Page 1: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

Delivering DigitalNOTAMs

Progress of Digital NOTAM

Development and Implementation

Presented By: Eduard Porosnicu (Eurocontrol)

Date: August 25th, 2014

Page 2: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

(International) NOTAM Trends

0

200.000

400.000

600.000

800.000

1.000.000

1.200.000

2006 2007 2008 2009 2010 2011 2012 2013

Nu

mb

er /

year

Europe (L+E+B)

Pacific (A+N+Y)

Asia (R+V+W+Z)

Russia + Central Asia (U)

Africa (D+F+G+H)

Mid Asia (O)

North America (C+K+P)

South + Central America (M+S+T)

TOTAL

Page 3: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

Content

• Digital NOTAM key principles• Benefits• Automatic data validation• Current situation in Europe• Challenges to implementation

Page 4: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

4

AIXM as data model

Airspace<<feature>>

OrganisationAuthority(f rom Organisation)

<<feature>>

AircraftCharacteristic

type : CodeAircraftTypeengine : CodeAircraftEngineTypenumberEngine : CodeAircraftEngineNumberTypetypeAircraftICAO : CodeAircraftICAOTypeaircraftLandingCategory : CodeAircraftCategoryTypewingSpan : ValDistanceTypewingSpanInterpretation : CodeValueInterpretationTypeclassWingSpan : CodeAircraftWingspanClassTypeweight : ValWeightTypeweightInterpretation : CodeValueInterpretationTypepassengers : NoNumberTypepassengersInterpretation : CodeValueInterpretationTypespeed : ValWeightTypespeedInterpretation : CodeValueInterpretationTypewakeTurbulence : CodeWakeTurbulenceType

(f rom Aircraf t and Flight)

<<object>>

AirspaceUsage<<feature>>

1

0..*

+restrictedAirspace

1

0..*isSpecifiedFor

AirspaceLayerUsage

activity : CodeAirspaceActivityTypestatusActivation : CodeAirspaceActivationTypetrafficAllowed : CodeMilitaryStatusType

<<object>>

0..*

0..*

0..*

+user 0..*

hasUser

0..*

+aircraft

0..*

involvesAircraft

1..*+usage 1..*

isComposedOf

Timetable

workingHours : CodeTimetableType

(f rom Time Management)

<<object>>

LayerAndTime

upperLimit : ValDistanceVerticalTypeupperLimitReference : CodeVerticalReferenceTypelowerLimit : ValDistanceVerticalTypelowerLimitReference : CodeVerticalReferenceTypealtitudeInterpretation : CodeAltitudeUseType

(f rom Lev el and Time Block)

<<object>>

0..* +levels0..*

concerns

0..1 +schedule0..1

isActiveBy

StandardLevelColumn

series : CodeLevelSeriesTypeunitOfMeasurement : UomDistanceVerticalTypeseparation : CodeRVSMType

(f rom Standard Lev els)

<<feature>>

0..*

0..1

0..*

+discreteLevelSeries 0..1

isRestrictedTo

UML

XSD

Temporality Concept

Page 5: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

5

XML/GML as data exchange format

Page 6: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

Harmonized coding rules - Digital NOTAM Event Specification

optional

optional, multiple End

optional

optional

optionaloptional optional

Example – Special Activity Area – activation

Page 7: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

AirspaceGeometryComponent

operation : CodeAirspaceAggregationTypeoperationSequence : NoSequenceType

<<object>>

AirspaceVolumeDependency

dependency : CodeAirspaceDependencyType

<<object>>

Surface(from Geometry)

<<object>>

AirspaceVolume

upperLimit : ValDistanceVerticalTypeupperLimitReference : CodeVerticalReferenceTypemaximumLimit : ValDistanceVerticalTypemaximumLimitReference : CodeVerticalReferenceTypelowerLimit : ValDistanceVerticalTypelowerLimitReference : CodeVerticalReferenceTypeminimumLimit : ValDistanceVerticalTypeminimumLimitReference : CodeVerticalReferenceTypewidth : ValDistanceType

<<object>>

0..1

1

+horizontalProjection 0..1

1

hasBoundary

Airspace

type : CodeAirspaceTypedesignator : CodeAirspaceDesignatorTypelocalType : TextNameTypename : TextNameTypedesignatorICAO : CodeYesNoTypecontrolType : CodeMilitaryOperationsTypeupperLowerSeparation : ValFLType

<<feature>>

0..1

0..*

+contributorAirspace

0..1

0..*

dependsOn

0..*+geometryComponent 0..*

hasGeometry

PropertiesWithSchedule(from Schedules)

<<object>>

AirspaceLayer

upperLimit : ValDistanceVerticalTypeupperLimitReference : CodeVerticalReferenceTypelowerLimit : ValDistanceVerticalTypelowerLimitReference : CodeVerticalReferenceTypealtitudeInterpretation : CodeAltitudeUseType

(from Airspace Layer)

<<object>>

AirspaceActivation

activity : CodeAirspaceActivityTypestatus : CodeStatusAirspaceType

<<object>>

0..*+activation 0..*

isActive

0..*+levels

0..*

concerns

AIXM Mapping

FLOOR - CEILING

typename

designator

activation status

schedule

activity type note

upper limit

lower limit

Page 8: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

Rules – data encoding

Page 9: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

AIXM Message

9

Page 10: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

A0001/14 NOTAMNQ)EADL/QRRCA/IV/BO/W/000/420/5221N00745W050A)EADL B)1406132300 C)1407010800D)DAILY 0000-0800 2300-2359E)RESTRICTED AREA R736AB TOWNSVILLE ACTIVE, MILITARY OPERATIONS.F) SFC G) FL420

Legacy NOTAM message(automatic generation)

Page 11: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

Benefits – data qualityDigital data: clearer / more precise than free text enables validation

automatic by the system visually by the operator

Page 12: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

12

Enhanced Pre-flight Information Bulletin

Phase of flight

Page 13: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

FAA vs. ICAO NOTAM –reconciliation through digital data

Page 14: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

Data validationIs it correct, complete, …

safe for intended use?

Page 15: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

Using SBVR• SBVR = (OMG) Semantics of Business Vocabulary and Business Rules

– defines the vocabulary and rules for documenting the semantics of business vocabularies, business facts, and business rules.

– http://www.omg.org/spec/SBVR/1.1/PDF

• Example– “The geometry of operational airspace of type CTA, UTA and OCA shall be encoded as an

aggregation of the corresponding operational SECTORS”

– Each Airspace.type equal-to ('CTA','UTA', 'OCA') shall have exactly one AirspaceGeometryComponent.operation equal-to 'BASE' and shall not have AirspaceGeometryComponent.operation equal-to ('INTERS', 'SUBSTR', 'OTHER') and shall have each AirspaceVolume.contributorAirspace.type equal-to 'SECTOR' and each AirspaceVolumeDependency.dependency equal-to 'FULL_GEOMETRY'

Free text

SBVR

Page 16: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

Digital NOTAM – specific rules

• “Notes contained in TimeSlice(s) associated with a Digital NOTAM Event shall be limited to the character set indicated in the Digital NOTAM Event Specification, Part 1, section ‘Character Set’”

• Each Note that is-descendant-of FeatureTimeslice that has assigned descendant event:theEvent shall not have assigned translatedNote.note using a different character from {'A','B','C','D','E','F','G','H','I','J','K','L','M','N','O','P','Q','R','S','T','U','V','W','X','Y','Z', 'a','b','c','d','e','f','g','h','i','j','k','l','m','n','o','p','q','r','s','t','u','v','w','x','y','z','0','1','2','3','4','5','6','7','8','9','-','?',':','(',')','.',',',"'",'=','/','+'}.

16

Free text

SBVR

Page 17: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

Digital NOTAM in Europe

• SESAR– Digital NOTAM Prototypes (Thales, Frequentis)– Digital Briefing Prototype (Frequentis)

• Other industry projects– IDS, Comsoft, SnowflakeSoftware, etc.– Likely to see on State going live in the next 12 months!

• OGC OWS test beds– See OWS-10 reports: visualisation, use of WFS, WS-N,

etc.

Page 18: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

Challenges

• Baseline data availability– Digital data correctness/completeness

• Re-training of operators– Stop thinking in ‘Q codes’– No longer access to manually modify the text

• Delegation of digitisation to data originators– Availability of tools– Fear of “loosing control”

• Stability of specifications– Early adoption comes with improvement

Page 19: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

• Digital NOTAM– the only way forward– has many benefits– it is feasible world-wide

• United States – Europe cooperation– key for the success of the project– FAA – Eurocontrol joint developments under Memorandum of

Cooperation, Action Plan 20

Conclusion

Page 20: Delivering Digital NOTAMs Progress of Digital NOTAM Development and Implementation Presented By: Eduard Porosnicu (Eurocontrol) Date: August 25 th, 2014

Questions