department of planning sustainability michael ......performed all work included in contract and a...
TRANSCRIPT
DEPARTMENT OF PLANNING & SUSTAINABILITY
Page 1 of 8
404.371.2155 (o) 404.371.4556 (f) DeKalbCountyGa.gov
Clark Harrison Building 330 W. Ponce de Leon Ave Decatur, GA 30030
Application for Certificate of Appropriateness
Date Received: ___________________________ Application No.: ________________________________ Address of Subject Property: ________________________________________________________________________________ Applicant: _________________________________________________ E-Mail:_____________________________________
Applicant Mailing Address: _________________________________________________________________________________
_______________________________________________________________________________________________________
Applicant Phone(s): ______________________________________________ Fax: ________________________________ Applicant’s relationship to the owner: Owner Architect: Contractor/Builder Other ____________________________
*************************************************************************************************************************** Owner(s): _____________________________________________________ E-Mail:_________________________________
_____________________________________________________ E-Mail:__________________________________
Owner(s) Mailing Address: __________________________________________________________________________________
_______________________________________________________________________________________________________
Owner(s) Telephone Number: _______________________________________________________________________________ Approximate age or date of construction of the primary structure on the property and any secondary structures affected by this project: __________________________________________________ Nature of work (check all that apply): New construction Demolition Addition Moving a building Other building changes New accessory building Landscaping Fence/Wall Other environmental changes Sign installation or replacement Other Description of Work:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
This form must be completed in its entirety before the Planning Department accepts it. The form must be accompanied by supporting documents (plans, material, color samples, photos, etc.). Provide eight (8) collated sets of the application form and all supporting documentation. If plans/drawings are included, provide eight (8) collated sets on paper no larger than 11” x 17” and three (3) additional sets at scale. All documents submitted in hard copy must also be submitted in digital form (.pdf format). All relevant items from the application checklist must be addressed. An application which lacks any of the required attachments shall be determined incomplete and will not be accepted.
_________________________________________ Signature of Applicant/Date
Revised 1/26/17
Chief Executive Officer
Michael Thurmond
Director
Andrew A. Baker, AICP
975 BRIARCLIFF ROAD NE
Levi A Salazar, RA, LEED AP [email protected]
1954 Airport Road, Suite 141, Chamblee, GA
(404) 822-4291
THE DEMOLITION OF AN EXISTING 450 SF GARAGE AND 275 SF SHED. THEN THE CONSTRUCTION OF A 995 SF THREE CAR GARAGE. THE GARAGE WILL CONSIST OF A CONCRETE BLOCK FOUNDATION WITH WOOD FRAMING ABOVE. THE EXTERIOR MATERIALS SHALL BE BRICK, STUCCO AND WOOD BATTENS TO MATCH EXISTING HOUSE.
Victoria Teodorescu
975 Briarcliff Road NE, Atlanta, GA
(646) 717-1536
1922
CONCRETE
EARTH
GRAVELTILE
GYPSUM WALL BOARD
PLYWOOD
ARCHITECTURAL SHINGLE
STONE VENEER(IN ELEVATION)
METAL ROOFING
MASONRY OR STONE(IN SECTION)
SPRAY FOAM INSULATION
EXTERIOR SHEATHING
WOOD(IN SECTION)
WOOD FLOORING
BRICKBRICK SOLDIER COURSE
85
75/85
PONCE DE LEON
BRAI
RCLI
FFM
OR
ELAN
DFREEDOM PARKWAY
NORTH AVE
PROJECT SITE
DECATUR
COPYRIGHT 2019 SOLATECT DESIGN + BUILD, LLC.THIS DOCUMENT IS THE PROPERTY OF SOLATECT
DESIGN + BUILD, LLC. AND NO PART HEREIN SHALL BE USED FOR ANY PURPOSE WITHOUT THE WRITTEN
CONSENT OF SOLATECT DESIGN + BUILD, LLC.
1954 Airport Road, Suite 141Chamblee, GA 30341
(404) [email protected]
www.solatect.com
SDB PROJECT #: ISSUE DATE:
SHEET #:
DRAWN BY: CHECKED BY:
NO. DESCRIPTION DATE
1 9/10/2019DESIGN DEVELOPMENT
2 9/24/2019HISTORIC DISTRICT REVIEW
9/24/2019
A0.11916 9/20/2019
COVER SHEET
LAS LAS
BRIA
RCLI
FF G
ARAG
E97
5 BR
IAR
CLI
FF R
OAD
NE
ATLA
NTA
, GA
303
06LO
T 50
, BLO
CK
3, L
AND
LO
T 1,
18T
H D
ISTR
ICT
AP
PLI
CA
TIO
N f
or C
ER
TIF
ICA
TE
OF
AP
PR
OP
RIA
TE
NE
SS
-N
OT
IS
SU
ED
FO
R C
ON
ST
RU
CT
ION
GENERAL NOTES1 THE TERM "ARCHITECT" SHALL MEAN SOLATECT DESIGN + BUILD, LLC2 THE TERM "OWNER" SHALL MEAN VICTORIA TEODORESCU3 THE CONTRACTOR SHALL POST ALL BONDS REQUIRED BY THE CITY OR COUNTY AND OBTAIN ALL
NECESSARY CONSTRUCTION PERMITS.4 ACCEPTANCE OF THE WORK BY ANY CONTRACTOR, IT IS UNDERSTOOD THAT THE CONTRACTOR
HAS READ THE GENERAL NOTES AND IS AN AGREEMENT WITH ALL THEIR INTENT.5 ALL CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE BUILDING CODES, CITY CODES &
ORDINANCES, INCLUDING ZONING.SHOULD A CONFLICT OCCUR BETWEEN THE IRC AND THEDRAWINGS, THE IRC SHALL GOVERN.
6 IT IS UNDERSTOOD THAT THE OWNER MAY BE PURCHASING AND/OR INSTALLING MATERIALS,EQUIPMENT, APPLIANCES AND FURNISHING UNDER SEPARATE CONTRACTS WITHOUT A MARKUP.THE CONTRACTOR SHALL COOPERATE WITH THE OWNER TO ALLOW THE DELIVERY ANDINSTALLATION OF SUCH MATERIALS, EQUIPMENT AND FURNISHINGS BY OTHER CONTRACTORSAND SUPPLIERS WHICH MAY COMMENCE PRIOR TO FINAL ACCEPTANCE OF THE WORK BY THEOWNER SO AS TO ASSURE THE EARLIEST POSSIBLE COMPLETION DATE.
7 ALL DIMENSIONS ARE TO OUTSIDE FACE OF CONCRETE FOUNDATION OR WOOD FRAMINGUNLESS OTHERWISE NOTED.
8 ALL CONDITIONS AND DIMENSIONS SHALL BE VERIFIED IN FIELD PRIOR TO THE START OFFABRICATION OR CONSTRUCTION.
9 THESE DRAWINGS ARE NOT TO BE SCALED, IF THE REQUIRED DIMENSIONS OR INFORMATIONCANNOT BE FOUND HEREIN, THE ARCHITECT SHALL BE REQUESTED TO INTERPRET THEDOCUMENTS, AND HIS INTERPRETATIONS SHALL BE FINAL AND ENDING
10 THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT OF ANY DISCREPANCY ON THEDRAWINGS OR THE UNCOVERING OF HIDDEN CONDITIONS WHICH AFFECT THE WORK.
11 DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE DETAILED. WHERE SPECIFICDIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED, NOTIFY ARCHITECT FORCLARIFICATION.
12 ALL DISSIMILAR MATERIALS SHALL BE ISOLATED.13 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REQUEST AND RECEIVE APPROVAL
OF ANY COMPLETED PHASE OF WORK FROM THE CITY OR COUNTY INSPECTIONS BEFOREPROCEEDING TO THE NEXT PHASE OF CONSTRUCTION.
14 THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS SHALL WARRANT ALL WORK FOR APERIOD OF ONE (1) YEAR AFTER THE DATE OF SUBSTANTIAL COMPLETION.
15 DO NOT SUBSTITUTE, REVISE OR CHANGE THE WORK WITHOUT A WRITTEN DIRECTIVE FROM THEARCHITECT OR OWNER.
16 ALL DEFECTIVE WORKMANSHIP AS DETERMINED BY A GOVERNING AGENCY, ARCHITECT,INTERIOR DESIGNER OR OWNER SHALL BE REMOVED AND REPLACED IMMEDIATELY WITHOUTADDITIONAL COST TO THE OWNER UPON WRITTEN NOTIFICATION BY THE OWNER.
17 THE GENERAL CONTRACTOR AND SUB CONTRACTORS SHALL FURNISH SUFFICIENT MATERIALS, EQUIPMENT AND MAN POWER SO AS TO MAINTAIN THE PROJECT SCHEDULE AT ALL TIMES.
18 THE CONTRACTOR SHALL AT ALL TIMES KEEP THE PROJECT SITE FREE FROM ACCUMULATION OFWASTE MATERIAL OR RUBBISH ARISING OUT OF OPERATIONS AT ALL TIMES.
19 THE CONTRACTOR SHALL BE PAID PROGRESS PAYMENT MONTHLY AS WORK PROGRESSES. THECONTRACTOR SHALL SUBMIT AIA DOC G702 AS THE PAYMENT APPLICATION. THE CONTRACTOR
SHALL SUBMIT THE PAYMENT APPLICATION TO THE ARCHITECT ON THE LAST BUSINESS DAY OFTHE MONTH.
20 SUBCONTRACTOR AND CONTRACTOR LIEN WAIVERS SHALL ACCOMPANY EACH PAYMENTAPPLICATION PRIOR TO FINAL PAYMENT. CONTRACTORS SHALL SUBMIT IT'S OWN FINAL LIENWAIVER ALONG WITH FINAL LIEN WAIVERS FOR EVERY SUBCONTRACTOR.
21 THE FINAL PAYMENT CONSTITUTING THE ENTIRE UNPAID BALANCE OF THE CONTRACT SUM SHALLBE MADE BY THE OWNER TO THE CONTRACTOR WHEN THE CONTRACTOR HAS FULLYPERFORMED ALL WORK INCLUDED IN CONTRACT AND A FINAL CERTIFICATE OF PAYMENT HASBEEN ISSUED BY THE ARCHITECT.
22 PROVIDE ALL FIREBLOCKING, DRAFTSTOPS AND FIRESTOPS PER IBC REQUIREMENTS.23 ANY PERSON UNDER THE INFLUENCE OF ALCOHOL OR ILLEGAL DRUGS SHALL BE REMOVED
FROM OR REFUSED ADMITTANCE TO THE SITE.24 NO FIREARMS OR WEAPONS SHALL BE ALLOWED ON THE SITE.
PROJECT DESCRIPTIONTHE DEMOLITION OF AN EXISTING 450 SF GARAGE AND 275 SF SHED. THEN THE CONSTRUCTION OF A 995 SF THREE CAR GARAGE. THE GARAGE WILL CONSIST OF A CONCRETE BLOCK FOUNDATION WITH WOOD FRAMING ABOVE. THE EXTERIOR MATERIALS SHALL BE BRICK, STUCCO AND WOOD BATTENS TO MATCH EXISTING HOUSE.
APPLICABLE CODES
PROJECT TEAM
2012 INTERNATIONAL RESIDENTIAL CODE WITH LOCAL AMENDMENTS
2009 INTERNATIONAL ENERGY CODE WITHLOCAL AMENDMENTS
OWNER:VICTORIA TEODORESCU975 BRIARCLIFF ROAD NEATLANTA, GA 30306(646) [email protected]
ARCHITECT:LEVI A. SALAZAR, RA, LEED APSOLATECT DESIGN + BUILD, LLC1954 AIRPORT ROAD, SUITE 141 CHAMBLEE, GA 30341(404) [email protected]
CONTRACTOR:JONATHAN BALMACEDAR.A.I. / ALL AROUND CONSTRUCTION5251 LANFORD SPRINGS CTLILBURN, GA 30047(678) [email protected]
DRAWING LISTA0.1 COVER SHEETA1.1 EXISTING SITE PLANA1.2 NEW SITE PLANA2.1 GARAGE PLANSA3.1 GARAGE ELEVATIONSA4.1 EXISTING PICTURES & PROPOSED
PERSPECTIVES
BRIARCLIFF GARAGE 975 BRIARCLIFF ROAD NE
ATLANTA, GA 30306
MATERIAL LEGEND
CLASS: R3ZONING: R-85HISTORIC DISTRICT: DRUID HILLS HISTORIC DISTRICT
PARCEL ID: 18 001 05 028LOT: 50BLOCK: 3LAND LOT: 1COUNTY: DEKALB
BUILDING SETBACKS:FRONT AVERAGESIDE 8.5 FTREAR 40 FT
TOTAL SITE AREA 45,676.16 SF / 1.049 ACRES
MAX ALLOWABLE LOT COVERAGE: 35% / 15,986.66 SF / 0.367 ACRESEXISTING LOT COVERAGE: 13.3% / 6,080.75 SF / 0.139 ACRES
PROPOSED LOT COVERAGE: 14.7% / 6,733.6 SF / 0.154 ACRES
NOTE: NO WATERS OF THE STATE EXIST WITHIN 100 FEET OF THE DISTURBED AREA.
SITE INFORMATION
PROJECT LOCATION
984
986
988
990
986
988
990
992
994
996
998
1000
1002
1004
1006
1008
1010
992
994
996
998
1000
1002
1004
1006
1008
1010
1012
1012
1014
1014
1016
1016
46" HW
10" HW
17" HW
29" HW
11" HW
18" HW
8" MGN
8" HW
7" MGN
7" HW
13" HW
14" HW
26" HW26" HW
DEMO EXISTINGGARAGE
DEMO SHED
EXISTINGHOUSE
15" HW25" HW
7" MGN
10" HW6" HW
38" HW
EXISTING CHICKENCOOP
EXISTING CHICKENCOOP
EXISTING SIDEWALK
EXISTING DRIVEWAY
EXISTING PORCH
EXISTING DECK
BRIA
RCLI
FF R
OAD
NE
S 68°06'58" E 468.71'
S 34
°02'2
5" W
101
.85'
N 68°09'04" W 447.54'
N 22
°01'
39" E
99.
84'
9" HW
15" HW
26" HW
42" HW
15" HW
15" HW26" HW
9" HW
8" HW
41" HW
SETBACK
40' - 0"
8' -
6"
8' -
6"
8" HW10" HW
42" HW
33" HW
7" PN
6" PN7" PN
6" PN9" PN
22" HW
EXISTINGHOUSE
9' -
6"
EXISTING DRIVEWAY
EXISTING GATE
EXISTING NEIGHBOR'SHOUSE
EXISTING CHURCH
EXISTING NEIGHBOR'SGARAGE
SETBACK
50' - 0"
SETB
ACK
8' -
6"
SETB
ACK
8' -
6"
COPYRIGHT 2019 SOLATECT DESIGN + BUILD, LLC.THIS DOCUMENT IS THE PROPERTY OF SOLATECT
DESIGN + BUILD, LLC. AND NO PART HEREIN SHALL BE USED FOR ANY PURPOSE WITHOUT THE WRITTEN
CONSENT OF SOLATECT DESIGN + BUILD, LLC.
1954 Airport Road, Suite 141Chamblee, GA 30341
(404) [email protected]
www.solatect.com
SDB PROJECT #: ISSUE DATE:
SHEET #:
DRAWN BY: CHECKED BY:
NO. DESCRIPTION DATE
1 9/10/2019DESIGN DEVELOPMENT
2 9/24/2019HISTORIC DISTRICT REVIEW
9/24/2019
A1.11916 9/20/2019
EXISTING SITE PLAN
LAS LAS
BRIA
RCLI
FF G
ARAG
E97
5 BR
IAR
CLI
FF R
OAD
NE
ATLA
NTA
, GA
303
06LO
T 50
, BLO
CK
3, L
AND
LO
T 1,
18T
H D
ISTR
ICT
AP
PLI
CA
TIO
N f
or C
ER
TIF
ICA
TE
OF
AP
PR
OP
RIA
TE
NE
SS
-N
OT
IS
SU
ED
FO
R C
ON
ST
RU
CT
ION
1" = 20'-0"1 SITE - EXT
N
S
EW
N
0 40 60 8020
GRAPHIC SCALE
984
986
988
990
986
988
990
992
994
996
998
1000
1002
1004
1006
1008
1010
992
994
996
998
1000
1002
1004
1006
1008
1010
1012
1012
1014
1014
1016
1016
10" HW
17" HW
29" HW
11" HW
18" HW
8" MGN
8" HW
7" MGN
7" HW
13" HW
14" HW
26" HW26" HW
15" HW25" HW
7" MGN
10" HW6" HW
38" HW
EXISTING CHICKENCOOP
EXISTING SHED(TO REMAIN)
EXISTING SIDEWALK
EXISTING DRIVEWAY
EXISTING PORCH
EXISTINGHOUSE
NEW GARAGE
EXISTING DECK
NEW CONCRETEDRIVEWAY SLAB
BRIA
RCLI
FF R
OAD
NE
S 68°06'58" E 468.71'
S 34
°02'2
5" W
101
.85'
N 68°09'04" W 447.54'
N 22
°01'
39" E
99.
84'
BRIA
RCLI
FF R
OAD
NE
S 68°06'58" E 468.71'
S 34
°02'2
5" W
101
.85'
N 68°09'04" W 447.54'
N 22
°01'
39" E
99.
84'
26" HW
15" HW
15" HW26" HW
9" HW
8" HW
41" HW
8" HW10" HW
42" HW
33" HW
TREE PROTECTIONFENCE
46" HW6.6% DISTURBEDTREE
PROTECTIONFENCE
TYPE 'C' SILTFENCE W/ POSTS@ 4'-0" O.C. MAX.
TYPE 'C' SILTFENCE W/ POSTS@ 4'-0" O.C. MAX.
TYPE 'C' SILTFENCE W/ POSTS@ 4'-0" O.C. MAX.
DEMO EXISTING GARAGE
DEMO EXISTING SHED
SETB
ACK
8' -
6"
SETBACK
40' - 0"
SETB
ACK
8' -
6"
7" PN
6" PN7" PN
6" PN9" PN
22" HW
EXISTING GATE
EXISTING NEIGHBOR'SHOUSE
EXISTING CHURCH
EXISTING NEIGHBOR'SGARAGE
COPYRIGHT 2019 SOLATECT DESIGN + BUILD, LLC.THIS DOCUMENT IS THE PROPERTY OF SOLATECT
DESIGN + BUILD, LLC. AND NO PART HEREIN SHALL BE USED FOR ANY PURPOSE WITHOUT THE WRITTEN
CONSENT OF SOLATECT DESIGN + BUILD, LLC.
1954 Airport Road, Suite 141Chamblee, GA 30341
(404) [email protected]
www.solatect.com
SDB PROJECT #: ISSUE DATE:
SHEET #:
DRAWN BY: CHECKED BY:
NO. DESCRIPTION DATE
1 9/10/2019DESIGN DEVELOPMENT
2 9/24/2019HISTORIC DISTRICT REVIEW
9/24/2019
A1.21916 9/20/2019
NEW SITE PLAN
LAS LAS
BRIA
RCLI
FF G
ARAG
E97
5 BR
IAR
CLI
FF R
OAD
NE
ATLA
NTA
, GA
303
06LO
T 50
, BLO
CK
3, L
AND
LO
T 1,
18T
H D
ISTR
ICT
AP
PLI
CA
TIO
N f
or C
ER
TIF
ICA
TE
OF
AP
PR
OP
RIA
TE
NE
SS
-N
OT
IS
SU
ED
FO
R C
ON
ST
RU
CT
ION
1" = 20'-0"1 SITE - NEW
N
S
EW
N
SITE INFORMATION:CLASS: R3ZONING: R-85HISTORIC DISTRICT DRUID HILLS HISTORIC DISTRICT
PARCEL ID: 18 001 05 028
BUILDING SETBACKS:FRONT AVERAGESIDE 8.5 FTREAR 40 FT
TOTAL SITE AREA 45,676.16 SF / 1.049 ACRES
MAX ALLOWABLE LOT COVERAGE: 35% / 15,986.66 SF / 0.367 ACRESEXISTING LOT COVERAGE: 13.3% / 6,080.75 SF / 0.139 ACRES
PROPOSED LOT COVERAGE: 14.7% / 6,733.6 SF / 0.154 ACRES
NOTE: NO WATERS OF THE STATE EXIST WITHIN 100 FEET OF THE DISTURBED AREA.
EROSION CONTROL NOTES:1. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED
BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR CONCURRENT WITH LAND-DISTURBING ACTIVITIES.
2. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURE SHALLLL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
3. DISTURBED AREA LEFT IDLE FOR 14 DAYS SHALL BE STABILIZED WITH TEMPORARY VEGETATION AND MULCH DISTURBED AREA REMAINING IDLE 30 DAYS SHALL BE STABILIZED WITH PERMANENT VEGETATION.
4. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST WEEKLY, AFTER EACH RAIN AND REPAIRED AS NECESSARY.
5. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DETERMINED NECESSARY BY ON-SITE INSPECTION.
SILT FENCE:1. SILT FENCE SHALL BE TYPE 'C' AS PER THE MANUAL FOR EROSION
AND SEDIMENT CONTROL IN GEORGIA AND BE WIRE REINFORCED.
STONE CONSTRUCTION EXIT:1. CRUSHED STONE CONSTRUCTION EXIT SHALL BE A MIN 6" IN
DEPTH WITH A GEOTEXTILE UNDERLINER.
2. CRUSHED STONE SHALL BE N.S.A. R-2 (1.5" - 3.5") COARSE AGGREGATE.
3. THE EXIT SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OR MUD ONTO PUBLIC RIGHT OF WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 1.5" - 3.5" STONE.
4. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM VEHICLES OR SITE ONTO ROADWAYS, OR INTO STROM DRAINS MUST BE REMOVED IMMEDIATELY.
TREE PROTECTION:1. FOLLOW EXACT RECOMMENDATIONS FROM ARBORIST.
2. PROVIDE ACTIVE PROTECTION CONSISTING OF 2" X 2" POSTS WITH 4 FT HIGH ORANGE POLYETHYLENE LAMINAR SAFETY NETTING WITH POSTS TO PROTECT ALL HEALTHY TREES.
TEMP GROUND COVER:1. BAHA, WILMINGTON, 60 LBS / ACRE
2. BERMUDA, COMMON, 10 LBS / ACRES
3. STRAW OR HAY, 2 1/2" TONS / ACRE, 6" - 10"
0 40 60 8020
GRAPHIC SCALE
A3.1
1
24' - 0" 14' - 0"
1' - 4" 1' - 4" 1' - 11" 1' - 11"
2' -
0"
27' -
4"
A3.1 2
A3.1
3
A3.14
2' -
0"
NEW CONCRETE DRIVEWAY
25' -
9 1
/2"
36' - 5 1/2"
38' - 0"
23' -
2 1
/4"
EQEQ
EQEQ
GARAGE LIFT
A3.1
1
A3.1 2
A3.1
3
A3.14
NEW CONCRETE DRIVEWAY
GARAGE LIFT
9" / 12" 9" / 12"
6" /
12"
6" /
12"
6" / 12"
COPYRIGHT 2019 SOLATECT DESIGN + BUILD, LLC.THIS DOCUMENT IS THE PROPERTY OF SOLATECT
DESIGN + BUILD, LLC. AND NO PART HEREIN SHALL BE USED FOR ANY PURPOSE WITHOUT THE WRITTEN
CONSENT OF SOLATECT DESIGN + BUILD, LLC.
1954 Airport Road, Suite 141Chamblee, GA 30341
(404) [email protected]
www.solatect.com
SDB PROJECT #: ISSUE DATE:
SHEET #:
DRAWN BY: CHECKED BY:
NO. DESCRIPTION DATE
1 9/10/2019DESIGN DEVELOPMENT
2 9/24/2019HISTORIC DISTRICT REVIEW
9/24/2019
A2.11916 9/20/2019
GARAGE PLANS
LAS LAS
BRIA
RCLI
FF G
ARAG
E97
5 BR
IAR
CLI
FF R
OAD
NE
ATLA
NTA
, GA
303
06LO
T 50
, BLO
CK
3, L
AND
LO
T 1,
18T
H D
ISTR
ICT
AP
PLI
CA
TIO
N f
or C
ER
TIF
ICA
TE
OF
AP
PR
OP
RIA
TE
NE
SS
-N
OT
IS
SU
ED
FO
R C
ON
ST
RU
CT
ION
1/4" = 1'-0"1 GARAGE LEVEL - NEW1/4" = 1'-0"2 GARAGE ROOF
0 8 12 164
GRAPHIC SCALE
GARAGE LEVEL1006' - 0"
T.O. WALL1018' - 4 1/2"
12' -
4 1
/2"
BRICK VENEER
GARAGE DOOR
SOLDIER COURSEBRICK HEADER
2 x 10 TRIMBAND
STUCCO TO MATCHEXISTING HOUSE
1 x 8 TRIM BOARD
1 x 4 FASCIA TRIMOVER 2 x 8 RAFTERS
9" / 12" 9" / 12"
BRICK VENEER
GARAGE DOOR
STUCCO TO MATCHEXISTING HOUSE
1 x 8 TRIM BOARD
BRICK WATER TABLE
1 x 10 TRIMBOARD
ARCHITECTURALCOMPOSITE ROOF
SHINGLES TO MATCHEXISTING HOUSE
22' -
2 3
/4"
6" /
12"
GARAGE LEVEL1006' - 0"
T.O. WALL1018' - 4 1/2"
BRICK VENEER
STUCCO TO MATCHEXISTING HOUSE
1 x 8 TRIM BOARD
BRICK WATER TABLE
1 x 10 TRIMBOARD
ARCHITECTURALCOMPOSITE ROOF
SHINGLES TO MATCHEXISTING HOUSE
PREFINISHED METALGUTTER 9"
/ 12
"
GARAGE LEVEL1006' - 0"
T.O. WALL1018' - 4 1/2"
BRICK VENEER
GARAGE DOOR
SOLDIER COURSEBRICK HEADER
2 x 10 TRIMBAND
STUCCO TO MATCHEXISTING HOUSE
1 x 8 TRIM BOARD
1 x 4 FASCIA TRIMOVER 2 x 8 RAFTERS
BRICK VENEER
GARAGE DOOR
STUCCO TO MATCHEXISTING HOUSE
1 x 8 TRIM BOARD
BRICK WATER TABLE
1 x 10 TRIMBOARD
ARCHITECTURALCOMPOSITE ROOFSHINGLES TO MATCHEXISTING HOUSE
9" / 12"
9" / 12"
6" /
12"
GARAGE LEVEL1006' - 0"
T.O. WALL1018' - 4 1/2"
BRICK VENEER
STUCCO TO MATCHEXISTING HOUSE
1 x 8 TRIM BOARD
BRICK WATER TABLE
1 x 10 TRIMBOARD
ARCHITECTURALCOMPOSITE ROOFSHINGLES TO MATCHEXISTING HOUSE
PREFINISHED METALGUTTER
6" /
12"
9" /
12"
9" /
12"
COPYRIGHT 2019 SOLATECT DESIGN + BUILD, LLC.THIS DOCUMENT IS THE PROPERTY OF SOLATECT
DESIGN + BUILD, LLC. AND NO PART HEREIN SHALL BE USED FOR ANY PURPOSE WITHOUT THE WRITTEN
CONSENT OF SOLATECT DESIGN + BUILD, LLC.
1954 Airport Road, Suite 141Chamblee, GA 30341
(404) [email protected]
www.solatect.com
SDB PROJECT #: ISSUE DATE:
SHEET #:
DRAWN BY: CHECKED BY:
NO. DESCRIPTION DATE
1 9/10/2019DESIGN DEVELOPMENT
2 9/24/2019HISTORIC DISTRICT REVIEW
9/24/2019
A3.11916 9/20/2019
GARAGE ELEVATIONS
LAS LAS
BRIA
RCLI
FF G
ARAG
E97
5 BR
IAR
CLI
FF R
OAD
NE
ATLA
NTA
, GA
303
06LO
T 50
, BLO
CK
3, L
AND
LO
T 1,
18T
H D
ISTR
ICT
AP
PLI
CA
TIO
N f
or C
ER
TIF
ICA
TE
OF
AP
PR
OP
RIA
TE
NE
SS
-N
OT
IS
SU
ED
FO
R C
ON
ST
RU
CT
ION
1/4" = 1'-0"1 GARAGE FRONT1/4" = 1'-0"2 GARAGE MAIN SIDE
1/4" = 1'-0"3 GARAGE BACK1/4" = 1'-0"4 GARAGE BACK SIDE
0 8 12 164
GRAPHIC SCALE
COPYRIGHT 2019 SOLATECT DESIGN + BUILD, LLC.THIS DOCUMENT IS THE PROPERTY OF SOLATECT
DESIGN + BUILD, LLC. AND NO PART HEREIN SHALL BE USED FOR ANY PURPOSE WITHOUT THE WRITTEN
CONSENT OF SOLATECT DESIGN + BUILD, LLC.
1954 Airport Road, Suite 141Chamblee, GA 30341
(404) [email protected]
www.solatect.com
SDB PROJECT #: ISSUE DATE:
SHEET #:
DRAWN BY: CHECKED BY:
NO. DESCRIPTION DATE
1 9/10/2019DESIGN DEVELOPMENT
2 9/24/2019HISTORIC DISTRICT REVIEW
9/24/2019
A4.11916 9/20/2019
EXISTING PICTURES &PROPOSED
PERSPECTIVES
LAS LAS
BRIA
RCLI
FF G
ARAG
E97
5 BR
IAR
CLI
FF R
OAD
NE
ATLA
NTA
, GA
303
06LO
T 50
, BLO
CK
3, L
AND
LO
T 1,
18T
H D
ISTR
ICT
AP
PLI
CA
TIO
N f
or C
ER
TIF
ICA
TE
OF
AP
PR
OP
RIA
TE
NE
SS
-N
OT
IS
SU
ED
FO
R C
ON
ST
RU
CT
ION