DEPARTMENT OF WATER RESOURCES

GOVERNMENT OF ODISHA

Annual Report for the Year 2017-18

OF HYDROLOGY SOUTH ZONE,

JEYPORE AT: KORAPUT

March DEPUTY DIRECTOR Dt: 31.03.2018 HYDROLOGY SOUTH ZONE KORAPUT

Page 2: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati

ANNUAL REPORT FOR THE YEAR 2017-18

HYDROLOGY SOUTH ZONE JEYPORE AT: KORAPUT.

BRIEF DESCRIPTION:

Hydrology South Zone, Jeypur at Koraput has been created during the year 1998 and

functioning at Upper Kolab Irrigation Colony at Gandhinagar, Koraput. The Division

comprises of four Sub - Divisions as follows.

1. Hydrometry Sub - Division, Jeypore, At. Koraput.

2. Hydrometry Sub - Division Rayagada, At . Rayagada.

3. Hydrometry Sub-Division, Berhampur, At. Berhampur.

4. Hydrometry Sub-Division, Phulbani, At. Phulbani.

TARGETS: This Division is looking after the operation, maintenance and data collection of 29 nos

of stations under HP-I and 35 Nos of stations under HP-II. The type of stations are as

follows:

In HP-I : 1. G D 10 Nos 2. G (DWLR) 7 Nos

3. G.D.S 3 Nos 4. GDSW 5 Nos 5. F.C.S 4 Nos 29Nos In HP-II : 1. ARS, 21 Nos

2. AWS 7 Nos 3. AWL 7 Nos 35 Nos

The details and Status of above stations are attached separately in this booklet

ACHIEVEMENTS:

Collection, Transmission of Data from field stations have been done by the existing

Regular wages, work charged and NMR employees (The details of Staff position of Wages

Regular, work charged and NMR are enclosed separately) and Data processing has been

done by the field Engineers in the Divisional Data Processing Centre, during the year 2017-

2018. Thereafter all the Data are transmitted to the State Data processing Centre through

Soft copy. Besides the above, the preparatory work for fixation of 36 Nos of ARS,AWL,

AWS stations under National Hydrology Project has been carried out and will be installed

consequent upon procurement of materials for instruments. Improvement of Data centre

and procurement of T& P and survey materials are in process under National Hydrological

Project during the year 2017-18.

Page 3: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati

HYDROLOGY SOUTH ZONE, JEYPORE AT KORAPUT STAFF POSITION:

DIVISIONAL DATA PROCESSING CENTER (DDPC):

One Data processing Center is working at Division office. After receiving the

data from subdivision levels the same are being entered in computer. There after all the

data are transmitted to the State Data Processing Center through soft copy.

COLLECTION OF DATA:

Wages Regular, Work Charged and NMR Employees are engaged for collection &

transmission of data from field stations.

INSPECTION VEHILE:

One diesel jeep bearing Regn.No. OR 12 -1917 is available in Hydrometry Sub-

Division, Koraput for inspection of Gauge & Discharge sites.

1. HYDROMETRY SUB-DIVISION, JEYPORE AT KORAPUT:

This Sub- Division is functioning at Gandhinagar, Koraput in the premises of the

Division Office Building.

STAFF POSITION:

Sl no Name of post Sanction

strength in Nos

Present strength in Nos

Name

1 Asst. Executive Engineer

1 0 Vacant

2 Assistant Engineer

1 1 Vacant

3 Junior Engineer 1 1

Sri Sidhartha Shankar Das, J.E ( on deputation to o/o DD,D.A&P, Bhubaneswar) Smt Sheen Najar,JE, working under this Division on Deputation)

4 Peon 1 0 Vacant

Sl no

Name of post Sanction strength

Present strength

Name

1 Deputy Director 1 1 Er.A.Rama Gopal Rao

2 Asst. Director (Estimator)

1 0 Vacant

3 Junior Clerk 1 1 Bhagaban Nahak

4 Peon 2 1 Tikina Das

Page 4: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati

5 Wages Regular 7 3

Sri K.V.Ramana,Jeep driver, Sri B.N.Sahu,G.R Sri J.K.Samala, G.R.

6 W / C - 10

Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati Majhi G.R Sri Jiban Chandra BeheraG.R Sri Birash Satapathy G.R Sri Binod Sarabu G.R Sri Ghasi Harijan G.R Sri Premdan Asha G.R

7 N.M.R. 1 1 Sri Narayan Jena

WORKS :

This sub-division installed the following stations during HP- I and is looking after

operation and maintenance of the following type of stations.

Sl no Station Type

Code Location Purpose Status

1 GD KI-4 Pongam on Garianala nalah

Gauge , Discharge & rain fall observation

G & D and rain fall is being taken.

2 GD KI-5 Saradaput on river Saberi,

-do- G & D and rain fall

is being taken.

3 GDSW KI-6

Nuaguda on river Telingiri

Gauge Discharge , rain fall, Sedimentation & water quality

G & D and rain fall is being taken.

Laboratary is not working.

4 GD KI-7 Bikrampur On river Turi

Gauge , Discharge & rain fall observation

G & D and rain fall is being taken.

5 G

(DWLR) KI-1

Kolab Dam site Water level & Rainfall recording.

Rain fall is being taken. DWLR Not

working.

6 G

(DWLR) KI-9

Indravati Dam Site -do-

Rain fall is being taken. DWLR Not

working.

7 G (DWLR KI-8 Bhaskel Dam Site -do-

Rain fall is being taken. DWLR Not

working.

8 F.C.S - Koraput

Rainfall , sunshine duration , evaporation , wind speed & direction & relative humidity

Working

Page 5: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati

The sub Division has installed the following staions during HP –II

Sl.No Name of The Stations

Planned Type of station

Status

1 BIKRAMPUR ARS Fitted in own section office building and Solar panel stolen on 01.11.14, FIR lodged

2 KURUMULI ARS Fitted at Indravati Dam site. Not functioning due to signal Problem.

3 NUAGUDA ARS Fitted in own section office building. Solar panel stolen.

4 BHASKEL DAM ARS Fitted in own section office building. Working in good condition.

5 SARADAPUT ARS Fitted in Govindpalli R.D. Division. Working in good condition.

6 BALIMELA ARS

Fitted in Potteru Irr. Sub-Division, Balimela. Not functioning due to signal Problem.

7 PONGAM ARS Fitted in own section office building. Working in good condition.

8 NABARANGAPUR AWS Fitted in M.I. I.B, Maintained by Nawrangpur Block office. Not working. All stolen.

9 KORAPUT AWS Fitted in F.C.S at Koraput. Working in good condition.

10 INDRAVATI DAM AWL Not functioning due to signal Problem.

11 BALIMELA DAM AWL Fitted at Chitrakonda Dam. Not functioning due to signal Problem.

12 KOLAB DAM AWL Not functioning due to signal Problem.

Page 6: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati

Besides that the proposal for the following new ARS/AWS/AWL stations have

been approved, which are to be installed under NHP.

SL.NO. BASIN DISTRICT STATION NAME TYPE

1 Indravati Koraput Dasmantapur ARS

2 Kolab Koraput Nandapur ARS

3 Kolab Koraput Baipariguda ARS

4 Kolab Koraput Kundra ARS

5 Kolab Koraput Lamtaput ARS

6 Kolab Koraput Similiguda ARS

7 Kolab Malkangiri Kudumulugumma ARS

8 Kolab Malkangiri Podia ARS

9 Kolab Malkangiri Kalimela AWS

10 Kolab Koraput Jalaput Dam AWL

One inspection vehicle has been provided to this sub-division for inspection

of sites. The sub divisional officer shares the jeep for the inspection of sites along Deputy

Director. One sub divisional Data Processing center is functioning in the subdivision office.

The subdivision is also entrusted with the maintenance work of residential and non

residential buildings located at Upper Kolab Irrigation Colony, Gandhinagar, Koraput.

2. HYDROMETRY SUB-DIVISION, RAYAGADA :

The Sub- Division is functioning in a departmental Building acquired from

U.K.Project in the Block colony at Rayagada.

STAFF POSITION:

Sl no Name of post Sanction strength

Present strength

Name

1 Asst. Ex.Er 1 0 Vacant

2 Asst. Engineer 1 1 Sri J. N. Sahu, A.E

3 Junior Engineer 1 0 Vacant

4 Peon 1 0 Vacant

5 Wages Regular 2 1 Sri M.K.Rao, G.R

6 W / C 7 5

Sri Bhimsen Mishra,G.R Sri K.B.Kabi, G.R Sri Narendra Muduli, G.R Sri Raj Kishore Mallick G.R Sri Subash Ch. Sethy, G.R Shortage 2 nos.

Page 7: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati

WORKS :

The subdivision has installed the following stations during HP–I and is looking after

operation and maintenance of the following type of stations.

Sl no Station Type

Code Location Purpose Status

1 GD V-4 Gumuda Bridge On Vansadhara

Gauge , Discharge & rain fall observation

G & D and rain fall is being

taken.

2 GD V-5 Mohana on Harabhangi -do-

G & D and rain fall is being

taken.

3 GDS N-3

K. Singpur on Vansadhara

Gauge Discharge , rain fall, and Sedimentation

G & D and rain fall is being

taken. Laboratary is not

working.

4 GDSW N- 4

J.K.Pur on Nagavali

Gauge Discharge , rain fall, and Sedimentation &Water quality

G & D and rain fall is being

taken. Laboratary is not

working.

5 GDSW V – 6

Paralakhemundi on Mahendratanaya

-do-

G & D and rain fall is being

taken. Laboratary is not

working.

6 GD - Belkana on Nagavali

Gauge , Discharge & rain fall observation

G & D and rain fall is being

taken.

7 F.C.S - Gumuda

Rainfall , sunshine duration , evaporation , wind speed & direction & relative humidity

Working

The sub Division has installed the following stations during HP –II

Sl.No Name of The

Stations Planned Type of station

Status

1 MOHANA ARS Fitted in Block office. Working in good condition.

2 PARLAKHEMUNDI ARS Fitted in own section office building. Working in good condition.

Page 8: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati

3 J.K.PUR ARS Fitted in Kolnara Block office. Working in good condition.

4 KALYANSINGPUR ARS Fitted in own section office building. Working in good condition.

5 GUMUDA AWS Fitted in F.C.S at Gumuda. Not working properly. Battery down.

6 GUNUPUR BRIDGE AWL Fitted at Gunupur Bridge. Water level sensor is faulty.

7 J.K.PUR AWL

Fitted at J.K.Pur Bridge. Solar panel crack, Battery down. Connecting cable, sensor cable & RTU component destroyed by rat. Water level sensor is faulty.

Besides that the proposal for the following new ARS/AWS/AWL stations have been

approved, which are to be installed under NHP.

SL.NO. BASIN DISTRICT STATION NAME TYPE

1 Vansadhara Rayagada Padmapur ARS

2 Vansadhara Gajapati Gosani ARS

3 Vansadhara Gajapati Gumma ARS

4 Vansadhara Gajapati Rayaguda ARS

5 Nagavalli Rayagada Kolnara ARS

6 Nagavalli Rayagada Laxmipur ARS

7 Nagavalli Rayagada Kasipur AWS

8 Nagavalli Rayagada Ramanaguda AWS

9 Vansadhara Rayagada Chandrapur AWS

10 Vansadhara Rayagada Badanalla Dam AWL

11 Nagavalli Rayagada K.Singhpur Bridge AWL

No inspection vehicle has been provided to the subdivision for inspection of sites.

One sub-divisional Data Processing center is functioning in the subdivision office. The

subdivision is also entrusted with the maintenance of Sub-division Office building at

Rayagada.

Page 9: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati

3. HYDROMETRY SUB-DIVISION, BERHAMPUR :

This Sub-Division is functioning at Narendrapur Irrigation Colony in a Departmental

building acquired from Berhampur Irrigation Division.

STAFF POSITION :

Sl no Name of post Sanction strength

Present strength

Name

1 Asst. Ex.Er 1 1 Sri D.C.Nayak, A.E.E

2 Asst. Engineer 1 1 Sri N.Panda, A,E

3 Jr. Clerk 1 1 Sri Dasarath Sahu, JC on deputation to C.E, Dam Safty, BBSR

4 Peon 2 1 Sri Rasananda Samantray

5 N.W.M 1 1 Sri M.K.Sitha Deputed to D.D D.A & P BBSR

6 Wages Regular 2 2 Sri D.P.Panigrahi, G.R, & Sri A.K.Patnaik, Jeep Driver

7 Work Charged 7 5

Sri Lingaraj Gouda, G.R. Sri Maheswar Nayak, G.R. Sri Santosh Ku. Mishra, G.R. Sri Prafulla ku. Jena, G.R. Sri Niranjan Nayak, G.R. Shortage 2 nos.

WORKS :

The Subdivision has installed the following stations during HP-I & is looking after

operation and maintenance of the following type of stations.

Sl no Station Type

Code Location Purpose Status

1 GD R - 5 Pipal panka on Rusikulya

Gauge , Discharge & rain fall observation

G & D and rain fall is being taken.

2 GDSW R - 3

Nandighar on Rusikulya

Gauge Discharge , rain fall, and Sedimentation &Water quality

G & D and rain fall is being taken. Laboratary is not

working.

3 FCS - Dhaugaon

Rainfall , sunshine duration , evaporation , wind speed & direction & relative humidity

G & D and rain fall is being taken.

4 GD R - 6 Maulabhanja on Ghodahada

Gauge Discharge , rain fall

G & D and rain fall is being taken.

5 G (DWLR) R- 7 Daha dam site Water level and rain fall

Rain fall is being taken. DWLR Not

working.

Page 10: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati

6 GDS R - 4

Nahada on Badanadi

Gauge Discharge & rain fall and sedimentation

G & D and rain fall is being taken. Laboratary is not

working.

The Sub Division has installed the following stations during HP –II

Sl.No Name of The

Stations Planned Type of station

Status

1 PIPALPANKA ARS Fitted in own section office building. Working properly.

2 INDUGUDA ARS Fitted in Bhanjanagar Irr. Sub Division building. DTU faulty.

3 MOULABHANJA ARS Fitted on Cheligada Canal Division, Digapahandi. Working properly.

4 BERHAMPUR AWS

Fitted in own sub Division office building. Wind speed & Wind direction unit taken by RTDAS staff for repairing. Humidity nor functioning.

5 DHOUGAON AWS

Fitted in our FCS station. Wind speed & Wind direction unit taken by RTDAS staff for repairing. ADAM 4017+ is faulty.

6 ASKA BRIDGE AWL Fitted at Aska Bridge. Water level sensor is faulty.

Besides that the proposal for the following new ARS/AWS/AWL stations have been

approved, which are to be installed under NHP.

SL.NO. BASIN DISTRICT STATION NAME TYPE

1 Rusikulya Ganjam Digapahandi ARS

2 Rusikulya Ganjam Kabisurjyanagar ARS

3 Rusikulya Ganjam Kukudakhandi ARS

4 Rusikulya Ganjam Nahada ARS

5 Rusikulya Ganjam Khalikote AWS

6 Rusikulya Ganjam Ganjam AWS

7 Rusikulya Ganjam Nandighar AWS

8 Rusikulya Ganjam Sorada Dam AWL

9 Bahuda Ganjam Baghalati Dam AWL

10 Rusikulya Ganjam Ganianallah Dam AWL

Page 11: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati

No inspection vehicle has been provided to this subdivision for inspection of sites.

One Sub divisional Data Processing center is functioning in the Subdivision office. The

subdivision is also entrusted with maintenance works of the Subdivision Office building at

Berhampur.

Consequent upon restructuring, two nos. of sub-divisions have been created namely

Phulbani Hydrometry Sub-Division & Nayagarh Hydrometry Sub-Division with head

Quarters at Phulbani & Nayagarh respectively. The sanctioned strength of these Sub-

Divisions are as appended below.

4.HYDROMETRY SUB-DIVISION, PHULBANI :

This Sub-Division is functioning at Philbani in the Departmental building of

Pilasalki Canal Sub-Division, Phulbani in Kandhamal District.

STAFF POSITION :

Sl no Name of post Sanction strength

Present strength

Name

1 Asst. Ex.Er 1 1 Sri N.K.Mohanty.

2 Asst. Engineer 1 1 Sri Sarat Ch. Pradhan.

3 Jr. Clerk 1 0 Vacant

3 Peon 2 0 Vacant

4 N.W.M 1 0 Vacant

4 Wages Regular 2 0 Vacant

5 Work Charged 7 5

Sri Rama Ch. Sahu G.R SriPramod Ku. Mohanty Sri kailash Ch. Rout G.R Sri Biswajit Mohanty G.R Sri Sulava Ch. Patra G.R Shortage 2 nos.

WORKS :

The Subdivision installed the following stations during HP-I & is looking after

operation and maintenance of the following type of stations

Sl no

Station Type

Code Location Purpose Status

1 GD M20 Surubali Gauge , Discharge & rain fall observation

G & D and rain fall is being

taken.

Page 12: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati

2 GDSW M32 Takara

Gauge Discharge , rain fall, and Sedimentation &Water quality

G & D and rain fall is being

taken. Laboratary is not working.

3 FCS

(DWLR) - Daspalla

Rainfall , sunshine duration , evaporation , wind speed & direction & relative humidity

FCS working. DWLR Not

working.

4 GD M34 Badapandusar Gauge Discharge , rain fall

G & D and rain fall is being

taken.

5 G(DWLR) M35 Sidhamula

(Gania)

Water level and rain fall

Rain fall is being taken. DWLR Not working.

6 GDS M26 Bishipada

Gauge Discharge & rain fall and sedimentation

G & D and rain fall is being

taken. Laboratary is not working.

7 G(DWLR) M25 Sagada Water level and rain fall

Rain fall is being taken. DWLR Not working.

The sub Division has installed the following stations during HP –II

Sl.No Name of The Stations

Planned Type of station

Status

1 BISHIPADA ARS ARS not working. Network problem

2 SURUBALI ARS ARS not working. Solar panel stolen

3 SAGADA ARS ARS not working.

4 BADAPANDUSAR ARS Working properly

5 TAKARA ARS ARS not working. Network problem

6 SIDHAMULA(GANIA) ARS ARS not working.

7 BUDHA BUDHIANI ARS ARS not working. Network problem

8 PHULBANI AWS Working properly

Page 13: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati

9 DASHPALLA AWS ARS not working. Battery problem

10 BOUDH AWL Working properly. Fitted on Kiakatta Bridge.

Besides that the proposal for the following new ARS/AWS/AWL stations have been

approved, which are to be installed under NHP.

SL.NO. BASIN DISTRICT STATION NAME TYPE

1 Rusikulya Kandhamala Daringbadi ARS

2 Vansadhara Kandhamala Kotagarh ARS

3 Mahanadi Nayagarh Madhupur ARS

4 Mahanadi Nayagarh Kuanria Dam AWL

5 Mahanadi Nayagarh Budha Budhiani Dam AWL

No inspection vehicle has been provided to this subdivision for inspection of sites.

The subdivision is also entrusted with maintenance works of the Subdivision Office

building at Phulbani.

5.HYDROMETRY SUB-DIVISION, NAYAGARH :

This Sub- Division will be functioning at Nayagarh with one section office at Dasapalla. STAFF POSITION:

Sl no

Name of post Sanction strength

Present strength Name

1 Asst. Ex.Er 1 0 Vacant

2 Asst. Engineer 1 1

Sri Abhimanyu Behera,A.E working on deputation at O/O the Director, Hydrometry, BBSR.

3 Jr. Clerk 1 0 Vacant

3 Peon 2 0 Vacant

4 N.W.M 1 0 Vacant

4 Wages Regular 2 0 Vacant

5 Work Charged - 0 Vacant

Page 14: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati

WORK :

As the Sub-division has not functioned bodily at Nayagarh , all the HP-I & HP-II

stations are being looked after by the Sub-Division Office, Phulbani.

ABBREVATIONS :

1. G(DWLR) : Gauge(Water level) & Rainfall

2. GD : Gauge Discharge & Rainfall

3. GDS : Gauge Discharge, Rainfall & Sedimentation

4. GDSW : Gauge Discharge, Rainfall, Sedimentation & Water Quality

5. FCS : Full Climatic Station(R.Fall,Wind speed & Direction, evaporation)

6. ARS : Automated Rainfall Station

7. AWS : Automated Weather Station

8. AWL : Automatic Water Level

Deputy Director Hydrology South Zone

Jeypore, at Koraput

Page 15: DEPARTMENT OF W ATER RESOURCES …...Sri B.N.Sahu,G.R Sri J.K.Samala, G.R. 6 W / C - 10 Sri M.Khilla G.R Sri H.C.Jenamani G.R Sri Baburam Bisoi G.R Sri Simanchal Dash G.R Sri Tripati