department of measurement and inspection environmental reference laboratory water and wastewater...
TRANSCRIPT
THE MINISTRY of ENVIRONMENT AND FORESTRY
Department of Measurement and Inspection
Environmental Reference Laboratory
Water and Wastewater Mobile Laboratory
Sevil ÖKSÜZ
Deputy Expert
• ERL would perform ERL would perform water, waste water, waste
water, water, soil, sediment, waste, waste oil soil, sediment, waste, waste oil
and and fuel fuel analyses in the content of analyses in the content of
environmental laws.environmental laws.
▪▪ ERL pERL performerformss River Basin Monitoring River Basin Monitoring
studiesstudies and inspection of facilities with and inspection of facilities with
3 Mobile Water/Waste water 3 Mobile Water/Waste water
Laboratories which were Laboratories which were obtained from
EU funds in 1993.
• These monitoring studies These monitoring studies planned as planned as
yearly programyearly programss
MOBILE LABORATORYunder theENVIRONMENTAL REFERENCE LABORATORY
Marine water, Lakes, River, Wastewater Treatment Plants, Inspections, Some monitoring studies.
Marine water, Lakes, River, Wastewater Treatment Plants, Inspections, Some monitoring studies.
Working Areas Working Areas
MOBILE LABORATORY
Parameters:
Temperature (oC), * - Fecal coliform (EMS/100 mL), pH, * - Total coliform (EMS/100 mL), Dissolved oxygen (mg O2/L) * - Streptoccoccus (EMS/100 mL),Chloride ion (mg Cl‾/L), - Salmonella (EMS/100 mL), Sulphate (mg SO4=/L), - Chlorophyll -a (μg/L), Ammonium (mg NH4+-N/L), Nitrite (mg NO2‾-N/L),Nitrate (mg NO3‾-N/L),Total Nitrogen (mg/L),Total Phosphorus (mg P/L),Phosphate Phosphorus (mg PO4-P/L),Total Suspended Solids (mg/L), * Colour (Pt-Co),Chemical Oxygen Demand (COD) (mg/L), Biological Oxygen Demand (BOD) (mg/L), Detergent Analyses (MBAS) (mg/L),Phenol (mg/L),Chrome (mg/L), ,Fluoride (mg/L), , Free chlorine (mg/L), Sulphur (mg/L),
Parameters:
Temperature (oC), * - Fecal coliform (EMS/100 mL), pH, * - Total coliform (EMS/100 mL), Dissolved oxygen (mg O2/L) * - Streptoccoccus (EMS/100 mL),Chloride ion (mg Cl‾/L), - Salmonella (EMS/100 mL), Sulphate (mg SO4=/L), - Chlorophyll -a (μg/L), Ammonium (mg NH4+-N/L), Nitrite (mg NO2‾-N/L),Nitrate (mg NO3‾-N/L),Total Nitrogen (mg/L),Total Phosphorus (mg P/L),Phosphate Phosphorus (mg PO4-P/L),Total Suspended Solids (mg/L), * Colour (Pt-Co),Chemical Oxygen Demand (COD) (mg/L), Biological Oxygen Demand (BOD) (mg/L), Detergent Analyses (MBAS) (mg/L),Phenol (mg/L),Chrome (mg/L), ,Fluoride (mg/L), , Free chlorine (mg/L), Sulphur (mg/L),
The ML carries out Inspections to river basins and to some provinces with cooperation of the other departments of General Directorate of Envıronment Management.
Samples from these inspection are analyzed in the ML, the parameters which can not be anlyzed are taken to Environmental Referance Laboratory in appropriate storage conditions and analyzed there.
The ML carries out Inspections to river basins and to some provinces with cooperation of the other departments of General Directorate of Envıronment Management.
Samples from these inspection are analyzed in the ML, the parameters which can not be anlyzed are taken to Environmental Referance Laboratory in appropriate storage conditions and analyzed there.
İzaydaş
Inspection and Analyses About By-Law on Water Pollution Control (No.20748, 1991)
Equipments:
Spectrophotometer, photometer,
Thermoreactor,
Fridge and deep-freeze,
Incubator and drying oven,
Centrifuge,
Vacuum filtration and glasswares,
Climates,
Fume hood,
Sampling equipments,
Automatic and glass pipettes,
Test kits and chemicals,
Oil and grease analyzer.
Equipments:
Spectrophotometer, photometer,
Thermoreactor,
Fridge and deep-freeze,
Incubator and drying oven,
Centrifuge,
Vacuum filtration and glasswares,
Climates,
Fume hood,
Sampling equipments,
Automatic and glass pipettes,
Test kits and chemicals,
Oil and grease analyzer.
MOBILE LABORATORY
River basins and provinces inspected in 2009
- GEDİZ BASIN
- AKARÇAY BASIN
- KIZILIRMAK BASIN
- BÜYÜK MENDERES BASIN
- ERGENE BASIN
- FIRAT – DİCLE BASIN
- SAKARYA BASIN
- YEŞİLIRMAK BASIN
- VAN BASIN
- DENİZLİ - ELAZIĞ AND MALATYA
River basins and provinces inspected in 2009
- GEDİZ BASIN
- AKARÇAY BASIN
- KIZILIRMAK BASIN
- BÜYÜK MENDERES BASIN
- ERGENE BASIN
- FIRAT – DİCLE BASIN
- SAKARYA BASIN
- YEŞİLIRMAK BASIN
- VAN BASIN
- DENİZLİ - ELAZIĞ AND MALATYA
ACTIVITIES IN 2009
Inspection and Analyses About By-Law on Water Pollution Control (No.20748, 1991)
- Inspections 110 samples- Surface water 34 samples
- Monitoring activies 121 samples
Total: 265 samples
- Inspections 110 samples- Surface water 34 samples
- Monitoring activies 121 samples
Total: 265 samples
ACTIVITIES IN 2009
Water quality monitoring studies in the Köprü Stream in the Köprülü Kanyon National Park. (2007-2012) Water quality monitoring studies in the Köprü Stream in the Köprülü Kanyon National Park. (2007-2012)
Activities in cooperation with Activities in cooperation with General Directorate of General Directorate of Nature Protection and National Parks of MoEFNature Protection and National Parks of MoEF : :Activities in cooperation with Activities in cooperation with General Directorate of General Directorate of Nature Protection and National Parks of MoEFNature Protection and National Parks of MoEF : :
ACTIVITIES IN 2009
Activities in cooperation with Activities in cooperation with General Directorate of Nature Protection and General Directorate of Nature Protection and National Parks of MoEFNational Parks of MoEFActivities in cooperation with Activities in cooperation with General Directorate of Nature Protection and General Directorate of Nature Protection and National Parks of MoEFNational Parks of MoEF
ACTIVITIES IN 2009
- Keban reservoir
- Fırat River-to determine the pollution arised from salmon farms
- Karakaya reservoir
- Keban reservoir
- Fırat River-to determine the pollution arised from salmon farms
- Karakaya reservoir
Activities in Provinces of Malatya and Elazığ :Activities in Provinces of Malatya and Elazığ :Activities in Provinces of Malatya and Elazığ :Activities in Provinces of Malatya and Elazığ :
ACTIVITIES IN 2009
ACTIVITIES IN 2009
- In Büyük Menderes River basin monitoring study in 13 points were carried out.
- Data obtained from this activities were used in the “Capacity Building Support to the Water Sector in Turkey ” project.
- In Büyük Menderes River basin monitoring study in 13 points were carried out.
- Data obtained from this activities were used in the “Capacity Building Support to the Water Sector in Turkey ” project.
Monitoring activitiesMonitoring activities : : Monitoring activitiesMonitoring activities : :
ACTIVITIES IN 2009
The purpose of the project was to assist Turkey in the water management
in accordance with the EU water legislation, in particular the WFD
(2000/60/EC), Urban Wastewater Treatment Directive (UWWTD
91/271/EEC) and Dangerous Substances Directive (DSD 76/464/EEC) and
daughter directives in order to reinforce Turkey’s accession to EU and thus
provide support to the water sector. This project had been executed from
December 2007 till March 2010.
ACTIVITIES IN 2009
Monitoring – B. MENDERES BASİNMonitoring – B. MENDERES BASİNMonitoring – B. MENDERES BASİNMonitoring – B. MENDERES BASİN
ACTIVITIES IN 2009
•The aim of the project is to implement good agriculture practices in order to decrease the entrance of the pollutants to the surface and groundwater to Kızılımak and Yeşilırmak river basins.
•In these river basins ML monitored nitrogen and phosphorus and other pollutants.
•The aim of the project is to implement good agriculture practices in order to decrease the entrance of the pollutants to the surface and groundwater to Kızılımak and Yeşilırmak river basins.
•In these river basins ML monitored nitrogen and phosphorus and other pollutants.
Anatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation Project Anatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation Project
ACTIVITIES IN 2009
The objective of the project is to introduce sustainable natural resource management practices in 28 river basins in Anatolia and Turkey’s Black Sea region and thereby raise incomes of communities affected by resource degradation.
encourage local communities to take responsibility for planning and implementing an integrated approach to sustainable resource management in selected river basins;
introduce communities to more environmental friendly farming and forestry production practices that raise land productivity, release pressure on marginal land and improve household income;
help reduce nutrient discharge from agricultural sources into the Black Sea;
Anatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation Project Anatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation Project
ACTIVITIES IN 2009
strengthen the policy formulation and regulatory capacity towards meeting European Union (EU) standards for agricultural nutrient pollution control;
improve the overall framework for river basin planning and management in the context of EU directives on water;
strengthen institutional capacity to promote sustainable natural resource management and raise public awareness on resource degradation issues.
Anatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation Project Anatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation Project
Anatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation Project
Temperature C
pH
Dissolved Oxygen mg/L
Conductivity µS/cm
PO4-P mg/L
Total Phosphorous mg/L
Total Nitrogen mg/L
NH4-N mg/L
NO2-N mg/L
NO3-N mg/L
Turbidity NTU
Total Suspended Solids mg/L
Total Dissolved Solids mg/L
Total Coliform EMS/100 ml
Fecal Coliform EMS/100 ml
ACTIVITIES IN 2009
Anatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation Project
ACTIVITIES IN 2009
Training of samplingTraining of sampling- Provincial Directorates of MoEFProvincial Directorates of MoEF ;;- Authorized laboratories; (public and private)(Authorized laboratories; (public and private)( 292 people)292 people)
Training of samplingTraining of sampling- Provincial Directorates of MoEFProvincial Directorates of MoEF ;;- Authorized laboratories; (public and private)(Authorized laboratories; (public and private)( 292 people)292 people)
Training activitiesTraining activitiesTraining activitiesTraining activities
ML gives this sampling training to take consider in to the Communiqué on
Methods of Sampling and Analysis stated in the By-Law on Water Pollution
Control (No.27372, 2009) and people who takes this training are certified.
ACTIVITIES IN 2009
In 2010In 2010
•inspection, inspection,
•monitoring studies and monitoring studies and
•sampling activitiessampling activities
will be increased by increasing the capacity of ML (personnel, vehicle)will be increased by increasing the capacity of ML (personnel, vehicle)
•Water monitoring in Burdur and Salda lakesWater monitoring in Burdur and Salda lakes
•Training of sampling Training of sampling
In 2010In 2010
•inspection, inspection,
•monitoring studies and monitoring studies and
•sampling activitiessampling activities
will be increased by increasing the capacity of ML (personnel, vehicle)will be increased by increasing the capacity of ML (personnel, vehicle)
•Water monitoring in Burdur and Salda lakesWater monitoring in Burdur and Salda lakes
•Training of sampling Training of sampling
FUTURE PLANNING ACTIVITIES
- In marine water, to determine the pollution arised from deep marine In marine water, to determine the pollution arised from deep marine
discharge and salmon farms both of the departments will carry out a study in discharge and salmon farms both of the departments will carry out a study in May and October 2010.May and October 2010.
- In marine water, to determine the pollution arised from deep marine In marine water, to determine the pollution arised from deep marine
discharge and salmon farms both of the departments will carry out a study in discharge and salmon farms both of the departments will carry out a study in May and October 2010.May and October 2010.
Activities in cooperation with Activities in cooperation with General Directorate for General Directorate for Environmental Management Department of Environmental Management Department of Marine and Marine and Coastal ManagementCoastal Management
Activities in cooperation with Activities in cooperation with General Directorate for General Directorate for Environmental Management Department of Environmental Management Department of Marine and Marine and Coastal ManagementCoastal Management
FUTURE PLANNING ACTIVITIES
Sampling boat of ML and Turkish Coast Guard Command boats will be used in this study.Sampling boat of ML and Turkish Coast Guard Command boats will be used in this study.
Activities in cooperation withActivities in cooperation with Department of Department of Marine and Marine and Coastal ManagementCoastal Management Activities in cooperation withActivities in cooperation with Department of Department of Marine and Marine and Coastal ManagementCoastal Management
FUTURE PLANNING ACTIVITIES
- Ergene Basin (March 2010),Ergene Basin (March 2010),
- Seyhan – Ceyhan Basin (March 2010),Seyhan – Ceyhan Basin (March 2010),
- Susurluk Basin (Nowadays)Susurluk Basin (Nowadays)
- Ergene Basin (March 2010),Ergene Basin (March 2010),
- Seyhan – Ceyhan Basin (March 2010),Seyhan – Ceyhan Basin (March 2010),
- Susurluk Basin (Nowadays)Susurluk Basin (Nowadays)
Inspection Activities in BasinsInspection Activities in BasinsInspection Activities in BasinsInspection Activities in Basins
FUTURE PLANNING ACTIVITIES
-The monitoring strategy of the Laboratory will be updated in the scope
of WFD and Capacity Building on Water Quality Monitoring Project. The
monitoring programme in determined points in Büyük Menderes Pilot
Basin has begun in 2010.
-The monitoring strategy of the Laboratory will be updated in the scope
of WFD and Capacity Building on Water Quality Monitoring Project. The
monitoring programme in determined points in Büyük Menderes Pilot
Basin has begun in 2010.
MONITORING ACTIVITIESMONITORING ACTIVITIESMONITORING ACTIVITIESMONITORING ACTIVITIES
FUTURE PLANNING ACTIVITIES
MONITORING – B. MENDERES BASINMONITORING – B. MENDERES BASINMONITORING – B. MENDERES BASINMONITORING – B. MENDERES BASIN
FUTURE PLANNING ACTIVITIES
•Mobile Water/Wastewater Laboratory has also been making analyses and Mobile Water/Wastewater Laboratory has also been making analyses and
monitoring studies in the basins defined in “Anatolia Watershed Rehabilitation monitoring studies in the basins defined in “Anatolia Watershed Rehabilitation
Project” for every three months since 2004. The data obtained from these Project” for every three months since 2004. The data obtained from these
studies has been sent to General Directorate for Environmental Management studies has been sent to General Directorate for Environmental Management
Department of Department of Marine and Coastal Management in order to be evaluated and Marine and Coastal Management in order to be evaluated and
reported.reported.
•The project has been commenced on June 01, 2004 and will be finalized on June The project has been commenced on June 01, 2004 and will be finalized on June
30st, 201230st, 2012.
•Mobile Water/Wastewater Laboratory has also been making analyses and Mobile Water/Wastewater Laboratory has also been making analyses and
monitoring studies in the basins defined in “Anatolia Watershed Rehabilitation monitoring studies in the basins defined in “Anatolia Watershed Rehabilitation
Project” for every three months since 2004. The data obtained from these Project” for every three months since 2004. The data obtained from these
studies has been sent to General Directorate for Environmental Management studies has been sent to General Directorate for Environmental Management
Department of Department of Marine and Coastal Management in order to be evaluated and Marine and Coastal Management in order to be evaluated and
reported.reported.
•The project has been commenced on June 01, 2004 and will be finalized on June The project has been commenced on June 01, 2004 and will be finalized on June
30st, 201230st, 2012.
FUTURE PLANNING ACTIVITIES
Anatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation Project Anatolia Watershed Rehabilitation ProjectAnatolia Watershed Rehabilitation Project
FUTURE PLANNING ACTIVITIES
Capacity Building on Water Quality Monitoring Project Capacity Building on Water Quality Monitoring Project
• The overall objective of the project is to achieve a good environmental status for surface waters.
• Strengthening Turkey’s capacity to implement the EU Water Framework Directive
•Project began it’s activities on January 2010, and project will be
finalized at the first quarter of 2013.
This Project;
will enhance the harmonization of environmental Acquis Communautaire,
especially for WFD with regarding to surface waters,
will be a good instrument for the preparation of plans and programmes for the
National Policy,
will make the supervision system more effective,
will constitute a good model for Turkey’s other basins and also neighboring
countries in terms of the objectives of integrated and holistic approach;
will enable better environmental protection and management.
FUTURE PLANNING ACTIVITIES
Capacity Building on Water Quality Monitoring Project Capacity Building on Water Quality Monitoring Project
Assumed Results of Project:
The legal and institutional gap analysis is executed between Turkey and EU
in terms of WFD requirements.
Capacity building of related institutions is provided on water quality
monitoring, analysis and assessment of surface water bodies in line with
WFD
Pilot implementation is executed related to monitoring of surface water
bodies for selected basins.
FUTURE PLANNING ACTIVITIES
Capacity Building on Water Quality Monitoring Project Capacity Building on Water Quality Monitoring Project
The regions which are MOBILE LABORATORY studied during the 2007-2008
THANKS FOR YOUR ATTENTIONTHANKS FOR YOUR ATTENTION.. THANKS FOR YOUR ATTENTIONTHANKS FOR YOUR ATTENTION..