1.0
Administration and Customer Services Officers 2.2
Parks Services Team 11
Biodiversity Team 2
Arboriculture Team 8
City Clean Team 8
City Civil Maintenance Team 7
City Safe Team 3
Workshop Team 2
Internal Stakeholders
The Council
City of Burnside Elected MembersEmployees, Staff & Volunteers of the City of Burnside
External Stakeholders
Ratepayers/Residents
Local, State and Federal Government Agencies as needed
Suppliers
Adelaide and Mount Lofty Ranges Natural Resources Management Board
Sporting Clubs
Schools .
Businesses.
Contractors.
Community Groups
Action
Action: Undertake High Risk Proactive Tree Maintenance Program.Implementation Officer/s:
David Sheldrick
Program Function: Arboriculture Maintenance Program Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome:
146
1.5 - Sustainable, engaging and functional community public spaces and streetscapes.
Approach: 1.5.2 - Maintain and enhance streetscapes for improved amenity, character and environmental outcomes
Is this Action a control or risk mitigation activity for an identified risk?
YesCouncil fails to maintain or improve the environment through the undertaking of its activities or operations
Action Category: StrategicAction Type: Operating
KPI: High Risk Trees Program – 100% completed.
Action
Action: Undertake Moderate Risk Proactive Tree Maintenance Program.Implementation Officer/s:
David Sheldrick
Program Function: Arboriculture Maintenance Program Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.5 - Sustainable, engaging and functional community public spaces and
streetscapes.Approach: 1.5.2 - Maintain and enhance streetscapes for improved amenity, character and
environmental outcomesIs this Action a control or risk mitigation activity for an identified risk?
YesCouncil fails to maintain or improve the environment through the undertaking of its activities or operations
Action Category: Business NeedAction Type: Operating
KPI: Moderate Risk Program – 25 % completed
Action
Action: Undertake Footpath and Road Vegetation Clearance Program..Implementation Officer/s:
David Sheldrick
Program Function: Arboriculture Maintenance Program Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.5 - Sustainable, engaging and functional community public spaces and
streetscapes.Approach: 1.5.2 - Maintain and enhance streetscapes for improved amenity, character and
environmental outcomesIs this Action a control or risk mitigation activity for an identified risk?
YesCouncil fails to maintain or improve the environment through the undertaking of its activities or operations
Action Category: Business NeedAction Type: Operating
KPI: Footpath and Road Vegetation Clearance Program
Action
Action: Undertake Tree Planting ProgramImplementation Officer/s:
David Sheldrick
Program Function: Arboriculture Maintenance Program
147
Strategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.5 - Sustainable, engaging and functional community public spaces and
streetscapes.Approach: 1.5.2 - Maintain and enhance streetscapes for improved amenity, character and
environmental outcomesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Tree Planting Program – program completed within the financial year.
Action
Action: Undertake Street Sweeping ProgramsImplementation Officer/s:
John Beard
Program Function: City Clean ProgramStrategic Direction: 2 - Our Protected and Valued EnvironmentDesired Outcome: 2.1 - Natural environments and watercourses protected and conserved in both
the Hills Face and the PlainsApproach: 2.1.3 - Harness the city’s water resources to achieve reuse, flood protection,
healthy watercourses and improved stormwater quality.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Street Sweeping – program completed within financial year
Action
Action: Undertake Footpath Sweeping programsImplementation Officer/s:
John Beard
Program Function: City Clean ProgramStrategic Direction: 2 - Our Protected and Valued EnvironmentDesired Outcome: 2.1 - Natural environments and watercourses protected and conserved in both
the Hills Face and the PlainsApproach: 2.1.3 - Harness the city’s water resources to achieve reuse, flood protection,
healthy watercourses and improved stormwater quality.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Footpath Sweeping – program completed within financial year Illegal Rubbish Collection
Action
Action: Undertake Illegal Rubbish CollectionImplementation
148
Officer/s: John BeardProgram Function: City Clean ProgramStrategic Direction: 2 - Our Protected and Valued EnvironmentDesired Outcome: 2.1 - Natural environments and watercourses protected and conserved in both
the Hills Face and the PlainsApproach: 2.1.3 - Harness the city’s water resources to achieve reuse, flood protection,
healthy watercourses and improved stormwater quality.Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Illegal Rubbish Collection – All illegal dumping removed within response times.
Action
Action: Monitor Water Consumption IPOS Code of PracticeImplementation Officer/s:
Jon McEachern
Program Function: Parks Maintenance ServicesStrategic Direction: 2 - Our Protected and Valued EnvironmentDesired Outcome: 2.2 - Sustainable use of natural resources, and minimisation of waste to address
climate changeApproach: 2.2.1 - Implement sustainable water use practices through water conservation,
capture and reuseIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: Water consumption – maintain (IPOS) Irrigation Efficiency Index (between 0.8 –1.2)
Action
Action: Undertake Verge Grass Cutting Implementation Officer/s:
Peter Richardson
Program Function: Parks Maintenance ServicesStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.5 - Sustainable, engaging and functional community public spaces and
streetscapes.Approach: 1.5.2 - Maintain and enhance streetscapes for improved amenity, character and
environmental outcomesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Verge Grass Cutting – program completed within financial year
Action
149
Action: Undertake Weed Spraying.Implementation Officer/s:
Peter Richardson
Program Function: Parks Maintenance ServicesStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.5 - Sustainable, engaging and functional community public spaces and
streetscapes.Approach: 1.5.2 - Maintain and enhance streetscapes for improved amenity, character and
environmental outcomesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Weed Spraying – program completed within financial year.
Action
Action: Implement Oval Maintenance ProgramsImplementation Officer/s:
Peter Richardson
Program Function: Parks Maintenance ServicesStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.5 - Sustainable, engaging and functional community public spaces and
streetscapes.Approach: 1.5.1 - Ensure that an accessible network of public spaces exists that responds to
the needs of the communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Oval Maintenance – less than 20% monthly high risk notifications from monthly oval inspections.
Action
Action: Maintain Tusmore Wading Pool.Implementation Officer/s:
Peter Richardson
Program Function: Parks Maintenance ServicesStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.5 - Sustainable, engaging and functional community public spaces and
streetscapes.Approach: 1.5.1 - Ensure that an accessible network of public spaces exists that responds to
the needs of the communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
150
KPI: Tusmore Wading Pool – meets relevant Standards
Action
Action: Implement the Nursery ProgramImplementation Officer/s:
David Howlett
Program Function: Conservation and Land ManagementStrategic Direction: 2 - Our Protected and Valued EnvironmentDesired Outcome: 2.1 - Natural environments and watercourses protected and conserved in both
the Hills Face and the PlainsApproach: 2.1.2 - Restore and improve local native vegetation and habitat ensuring
biodiversity is protectedIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Nursery Program – At least 10,000 plants propagated for local projects and for distribution to residents by end of financial year.
Action
Action: Develop and implement the Urban Biodiversity ProgramImplementation Officer/s:
Mark EllisDavid Howlett
Program Function: Conservation and Land ManagementStrategic Direction: 2 - Our Protected and Valued EnvironmentDesired Outcome: 2.1 - Natural environments and watercourses protected and conserved in both
the Hills Face and the PlainsApproach: 2.1.2 - Restore and improve local native vegetation and habitat ensuring
biodiversity is protectedIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Urban Biodiversity Program – Maintain 10ha of core urban biodiversity site area meeting 90% of Conservation and Land Management audit standards.
Action
Action: Develop and implement the Hills Face Conservation and Land Management Program
Implementation Officer/s:
Mark Ellis
Program Function: Conservation and Land ManagementStrategic Direction: 2 - Our Protected and Valued EnvironmentDesired Outcome: 2.1 - Natural environments and watercourses protected and conserved in both
the Hills Face and the PlainsApproach: 2.1.2 - Restore and improve local native vegetation and habitat ensuring
biodiversity is protectedIs this Action a control or risk mitigation activity
YesCouncil fails to maintain or improve the environment through the undertaking of
151
for an identified risk?
its activities or operations
Action Category: StrategicAction Type: Operating
KPI: Hills Face Conservation and Land Management Program – Overall fire fuel loadings maintained at levels determined by Fire Prevention Officer.
Action
Action: Implement the Indigenous Vegetation Conservation Programs.Implementation Officer/s:
David Howlett
Program Function: Conservation and Land ManagementStrategic Direction: 2 - Our Protected and Valued EnvironmentDesired Outcome: 2.1 - Natural environments and watercourses protected and conserved in both
the Hills Face and the PlainsApproach: 2.1.2 - Restore and improve local native vegetation and habitat ensuring
biodiversity is protectedIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Indigenous Vegetation Conservation Programs – Maintain 90 local species in secure populations at urban biodiversity sites
Action
Action: Develop and implement the Walking Trails Maintenance Program.Implementation Officer/s:
Mark Ellis
Program Function: Conservation and Land ManagementStrategic Direction: 2 - Our Protected and Valued EnvironmentDesired Outcome: 2.1 - Natural environments and watercourses protected and conserved in both
the Hills Face and the PlainsApproach: 2.1.2 - Restore and improve local native vegetation and habitat ensuring
biodiversity is protectedIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Walking Trails Maintenance Program – Trails maintained to Conservation and Land Management audit standards.
Action
Action: Implement the Volunteer Conservation and Land Management Program.Implementation Officer/s:
Mark Ellis
Program Function: Conservation and Land ManagementStrategic Direction: 2 - Our Protected and Valued EnvironmentDesired Outcome: 2.1 - Natural environments and watercourses protected and conserved in both
the Hills Face and the Plains
152
Approach: 2.1.2 - Restore and improve local native vegetation and habitat ensuring biodiversity is protected
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Volunteer Conservation and Land Management Program - maintain all Volunteer contribution to at least 1000 hours per year.
Action
Action: Undertake the Major Plant Maintenance ProgramImplementation Officer/s:
Sean Cunningham
Program Function: WorkshopStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.2 - Provide convenient and flexible service deliveryIs this Action a control or risk mitigation activity for an identified risk?
YesFailure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Action Category: Business NeedAction Type: Operating
KPI: Major Plant Maintenance Program – All major plant serviced cost effectively in accordance with service standards.
Action
Action: Undertake the Light Fleet Maintenance ProgramImplementation Officer/s:
Sean Cunningham
Program Function: WorkshopStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.2 - Provide convenient and flexible service deliveryIs this Action a control or risk mitigation activity for an identified risk?
YesFailure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Action Category: Business NeedAction Type: Operating
KPI: Light Fleet Maintenance Program – All vehicles serviced cost effectively in accordance with service standards.
Action
Action: Undertake the Minor Plant Maintenance ProgramImplementation Officer/s:
Sean Cunningham
Program Function: WorkshopStrategic Direction: 4 - Our Leading Inclusive and Connected Council
153
Desired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council services that benefit the community
Approach: 4.5.1 - Enable effective and efficient Council businessIs this Action a control or risk mitigation activity for an identified risk?
YesFailure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Action Category: Business NeedAction Type: Operating
KPI: Minor Plant Maintenance Programs – All minor plant serviced cost effectively in accordance with service standards.
Action
Action: Renew Contracts that are due.Implementation Officer/s:
Mario CatalanoJon McEachernBrenton Moule
Program Function: Contract ManagementStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.5.1 - Enable effective and efficient Council businessIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Contract renewal - 100% contracts requiring renewal renewed.
Action
Action: Undertake the Major, Light and Minor Plant Replacement ProgramImplementation Officer/s:
Brenton Moule
Program Function: Contract ManagementStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.5 - Cost effective, leading edge technologies that deliver efficient council
services that benefit the communityApproach: 4.4.5 - Continuously improve service delivery to balance customer expectation,
value of service and organisational capacity to deliverIs this Action a control or risk mitigation activity for an identified risk?
YesFailure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Action Category: Service ImprovementAction Type: Operating
KPI: Major, Light and Minor Plant Replacement Program – 100% complete within 2.5 % of budget
Action
Action: Undertake Work Health Safety risk assessments of new and existing tasks.Implementation
154
Officer/s: Mario CatalanoPeter MillardPeter RichardsonJohn BeardCraig WadhamWarren RadloffSean Cunningham
Program Function: Operations Management and AdministrationStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.3 - Provide a workplace environment that is healthy and safeIs this Action a control or risk mitigation activity for an identified risk?
YesFailure to deliver and maintain infrastructure that is safe and adequately fits the needs of users
Action Category: LegislativeAction Type: Operating
KPI: Work Health and Safety risk assessments of new and existing tasks – 100% completion by end of financial year..
Action
Action: Standard Operating Procedures and Standard Work Methods Reviews.Implementation Officer/s:
Mario CatalanoPeter MillardPeter RichardsonJohn BeardCraig WadhamWarren RadloffSean Cunningham
Program Function: Operations Management and AdministrationStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.3 - Provide a workplace environment that is healthy and safeIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: SOP’s and SWM’s Reviews – 100% completion of those requiring review.
Action
Action: Undertake Work Health Safety Corrective and Preventative Actions.Implementation Officer/s:
Mario CatalanoPeter MillardPeter RichardsonJohn BeardCraig Wadham
155
Warren RadloffSean Cunningham
Program Function: Operations Management and AdministrationStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.3 - Provide a workplace environment that is healthy and safeIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: LegislativeAction Type: Operating
KPI: Corrective and Preventative Actions – 95% completion rate
Action
Action: Respond to Customer RequestsImplementation Officer/s:
Mario CatalanoPeter MillardPeter RichardsonJohn BeardCraig WadhamWarren RadloffSean CunninghamBrenton MouleAndrew CromptonDavid SheldrickColin PlunkettJon McEachern
Program Function: Operations Management and AdministrationStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.5 - Continuously improve service delivery to balance customer expectation,
value of service and organisational capacity to deliverIs this Action a control or risk mitigation activity for an identified risk?
YesLoss of trust, faith or confidence in the services impacting upon customer relations
Action Category: LegislativeAction Type: Operating
KPI: Positive recognition from external customers – number received.
Action
Action: Identify and implement (where possible) the department's engagement in continuous improvement opportunities.
Implementation Officer/s:
Mario Catalano
Program Function: Operations Management and AdministrationStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
156
culture that encourages well-being, learning and developmentApproach: 4.4.5 - Continuously improve service delivery to balance customer expectation,
value of service and organisational capacity to deliverIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Service ImprovementAction Type: Operating
KPI: Continuous Improvement – at least 4 new initiatives that result in administration productivity improvement.
Action
Action: Respond to private overhanging vegetation.Implementation Officer/s:
Colin Plunkett
Program Function: Operations Management and AdministrationStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.7 - An effective transport network that supports safe and efficient movement,
connecting people and places.Approach: 1.7.2 - Develop and maintain connections that link our neighbourhoods, facilities,
open space through a network of cycle and pedestrian routesIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Private overhanging vegetation – 95% compliance after second letter.
Action
Action: Respond to builders damage to council infrastructureImplementation Officer/s:
Colin Plunkett
Program Function: Operations Management and AdministrationStrategic Direction: 1 - Our Integrated Urban Form and Living SpacesDesired Outcome: 1.6 - Fit for purpose and cost effective infrastructure that meets community needsApproach: 1.6.2 - Plan, maintain and deliver Council infrastructure and assets to the
required level of service and condition that meets the needs of the community now and into the future.
Is this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Builders damage to council infrastructure – 95% compliance after second letter.
Action
Action: Response to after hours call outs.Implementation Officer/s:
Jon McEachernDavid Sheldrick
157
Program Function: Operations Management and AdministrationStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.4 - A respected organisation that is resilient, progressive and adaptable with a
culture that encourages well-being, learning and developmentApproach: 4.4.5 - Continuously improve service delivery to balance customer expectation,
value of service and organisational capacity to deliverIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Response to After Hours Call Out – 100% completion.
Action
Action: Operations Service’s functions managed within budget parameters and to Council and service standards
Implementation Officer/s:
Mario Catalano
Program Function: Operations Management and AdministrationStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.2 - Review services to ensure they meet community needs facilitating efficient
and effective outcomes of the Strategic PlanIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Operations Service’s functions managed within budget parameters and to Council and service standards.
Action
Action: All Operation Service’s policies and strategies requiring review completed within required timeframes.
Implementation Officer/s:
Mario Catalano
Program Function: Operations Management and AdministrationStrategic Direction: 4 - Our Leading Inclusive and Connected CouncilDesired Outcome: 4.3 - Delivery of good governance in Council businessApproach: 4.3.2 - Review services to ensure they meet community needs facilitating efficient
and effective outcomes of the Strategic PlanIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: Business NeedAction Type: Operating
KPI: Operations Service’s functions managed within budget parameters and to Council and service standards.
Action
158
Action: To support the volunteer graffiti removal team to continue to provide a rapid response to reported incidences of graffiti.
Implementation Officer/s:
Brenton Moule
Program Function: Graffiti ProgramStrategic Direction: 3 - Our Diverse Supportive, Happy and Healthy PeopleDesired Outcome: 3.3 - A safe community that values and supports its peopleApproach: 3.3.1 - Encourage volunteerism in the communityIs this Action a control or risk mitigation activity for an identified risk?
No
Action Category: StrategicAction Type: Operating
KPI: Maintain 2012/13 average numbers of volunteers on the Graffiti Removal team.