delphi, corrective measures proposal · g:\clients &...

8
DELPHI SYSTEMS CORP. CORRECTIVE MEASURES PROPOSAL FIGURE 4 AREAS OF INTEREST

Upload: dinhcong

Post on 16-Dec-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Delphi, Corrective Measures Proposal · g:\clients & projects\delphi-32486\anaheim-32486\figures\from cl scale: eveland figures\july 2007\cmp-final-pdfs\geol ogic_x-secs-dec06.dwg

DELPHI SYSTEMS CORP.

CORRECTIVE MEASURES PROPOSAL

FIGURE 4

AREAS OF INTEREST

Page 2: Delphi, Corrective Measures Proposal · g:\clients & projects\delphi-32486\anaheim-32486\figures\from cl scale: eveland figures\july 2007\cmp-final-pdfs\geol ogic_x-secs-dec06.dwg

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!

!

!!!

!!

!!

!!

!

!

!!

!!

!!

!

!

!

!

!

!

!!

!!

!!

!!

!!

!!!!!!!!

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!!

!

!!!!!!!!!!!!!!!!!!!!

!!

!

!

!

!

!

!

!

!

!

AIR VENTTUNNEL

SCRAPCONVEYOR

STEAMCHAMBERS

AIR VENTTUNNEL

STORM WATERLIFT GATE

SUMP

FORMERHWSA

Haz. Waste Dock

OIL RECOVERYUNIT

SUMP

WATERTANK

HWSASHED

STORM WATEROIL WATERSEPARATOR

SUMP

OLD OILHOUSE

SUMP

SUMP

CLARIFIER

MA

INT

EN

AN

CE

WO

RK

AR

EA

OFF

ICE

AIS

LE

FINISHEDBATTERIES

HYDRAULICLIFT PIT

WATE

RU

ST

15K

SUMP

HY

DR

AU

LIC

PALL

ET

IZE

R

FINISHEDBATTERIES

PALLETWRAPPER

STORM WATERPUMP HOUSE

FORMER500-GALUST

FINAL FINISHLABEL APP. AREA

FMR. OILCOLLECTIONTANKS

FORMER DEADBATTERYSTORAGEAREA

SWM

UN

o.8

SWMU No. 11

SWMU No. 10

SWM

UN

o.2

SWM

UN

o.7

SWMU No. 13

SWMU No. 4 & 5

SWMU No. 12

SWMU No. 6

SWM

UN

o.1

&3

SWMU No. 9

LC

95

90

90

90

9090

90

90

90

9090

9090

9090

DR

3s

PATIO

CONC.BLDG.

CHILLER

CO

MPA

CTO

R

Q.C.LAB

CO

MP

AC

TO

R

MAIN LINE

ACID FILL

ACIDMIX

CO

NC

RE

TEW

ALK

MIL

LS

TRIP

TOOLCRIB

AIR WASHER

AIR WASHER

PUMPHOUSE

CURE OVENS

POWER HOUSE

LUNCHROOM

OFFICEAREA

OFFICEAREA

GUARDSHACK

ACIDSTORAGE

ACIDSTORAGE

COVERMARKET

MACHINESHOP

LOADINGDOCK

FINALFINISH

PROCESSWATER

PLATEPASTING

COOLINGTOWER

HW SCRAPBIN

ELEC.SUBSTA.

COOLINGTOWER

PLATESTORAGE

METALBUILDING

MIS

CLI

NE

PE

RF.

MA

INLI

NE

PE

RF.

NEG.PLATEBANK

HAZ MATSTORAGE

WAREHOUSENO. 3

PLASTICMOLDING MACHINES

WAREHOUSENO. 1

WATERTREATMENTWAREHOUSE

NO. 2

MAINTENANCEAREA

CONC.PATCH

BAT

TE

RY

TEA

RD

OW

N

NEW BATTERYCHARGING AREA

EXISTING BUILDING

EXISTIN

GBU

ILDIN

G

FORK LIFTREPAIR

MEN'SLOCKER

ROOM

RE

DLE

AD

DE

LIV

ER

Y

OILPUMP

HOUSE

OLDCHARGEFLOOR

MAIN BUILDING

STORMWATERBASIN

OXIDEMANUFACTURING WOMEN'S

LOCKERROOM

AGM WATERBATH AG

MC

ON

TAIN

ME

NT

ARE

A

AGM BATTERYASSEMBLY

PLASTICSTORAGE SILOS

GR

EEN

GR

P.M

AIN

TEN

AN

CE

WASTEWATER

TRTMNT.

ON

ES

TOR

YM

ETA

LB

UIL

DIN

G

EXISTING CONCRETE BUILDING

EXISTING CONCRETE BUILDINGEXISTING CONCRETE BUILDING

EXISTIN

GC

ON

CR

ETE

BU

ILDIN

GEX

ISTING

CO

NC

RE

TEB

UILD

ING

SANTAANA

FREEWAY ( I - 5 )

NORTH AND SOUTHHOLDING TANKS

MA

GN

OLI

AAV

EN

UE

SOUTH NEWCHARGE BUILDING

SOUTHERN

PACIFIC

RAILROAD

FORMERUST AREA

NO. 2EXCAVATED

PLASTICSTORAGE

CONC.PATCH

FINISHED BATTERYSTORAGE RACKS

WO

OD

+P

LAST

ICPA

LLE

TS

TOR

AG

E

BAG HOUSE

EXISTIN

GBU

ILDIN

G

FORMER DEFECTIVEBATTERY STORAGE

AREA

FORMERTREATMENTUNIT

NEG.PLATEBANK

CO

NC

RE

TEW

ALK

DRIVEWAY

DRIVEWAY

DR

IVE

WAY

!(9

!(8

!(7

!(6

!(5

!(4!(3

!(2

!(1

!(48

!(48

!(14

!(14 !(14

!(53

!(52

!(51

!(50

!(49!(49

!(48

!(48

!(48

!(45

!(40

!(38

!(47

!(46

!(45

!(44

!(37

!(35

!(34!(42

!(33

!(43

!(41

!(39

!(36

!(32

!(31

!(30

!(29

!(28

!(27

!(26

!(25

!(23

!(24

!(22

!(21

!(20

!(19!(18

!(12

!(17

!(16

!(15

!(14

!(13

!(11

!(10

G:\C

LIEN

TS&

PRO

JEC

TS\D

elph

i-324

86\A

nahe

im\F

igur

es\G

IS\C

MP

\324

86-0

11-0

004-

AO

I.mxd

DELPHI CORPORATIONFORMER BATTERY OPERATIONS, 1201 N. MAGNOLIAANAHEIM, CALIFORNIA32486-011

SCALE: AS SHOWNAUGUST 2007 FIGURE 4

0 12060

FEET

AREAS OF INTEREST (AOIs)

LEGENDBUILDING OUTLINESPROPERTY LINE

(53 AREAS OF INTEREST

MILL STRIP/ LEAD MELTING INTO COILS

PLATE PASTING (SWMU # 4 & 5)

SCRAP CONVEYOR

STEAM CHAMBERS

RED LEAD OXIDE TANK AREA (SWMU # 9)

OXIDE CONVEYORS

LEAD MELTING POTS

PLASTIC CONTAINER MOLDING & COVER MFG. (SWMU # 6)

POWER HOUSE / STEAM BOILER ROOM / OILRECOVERY UNIT + COMPRESSORS

FORKLIFT REPAIR AREA SOLUBLE MACHINEOIL RECOVERY TANKS (SWMU # 9)

ACID FILLING AREA & SUMP

AGM WATER BATH / BATTERY TEARDOWN AREA(SWMU # 8)

CAST ON STRAP (C.O.S.) MAINLINE PLATE GROUP

OLD CHARGE FLOOR / VENTILATION TRENCHES

MACHINE SHOP IN NORTHEASTAREA

HAZARDOUS WASTE STORAGE AREA / FORMER SMELTER

MAINTENANCE WORK AREA IN MAIN BUILDING

HYDRAULIC PALLETIZER IN SOUTH CHARGE BUILDING

HYDRAULIC LIFT IN SOUTH CHARGE BUIDING WET FINISH AREA

WET FINISH AREA OF SOUTH CHARGE BUILDING

FINAL FINISH LABEL APPLICATION AREA OF SOUTH CHARGEBUILDING

WATER TREATMENT FIXED UNIT /ACID NEUTRALIZATION AREA / (SWMU # 1 & 3)

NEW BATTERY CHARGING AREA FLOOR + SUMPS

ACID MIX / EXCHANGE AREA SUMP PIT

HAZARDOUS MATERIALS AREA ON EAST SIDE OFWAREHOUSE # 3 (SWMU # 2)

MAINTENANCE AREA IN NE CORNER OF WAREHOUSE # 3

FORMER HAZARDOUS WASTE STORAGE AREA IN SWCORNER OF WAREHOUSE # 3

NORTH COOLING TOWER FOR MILL STRIP

ELECTRICAL SUBSTATION

FORMER OIL PUMP HOUSE

DUMPSTER PAD

FORMER 500-GAL UST

FORMER FUEL OIL TANK AREA NO. 1NORTH LOADING DOCK (SWMU # 13)

FORMER UST AREA NO. 2 USED OIL(SWMU # 7)

EQUIPMENT CLEANING AND HAZARDOUS WASTE DOCK AREA

HAZARDOUS MATERIALS STORAGE SHED ON NORTH DRIVEWAY

PATCHED AREA SOUTH BY NE CORNER OF WAREHOUSE # 3

STORM WATER OIL / WATER SEPARATOR

STORM WATER RETENTION BASINTREATMENT AREA

RED LEAD DELIVERY & HW STORAGE SHED

OIL PUMP HOUSE (SWMU # 10)

5K USED OIL AST WITH ABOVE GROUND CONTAINMENT VAULT

COOLING TOWER & BASIN FOR PLASTIC MOULDING +FORMER PROCESS PIT (SWMU # 11)

ACID & CAUSTIC STORAGE NE CORNER OF SOUTH BUILDING

AIR WASHERS

END OF TRENCH ON SE CORNER OF MAIN BUILDING

WASTE WATER TREATMENT PIT (SWMU # 1 & 3)

RAILROAD TRACKS

GRASS STRIP AREA NORTH OF NORTH DRIVEWAY

NORTH END OF GRASS AREA

SOUTH END OF GRASS AREA

GRASS AREA IN SOUTHEAST CORNER

GROUNDWATER

(1

(2

(3

(4

(5

(6

(7

(8

(9

(10

(11

(12

(13

(14

(15

(16

(17

(18

(19

(20

(21

(22

(23

(24

(25

(26

(27

(28

(29

(30

(31

(32

(33

(34

(35

(36

(37

(38

(39

(40

(41

(43

(44

(45

(46

(47

(42

(48

(49

(50

(51

(52

(53

!

©

Page 3: Delphi, Corrective Measures Proposal · g:\clients & projects\delphi-32486\anaheim-32486\figures\from cl scale: eveland figures\july 2007\cmp-final-pdfs\geol ogic_x-secs-dec06.dwg

DELPHI SYSTEMS CORP.

CORRECTIVE MEASURES PROPOSAL

FIGURE 5

SITE PLAN

WITH GEOLOGIC PROFILE

CROSS-SECTION LINES

Page 4: Delphi, Corrective Measures Proposal · g:\clients & projects\delphi-32486\anaheim-32486\figures\from cl scale: eveland figures\july 2007\cmp-final-pdfs\geol ogic_x-secs-dec06.dwg

SCALE:

G:\C

LIE

NTS

&P

RO

JEC

TS\D

ELP

HI-3

2486

\AN

AH

EIM

-324

86\F

IGU

RE

S\F

RO

MC

LEV

ELA

ND

FIG

UR

ES\

JULY

2007

\CM

P-FI

NAL

-PD

FS\3

2486

-GEO

LOG

IC-X

SEC

-BAS

EPLA

N-D

EC06

.DW

G

FIGURE 5

DELPHI CORPORATIONFORMER BATTERY OPERATIONS, 1201 N. MAGNOLIAANAHEIM, CALIFORNIA32486-011

SITE PLAN WITH GEOLOGICAL PROFILECROSS-SECTION CUT LINES

AS SHOWNAUGUST 2007

0 60 120 180 240

SCALE IN FEET

Page 5: Delphi, Corrective Measures Proposal · g:\clients & projects\delphi-32486\anaheim-32486\figures\from cl scale: eveland figures\july 2007\cmp-final-pdfs\geol ogic_x-secs-dec06.dwg

DELPHI SYSTEMS CORP.

CORRECTIVE MEASURES PROPOSAL

FIGURE 6

GEOLOGIC PROFILE

AOI-25+26+30-A

Page 6: Delphi, Corrective Measures Proposal · g:\clients & projects\delphi-32486\anaheim-32486\figures\from cl scale: eveland figures\july 2007\cmp-final-pdfs\geol ogic_x-secs-dec06.dwg

60

65

60

65

70

ELE

VA

TIO

N(F

T.)

75

80

AOI-25+26+30-A

85

90

NORTH

70

ELE

VA

TIO

N(F

T.)

75

80

AOI-25+26+30-A'

85

90

SOUTH

NO

RTH

ER

NW

ALL

OF

WA

RE

HO

USE

NO

.3

BOE=25'

ML

SM

CL

SP

CL

SP

ML

SPCL

SP

ML

SP

CL

SP

ML

BOE=25'

(LIGHT GRAY)SP

(RED-BROWN)SP

ML

ML

ML

SM

SM/GP

ML

(RED-BROWN)

(LIGHT GRAY)

(DARK GRAY)SP

SM

ML

ML

SP

SP

SM/GP

BOE=25'

ML

SP

ML

ML

SM

SM/GP

(RED-BROWN)

BOE=25'

SP

SM

SP

ML

SM/GP

BOE=25'

SP

SP/SM

SM/ML

BOE=25'

ML

(LIGHT GRAY)SP

ML

SM

(RED-BROWN)SP

ML

SM/GP

ML

(RED-BROWN)

(LIGHT GRAY)

SM

ML

ML

SP

SP

SM/GP

BOE=25'

GP

SM

SW

ML

SM

ML

SW

SP

MH

SM

SM

BOE=25'

SP

SM

BOE=25'

SP

SM

?

BOE=25'

?

ML

SW

ML

SM

CL

SP

MH

SW

SP

ML

SW

SM

BOE=25'

CONCRETE

ML

SM

CL

ML

SP

CL

SP

ML

SP

CL

SP

SP

BO

E=16

'

BOE=16' BOE=16'

SP(LIGHT GRAY)

SP(DARK GRAY)

(DARK GRAY)SP (DARK GRAY)

SP(DARK GRAY)SP

AO

I26

MA

INTE

NA

NC

EAR

EA

ED

GE

OF

PAV

EM

ENT

AOI 25SWMU #2 HAZ WASTE

STORAGE UNIT

TRE

NC

H

SOIL CLASSIFICATION

SM - SILTY SAND

ML - SILT

SP - SAND

CL - CLAY

EXPLORATION DESIGNATION

SOIL BORING LEGEND:

BOE=28'

NOTES:1. ONLY DETECTED SOIL GAS VOC DATA IS PRESENTED IN THIS CROSS SECTION.2. REFER TO REPORT TEXT FOR MORE DETAILED SOIL STRATUM DESCRIPTIONS

AND THE TEST BORING LOGS FOR DETAILED SAMPLE DESCRIPTIONS.3. SUBSURFACE PROFILES DEPICT THE GENERAL GEOLOGIC CONDITIONS AT THE

SITE AND ARE BASED ON INTERPRETATION OF DATA ENCOUNTERED IN THEEXPLORATIONS. ACTUAL SOIL CONDITIONS AND INTERFACES BETWEENEXPLORATIONS MAY VARY SIGNIFICANTLY FROM THOSE INDICATED ON THE PROFILES.

0

0

HORIZ.

VERT.

8 16 24 32

2 4 6 8

SCALE:

G:\C

LIE

NTS

&P

RO

JEC

TS\D

ELP

HI-3

2486

\AN

AH

EIM

-324

86\F

IGU

RE

S\F

RO

MC

LEV

ELA

ND

FIG

UR

ES\J

ULY

2007

\CM

P-FI

NAL

-PD

FS\G

EOLO

GIC

_X-S

ECS-

DEC

06.D

WG

FIGURE 6

DELPHI CORPORATIONFORMER BATTERY OPERATIONS, 1201 N. MAGNOLIAANAHEIM, CALIFORNIA32486-011

GEOLOGICAL PROFILEAOI-25+26+30-A

AS SHOWNAUGUST 2007

GROUND SURFACE

BOTTOM OF EXPLORATION

Page 7: Delphi, Corrective Measures Proposal · g:\clients & projects\delphi-32486\anaheim-32486\figures\from cl scale: eveland figures\july 2007\cmp-final-pdfs\geol ogic_x-secs-dec06.dwg

DELPHI SYSTEMS CORP.

CORRECTIVE MEASURES PROPOSAL

FIGURE 7

GEOLOGIC PROFILE

AOI-26-A

Page 8: Delphi, Corrective Measures Proposal · g:\clients & projects\delphi-32486\anaheim-32486\figures\from cl scale: eveland figures\july 2007\cmp-final-pdfs\geol ogic_x-secs-dec06.dwg

60

65

60

65

70

ELE

VA

TIO

N(F

T.)

75

80

85

90

70

ELE

VA

TIO

N(F

T.)

75

80

85

90

SP

SP

SP

(LIGHT GRAY)

(DARK GRAY)

ML

ML

ML

SM

SM/GP

(RED-BROWN)

(DA

RK

GR

AY)

SP

(LIGHT GRAY)SP

(RED-BROWN)SP

ML

ML

ML

SM

SM/GP

SP

ML

SM/GP

SM

SP

ML

SM

BOE=25'BOE=25'

BOE=25'

BOE=16'

BOE=5'

BOE=30'

SM

SC

SM

CL

OL

SP

SP

SW

SW

OL

SW

SW

SW

SW

SW

MH

(DARK GRAY)SP

(LIGHT GRAY)SP

(RED-BROWN)SP

ML

ML

ML

SM

SM/GP

BOE=25'

BOE=25'

SM

CL

SM

CL

SM

CL

SP

ML

SP

ML

CL

SP

AOI-26-AWEST

AOI-26-A'EASTWAREHOUSE NO.3

AOI-26 MAINTENANCEAREA

EAS

TER

NW

ALL

OF

WA

RE

HO

USE

NO

.3

WES

TER

NW

ALL

OF

WA

RE

HO

USE

NO

.3

EAS

TER

NW

ALL

OF

OFF

SITE

BU

ILD

ING

PR

OPE

RTY

LIN

E

PAV

EDD

RIV

EW

AY

AR

EA

SOIL CLASSIFICATION

SM - SILTY SAND

ML - SILT

SP - SAND

CL - CLAYSCALE:

G:\C

LIE

NTS

&P

RO

JEC

TS\D

ELP

HI-3

2486

\AN

AH

EIM

-324

86\F

IGU

RE

S\F

RO

MC

LEV

ELA

ND

FIG

UR

ES\J

ULY

2007

\CM

P-FI

NAL

-PD

FS\G

EOLO

GIC

_X-S

ECS-

DEC

06.D

WG

FIGURE 7

DELPHI CORPORATIONFORMER BATTERY OPERATIONS, 1201 N. MAGNOLIAANAHEIM, CALIFORNIA32486-011

GEOLOGICAL PROFILEAOI-26-A

AS SHOWNAUGUST 2007

NOTES:1. REFER TO REPORT TEXT FOR MORE DETAILED SOIL STRATUM DESCRIPTIONS AND THE

TEST BORING LOGS FOR DETAILED SAMPLE DESCRIPTIONS.2. SUBSURFACE PROFILES DEPICT THE GENERAL GEOLOGIC CONDITIONS AT THE SITE AND

ARE BASED ON INTERPRETATION OF DATA ENCOUNTERED IN THE EXPLORATIONS. ACTUALSOIL CONDITIONS AND INTERFACES BETWEEN EXPLORATIONS MAY VARY SIGNIFICANTLYFROM THOSE INDICATED ON THE PROFILES. 0

0

HORIZ.

VERT.

5 10 15 20

2 4 6 8

EXPLORATION DESIGNATION

SOIL BORING LEGEND:

BOE=28'

GROUND SURFACE

BOTTOM OF EXPLORATION