McKenney’s recommended an innovative approach - Demand Control Ventilation - to monitor and adjust the building’s outside air ventilation levels based on ASHRAE 90.1 standards. For more information visit http://www.mckenneys.com.

TRANSCRIPT

Page 2: Demand Control Ventilation for HVAC Systems

Columbia Property Trust has had a longtime commitment to sustainable practices that maximize energy efficiency and reduce environmental impact on the community.

Its 14-story, 353,000-square-foot suburban office building in Atlanta had already achieved ENERGY STAR® certification and consistently maintained a score of 87, putting the structure in the top tier of the 15 percent most energy-efficient buildings in the U.S.

Photo courtesy of Columbia Property Trust

Page 3: Demand Control Ventilation for HVAC Systems

However, Columbia Property Trust still had room for improvement. With aspirations ofachieving even greater energy efficiency, the senior property manager approached the McKenney’s Automation & Control Solutions (ACS) team for insight and recommendations to improve its HVAC system efficiency.

Page 4: Demand Control Ventilation for HVAC Systems

After thoroughly reviewing the facility,McKenney’s recommended an innovative approach to monitor and adjust the building’s outside air ventilation levels based on ASHRAE 90.1 standards.

The solution involved introducing Demand Control Ventilation(DCV) to monitor the amount of outside air entering the building based on carbon dioxide (CO2) concentrations. CO2 levels continuously fluctuate in a building as its population changes.

Page 5: Demand Control Ventilation for HVAC Systems

DCV continuously monitors each floor in a building and automatically adjusts outside air ventilation rates. This is achieved by using controls and variable frequency drive (VFD)technology as needed, while still meeting ASHRAE ventilation standards.

By optimizing the amount of outside air coming into the building, there is less air that has to be heated or cooled, resulting in a reduced load on the HVAC system.

Page 6: Demand Control Ventilation for HVAC Systems

To ensure the solution was as effective aspossible for the company, the McKenney’s ACS team installed CO2 monitors in the building, added custom programming for certain aspects of the project and reprogrammed the existing controls system to effectively integrate the DCV solution.

Since installing the DCV system, the load on the building’s HVAC system has been substantially reduced by an estimated 70 tons on a 70-degree day.In turn, this solution lowered the energy usage for the building by an average of 65,000 kWh per month since installation while maintaining a comfortable environment for tenants.The DCV solution also achieved a quick return on investment (ROI) of less than four months.

The content of this document is not intended as an endorsement.

Page 7: Demand Control Ventilation for HVAC Systems

Owner: Columbia Property TrustGeneral Contractor: McKenney’s, Inc.

Project Team

The ChallengeProvide energy-saving solutions with quick ROIMaintain tenant comfortComply with ASHRAE standards

The SolutionIntroduced DCV system to monitor outside air entering buildingInstalled CO2 monitorsCustom programming and reprogramming of controls

Average of 65,000 kWh per month energy usage reductionSolutions meet ASHRAE standardsROI was less than four monthsComfortable and healthy environment for tenants

The Results

Page 8: Demand Control Ventilation for HVAC Systems

1056 Moreland Industrial BoulevardAtlanta, Georgia 30316P: 404-622-5000

[email protected]

www.mckenneys.com

3601 Performance RoadCharlotte, North Carolina 28214P: 704-357-1200

Atlanta Office:

Charlotte Office: