![Page 1: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/1.jpg)
DELIVERY PROGRAM 2013/14 - 2016/17(incorporating Operational Plan 2015/16) Adopted June 2015
Prepared by Community and Strategy Unit - Telephone: 9710 0684
Finalise the Transport Strategy
Integrated Transport Options: 17
Energy efficiency upgrades
Conserve Natural Resources: 18
Early childhood education and care centres
Strengthening our Community: 21
Community cultural events
Respect and Value all Heritage and Culture: 24
Community-based events and promotions
Strengthening our Community: 22
Tree-planting programs on Council land
Protect Our Environment: 19
Road safety and improvements
Provide Effective and Critical Infrastructure: 12
Residential waste collection services
Protect Our Environment: 19
Construct and maintain footpaths
Provide Effective and Critical Infrastructure: 12
Annual council newsletter
Civic Life and Corporate Performance: 25
Energy and water usage across council sites
Conserve Natural Resources: 18
![Page 2: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/2.jpg)
MAYORAL MESSAGENo. 32/14-15 (excerpt) 20 April 15 and No. 36/14-15 (excerpt) 25 May 2015
This is a balanced budget that responds to the direction set by council since its election. It focuses on addressing the Shire’s infrastructure backlog, renewing and maintaining our community infrastructure and reducing the cost of council’s operations so that maximum funds are available for the services and projects our community needs and expects.
This budget is based on some key principles such as retaining our debt reduction targets, ongoing reform savings and maintaining our budget within rate pegging limits, while limiting the increase in the average residential rate to 1.50%.
It is a financially responsible budget that focuses on addressing the Shire’s infrastructure backlog. This is vital in order to achieve the requirements set out in the NSW Government’s Fit for the Future benchmarks, to demonstrate that we are financially sustainable into the future
Highlights of a comprehensive $42.7 million program of capital works include $1.776 million devoted to leisure centre upgrades, $11.373 million for road surface and kerb and guttering upgrades, $2.065 million for stormwater quality and infrastructure improvements works, $1 million for footpath construction, passive reserves and park upgrades worth $3.345 million and more than $7 million to be spent on sports field upgrades and capital works.
BUDGET HIGHLIGHTS BY WARDA WARD
• Contributions of $1.71m for the completion of the skate park, two synthetic hockey fields and a playing field at Greenhills Parklands
• Lugano Avenue Wharf upgrade - $300,000• Lifeguard building & tower upgrades -
$100,000• Improvements to Dunningham playground,
picnic areas and paving - $150,000
TABLE OF CONTENTS
Mayoral Message ..........................................
Overview of 2015/16 Operational Plan ............
A brief profile of the Sutherland Shire ..............
Vision, goal and commitment .........................
Council’s commitment ...............................
Council’s responsibilities and services ..............
Council’s Integrated Planning and Reporting framework .....................................
Strategic Plan ...............................................
Council’s four-year priorities ...........................
Organisational Budget Summary .....................
Strategy 1: Provide effective and critical infrastructure ...................
Strategy 2: Deliver integrated transport options ........................
Strategy 3: Conserve natural resources ..........
Strategy 4: Protect our environment ..............
Strategy 5: Strengthening our community ......
Strategy 6: Respect and value all heritage and culture ...............
Civic Life and Corporate Performance ..............
2015/16 Operational Plan Financial Information .....................................
© Sutherland Shire Council 2015ISSN 1835-9736Designed and printed by Sutherland Shire Council
![Page 3: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/3.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 1
MAYORAL MESSAGENo. 32/14-15 (excerpt) 20 April 15 and No. 36/14-15 (excerpt) 25 May 2015
• Upgrades to Gunnamatta Park including the large shelter and main entry - $425,000
• Silver Beach Western end shared pathway - $750,000
• Stage two of the Roger Summers Park in Bundeena - $390,000
• Lilli Pilli Baths public toilet upgrade - $105,000• Seawall reconstruction at Hordens Beach,
Bundeena - $300,000B WARD
• Shopping Centre upgrades: $100,000 for Caringbah and $625,000 for Sylvania
• Stage one of the Grays Point Reserve upgrade - $75,000
• Upgrade of the Gymea Community Centre playground - $50,000
• Construction of a new footbridge and track repair works at Coonong Creek - $20,000
• Drainage improvements at Dents Creek, Gymea ($10,000), Wonga Road Reserve, Yowie Bay ($10,000), Forest Road, Kirrawee ($10,000) and Kareena Creek, Caringbah ($40,000)
• Pool maintenance works at Caringbah Leisure Centre ($10,000)
C WARD
• New amenities building and floodlighting at Sylvania High School - $679,000
• Stage three of the Captain Cook Drive upgrade between Woolooware Road & Elouera Road - $1.3 million
• Como Pool Deck Replacement/Shared pathway - $260,000
• Como Railway Bridge shared path, retaining wall and lighting upgrade - $50,000
• Upgrade to Tom Ugly’s Wharf - $350,000• Kareela Sports Field Amenities upgrade - $1
million• Stage two of the Soldiers Road baseball field
footpath - $21,000• Bridge restoration works at Sylvania Waters -
$740,000
D WARD
• Heathcote Shopping Centre upgrade - $40,000• Waratah Park, Sutherland Masterplan - $20,000• Lincoln Oval – Development of Regional AFL
Facility - $775,000• Roof replacement at Waratah Park Dog training
facility - $15,000• Forum Drive Reserve, Heathcote playground
upgrade - $100,000• Refurbishment of Anzac Oval, Engadine -
$55,000• Drainage upgrades in Forest Road, Sutherland
($10,000) and Fourth Avenue, Loftus ($10,000)• Wetland maintenance in Tudor Road, Sutherland
- $7,000• Speed calming in Lantana Road, Engadine near
Glenview Place - $50,000E WARD
• Relocation of Illawong Men’s Shed to the Ridge - $140,000
• Boat ramp upgrade at Burnum Burnum Reserve, Woronora - $440,000
• Barden Ridge Park Design and Construction - $275,000
• Stage two of Old Ferry Road Reserve upgrade including carpark, picnic area and kayak launch - $900,000
• LED lighting upgrade at The Ridge Sports Complex - $391,000
• Construction of Menai Rural Fire Station - $200,000
• Softfall replacement at Timbrey Circuit playground, Barden Ridge - $75,000
• Wetland maintenance at Still Creek, Menai - $40,000
• Refurbishment of Billa Road Oval - $60,000• Planning for BMX facility at The Ridge Sports
Complex - $200,000
Councillor Kent JohnsMayor
For the full text of the Mayoral Minute see Council’s website at www.sutherlandshire.nsw.gov.au
![Page 4: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/4.jpg)
PAGE 2 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
In preparing the 2015/16 Operational Plan the following points were considered:
• program deliverables for the 4-year term as outlined in the Delivery Program• establishment of data mining processes to enable efficient and accurate reporting of corporate
information• strategic priorities from 2013 Councillor workshops • requirement for a major strategy review in 2016/17• NSW Government Fit for the Future reforms.The Plan addresses each of the 6 primary strategies of the Community Strategic Plan, and includes programs and performance measures for key achievements in 2015/16.
OVERVIEW OF 2014/15 OPERATIONAL PLAN
![Page 5: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/5.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 3
Sutherland Shire covers 370km2 with about half the area taken up with National Park and bushland. The geographic features include beaches, wetlands, bays, rivers and Hawkesbury sandstone tablelands dissected by deep river valleys and gorges covered in vegetation.
The population is approximately 220,000, making Sutherland Shire Council the second largest
local government area, in terms of population, in NSW. The proportion of Sutherland Shire’s population is declining in every age group between the ages of 10 - 49 years; however, each age group over 50 years is experiencing population increases. Only 17.3% of the Shire’s population was born overseas, compared with Sydney (34.2%).
Whilst the urban area is predominantly residential, Sutherland Shire is home to a small but highly significant commercial and industrial presence. This includes Australia’s only nuclear reactor, Australia’s largest oil refinery, Sydney’s desalination plant, a regional waste facility and a major regional shopping centre.
Socio-economically Sutherland Shire ranks highly with low unemployment at about 2.2%. Council plays an important role in economic development and promotion of the tourist attractions and facilities in the Shire.
The Sutherland Shire community is articulate, involved and places high expectations on council and the services it delivers. The community expects the council to take a stand against proposals which do not meet high environmental and social standards that the community has set for this area.
The Delivery Program and Operational Plan respond to the unique range of circumstances which exist within the shire and region.
A BRIEF PROFILE OF THE SUTHERLAND SHIRE
![Page 6: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/6.jpg)
PAGE 4 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
VISION, GOAL AND COMMITMENT
THE SHIRE VISIONSutherland Shire, in Sydney’s south, shaped by bays, rivers, beaches and national parks: “A connected and safe community that respects people and nature, enjoying active lives in a strong local economy.”
COUNCIL’S GOAL
To provide services and projects that deliver the Shire community vision.
COUNCIL’S COMMITMENTIn our dealings with residents, business, visitors and government we strive to achieve:
Strategic DeliveryOutstanding community outcomes that fulfil local needs and expectations.
Informed DecisionsDecisions and actions based on fact, community engagement and sound judgment.
Service ExcellenceContemporary, responsive and competitive quality service delivery.
Ethical PracticeOpen, honourable and legal practice.
![Page 7: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/7.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 5
COUNCIL’S RESPONSIBILITIES AND SERVICES
Council responds to both the community’s long term vision and short term needs.
It achieves this through planning for and delivering an extensive range of services, facilities and infrastructure which support community life and the ongoing sustainability of the Sutherland Shire.
Below is a snapshot of the type and range of council services and facilities that the community uses every day.
![Page 8: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/8.jpg)
PAGE 6 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
COUNCIL’S INTEGRATED PLANNING AND REPORTING FRAMEWORK
The diagram below outlines the relationship between council’s major planning and reporting tools. In our activities we aim to respond to the Community Strategic Plan for the Sutherland Shire and address local needs and issues as they arise.
![Page 9: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/9.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 7
STRATEGIC PLANIn 1999 council adopted the first Our Shire, Our Future: Our Guide for Shaping the Shire to 2030 (the Guide) which was developed with the community as a long-term strategic plan for the Sutherland Shire. The Guide was reviewed in consultation with the community and updated in 2007. In 2011 it again underwent a review and was changed considerably in response to community aspirations. The Guide is a community plan. It was prepared by council in collaboration with and on behalf of residents, other levels of government and agencies. It is used to steer planning for the Shire to achieve the long term outcomes that residents want for the Shire. Where council does not have control over outcomes, it works with other levels of government and key stakeholders to influence policy, planning, infrastructure and service delivery.DELIVERY PROGRAM AND OPERATIONAL PLAN
Council is committed to environmental protection, community empowerment and strong local governance. Our activities work towards achieving the community’s 2030 vision and desired outcomes for the Sutherland Shire. This Delivery Program outlines the action council will take to achieve its part in delivering the community‘s long term vision and desired local outcomes. Council will do so by directly providing, partnering other levels of government or agencies, or lobbying them to:1. Provide effective and integrated infrastructure2. Deliver integrated transport options3. Conserve natural resources4. Protect our environment5. Strengthen our community6. Respect and value all culture and heritage.
Together, these strategies are at the core of achieving the community’s long term goals. They cut across all areas of Shire life, contributing in some way to achieving the community outcomes identified in the Community Strategic Plan. The Delivery Program and Operational Plan detail the activities which fall under these six primary strategies. It also includes a Civic Life section, which focuses on council’s own internal operations and encouraging community involvement in civic affairs. In our actions, council aims to create positive social, economic, environmental and governance outcomes and address or minimise any undesirable impacts.Council plays a range of roles in responding to and addressing local needs. It either:• directly provides services, facilities or
infrastructure
• partners other government, community or business agencies to do so, or
• advocates on behalf of the Shire community by lobbying other agencies where something falls outside its jurisdiction.
The Delivery Program and Operational Plan reflect council’s scope and full range of responsibilities.The Program also identifies targets and measures to enable us to monitor and evaluate our progress and performance. Reviewed following the 2012 local government election the Delivery Program covers the four year period from 1 July 2013. This allows all newly elected councillors to outline the organisation’s main activities throughout their term and commit to the Program’s implementation.Council’s annual Operational Plan supports the Delivery Program. It details the activities which the organisation will undertake from 1 July 2015 to 30 June 2016. The Operational Plan is reported on every six months and reviewed annually.RESOURCING STRATEGYA comprehensive draft Resourcing Strategy supports both the Community Strategic Plan and Delivery Program. The Resourcing Strategy consists of an Asset Management Strategy and Plans and a Workforce Strategy. All plans will be linked to the other component, council’s Long Term Financial Plan.LINKS TO OTHER PLANSCouncil’s range of plans and strategies are integrated into our planning and reporting cycle through the Delivery Program and Operational Plan.LINKS TO BUSINESS PLANSThe Delivery Program and Operational Plan also helps council staff to make more informed decisions about daily operations through business plans and provides tools to measure the effectiveness of what council does.REPORTING ON OUR PERFORMANCECouncil has set four year targets for each Strategy and annual targets/measures to monitor progress towards achieving these longer term targets. Every six months, council reports on the key activities it has undertaken which contribute to achieving our targets. Performance reports will be received by council and then placed on council’s website to inform the community of our progress. We will also provide a comprehensive report of our activities and performance in our next Annual Report.Every four years council formally evaluates the implementation of the Community Strategic Plan through the State of the Shire (SOS) research report. The SOS report evaluates whether the Shire community as a whole is moving towards meeting community aspirations.It also incorporates the State of the Environment report for the Shire.
![Page 10: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/10.jpg)
PAGE 8 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
COUNCIL’S FOUR-YEAR PRIORITIES
At the start of council’s current 4 year term five primary priorities for the Sutherland Shire were identified:• Focus on core responsibilities • Protect the Shire’s unique environment• Champion local business
• Strict financial management• Cut red tape
An on-going program of evaluation and review identified specific activity priorities linked to council’s 4 community commitments, and acknowledging the 5 primary priorities. These linkages are as follows:
STRATEGIC DELIVERY: Outstanding community outcomes that fulfil local needs & expectations
Specific activity priorities
2015/16 Operational Plan response
Address Infrastructure backlog
• Infrastructure program 80% complete 30 June 2016 and 100% complete by 31 August 2016 (Strategy 1)
• Commission, produce and finalise the Integrated Transport Study (Item 2.1)• Lobby State and Federal government for key infrastructure to support identified transport
options (Item 2.2)• Undertake Central Library Redesign and Refurbishment Plan (Item 5.7)
Diversity of housing stock
• Provide an effective development assessment process (Item 4.6)
Core service provision
• Maintain a financially sustainable organisation (Item 7.3)• Reform service delivery to enhance organisational capability (Item 7.3)
Environmental protection
• Consumption of energy and water usage across council sites tracked on an ongoing basis and reported annually (Item 3.1)
• Waste collection service which encourages waste diversion from landfill (4.2) • Investigate incidents of pollution, conduct audits of commercial and industrial premises (Item 4.4)• Manage ongoing Bushcare program, continue Greenweb program and Greenweb schools, maintain
or improve quality of Shire waterways through the Stormwater Improvement Program (Item 4.5)
Economic growth • Registered businesses inspected in accordance with respective inspection programs (Item 4.4)• Operate and manage 11 Early Education and Childcare Centres, OOSH, Vacation Care and a
Family Day Care scheme (Item 5.1)• Deliver an Economic Development Strategy to maximise opportunities to promote business
growth. Facilitate economic development opportunities at a variety of locations throughout the Shire. Develop capacity of community and business organisations to deliver economic development focussed activitie s and events (Item 5.4 & 5.5)
Shire as a Destination
• Provide exhibitions, events, classes and venue hire at Hazelhurst Regional Gallery and Arts Centre (Item 6.1)
• Assistance for community groups conducting arts & cultural events (Item 6.3)
Enhanced recreation opportunities
• Shared pathways at Como Railway, Atkinson Road, Woolooware Stage 6 studies, Cycleways Network Plan Program (Strategy 1)
• Waratah Park dog training building, Waterfall RFS Playgroup soft-fall replacement, Men’s Shed Facility, Sylvania High School provision of lights and amenities for sporting use (Strategy 1)
• Sutherland Leisure Centre, Como pool, Engadine Leisure Centre and Cronulla Sports Complex upgrades. Stormwater and drainage works at The Ridge Golf course and Kareela Golf course. The Ridge, Greenhills Hockey field, Kareela sports field amenities, Waratah Field development to regional AFL standard (Strategy 1)
• Silver Beach path, Forum Drive playground, Barden Ridge Park, Gunnamatta Park pathway (Strategy 1)
• Manage local halls and spaces for local groups to meet or operate (Item 5.6)• Library service that community use demands (Item 5.7)
![Page 11: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/11.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 9
Presentation of the Shire
• Management and enhancement program for presentation of public places, and shopping and business centres (Strategy 1)
• Taren Point Road and Captain Cook Drive landscaping, Taren Point, Heathcote, Sylvania Heights and Sylvania shopping centres including various upgrades, Cronulla Plaza shade structures and kiosk structure upgrade (Strategy 1)
• Provide timely and effective household waste services within service standard time (Item 4.1)
Protect cultural environment
• Library services that match community use demands, library spaces and facilities that encourage participation by diverse groups (Item 5.7)
• Provide opportunities for the community to enjoy the performing arts as participants and audiences at Sutherland Entertainment Centre (Item 6.1)
• Provision of useful, accessible and timely information to guide grant funding decisions. Administer heritage building and publication grants (Item 6.2)
SERVICE EXCELLENCE: Contemporary, responsive and competitive quality service delivery
Specific activity priorities
2015/16 Operational Plan response
Cultivating a culture of high performance
• Undertake organisational capability reform (Item 7.3)• Maximise return from council’s Commercial Property fund (Item 5.6)• Solutions that deliver online and technology services to the community and the organisation
(Item 7.1)• Provide customer service at council’s front counter and over the telephone in a timely manner
(Item 7.3)
Responsive ‘Can Do’ attitude
Value for money for the community
Competitive and quality service delivery
Deliver on our projects
• Infrastructure program 80% complete 30 June 2016 & 100% complete by 31 August 2016 • Planned maintenance 100 % complete and 85% reactive maintenance complete in service
standard (Strategy 1)Availability of appropriate resources
Integrated asset management
Informed Decisions Decisions & actions based on fact, community engagement & sound judgment
Specific activity priorities
2015/16 Operational Plan response
Engaging with and Informing the Community
• Provision of useful and accessible information to guide decision making, production of six ‘Our Shire’ publications annually, determine baseline Customer Service indicators for counter customer service points (Item 7.1)
• Increase organisational capability to engage with the community (Item 7.3) • Ensure a safe workplace (Item 7.3)• Assist management and employees to adhere to the Fair Workplace Policy and Resolution
Procedures through education and support (Item 7.3)
Improving information provision to councillors
Improving staff and councillors relationships
Retention of valuable staff
• Implement Equal Opportunity Management Plan (Item 7.3)
Ethical Practice Open, honourable and legal practice
Civic Life & Corporate Performance - Item 7.4
• Provide an efficient application assessment service while meeting all related legislative requirements (Item 4.7)
• Manage Integrated Planning and Reporting Program (Item 7.1)• Respond to formal access requests for information according to Government Information
Public Access Act 2009, undertake internal audit program (7.3)• Uphold and enforce planning laws & regulations through legal action where required (Item 7.3)
![Page 12: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/12.jpg)
PAGE 10 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
OR
GA
NIS
ATIO
NAL
BU
DG
ET S
UM
MA
RY
TEN
YEA
R F
INA
NC
IAL
PLA
N M
OD
EL
T
OTA
L 2
013/1
4
2014
/15
2
01
5/1
6
20
16
/17
$’0
00
$’0
00
$’0
00
$’0
00
$’0
00
$’0
00
$
’00
0
$’0
00
$
’00
0
$’0
00
Dis
cret
iona
ry F
unds
Ava
ilabl
e
Avai
labl
e W
orki
ng F
unds
Bro
ught
For
war
d 4,6
89
3,1
90
1,4
99
Rec
urre
nt O
pera
tions
61,4
78
9,8
63
15
,90
01
7,1
96
18
,51
9
Futu
re W
orks
Res
erve
14,0
84
5,4
13
4,4
42
3,1
50
1,0
79
Add
ition
al B
orro
win
g (N
et o
f Deb
t Se
rvic
ing
Cos
ts)
--
--
-
Oth
er
-8
0,2
51
-1
8,4
66
-2
1,8
41
-2
0,3
46
-1
9,5
98
Prop
osed
Gen
eral
Rev
enue
C
apita
l Pro
gram
83
,90
11
8,4
66
21
,84
12
0,3
46
23
,24
8
Ann
ual S
urpl
us/(Sh
ortfa
ll)
(3
,65
0)
--
-(3
,65
0)
![Page 13: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/13.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 11
PR
OP
OSE
D I
NFR
AST
RU
CTU
RE/C
AP
ITA
L P
RO
GR
AM
TO
TAL
20
13
/14
2
01
4/1
5
2015/1
6
2016/1
7
$’0
00
$
’00
0
$’0
00
$
’00
0
$’0
00
$
’000
$’0
00
$’0
00
$’0
00
$’0
00
Tota
l Pro
gram
Prop
osed
Gro
ss In
fras
truc
ture
Pr
ogra
m
Gen
eral
Rev
enue
Fun
ding
71
,57
31
5,6
58
18
,76
117,1
71
19,9
83
Oth
er F
unds
76
,79
71
48
,37
01
5,1
27
30
,78
52
2,3
09
41,0
70
21,2
88
38,4
59
18,0
73
38,0
56
Prop
osed
Gro
ss O
ther
Cap
ital
Wor
ks
Gen
eral
Rev
enue
Fun
ding
12
,32
82
,80
83
,08
03,1
75
3,2
65
Oth
er F
unds
5,8
71
18
,19
91
,74
44
,55
21
,95
25,0
32
1,0
75
4,2
50
1,1
00
4,3
65
Tota
l Pro
pose
d G
ross
Cap
ital
Wor
ks1
66
,56
93
5,3
37
46,1
02
42,7
09
42,4
21
Gen
eral
Rev
enue
Com
pone
nt o
f P
rogr
am
Prop
osed
Gro
ss In
fras
truc
ture
Pr
ogra
m
71
,57
31
5,6
58
18,7
01
17,1
71
19,9
83
Prop
osed
Gro
ss O
ther
Cap
ital
Wor
ks
12
,32
82
,80
83,0
80
3,1
75
3,2
65
Tota
l Pro
pose
d G
ross
Cap
ital
Wor
ks8
3,9
01
18
,46
621,8
41
20,3
46
23,2
48
![Page 14: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/14.jpg)
PAGE 12 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
STR
ATEG
Y 1:
PR
OVI
DE
EFFE
CTI
VE A
ND
CR
ITIC
AL
INFR
AST
RU
CTU
RE
Four
Yea
r D
eliv
ery
Pro
gram
2
01
3/1
4 –
20
16
/17
Ann
ual O
pera
tiona
l Pla
n ac
tions
2
01
5/1
6Pe
rfor
man
ce m
easu
re 2
01
5/1
6
Cou
ncil
will
del
iver
:A
ctiv
ities
, pr
ogra
ms,
pro
ject
s, w
orks
:1
.1
Roa
ds$16.5
m t
o un
dert
ake
cons
truc
tion
and
annu
al m
aint
enan
ce
prog
ram
s on
: •
Roa
ds•
Brid
ges
• Fo
otpa
ths
• Tr
affic
man
agem
ent
& p
edes
tria
n sa
fety
• C
ycle
way
s•
Pres
enta
tion
of p
ublic
spa
ces
• Sh
oppi
ng a
nd b
usin
ess
cent
res.
Ann
ual p
roje
ct s
ched
ules
: •
80
% c
ompl
ete
by
30
Jun
e 2
01
6, an
d•
10
0%
com
plet
e by
31
Aug
ust
20
16
Pla
nned
mai
nten
ance
10
0%
com
plet
e
85
% r
eact
ive
mai
nten
ance
com
plet
e in
ser
vice
st
anda
rd
1.8
B
uild
ings
$5.5
3 m
to
unde
rtak
e co
nstr
uctio
n an
d an
nual
mai
nten
ance
pr
ogra
ms
on:
• Le
isur
e C
entr
es•
Com
mun
ity b
uild
ings
• Pu
blic
toi
lets
and
,•
Emer
genc
y Se
rvic
es fa
cilit
ies.
1.9
.1
Ope
n Sp
ace,
Sp
ortin
g an
d R
ecre
atio
nal
Faci
litie
s
$13.6
m t
o un
dert
ake
cons
truc
tion
and
annu
al m
aint
enan
ce
prog
ram
s on
:
• Pa
rks
• Pla
ygro
unds
• Pa
ssiv
e re
serv
es•
Spor
ting
field
s an
d,•
Wha
rves
and
jett
ies.
![Page 15: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/15.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 13
Four
Yea
r D
eliv
ery
Pro
gram
2
01
3/1
4 –
20
16
/17
Ann
ual O
pera
tiona
l Pla
n ac
tions
2
01
5/1
6Pe
rfor
man
ce m
easu
re 2
01
5/1
6
Cou
ncil
will
del
iver
:A
ctiv
ities
, pr
ogra
ms,
pro
ject
s, w
orks
:1
.11
Sus
tain
able
St
orm
wat
er
Man
agem
ent
&
Dra
inag
e an
d Es
tuar
y M
anag
emen
t
$1.9
6 m
to
unde
rtak
e st
orm
wat
er q
ualit
y im
prov
emen
t m
easu
res
and
annu
al m
aint
enan
ce p
rogr
ams
on:
• St
orm
wat
er m
anag
emen
t an
d dr
aina
ge•
Estu
ary
man
agem
ent.
Ann
ual p
roje
ct s
ched
ules
:
• 8
0%
com
plet
e b
y 3
0 J
une
20
16
, an
d•
10
0%
com
plet
e by
31
Aug
ust
20
16
Pla
nned
mai
nten
ance
10
0%
com
plet
e
85
% r
eact
ive
mai
nten
ance
com
plet
e in
ser
vice
st
anda
rdAdo
ptio
n of
Flo
odpl
ain
Ris
k M
anag
emen
t St
udie
s an
d P
lans
in
clud
ing:
• G
waw
ley
Bay
• Lo
wer
Geo
rges
Riv
er•
Kur
nell
Tow
nshi
p•
Sea
Leve
l Ris
e B
ench
mar
ks a
nd P
olic
y.
7.5
% in
crea
se in
are
a of
the
Shi
re w
here
Flo
odpl
ain
Ris
k M
anag
emen
t St
udie
s &
Pla
ns h
ave
been
ado
pted
Ple
ase
note
: K
ey p
roje
cts
to b
e un
dert
aken
for
eac
h of
the
ass
et c
ompo
nent
s lis
ted
are
prov
ided
in A
ppen
dix
1 a
t th
e en
d of
thi
s re
port
.
![Page 16: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/16.jpg)
PAGE 14 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
Four
Yea
r D
eliv
ery
Pro
gram
2
01
3/1
4 –
20
16
/17
Ann
ual O
pera
tiona
l Pla
n ac
tions
2
01
4/1
5Pe
rfor
man
ce m
easu
re 2
01
4/1
5
Cou
ncil
will
del
iver
:A
ctiv
ities
, pr
ogra
ms,
pro
ject
s, w
orks
:2
.1
Dev
elop
a T
rans
port
St
rate
gy w
hich
al
igns
with
the
N
SW S
tate
Pla
n an
d fa
cilit
ates
br
oade
r in
tegr
ated
tr
ansp
ort
in
conj
unct
ion
with
la
nd u
se p
lann
ing
Com
mis
sion
, pr
oduc
e an
d fin
alis
e th
e Tr
ansp
ort
Stra
tegy
Tran
spor
t St
rate
gy p
rodu
ced
and
adop
ted
by M
arch
2
01
6
2.2
Lo
bby
Fede
ral
and
Stat
e fo
r ke
y in
fras
truc
ture
fu
ndin
g to
sup
port
al
l tra
nspo
rt o
ptio
ns
Lobb
y St
ate
Gov
ernm
ent
on id
entifi
ed is
sues
:
1.
Roa
d C
orrid
or S
trat
egy
for
Hea
thco
te R
d (t
raffi
c sa
fety
)
2.
Gan
nons
Roa
d ra
il br
idge
wid
enin
g
3.
Dire
ct B
us S
ervi
ces
to a
nd fr
om S
ydne
y A
irpor
t
4.
Suth
erla
nd t
o C
ronu
lla B
icyc
le/S
hare
d Pa
thw
ay
5.
Add
ition
al C
omm
uter
Car
Par
king
at
Rai
lway
Sta
tions
Lobb
ying
und
erta
ken
on a
t le
ast
4 k
ey is
sues
STR
ATEG
Y 2:
DEL
IVER
INTE
GR
ATED
TR
AN
SPO
RT
OP
TIO
NS
![Page 17: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/17.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 15
Four
Yea
r D
eliv
ery
Pro
gram
2
01
3/1
4 –
20
16
/17
Ann
ual O
pera
tiona
l Pla
n ac
tions
2
01
5/1
6Pe
rfor
man
ce m
easu
re 2
01
5/1
6
Cou
ncil
will
del
iver
:A
ctiv
ities
, pr
ogra
ms,
pro
ject
s, w
orks
:3
.1
Impl
emen
t En
ergy
and
Wat
er
Effic
ienc
y St
rate
gy
Con
sum
ptio
n of
ene
rgy
and
wat
er u
sage
acr
oss
Cou
ncil
site
s tr
acke
d on
ong
oing
bas
is a
nd r
epor
ted
annu
ally
Rep
ort
cons
umpt
ion
and
trac
king
of i
mpr
ovem
ents
an
nual
ly
3.2
En
ergy
and
wat
er
effic
ienc
y pr
ojec
ts
fund
ed b
y C
ounc
il an
d gr
ants
(w
here
av
aila
ble)
Ener
gy e
ffici
ency
upg
rade
s%
of s
ched
uled
pro
ject
s co
mpl
eted
STR
ATEG
Y 3:
CO
NSE
RVE
NAT
UR
AL
RES
OU
RC
ES
![Page 18: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/18.jpg)
PAGE 16 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
Four
Yea
r D
eliv
ery
prog
ram
2
01
3/1
4 –
20
16
/17
Ann
ual O
pera
tiona
l Pla
n ac
tions
2
01
5/1
6Pe
rfor
man
ce M
easu
re 2
01
5/1
6
Cou
ncil
will
del
iver
:A
ctiv
ities
, pr
ogra
ms,
pro
ject
s, w
orks
:4
.1
Tim
ely,
effe
ctiv
e do
mes
tic w
aste
co
llect
ion
serv
ices
Prov
ide
timel
y an
d ef
fect
ive
hous
ehol
d w
aste
ser
vice
with
in s
ervi
ce
stan
dard
tim
e≥
90
% o
f cus
tom
er r
eque
sts
rela
ting
to w
aste
ser
vice
s ar
e ac
tione
d w
ithin
ser
vice
sta
ndar
dC
ondu
ct a
nnua
l pro
gram
of h
ouse
hold
che
mic
al a
nd e
-was
te
colle
ctio
n se
rvic
es2
% in
crea
se in
vol
ume
of e
-was
te d
iver
ted
from
land
fill
com
pare
d to
20
14
/15
bas
elin
e2
% in
crea
se in
vol
ume
of c
hem
ical
was
te d
iver
ted
from
la
ndfil
l com
pare
d to
20
14
/15
bas
elin
e4
.2
Res
pons
ible
, et
hica
l w
aste
man
agem
ent
that
pro
mot
es
prac
tices
whi
ch
min
imis
e w
aste
Was
te c
olle
ctio
n se
rvic
e w
hich
enc
oura
ges
was
te d
iver
sion
from
la
ndfil
lIn
crea
se la
ndfil
l div
ersi
on r
ate
from
the
2012
/13
rate
(5
1%)
tow
ard
Envi
ronm
ent P
rote
ctio
n Au
thor
ity’s
202
1
targ
et o
f 70%
Con
duct
Was
te W
ise
Livi
ng w
orks
hops
Annu
al c
usto
mer
(pa
rtic
ipan
t) s
atis
fact
ion
ratin
g ≥
7
4.3
In
trod
uce
and
adm
inis
ter
stra
tegi
es a
nd
prog
ram
s to
rep
lace
lo
st t
rees
Impl
emen
t m
ajor
tre
e-pl
antin
g pr
ogra
ms
on C
ounc
il La
nd1
00
% o
f maj
or t
ree
plan
ting
prog
ram
s im
plem
ente
d
Reg
ulat
e tr
ee p
lant
ing
prog
ram
on
priv
ate
prop
erty
Med
ian
dete
rmin
atio
n tim
e of
≤3
0 d
ays
for
tree
re
mov
al a
pplic
atio
nsM
aint
ain
resi
dent
tre
e is
sue
prog
ram
Cha
nge
from
pre
viou
s ye
ar in
no.
of t
rees
issu
ed t
o re
side
nts
(tot
al n
umbe
r is
sued
in 2
01
5/1
6)
4.4
En
forc
e co
mpl
ianc
e w
ith la
ws
and
regu
latio
ns t
o en
sure
qua
lity
of
nois
e, a
ir, w
ater
an
d la
nd p
ollu
tion
Inve
stig
ate
inci
dent
s of
pol
lutio
nN
o. o
f inv
estig
atio
ns c
ondu
cted
com
pare
d to
20
13
/14
Con
duct
aud
its o
f com
mer
cial
and
indu
stria
l pre
mis
es%
of t
otal
in
spec
tions
for
com
mer
cial
and
indu
stria
l pr
emis
es w
ith a
Sat
isfa
ctor
y or
Min
or Is
sue
(non
cr
itica
l) in
spec
tion
resu
ltsR
egis
tere
d bu
sine
sses
insp
ecte
d in
acc
orda
nce
with
the
ir re
spec
tive
insp
ectio
n pr
ogra
ms
10
0%
com
plet
ion
rate
for
all
regi
ster
ed p
rem
ises
in
spec
tion
prog
ram
s
STR
ATEG
Y 4:
PR
OTE
CT
OU
R E
NVI
RO
NM
ENT
![Page 19: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/19.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 17
Four
Yea
r D
eliv
ery
prog
ram
2
01
3/1
4 –
20
16
/17
Ann
ual O
pera
tiona
l Pla
n ac
tions
2
01
5/1
6Pe
rfor
man
ce M
easu
re 2
01
5/1
6
Cou
ncil
will
del
iver
:A
ctiv
ities
, pr
ogra
ms,
pro
ject
s, w
orks
:4
.5
Loca
l com
mun
ity
grou
ps,
busi
ness
, in
dust
ry a
nd
resi
dent
s in
in
itiat
ives
whi
ch
prot
ect
and/
or
enha
nce
natu
re
Man
age
ongo
ing
Bus
hcar
e pr
ogra
mC
hang
e fr
om p
revi
ous
year
in n
o. o
f act
ive
volu
ntee
rs
(tot
al n
umbe
r of
vol
unte
ers
in 2
01
5/1
6)
Cha
nge
from
pre
viou
s ye
ar in
ann
ual t
otal
hou
rs o
f B
ushc
are
rege
nera
tion
(tot
al h
ours
of r
egen
erat
ion
wor
k 2
01
5/1
6)
Con
tinue
Gre
enw
eb P
rogr
am a
nd G
reen
web
Sch
ools
Ann
ual %
incr
ease
in p
artic
ipat
ing
prop
ertie
s an
d sc
hool
s in
Gre
enw
eb P
rogr
am (
base
line
20
02
)%
of s
ched
uled
agr
eed
actio
ns c
ompl
eted
by
Gre
enw
eb
gran
t re
cipi
ents
M
aint
ain
or im
prov
e qu
ality
of S
hire
wat
erw
ays
thro
ugh
the
Stor
mw
ater
Impr
ovem
ent
Prog
ram
.≥
70
% o
f Shi
re w
ater
way
site
s ra
ted
in e
xcel
lent
to
fair
cond
ition
4.6
A
loca
l pla
nnin
g fr
amew
ork
that
up
hold
s th
e Sh
ire’s
ch
arac
ter
Prov
ide
an e
ffect
ive
deve
lopm
ent
asse
ssm
ent
proc
ess
No.
of d
evel
opm
ent a
sses
smen
t det
erm
inat
ions
% o
f dev
elop
men
t app
licat
ions
app
rove
dM
edia
n de
term
inat
ion
time
of:
50 d
ays
for
resi
dent
ial (
sim
ple)
app
licat
ions
&
90 d
ays
for
proj
ect(
com
plex
) ap
plic
atio
ns4
.7
Bui
ldin
g C
ertifi
catio
n Se
rvic
es
Prov
ide
a se
rvic
e th
at m
eets
the
nee
ds a
nd e
xpec
tatio
ns o
f its
cu
stom
ers
Mai
ntai
n a
wei
ghte
d cu
stom
er r
espo
nse
scor
e of
≥9
0
in c
usto
mer
sur
veys
Mai
ntai
n an
ave
rage
tur
naro
und
time
not
exce
edin
g 2
0
days
for
com
plyi
ng d
evel
opm
ent
cert
ifica
te a
pplic
atio
ns
![Page 20: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/20.jpg)
PAGE 18 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
Four
Yea
r D
eliv
ery
Pro
gram
2
01
3/1
4 –
20
16
/17
Ann
ual O
pera
tiona
l Pla
n ac
tions
2
01
5/1
6Pe
rfor
man
ce M
easu
re 2
01
5/1
6
Cou
ncil
will
del
iver
:A
ctiv
ities
, pr
ogra
ms,
pro
ject
s, w
orks
:5
.1
Qua
lity
and
resp
onsi
ve
early
chi
ldho
od
educ
atio
n an
d ca
re
Ope
rate
and
man
age
11
Ear
ly E
duca
tion
& C
are
Cen
tres
, O
OSH
, Va
catio
n C
are
& a
Fam
ily D
ay C
are
sche
me
Man
age
Fam
ily D
ay C
are
Sche
me
% o
f sta
ff th
at r
epor
ted
that
the
y w
ould
rec
omm
end
wor
king
in S
SC C
hild
ren’
s Se
rvic
es (
base
line)
% o
f par
ents
who
rep
orte
d an
incr
ease
in t
heir
wel
lbei
ng fr
om t
heir
invo
lvem
ent
in C
ounc
il’s
qual
ity
resp
onsi
ve E
arly
Edu
catio
n &
Car
e se
rvic
es (
base
line)
% o
f par
ents
who
rep
orte
d th
at t
heir
child
(ren
) be
nefit
fr
om b
eing
enr
olle
d in
Chi
ldre
n’s
Serv
ices
qua
lity
resp
onsi
ve E
arly
Edu
catio
n &
Car
e pr
ogra
ms
(bas
elin
e)A
chie
ve a
rat
ing
of:
mee
ting
or a
bove
the
Nat
iona
l Q
ualit
y St
anda
rds
for
all s
ervi
ces
5.2
Tr
aini
ng t
o bu
ild
the
capa
city
of
early
chi
ldho
od
prof
essi
onal
s an
d pa
rent
s
Prov
isio
n of
pro
fess
iona
l lea
rnin
g fo
r Ea
rly C
hild
hood
Edu
cato
rs &
tr
aini
ng fo
r fa
mili
es%
of f
amili
es w
ho r
epor
ted
an in
crea
se in
the
ir pa
rent
ing
skill
s &
kno
wle
dge
as a
res
ult
of t
heir
invo
lvem
ent
in t
rain
ing
offe
red
by C
hild
ren’
s Se
rvic
es
(bas
elin
e)
5.3
C
omm
unity
in
itiat
ives
whi
ch
resp
ond
to lo
cal
soci
al is
sues
Pla
n an
d de
velo
p ca
paci
ty b
uild
ing
prog
ram
s w
ith r
esid
ents
% o
f cus
tom
ers
(com
mun
ity)
surv
eyed
who
rep
orte
d an
in
crea
se in
wel
lbei
ng a
s a
resu
lt of
the
ir in
volv
emen
t in
th
e pr
ogra
ms
deliv
ered
(ba
selin
e)Pla
n an
d de
velo
p ca
paci
ty b
uild
ing
trai
ning
initi
ativ
es fo
r lo
cal
orga
nisa
tions
Ann
ual c
usto
mer
(co
mm
unity
org
anis
atio
ns)
surv
ey
satis
fact
ion
ratin
g ≥
7
STR
ATEG
Y 5:
STR
ENG
THEN
ING
OU
R C
OM
MU
NIT
Y
![Page 21: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/21.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 19
Four
Yea
r D
eliv
ery
Pro
gram
2
01
3/1
4 –
20
16
/17
Ann
ual O
pera
tiona
l Pla
n ac
tions
2
01
5/1
6Pe
rfor
man
ce M
easu
re 2
01
5/1
6
Cou
ncil
will
del
iver
:A
ctiv
ities
, pr
ogra
ms,
pro
ject
s, w
orks
:5
.4
Com
mun
ity e
vent
s w
hich
faci
litat
e pe
ople
con
nect
ing
at t
he lo
cal a
nd
Shire
wid
e le
vel
and
enco
urag
e lo
cal
econ
omic
act
ivity
Con
duct
com
mun
ity-b
ased
eve
nts
and
prom
otio
ns,
incl
udin
g Sp
ring
fest
ival
, Ea
ster
sho
w,
Chr
istm
as,
Mot
hers
’ day
, an
d th
ree
scho
ol h
olid
ay p
rogr
ams
At
leas
t 7
key
Eve
nts
and
Prom
otio
ns c
ondu
cted
with
in
budg
et (
subj
ect
to e
vent
rev
iew
)
10
0%
of K
ey E
vent
s &
Pro
mot
ions
at
or a
bove
tar
get
part
icip
atio
n le
vels
Supp
ort
and
faci
litat
e th
e st
agin
g of
indu
stry
led
initi
ativ
es a
nd
even
ts a
imed
at
incr
easi
ng e
ngag
emen
t w
ith a
nd b
etw
een
loca
l bu
sine
sses
Ann
ual c
usto
mer
(bu
sine
ss n
etw
ork)
Satis
fact
ion
ratin
g of
≥ 7
Dev
elop
cap
acity
of c
omm
unity
and
bus
ines
s or
gani
satio
ns t
o de
liver
eco
nom
ic d
evel
opm
ent
focu
ssed
act
iviti
es a
nd e
vent
sIn
crea
se in
% o
f eve
nts
deliv
ered
by
com
mun
ity a
nd
busi
ness
org
anis
atio
ns
5.5
In
itiat
ives
whi
ch
supp
ort
the
loca
l ec
onom
y an
d to
uris
m
Mon
itor
and
resp
ond
to t
rend
s an
d ch
ange
s in
the
loca
l eco
nom
y
Supp
ort
and
enco
urag
e gr
owth
in S
hire
’s e
cono
mic
sec
tors
Tailo
red
prog
ram
s an
d re
spon
ses
prov
ided
to
all k
ey
econ
omic
sec
tors
Util
ise
revi
sed
Visi
tor
Acc
omm
odat
ion
Rep
ort
to in
form
cou
ncil
deci
sion
mak
ing
on d
evel
opm
ent
oppo
rtun
ities
Iden
tified
prio
rity
site
s fo
r vi
sito
r ac
com
mod
atio
n re
port
ed t
o C
ounc
ilD
eliv
er a
n Ec
onom
ic D
evel
opm
ent
Stra
tegy
to
max
imis
e op
port
uniti
es t
o pr
omot
e bu
sine
ss g
row
thEc
onom
ic D
evel
opm
ent
Stra
tegy
act
ions
dev
elop
ed a
nd
impl
emen
ted
in a
ccor
danc
e w
ith a
ppro
ved
timef
ram
esFa
cilit
ate
the
deve
lopm
ent
of s
mal
l bus
ines
s in
the
Shi
reN
umbe
r of
SSH
ED (
busi
ness
incu
bato
r) g
radu
ates
in
past
five
yea
rs a
nd %
who
are
stil
l in
activ
e bu
sine
ss
oper
atio
n5
.6
Com
mun
ity
faci
litie
s an
d sp
aces
fo
r ne
ighb
ourh
ood
and
Shire
wid
e co
mm
unity
and
sm
all b
usin
ess
activ
ity
Faci
litat
e ec
onom
ic d
evel
opm
ent
oppo
rtun
ities
at
a va
riety
of lo
catio
ns t
hrou
ghou
t th
e Sh
ire
% s
mal
l bus
ines
ses
who
rep
ort
that
tha
t ar
e sa
tisfie
d w
ith t
he va
riety
of l
ocat
ions
whe
re ec
onom
ic
deve
lopm
ent
activ
ities
are
con
duct
edM
anag
e co
mm
unity
hal
ls a
nd s
pace
s fo
r lo
cal g
roup
s to
mee
t an
d or
ope
rate
with
in%
incr
ease
in b
ooke
d ho
urs
in C
ounc
il m
anag
ed
com
mun
ity h
alls
& o
pen
spac
es fr
om 2
01
4/1
5 b
asel
ine
% in
crea
se in
rev
enue
from
Cou
ncil
man
aged
co
mm
unity
hal
ls &
ope
n sp
aces
from
20
14
/15
bas
elin
eM
axim
ise
retu
rn fr
om C
ounc
il’s
Com
mer
cial
Pro
pert
y Fu
ndA
t le
ast
6%
rat
e re
turn
on
the
valu
e of
com
mer
cial
pr
oper
ty
![Page 22: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/22.jpg)
PAGE 20 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
Four
Yea
r D
eliv
ery
Pro
gram
2
01
3/1
4 –
20
16
/17
Ann
ual O
pera
tiona
l Pla
n ac
tions
2
01
5/1
6Pe
rfor
man
ce M
easu
re 2
01
5/1
6
Cou
ncil
will
del
iver
:A
ctiv
ities
, pr
ogra
ms,
pro
ject
s, w
orks
:5
.7
Qua
lity
and
resp
onsi
ve li
brar
y se
rvic
es a
nd s
pace
s
Libr
ary
serv
ices
tha
t m
atch
com
mun
ity u
se d
eman
dsA
nnua
l cus
tom
er (
part
icip
ant)
sat
isfa
ctio
n ra
ting
>/7
% o
f cus
tom
ers
(com
mun
ity g
roup
s) s
urve
yed
who
re
port
ed t
hat
they
wer
e m
ore
conn
ecte
d an
d in
volv
ed
as a
res
ult
of t
he in
form
atio
n pr
ovid
edLi
brar
y sp
aces
and
faci
litie
s th
at e
ncou
rage
par
ticip
atio
n by
div
erse
gr
oups
% o
f cus
tom
ers
surv
eyed
who
rep
orte
d an
incr
ease
in
wel
l-bei
ng fr
om t
heir
invo
lvem
ent
in C
ounc
il’s
Libr
ary
Serv
ices
5.9
Lo
cal e
mer
genc
y se
rvic
es t
o pr
epar
e fo
r, re
spon
d an
d m
anag
e na
tura
l di
sast
ers
Mee
t th
e ob
ligat
ions
in a
ccor
danc
e w
ith E
ndor
sed
Cou
ncil
Rep
ort
(FIN
30-1
4 d
ated
19
/08
/20
13
) as
req
uire
d by
the
Sta
te E
mer
genc
y an
d R
escu
e M
anag
emen
t A
ct 1
98
9.
10
0%
com
plia
nce
with
the
Sut
herla
nd S
hire
Dis
aste
r P
lan
(DIS
PLA
N)
and
resp
onsi
bilit
ies
as t
he L
ocal
Em
erge
ncy
Man
agem
ent
Offi
cer
(LEM
O)
![Page 23: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/23.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 21
Four
Yea
r D
eliv
ery
Pro
gram
2
01
3/1
4 –
20
16
/17
Ann
ual O
pera
tiona
l Pla
n A
ctio
ns
20
15
/16
Perf
orm
ance
Mea
sure
20
15
/16
Cou
ncil
will
del
iver
:A
ctiv
ities
, pr
ogra
ms,
pro
ject
s, w
orks
:6
.1
Loca
l cul
tura
l, ar
ts
and
ente
rtai
nmen
t op
port
uniti
es
Prov
ide
exhi
bitio
ns,
even
ts,
clas
ses
and
venu
e hi
re a
t H
azel
hurs
t R
egio
nal G
alle
ry &
Art
s C
entr
eA
min
imum
of 8
5%
of c
usto
mer
s su
rvey
ed t
hat
are
satis
fied
with
the
var
iety
and
qua
lity
of H
azel
hurs
t R
egio
nal G
alle
ry &
Art
s C
entr
e pr
ogra
ms
and
activ
ities
A m
inim
um o
f 55
0 e
nrol
men
ts o
n ar
t cl
asse
s pe
r te
rmM
inim
um o
f 15
0,0
00
vis
itors
to
Haz
elhu
rst
per
annu
mPr
ovid
e op
port
uniti
es fo
r th
e co
mm
unity
to
enjo
y th
e pe
rfor
min
g ar
ts a
s pa
rtic
ipan
ts a
nd a
udie
nces
at
the
Suth
erla
nd E
nter
tain
men
t C
entr
e
Red
evel
opm
ent
optio
ns o
f Sut
herla
nd E
nter
tain
men
t C
entr
e ar
e re
port
edM
inim
um 1
50
,00
0 p
atro
ns o
f SEC
per
ann
umM
axim
um n
et c
ost
per
patr
on t
o C
ounc
il of
$3
.95
6.2
G
rant
s pr
ogra
ms
that
:•
faci
litat
e a
rang
e of
art
s an
d cu
ltura
l act
iviti
es•
prot
ect
and
prom
ote
herit
age
Prov
isio
n of
use
ful,
acce
ssib
le a
nd t
imel
y in
form
atio
n to
gui
de g
rant
fu
ndin
g de
cisi
ons
Tota
l fun
ds a
lloca
ted
to c
omm
unity
org
anis
atio
ns fo
r co
mm
unity
dev
elop
men
t, a
rts
and
cultu
ral a
ctiv
ities
Adm
inis
ter
herit
age
build
ing
gran
ts a
nd h
erita
ge p
ublic
atio
ns g
rant
sN
o. o
f Her
itage
Bui
ldin
gs g
rant
s an
d no
. of
Her
itage
Pu
blic
atio
ns gr
ants
6.3
Su
ppor
t fo
r co
mm
unity
bas
ed
arts
and
cul
tura
l ac
tiviti
es
Ass
ist
com
mun
ity g
roup
s an
d or
gani
satio
ns c
ondu
ctin
g co
mm
unity
cu
ltura
l eve
nts
No.
of c
omm
unity
gro
ups
and
orga
nisa
tions
ass
iste
d to
co
nduc
t co
mm
unity
cul
tura
l eve
nts
STR
ATEG
Y 6:
RES
PEC
T AN
D V
ALU
E ALL
HER
ITAG
E A
ND
CU
LTU
RE
![Page 24: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/24.jpg)
PAGE 22 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
Esse
ntia
l to
carr
ying
out
thi
s D
eliv
ery
Prog
ram
and
Ope
ratio
nal P
lan
is h
avin
g ef
ficie
nt a
nd e
ffect
ive
coun
cil o
pera
tions
tha
t ar
e un
derp
inne
d by
goo
d co
rpor
ate
gove
rnan
ce.
Sut
herla
nd S
hire
Cou
ncil
has
mad
e a
num
ber
of c
omm
itmen
ts t
o th
e co
mm
unity
and
its
staf
f.
Thes
e co
mm
itmen
ts a
re t
rans
late
d in
to o
ur e
very
day
wor
k in
a n
umbe
r of
way
s, w
heth
er it
is t
hrou
gh e
nsur
ing
ethi
cal a
nd t
rans
pare
nt d
ecis
ion-
mak
ing,
en
gagi
ng in
mea
ning
ful d
ialo
gue
with
our
com
mun
ity o
r m
anag
ing
coun
cil’s
fina
nces
in a
sus
tain
able
way
to
ensu
re t
he lo
ng t
erm
via
bilit
y of
the
or
gani
satio
n.
Four
Yea
r D
eliv
ery
Pro
gram
2
01
3/1
4 –
20
16
/17
Ann
ual O
pera
tiona
l Pla
n A
ctio
ns
20
15
/16
Perf
orm
ance
Mea
sure
20
15
/16
Cou
ncil
will
del
iver
:A
ctiv
ities
, pr
ogra
ms,
pro
ject
s, w
orks
:7
.1
Stra
tegi
c D
eliv
ery
O
utst
andi
ng
com
mun
ity o
utco
mes
th
at fu
lfil l
ocal
nee
ds
and
expe
ctat
ions
.
Det
erm
ine
base
line
Cus
tom
er S
ervi
ce in
dica
tors
for
face
to
face
se
rvic
e po
ints
Bas
elin
e C
usto
mer
Ser
vice
indi
cato
rs d
evel
oped
and
im
plem
ente
d ac
ross
Cou
ncil’
s se
rvic
e po
ints
Impl
emen
tatio
n of
‘Fit
for
the
Futu
re’ I
mpr
ovem
ent
Act
ion
Pla
n%
of s
ched
uled
act
ions
com
plet
ed fr
om Im
prov
emen
t A
ctio
n P
lan
The
prov
isio
n of
use
ful a
nd a
cces
sibl
e in
form
atio
n to
gui
de d
ecis
ion
mak
ing
deliv
ered
in a
pro
fess
iona
l and
tim
ely
man
ner
Ann
ual c
lient
(C
ounc
illor
& E
xecu
tive)
sat
isfa
ctio
n ra
ting
≥7
Man
age
Inte
grat
ed,
Pla
nnin
g &
Rep
ortin
g Pr
ogra
m1
00
% c
ompl
ianc
e w
ith In
tegr
ated
, P
lann
ing
&
Rep
ortin
g re
quire
men
tsPr
oduc
e si
x ‘O
ur S
hire
’ cou
ncil
new
slet
ters
ann
ually
At
leas
t 9
0%
ann
ual r
eade
rshi
p am
ong
new
slet
ter
reci
pien
ts (
as m
easu
red
by C
omm
unity
Sat
isfa
ctio
n Su
rvey
bia
nnua
lly)
Solu
tions
tha
t de
liver
onl
ine
and
tech
nolo
gy s
ervi
ces
to t
he
com
mun
ity a
nd t
he o
rgan
isat
ion
Num
ber
of o
nlin
e co
mm
unity
inte
ract
ions
Onl
ine
inte
ract
ions
are
gre
ater
tha
n 3
0%
of t
otal
co
mm
unity
inte
ract
ions
Satis
fact
ion
with
onl
ine
inte
ract
ions
is ≥
65
%Lo
bby
Fede
ral &
NSW
Gov
ernm
ents
Lobb
ying
act
iviti
es b
y va
rious
Cou
ncil
units
und
erta
ken
CIV
IC L
IFE
AN
D C
OR
PO
RAT
E PER
FOR
MAN
CE
![Page 25: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/25.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 23
7.2
In
form
ed D
ecis
ions
D
ecis
ions
and
ac
tions
bas
ed o
n fa
ct, co
mm
unity
en
gage
men
t an
d so
und
judg
men
t
Incr
ease
org
anis
atio
nal c
apab
ility
to
enga
ge w
ith t
he c
omm
unity
% o
f cus
tom
ers
(Cou
ncill
ors
and
staf
f) r
epor
ting
prof
essi
onal
sup
port
in
crea
sed
ski
lls a
nd k
now
ledg
e to
eng
age
with
the
com
mun
ity
7.3
Se
rvic
e Exc
elle
nce
C
onte
mpo
rary
, re
spon
sive
and
co
mpe
titiv
e qu
ality
se
rvic
e de
liver
y
\
(con
tinue
s)..
..
Und
erta
ke s
ervi
ce d
eliv
ery
revi
ew o
f Cou
ncil’
s in
tern
al a
nd e
xter
nal
serv
ice
prov
isio
n%
of s
ched
uled
act
ions
com
plet
ed a
s ou
tline
d w
ithin
th
e Fi
t fo
r th
e Fu
ture
Impr
ovem
ent
Act
ion
Pla
nIm
plem
ent
Bus
ines
s Pr
oces
s Im
prov
emen
t ac
tions
as
outli
ned
with
in
the
Fit
for
the
Futu
re Im
prov
emen
t A
ctio
n P
lan
Mai
ntai
n a
finan
cial
ly s
usta
inab
le o
rgan
isat
ion
Equa
l or
exce
ed in
dust
ry fi
nanc
ial b
ench
mar
ks –
un
rest
ricte
d cu
rren
t ra
tio &
deb
t se
rvic
e ra
tioC
ash
Expe
nse
Cov
er R
atio
% R
atio
of r
ates
, an
nual
inte
rest
& e
xtra
cha
rges
ou
tsta
ndin
gPr
ovid
e cu
stom
er s
ervi
ce a
t C
ounc
il’s
fron
t co
unte
r an
d ov
er t
he
tele
phon
e in
a t
imel
y m
anne
rC
usto
mer
ser
vice
by
tele
phon
e
Aver
age
tele
phon
e w
aitin
g tim
e ≤
15
sec
s
% a
nsw
ered
with
in 1
5 s
ecs
is ≥
70
%
Aba
ndon
men
t ra
te <
2%
% C
usto
mer
s w
ho r
epor
t sa
tisfa
ctio
n ra
ting
of ≥
7 a
t C
usto
mer
Ser
vice
cou
nter
(ba
selin
e m
easu
re s
et a
t 2
01
4/1
5)
Mul
ti-oc
cupa
ncy
clea
nups
(w
ithin
2 d
ays
≥9
5%
co
mpl
ete)
Onl
ine
anim
al r
egis
trat
ion
appl
icat
ions
(w
ithin
2 d
ays
≥ 9
5%
)
Emai
l (w
ithin
5 d
ays
≥ 9
5%
com
plet
e)
(bas
elin
e m
easu
re s
et a
t 2
01
4/1
5)
Res
pond
to
form
al a
cces
s re
ques
ts fo
r in
form
atio
n, in
acc
orda
nce
with
Gov
ernm
ent
Info
rmat
ion
(Pub
lic A
cces
s) A
ct 2
00
91
00
% o
f GIP
A r
eque
sts
proc
esse
d w
ithin
the
sta
tuto
ry
timef
ram
e
![Page 26: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/26.jpg)
PAGE 24 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
.....(
cont
Inue
d)
7.3
Se
rvic
e Exc
elle
nce
C
onte
mpo
rary
, re
spon
sive
and
co
mpe
titiv
e qu
ality
se
rvic
e de
liver
y
Con
tinue
to
prov
ide
relia
ble
and
effic
ient
rec
ruitm
ent
and
payr
oll
serv
ices
Elap
sed
wee
ks t
o fil
l ope
n po
sitio
ns c
ompa
red
to
sect
or a
vera
ge (
20
13
bas
elin
e)%
of p
ays
that
are
red
raw
n as
tot
al o
f all
payr
oll r
uns
Und
erta
ke E
mpl
oyee
Clim
ate
surv
eySc
ore
of ≥
7 o
n “o
vera
ll sa
tisfa
ctio
n” o
n em
ploy
ee
clim
ate
surv
eyEn
sure
a s
afe
wor
kpla
ceW
HS
inci
dent
s pe
r 1
00
wor
kers
is d
ecre
asin
gW
orke
rs c
ompe
nsat
ion
clai
ms
inci
dent
rat
e pe
r 1
00
w
orke
rs is
dec
reas
ing
Lost
tim
e in
jury
rat
e is
dec
reas
ing
Impl
emen
t Eq
ual E
mpl
oym
ent
Opp
ortu
nity
Man
agem
ent
Pla
n%
of s
taff
who
agr
ee t
hat
they
und
erst
and
Cou
ncil’
s EE
O a
nd F
WP
pol
icie
s an
d pr
actic
es (
mea
sure
d by
th
e 2
01
6 E
mpl
oyee
Clim
ate
Surv
ey)
% o
f sta
ff w
ho r
epor
ted
an in
crea
se in
kno
wle
dge
and
skill
s fo
llow
ing
com
plet
ion/
part
icip
atio
n in
a s
peci
fic
EEO
/ FW
P P
rogr
amPr
ovid
e pr
ogra
ms
whi
ch p
rom
ote
Equa
l Em
ploy
men
t O
ppor
tuni
ty fo
r w
omen
, yo
uth
unde
r 2
5,
peop
le w
ith d
isab
ility
, an
d A
borig
inal
and
To
rres
Str
ait
Isla
nder
peo
ple
% o
f sta
ff w
ho r
epor
ted
an in
crea
se in
kno
wle
dge
and
skill
s fo
llow
ing
com
plet
ion/
part
icip
atio
n in
a s
peci
fic
EEO
/ FW
P P
rogr
am%
of i
dent
ified
pos
ition
tra
inee
s w
ho r
epor
ted
an
incr
ease
in k
now
ledg
e an
d sk
ills
at s
peci
fic s
tage
s th
roug
h th
eir
trai
nees
hip
Com
plet
ion
rate
of i
dent
ified
pos
ition
tra
inee
ship
s%
of t
rain
ees
that
sec
ure
perm
anen
t em
ploy
men
t w
ith
coun
cil f
ollo
win
g co
mpl
etio
n of
tra
inee
ship
Ass
ist
man
agem
ent
and
empl
oyee
s ad
here
to
the
Fair
Wor
kpla
ce
Polic
y an
d R
esol
utio
n Pr
oced
ures
thr
ough
edu
catio
n an
d su
ppor
t%
of c
onta
cts
rece
ived
rel
ativ
e to
num
ber
of
empl
oyee
s%
of F
air
Wor
kpla
ce g
rieva
nces
sub
stan
tiate
d re
lativ
e to
num
ber
of e
mpl
oyee
s
![Page 27: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/27.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 25
7.4
Eth
ical
Pra
ctic
e
Ope
n, h
onou
rabl
e an
d le
gal p
ract
ice
Und
erta
ke In
tern
al A
udit
prog
ram
in a
ccor
danc
e w
ith In
tern
al A
udit
Com
mitt
ee’s
req
uire
men
ts1
00
% o
f pro
gram
com
plet
ed
Uph
old
and
enfo
rce
our
loca
l pla
nnin
g la
ws
and
regu
latio
ns t
hrou
gh
lega
l act
ion
whe
re r
equi
red
No.
of l
egal
act
ions
% o
f suc
cess
ful p
rose
cutio
nsN
o. o
f Inv
estig
atio
ns, N
otic
es &
Ord
ers
Und
erta
ke t
o pr
ovid
e le
gal a
dvic
e in
an
effic
ient
man
ner
No.
of m
atte
rs c
ompl
eted
No.
of m
atte
rs r
ecei
ved
No.
of m
atte
rs o
utst
andi
ng
![Page 28: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/28.jpg)
PAGE 26 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
STRATEGY 1 – KEY PROJECTS BY ASSET COMPONENT FOR 2015/16.
1.1 RoadsRoads Captain Cook Drive (between Woolooware Road and Elouera Road) Stage 3
North West Arm Road, Grays Point – S afety upgrade of footpath crossings
Bundanoon Road Woronora Heights East side Kerb & Guttering
Maianbar Road curve, east of King Street – road safety improvementsBridges 216 Belgrave Esplanade, Sylvania – Seawall ReplacementFootpaths Prioritised footpath constructionTraffic management & pedestrian safety
Belgrave Esplanade at Murrumbidgee Avenue – Pedestrian Refuge & Mini Roundabout
Lantana Road, Engadine near Glenview Place – half oval threshold
Waratah Street & Parramatta Street – Roundabout
Rawson Avenue on-road cycle laneCycleways Como Railway shared path
Woolooware Bay Stage 6 Studies
Atkinson Road Shared Path
Program: Cycleways – As Per Sutherland Council Bicycle Network PlanPresentation of public spaces
Taren Point Road Beautification – Landscaping
Captain Cook Drive / Elouera Road Roundabout – Landscaping Upgrade
Caringbah Shopping Centre Domain Improvements
Heathcote Shopping CentreShopping and business centres
Sylvania Heights Shopping Centre Upgrade
Sylvania Shopping Centre Upgrade
Cronulla Plaza – Shade Structures
Cronulla Plaza Mall Kiosks – Structural Steel Replacement
APPENDIX 1
![Page 29: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/29.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 27
1.8 BuildingsLeisure Centres Sutherland Leisure Centre – Shutdown upgrade works
Como Pool – Northern pool deck replacement
Engadine Leisure Centre – Plant room safe roof access
Cronulla Sports Complex – Rectification worksCommunity Buildings Waratah Park Dog Training Building – Roof Replacement
Waterfall RFS Playgroup – Soft-fall replacement
Mens’ Shed Facility
Sylvania High School installation floodlights, construction of amenities building for school & community sporting use
Public Toilets Burnum Burnum Sewer Upgrade Works
Lilli Pilli Baths public toilet & change room replacement
Cronulla CBD south new public toiletEmergency Services facilities
Program SES Headquarters – renewal works
Program – RFS and SES buildings unplanned renewals
Heathcote Fire Control Centre – vehicle accommodation (SES)
Menai RFS Building
1.9 Open Space, Sporting and Recreational FacilitiesParks, Playgrounds & Passive Reserves
Silver Beach western-end path including catamaran car park
Gunnamatta Park path construction and bridge installation
Forum Drive Playground
Barden Ridge Park 150 Old Illawarra RoadSporting & Recreational facilities
The Ridge LED Lighting upgrade – Stage 1 & 2
Greenhill’s Hockey Field Construction Stage 1B
Kareela Sports Field site – Ancillary amenity upgrades
Waratah AFL/cricket field (Lincoln oval) – Development to Regional AFL facility
Greenhills Hockey Field amenities buildingWharves & Jetties Old Ferry Road – Small Craft Facility
Burnum Burnum boat ramp upgrade
Lugano Avenue wharf upgrade
Tom Uglys wharf upgrade
1.11 Sustainable Stormwater Management & Drainage and Estuary ManagementThe Ridge Sports Complex Dam – Water treatment
156 Karimbla Road Miranda – Piping of open drain
Field Verification of Stormwater Assets
Kareela Golf Course – Bank stabilisation
![Page 30: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/30.jpg)
PAGE 28 - SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015
2015/16 OPERATIONAL PLAN FINANCIAL INFORMATION
Full details are contained in the supplementary publication: Draft Budget, Revenue/Rating Policy and Operational Plan 2015/16
![Page 31: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/31.jpg)
SUTHERLAND SHIRE COUNCIL Delivery Program 2013/14 to 2016/17 incorporating Operational Plan 2015/16 Adopted June 2015 - PAGE 29
THIS PAGE LEFT INTENTIONALLY BLANK
![Page 32: DELIVERY PROGRAM 2013/14 - 2016/17 · DELIVERY PROGRAM 2013/14 - 2016/17 (incorporating Operational Plan 2015/16) Adopted June 2015 Prepared by Community and Strategy Unit - Telephone:](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f033b507e708231d408301a/html5/thumbnails/32.jpg)
4-20 Eton Street, Sutherland NSW 2232Tel 02 9710 0333 Fax 02 9710 0265www.sutherlandshire.nsw.gov.au