Demands of Demands of Drawing/Design cadre of Drawing/Design cadre of Indian Railways Indian Railways in Electrical Branch in Electrical Branch of Railway Electrification of Railway Electrification project project

Upload: navtej-singh

Post on 12-Mar-2016

215 views

Category:

Documents


2 download

DESCRIPTION

Demands of Drawing/Design cadre of Indian Railways in Electrical Branch of Railway Electrification project

TRANSCRIPT

Page 1: Demands of Drawing/Design cadre of Indian Railways

Demands of Demands of Drawing/Design cadre of Drawing/Design cadre of

Indian RailwaysIndian Railwaysin Electrical Branchin Electrical Branch

of Railway Electrification of Railway Electrification projectproject

Page 2: Demands of Drawing/Design cadre of Indian Railways

Demands of Drawing/Design cadre of Demands of Drawing/Design cadre of Indian RailwaysIndian Railways

in Electrical Branchin Electrical Branchof Railway Electrification projectof Railway Electrification project

Introduction:Introduction:--

The drawing staff are all selected through The drawing staff are all selected through Railway Recruitment Board (RRB) with minimum Railway Recruitment Board (RRB) with minimum qualification of Diploma Engineers (which is three qualification of Diploma Engineers (which is three years course and appointed as Junior Engineer years course and appointed as Junior Engineer (Drawing) grade(Drawing) grade--II in scale II in scale 5000 5000 –– 8000 8000 from 5from 5thth

CPC. The Section Engineers (Drawing) in scale RS. CPC. The Section Engineers (Drawing) in scale RS. 6500 6500 –– 10500 10500 20% is also selected through (RRB) 20% is also selected through (RRB) with min. qualification of BE (Bachelor of Engineer)with min. qualification of BE (Bachelor of Engineer)

Page 3: Demands of Drawing/Design cadre of Indian Railways

Nature of workNature of work

• This work is involved with highly technical and 100% accuracy. They have to be thorough technical knowledge in electrical Engineering side with calculation in various fields in Indian Railways. i.e. Traction, Rolling stock, General Electrical, Train lighting, Air-conditioning of coaches and office rooms etc., in general. The nature of work involved for Electrical group ‘C’ Engineers in Railway Electrification project are detailed below:-

Page 4: Demands of Drawing/Design cadre of Indian Railways

Works related to Railway ElectrificationWorks related to Railway Electrification• 1. Preparation of cost-cum feasibility survey for electrification of new

route sections• 2. Preparation of detailed estimate upon sanction from Railway Board• 3. Preparations / Checking of foot-by-foot survey and pegging plan.• 4. Preparation of wiring plans, General supply Diagrams,

Sectioning diagram duly studying the voltage drop calculations.• 5. Site checking of OHE layout-plans for entire route section as a

continuous process irrespective of the prevailing climate conditions.

• 6. Checking of OHE layout-plans, cross sectional drawings and structure erection drawings with necessary foundations stabilitycalculations.

• 7. Preparation of quantity schedule for OHE/TSS works.• 8. Checking of assessment quantity .• 9. Preparation site plans quantity schedule for TSS.• 10. Checking of Design drawings and quantity schedule for TSS work.• 11. Checking of as erected drawings for OHE and TSS works.• 12. Preparation of clearance study for over head structure.

Page 5: Demands of Drawing/Design cadre of Indian Railways

SpecialitySpeciality– To do the above work 100% concentration is highly essential.

For collecting the required data for the above work this Engineers have to go on line to various places to asses the correct quantity. This work also involves more calculations withmental agony because of more brain work, so as to create new work for various departments in Railways.

– By – M.Dayalan, SSE/D/RE/MS(Electr), Cell-9003142329