delhi development authority - online.dda.org.in...sw e w til y boundaries village zone forest land...
TRANSCRIPT
DELHI DEVELOPMENT AUTHORITY
KEY PLAN
P-II
SECTOR - 07
SECTOR - 15
SECTOR - 06
SECTOR - 05
SECTOR - 17
SECTOR - 04
SECTOR - 10
SECTOR - 18
SECTOR - 12
SECTOR - 03
SECTOR - 11
SECTOR - 08
SECTOR - 01
SECTOR - 09SECTOR - 13
SECTOR - 14
SECTOR - 02
SECTOR - 16
BURARI
KADI PUR
BAKOLI
BAKTAWARPUR
HIRANKIALIPUR
HAMIDPUR
TIGIPUR
JINDPUR
IBRAHIMPUR
SINGHOLA
MUKHMALPUR
MUKUNDPUR
BHALSWA JAHANGIRPUR
TAJPUR KALAN
LIBAS PUR
AKBARPURMAZARA
GADI KHASRO
KHAM PUR
NANGLI PUNA
SALEMPUR MAJRA BURARI
SAMAYPUR
BADLI
MOHAMMADPUR RAMJANPUR
JHARODA MAJRA BURARI
PALLA
SEERASPUR
FATEHPUR JAT
DHIRPUR
KAMALPUR MAJRA BURARI
BUDPUR BIJAPUR
SUNGARPUR - DELHI
PALLAAKBARPURMAZARA
TIKRI KHURD
DUSIB
DWG.NO.
Date
Dy. Dir(Plg.) Zone - PII
Director (Plg.)Land Policy/Zone - PII Commissioner(Plg.)
Plg. Asstt. Zone - PII
Asstt. Dir(Plg.)Zone - PII
Asstt. Dir(Plg.)Land Policy
UER-I 80 M R/W
PROPOSED BUND
GT KA
RNAL
ROAD
100 M
R/W
GT KA
RNAL
ROAD
100 M
R/W
ROAD
100 M
R/W
ROAD 90 M R/W
HARYANA
ROAD
60 M
R/W
ROAD
60 M
R/W
ROAD 40 M R/W
UER- III 80 M R/W
ROAD 30 M R/W
ROAD 30 M R/W
ROAD 40 M R/WROAD 40 M R/W
ROAD
30 M
R/WROAD 40
M R/W
ROAD 30 M R/W
ROAD 80 M R/W220 KV HT LINE400 KV HT LINE
220 KV HT LINE
220 KV HT LINE
220 KV HT LINE
To Am
bala
Ambala Rly. Line
S
S
SW
SW
W
Drain
Drain
Drain
Drain
UER- II 100 M R/W
ROAD 60 M R/W
Z O N E - CZ O N E - C
Z O N E - P - IZ O N E - P - I
Z O N E - OZ O N E - O
UER-I 80 M R/W
UER- II 100 M R/W
UER- III 80 M R/W
TO ROHINI
BHALSWA LAKE
DRAIN
RIVER
YAMU
NA
UTTARPRADESH
P-I
L
J
N
F
G EOD
HM C
P - I P - II
K - I BK - II
A
KEY PLAN
0 1 2 3 40.5Kms
SECTOR DELINEATION PLAN- ZONE P-II
Legend
Green BeltLDRALaldora/Extended Laldora
Existing Housing Scheme/ Other allotment
JhorDrain
River
Existing Utilities/SchemesGovernment Land(DDA, Other Govt & Gramsabha)
Road Network
Existing Physical Features
Proposed Road Existing Road
HT Lines with buffer
! ! ! DMRC Metro LineRailway Line
S W UtilityE SW
Boundaries
Village
Zone
Forest Land
Water Body
Sector
Sector Total Area in Ha. (Approx)
Vacant Area in Ha. (Approx)
1 275 1722 221 1403 311 2104 421 05 456 696 470 2317 554 2378 284 1239 268 148
10 362 16411 293 12312 336 19813 245 16514 244 22315 553 11016 195 2617 455 6718 342 42
I This drawing is specifically prepared only for the purpose of delineation of sector boundaries
II Presently NHAI is working on the feasibility of alignment of UER-II and changes based on the finalized alignment will be incorporated in the ZDP as per due procedure
III The sector boundaries may require readjustment depending upon ground realities.
IV The vacant land is approximate and is based on satellite imagery of 2015 available in ESRI Arc GIS Platform (open source).It is not indicative of the developable area under land pooling and may vary based on actual ground truthing.
V Vacant land on either side of existing road/natural features has been considered contiguous for sector delineation.
VI ROW of roads are as per Notified ZDP.
Notes