    Waratah PPTV Test Crew CourseDelivery & Assessment Strategy

    Section 1 Course Outline:

    CourseCode &Title:

    Code:WT 10

    Title:Waratah Pre Production Test Vehicle (PPTV) Test Crew Course

    Aim or PurposeStatement:

    This course aims to equip Participants with the required knowledge and skills to drive thePPTV while under initial test conditions (limited eTIS)

    LearningOutcomes:

    At the completion of this Course, the participants will be able to:Drivers

    Apply power to move the train

    Apply brakes to stop the train

    Identify the location and function of components and equipment on the PPTV which varyfrom Millennium

    Carry out train preparation procedures on PPTV

    Respond to fault and alarm indications

    Locate Emergency coupler and related cocks

    Understand the roles and responsibilities of Train Captain and crew while working onand around the PPTV.

    Guards

    Perform Guard functions on a moving train

    Identify the location and function of components and equipment on the PPTV which varyfrom Millennium, OSCar or HRC

    Carry out train preparation procedures on PPTV

    Respond to fault and alarm indications

    Understand the roles and responsibilities of Train Captain and crew while working onand around the PPTV

    Enabling Objectives for PPTV Training are:Drivers

    Apply power to move the train Operate driver controls to gain traction in the correct direction smoothly

    Apply sufficient traction for safe operation and to suit environmentApply brakes to stop the train

    Operate driver controls to bring the train to a halt smoothly

    Apply sufficient braking for safe operation and to suit environmentIdentify the location and function of components and equipment on the PPTV which vary fromMillennium

    Identify location and function of underfloor components and equipment on the PPTVthat vary by location or function to the Millennium

    Describe underfloor components and equipment on the PPTV that vary by locationor function to the Millennium

    Identify and describe cab components and equipment in the PPTV Cab that vary bylocation or function to the Millennium

    Carry out train preparation procedures on PPTV Navigate and identify alerts and alarms using eTIS

    Carry out Driver tasks to check a PPTV is ready for serviceCarry out Driver tasks to prepare a Dead PPTV for Towing

    Understand preparatory tasks for a towed Waratah A Set

    Understand preparatory tasks when an Waratah A Set is to tow a trainRespond to fault and alarm indications

    Identify and report eTIS alerts and alarms

    Identify Analogue indications of faults

    State fault or alarms correctly to the Train CaptainLocate Emergency coupler and related cocks

    Locate emergency coupler

    Locate cocks used with the emergency couplerUnderstand the roles and responsibilities of Train Captain and crew while working on and

    around the PPTV. Demonstrate appreciation of the role and responsibility of the Train Captain

    Demonstrate working effectively with the Train Captain

    Date Issued 18/01/2010 Revised: 01/04/2010 Uncontrolled when printedC:\Documents and Settings\Paul James\Local Settings\Temporary Internet

    Files\OLK14A\Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2).doc

  • 8/12/2019 Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2)

    2/11

    RailCorp Version 1.0 Page 2 of 11

    Date Issued 18/01/2010 Revised: 01/04/2010 Uncontrolled when printedC:\Documents and Settings\Paul James\Local Settings\Temporary Internet

    Files\OLK14A\Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2).doc

    GuardsPerform Guard functions on a moving train

    Monitor eTIS

    Operate Park BrakeIdentify the location and function of components and equipment on the PPTV which vary fromMillennium

    Identify location and function of underfloor components and equipment on the PPTVthat vary by location or function to the Millennium

    Describe underfloor components and equipment on the PPTV that vary by locationor function to the Millennium

    Identify and describe cab components and equipment in the PPTV Cab that vary bylocation or function to the Millennium

    Carry out train preparation procedures on PPTV

    Navigate and identify alerts and alarms using eTIS

    Carry out Driver tasks to check a PPTV is ready for serviceCarry out Driver tasks to prepare a Dead PPTV for Towing

    Understand preparatory tasks for a towed Waratah A Set

    Understand preparatory tasks when an Waratah A Set is to tow a trainRespond to fault and alarm indications

    Identify and report eTIS alerts and alarms

    State fault or alarms correctly to the Train CaptainLocate Emergency coupler and related cocks

    Locate emergency coupler

    Locate cocks used with the emergency couplerUnderstand the roles and responsibilities of Train Captain and crew while working on andaround the PPTV.

    Demonstrate appreciation of the role and responsibility of the Train Captain

    Demonstrate working effectively with the Train Captain

    Nominal Duration: 2 Days

    Prerequisites: Applicable?

    YES

    Participants must be current, qualified Train Drivers and Guards and/or TrainControl personnel, experienced in train testing on Millennium (MILL), Oscar(OSCAR) or Hunter Rail Car (HRC) as examples, and nominated by RailCorp.All Participants must complete a Site Induction for the relevant site where thetraining is to be conducted.

    Recertification Applicable?NO

    Target Audience: Test Drivers, Test Guards, OSM/Principal personnel identified to support the testing of theWaratah A Set Pre Production Test Vehicle (PPTV).

    InquiryRecommendations/Compliance issuesaddressed:

    Applicable?

    Yes/No

    List any Inquiry recommendations or compliance issues identified that thisprogram/course/session addresses and provide an overview of how they areaddressed.

    Reference to RiskRegister & KnownHazard Statements:

    Applicable?

    Yes/No

    List any risks/ known hazards that were identified that thisprogram/course/session considers or addresses.

    Safety Management

    System (SMS)Reference

    Applicable?

    Yes/No

    List any reference to relevant SMS System Requirement or Procedure. (Insert

    Document name and number)

    Reference torelevant Bus inessRules/ StandardOperatingProcedures:

    Applicable?

    YES

    Under development.

  • 8/12/2019 Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2)

    3/11

    RailCorp Version 1.0 Page 3 of 11

    Date Issued 18/01/2010 Revised: 01/04/2010 Uncontrolled when printedC:\Documents and Settings\Paul James\Local Settings\Temporary Internet

    Files\OLK14A\Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2).doc

    CourseStructureOverview:

    2 Days training as follows:

    Day 1

    Train Familiarisation

    Introduction with eTIS

    - Navigate Driver screens

    - Navigate Guard screens

    Working with the Train Captain

    - Roles and responsibilities- Responding to faults and alerts

    - Actions during an emergency

    TWPs/Minimum Standards

    Scenario Based Assessment

    Day 2

    Cab Familiarisation

    RailCorp Preparation Procedure

    Operate Test Train:- Apply traction- Braking the train

    - Cut out and Cut In

    Practical Assessment

    Delivery and Assessment Strategy

    The course will be delivered and assessed using the test train whilst in the EDI Downermaintenance facility and on the first day of on track operations (day 2 of the course). Trainingwill be undertaken using two facilitators (EDI and RailCorp).

    The crew will be trained together. The training can be delivered either on a train or in a classroom. The priority will be to train on a train and if not available then in a classroom.

    Day 1 training will cover the technical information related to the operation of the train, workingwith the Train Captain and PPTV TWPs.

    Day 2 is conducted on the train on the test track and will cover familiarisation to the cab, ,traction and stop. Also covered is an introduction to PPTV preparation.

    Assessments occur on both days to close off each module of training

    AssessmentStrategy Overview:

    Applicable?

    YES

    The DEDIR and RailCorp Assessors will conduct assessment together. Wherethe area being assessed is related to the conduct of the duties as a Driver orGuard then the RailCorp Assessor as the Assessor. Where the area beingassessed is related to the technical aspects of the PPTV then the DEDIRAssessor will be the Assessor1 x Scenario based assessments on train familiarisation and working with theTrain Captain

    1 x Practical assessments covering train traction and stop

    ResourcesRequired:

    1 x Downer EDI Facilitator or equivalent.

    1 x RailCorp Principal Driver or equivalent. 1 x Facilitators Guide per Facilitator.

    1 x Crew Record Book per Participant & Handouts

    1 x DRAFT Waratah A SET Operator Manual per Participant./TWPs/MinimumStandards

    5 x HRC Operator Manual.

    5 x Millennium Operator Manual.

    5 x OSCar Operator Manual.

    10 x CER01640Rev-PPTV Minimum Standard

    10 x Appendix A 100305 Minimum Standard v1.5

    10 x CER01642Rev-CN01 PPTV Train Preparation

    10 xCER01641 Rev-PPTV Train Working Procedures

    Scenario Based Assessment Tool To be packaged by the Assessor to suit theclass size.

    Quantity of plain paper.

    1 x Scenario Based Assessment Marking Guide.

    1 x Classroom set up for up to 15 Participants.

  • 8/12/2019 Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2)

    4/11

    RailCorp Version 1.0 Page 4 of 11

    Date Issued 18/01/2010 Revised: 01/04/2010 Uncontrolled when printedC:\Documents and Settings\Paul James\Local Settings\Temporary Internet

    Files\OLK14A\Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2).doc

    5 x Desk Easels.

    1 x Laptop with access to the web.

    1 x Digital Projector.

    1 x PPTV for Day 2 suitable operational condition and limited testing on board toallow the priority of operation being for training.

    Test Track between two rails stations of approximately 10 to 15 minutes travelduration for Day 2 of the course.

    Train Captain for Session 3, Day 1 and all of Day 2.

    RailCorp/EDI Downer to adviseQualification Code& Title and/or anyother Certificatesissued:

    Code: Qualification/Certificate to be issued:

    Statement of Attendance

    When to be issued:

    Relevant TrainingPackage Code &Title:

    Applicable?

    NO

    Code: Name of Training Package:

    Name ofRTO/TrainingProvider:

    RailCorp/EDI Downer to advise

  • 8/12/2019 Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2)

    5/11

    RailCorp Version 1.0 Page 5 of 11

    Date Issued 18/01/2010 Revised: 01/04/2010 Uncontrolled when printedC:\Documents and Settings\Paul James\Local Settings\Temporary Internet

    Files\OLK14A\Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2).doc

    Course Outline:

    Course Structure Overview PPTV Crew

    SESSION NO & TOPICS TIMINGRESOURCESREQUIRED COMMENTS

    DAY ONE (7 hours)Course Introduction

    Introduction of key appointments

    Explanation of the days training

    10 mins Facilitator GuideDRAFT Waratah ASET OperatorManual

    SESSION ONE: TRAIN FAMILIARISATION

    On Train Learning In Classroom Learning

    In Two Groups - One Group per End (groups Guard/Dr iver. System based discussion

    whilst on train relating same/similar or differentbetween Millennium or HRC or OSCar and ASet

    Commence at underfloor Introduce anddiscuss each system and present theirassessment of the comparison of the A Setto the Millennium while progressing to thecabin

    In Cab Driver and Guard desk layout,eTIS, Cupboard 7 and 8 and side cupboardequipment.

    Learning Activity

    Dead Train Preparation and EMCoupler storage and related cocks

    130minutes

    Group activity based using Train OperatorManuals relevant to their experience and

    Desk Easels.Group review of systems and cab layout, thenpresentation and discussion relating Millenniumor HRC or OSCar and A Set

    Break into groups based on the train typethey have worked. Give each group anumber of systems and then have the grouppresent to the class their assessment of thecomparison of systems. Rotate through allsystems

    Have the groups then review the cab layout.This may be supplemented by pictures andvideo as available.

    Learning Activity

    Dead Train Preparation and EMCoupler storage and related cocks

    Resources Required Comments Resources Required Comments

    PPTV or A Set Truide

    ainFacilitator GChecklistsDRAFT Waratah A SET

    OperatorManual/TWPs/other

    anualsm

    The Facilitator uses thechecklist to leaddiscussion and indicatecomponents and

    equipment, Seeking fromthe Participants to identifysimilarities or differenceso the Millennium traintThe Facilitator has theParticipants follow thediscussion by referencingthe DRAFT Waratah A

    ET Operator ManualS

    ClassroomFacilitator GuideDesk Easels x 5DRAFT Waratah A SET

    Operator ManualHRC Operator ManualsMillennium OperatorManuals

    SCar Operator ManualsO

    The use of the OperatorManuals provides anadditional opportunity forthe Participant to become

    conversant with theManual. It also reinforcesthe importance ofreferencing the Manualwhen seeking information

  • 8/12/2019 Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2)

    6/11

    RailCorp Version 1.0 Page 6 of 11

    Date Issued 18/01/2010 Revised: 01/04/2010 Uncontrolled when printedC:\Documents and Settings\Paul James\Local Settings\Temporary Internet

    Files\OLK14A\Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2).doc

    SESSION NO & TOPICS TIMINGRESOURCESREQUIRED COMMENTS

    SESSION TWO: INTRODUCTION TO E-TIS

    N igate Driver screens

    Sign in

    av

    Train Certificate

    tion of tractionDemonstraAuto brake

    and stop in

    rface

    ystem interface

    s

    Communications

    40 minutes

    aratah AET Operator

    Manual

    tyof

    ill providea basic introduction tothe system.

    mode

    s and alarmsFault alert

    Alert list

    Resets and system inte

    Sign off

    rd screensNavigate Gua

    Sign In

    Fault alerts and alarms

    Alert list

    Resets and s

    Park brakes Nightsafe

    Doors

    Climate control

    Lights

    Surveillance statu

    Fire detection

    ClassroomFacilitator Guide

    eTIS Web linkLCD projector andLaptop

    RAFT WDS

    The web based eTISprogram provides

    navigation capabiliand representationdata functionality(speed and airressures can bep

    imitated on commandby the Facilitator).

    As the level of eTIS isunknown and mayexpand during testing,the session w

    SESSION THREE: WORKING WITH THE PT up)TRAIN CA AIN (In 1 Gro

    Introduction to the Tr

    Responsibilities of theain Captain

    Train Captain

    o iolea

    train in an emergency

    80 minutes

    cilitator Guidesk Easels x 2

    rain Captain

    participating in the

    Lear ng1 scenar

    - Fault on thePPTV

    Division of Responsibilities Reporting faults

    W rking with the Train Captain Scenard discussions

    Working through faults

    Working together when evacuating the

    Train CaptainlassroomC

    FaeD

    Facilitated learningwith the T

    session

    ni Activity io

    SESSION FOUR: PPTV TWPs/Minimum Standards (In 1 Group)

    Group Discussion Led by the PrincipalDr ver covering:

    CER01640Rev-PPTV Minimum Stand

    i

    ard

    Appendix A 100305 Minimum Standardv1.5

    Engineering Report CER01641 Rev-PPTV Train Working Procedures

    60 minutes Training RoomFacilitator GuideSet of TWPS perParticipant

    edto allow

    the Principal Driver todiscuss the MOS andTWPs with theParticipants

    This is an informationonly session providin the training

  • 8/12/2019 Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2)

    7/11

    RailCorp Version 1.0 Page 7 of 11

    Date Issued 18/01/2010 Revised: 01/04/2010 Uncontrolled when printedC:\Documents and Settings\Paul James\Local Settings\Temporary Internet

    Files\OLK14A\Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2).doc

    SESSION NO & TOPICS TIMINGRESOURCESREQUIRED COMMENTS

    ASSESSMENT

    Scenario Based Assessment on trainfamiliarisation and working with the Train

    Captain.

    The Participants are put into Groups of 2as a crew (Driver and Guard)

    c t

    evid rmay1. Give them a new scenario to work

    nt orthe group against a

    nario to draw evidence ofcompetence

    120minutes nt which

    nario/s

    es.

    ssessment MarkingGuide

    The Assessor maymoderate the

    responses if required.

    Each Group is given a scenario and 15minutes to develop their solution and 5minutes for each to present their solutionper person (Driver/Guard Action)

    Facilitator to check their response againsta marking guide and rotate each group

    When all of the groups have presentedtheir solutions the Assessor will walkthrough the marking guide notations and

    indi ate sufficiency of responsesWhere a group has not provided sufficien

    ence in their response the Assesso:

    through and represeestion2. Orally qu

    new sce

    Assessment Toolper Participa

    ncludes sceiand paper to writedown their

    sponsreA

    The Participants aregiven time to develop

    their solutions.Once they have donethis, the responsesare handed in to theAssessor.Each crew group isthen called back intothe classroom handedtheir responses backand allowed time topresent their solutionto the Assessor.

    Wrap up days trainingBrief on Day 2

    10 minutes

  • 8/12/2019 Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2)

    8/11

    RailCorp Version 1.0 Page 8 of 11

    Date Issued 18/01/2010 Revised: 01/04/2010 Uncontrolled when printedC:\Documents and Settings\Paul James\Local Settings\Temporary Internet

    Files\OLK14A\Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2).doc

    SESSION NO & TOPICS TIMINGRESOURCESREQUIRED COMMENTS

    DAY TWO (7 hours)

    Introduction to the days training 10 minutes Facilitator Guide

    SESSION FIVE: CAB FAMILIARISATION

    Reconfirm Cab Layout and all requiredequipment are on board.

    Daily Briefing to occur during this period.

    60 minutes Facilitator Guide -ChecklistsDRAFT Waratah ASET OperatorManualPPTV at stationTest Track

    If more than 5 + 5Participant then thishas to be run as 2 x30 minute sessionsand the groups splitinto 2 with the Guardsfamil at one end andDriver famil at the

    other

    SESSION SIX: PPTV PREPARATION

    Issue:

    CER01642Rev-CN01 PPTV TrainPreparation

    Discuss:

    The procedures seeking comparison tothe train type the participant has operated.

    Explain:

    That the participants will be trained in theprocedures as crews when rostered to thePPTV and;

    Assessed when ready

    25 minutes Facilitator GuideCER01642Rev-CN01 PPTV TrainPreparationDRAFT Waratah ASET OperatorManualPPTV at stationTest Track

    This is a discussionsession to introduce theprocedure and explainwhen the training andassessment will occur

    NOTE: Participants willbe assessed in PPTVPreparation at the startof each night the train is

    tested until all areassessed.

    SESSION SEVEN: OPERATE TRAIN (In Pairs of a Driver + Guard each end of the train)

    DRIVER

    Power against Brake test

    Apply traction

    Braking the train

    Cut out

    GUARD Observe speed and ride characteristics of

    train

    Respond if speed and ride characteristicsremain dangerous

    Cut out

    NoteAt the end of the train run, the in charge crewcut out and the new crew complete a handover and then are trained in traction andbraking back to the original station

    160minutes

    Facilitator Guide -ChecklistDRAFT Waratah ASET OperatorManualPPTV

    Test Track

    Assessment DuringLearningComplete procedure inlog book whencompleted learning

    5 X 15 minutes percrew per run pluspreparation each end ofthe run

    If more that 5 x 5Participants thenoperate andassessment to becombined andcontrolled byFacilitators andAssessors

  • 8/12/2019 Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2)

    9/11

    RailCorp Version 1.0 Page 9 of 11

    Date Issued 18/01/2010 Revised: 01/04/2010 Uncontrolled when printedC:\Documents and Settings\Paul James\Local Settings\Temporary Internet

    Files\OLK14A\Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2).doc

    SESSION NO & TOPICS TIMINGRESOURCESREQUIRED COMMENTS

    ASSESSMENT (In Pairs Driver + Guard)

    Power against Brake Test

    Apply traction and stop

    Work with the Train Captain

    Cut out

    125minutes

    Assessment Toolper Participant

    PPTVTest Track

    5 X 15 minutes percrew per run plus a

    handover at eachend of the run

    END OF COURSE PROCEDURES

    Course Evaluation 10 minutes

    Wrap up of the course 10 minutes

    Units of Competency: Appl icable? No

    Approval Section 1: Course Outlineby Course Committee Members

    By signing below, the Course Committee members acknowledge they have read and agreed with Section 1 of theDelivery & Assessment Strategy prior to the development of curriculum material.

    Name Title Signature Date

  • 8/12/2019 Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2)

    10/11

    RailCorp Version 1.0

    Date Issued 18/01/1200 Revised: 01/04/2010 C:\Documents and Settings\Paul James\Local Settings\Temporary Internet Files\OLK14A\Delivery_and_Assessment_Strategy_W

    Section 2 Detailed Program/Course/Session Information:

    A. Mapping of Units of Competency to Courses (i f Program) or Session (if Course):

    B. Assessment Methods:

    C. Qualifications & Technical Competencies of Trainers/Assessors:

    A. Course & Mapping to Units of Competency B. Assessment Methods

    CourseCode

    Course or Session Title Unit Code(refer to

    Section 1)

    Full/PartialCompletion

    of Unit

    AssessedOn/Off the

    job

    A B C D E F G H

    Train Familiarisation Off-the-job

    Introduction to eTIS

    Off-the-joband On theJob (OnPPTV)

    Working with the Train Captain

    Off-the-joband On theJob (OnPPTV)

    Train Work Procedures (TWPs) (Not Assessed)

    Cab Familiarisation andCommunications Equipment

    Off-the-joband On theJob (OnPPTV)

    RailCorp PreparationOn the Job

    (On PPTV)

    Operate Test TrainOn the Job(On PPTV)

    Assessment Methods Key:

    (customise methods accordingly)

    A Writtentest

    B Practicalobservation

    C Questions D RolePlay

    E ThirdPartyReport

  • 8/12/2019 Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2)

    11/11

    RailCorp Version 1.0 Page 11 of 11

    Date Issued 18/01/2010 Revised: 01/04/2010 Uncontrolled when printedC:\Documents and Settings\Paul James\Local Settings\Temporary Internet

    Files\OLK14A\Delivery_and_Assessment_Strategy_Waratah PPTV v1 1 100407 (2).doc

    D. Mapping of courses to Units of Competency: Applicable? No

    Reasonable Adjustment:

    Participants are experienced in train testing and adaption to new trains. The delivery sessions allow for abroad range of experience in terms of Diesel or electric as long as Drivers have single control andeTIS/TOS experience. Likewise for Guards who have had eTIS/TOS experience and similar dooroperational equipment.

    Crews will be tested in accordance to their role.

    Allowances will be made for the capability of the Test Train as the level of functionality is unknown andmay change during training and assessment

    Recognition:

    The course is designed for personnel who have no previous experience with the Waratah (A Set) train andspecifically designed for the test crew to the PPTV ONLY. As such there is no recognition available.

    Record of Curriculum Materials:

    Curriculum materials are located on the RCT G: server under __________ (insert pathway) according to the

    Curriculum Development Procedure (QTMS-PR-39).

    Evaluation/Review/Validation & Continuous Improvement:

    The course package may need to be reviewed once RailCorp business rules for the Waratah (A Set) are issued.

    RCT TrainingManagersendorsement(name & signature):

    Date:

    DAS History:

    Version Date Changed Author of changes Descript ion of Changes

    0.1 18 JAN 2010 G. Jones Initial development

    0.2 19 JAN 2010 G Jones Feedback from EDI and SYDAC

    0.3 24 FEB 2010 G. Jones Feedback from EDI and RailCorp

    0.4 25 FEB 2010 G Jones Adjustment of delivery strategies

    0.5 06 MAR 2010 G. Jones Feedback from EDI and RailCorp

    0.6 26 MAR 2010 G. Jones Feedback from Test and Confirm Meetings

    0.7 29 MAR 2010 G. Jones Feedback from RailCrop

    1.0 01 APR 2010 G. Jones Feedback from Committee Meeting 31/03/2010