delegation notes 1

Upload: lokesh-narasimhaiah

Post on 03-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 Delegation Notes 1

    1/28

    DQS-ULM

    anagementSystemsSolutions

    Training Program

    on

    AS 9100- Rev C Implementation

    DQS-ULManagementSystemsSolutions

  • 7/28/2019 Delegation Notes 1

    2/28

    DQS-ULManagementSystemsSolutions

    I am

    DQS-ULManagementSystemsSolutions

    The differences between AS9100 Rev B & C.

    Required changes for the current Quality Manual.

    Road map for Upgrading to Rev C.

    Procedural requirements for Rev C.

    PROGRAM CONTENT

  • 7/28/2019 Delegation Notes 1

    3/28

    DQS-ULManagementSystemsSolutions

    AS9100 REVISION OBJECTIVES

    Incorporate ISO 9001 :2008 changes

    Expand the scope to include Land and Sea based systems

    for defense applications

    Ensure alignment with IAQG strategy (On time , on quality

    performance)

    Adopt new requirements based on stakeholder needs

    Improve existing requirements where stakeholders

    identified need for clarification, including when a

    documented procedure is required.

    DQS-ULManagementSystemsSolutions

    The Establishment of common requirements, for useThe Establishment of common requirements, for use

    at all levels of the supply chain, by the organizations around tat all levels of the supply chain, by the organizations around thehe

    globe, should result in:globe, should result in:

    Improved QualityImproved Quality

    Improved SafetyImproved Safety

    Decreased CostsDecreased Costs

    Reduction in customer specific requirementsReduction in customer specific requirements Reduce variationReduce variation

    AS9100 REVISION OBJECTIVES

  • 7/28/2019 Delegation Notes 1

    4/28

    DQS-ULManagementSystemsSolutions

    AS9100 Rev CAS9100 Rev CAS9100 Rev CAS9100 Rev C

    OverviewOverviewOverviewOverview

    DQS-ULManagementSystemsSolutions

    SUMMARY OF THE CHANGES

    6 ADDITIONS

    8 REVISIONS / RELOCATIONS

    3 DELETIONS

    AND AS9101D REQUIREMENTS

  • 7/28/2019 Delegation Notes 1

    5/28

    DQS-ULManagementSystemsSolutions

    6 ADDITIONS IN AS9100

    Clause 3.1 - Risk

    Clause 3.2 -Special Requirements

    Clause 3.3 - Critical Items

    Clauses 5.2/8.2.1 Customer Focus/Satisfaction

    Clause 7.1.1 - Project Management

    Clause 7.1.2 - Risk Management

    ADDITIONS

    DQS-ULManagementSystemsSolutions

    8 REVISIONS / RELOCATION IN AS9100

    Clause 1 - 9100 Scope and Application

    clause 4.1 QMS General requirements

    Clause7.1.3- Configuration Management

    Clause7.1.4 Work Transfer

    Clause 7.4.1 Recognition of Supplier Quality Data

    Clause 7.4.1 Approval status for suppliers

    Clause 7.5.1.1 Production Process Verification

    Clause 8.2.4 Sampling Inspection

    REVISION / RELOCATION

  • 7/28/2019 Delegation Notes 1

    6/28

    DQS-ULManagementSystemsSolutions

    3 DELETIONS AS PER AS 9100

    Clause 4.2.2 Quality Manual Relationships

    (Still available in AS9101)

    Clause 7.4.3 Validation of Test Reports

    Clause 8.2.2 Detailed Tools and Techniques

    (Process approach to be used for internal audit)

    DELETIONS

    DQS-ULManagementSystemsSolutions

    CHANGES IN DETAILCHANGES IN DETAILCHANGES IN DETAILCHANGES IN DETAIL

  • 7/28/2019 Delegation Notes 1

    7/28

    DQS-ULManagementSystemsSolutions

    TIME FRAME

    DQS-ULManagementSystemsSolutions

    Risk

    An undesirable situation or circumstance that has both a

    likelihood of occurring and a potentially negative consequence

    Special Requirements

    Those requirements identified by customers or determined by the

    organization, which have high risks to being achieved, thus

    requiring their inclusion in the risk management process.

    SOME IMPORTANT DEFINITIONS

  • 7/28/2019 Delegation Notes 1

    8/28

    DQS-ULManagementSystemsSolutions

    Critical Items

    Those items having significant effect on the product realization

    and use of the product; including safety, performance, form, fit,

    function, producilbility, service life etc.; that require specific

    actions to ensure they are adequately managed.

    Key Characteristics

    An attribute or feature whose variation has a significant effect on

    the product fit, form, function, performance, service life or

    producibility, that requires specific actions for the purpose ofcontrolling variations

    SOME IMPORTANT DEFINITIONS

    DQS-ULManagementSystemsSolutions

    SOME NEW REQUIREMENTS INTRODUCED

    IN AS9100 Rev C

  • 7/28/2019 Delegation Notes 1

    9/28

    DQS-ULManagementSystemsSolutions

    PROJECT MANAGEMENT

    Project Management

    As appropriate to the organization and the product, the

    organization shall plan and manage product realization in

    a structured and controlled manner to meet requirements at

    acceptable risk, within resource and schedule

    constraints.

    DQS-ULManagementSystemsSolutions

    1.Agree precise specification for the project - 'Terms of Reference'

    2.Plan the Project - time, team, activities, resources, financials -

    using suitable Project management tools

    3. Communicate the project plan to your project team - and to any

    other interested people and groups.

    4. Agree and delegate project actions.

    5. Manage and motivate - inform, encourage, enable the project

    team.

    6.Check, Measure, Monitor, Review project progress- adjust

    project plans, and inform the project team and others.

    7. Complete Project - review and report on project performance;

    give praise and thanks to the project team.

    8.Project followup - train, support, measure and report results and

    benefits.

    PROJECT MANAGEMENT PROCESS

  • 7/28/2019 Delegation Notes 1

    10/28

    DQS-ULManagementSystemsSolutions

    Critical path analysisGnatt Chart

    Cause & Effect diagram Brainstorming

    TOOLS FOR PROJECT MANAGEMENT

    DQS-ULManagementSystemsSolutions

    ***- Main Tool

    ** - Optional / Secondary Tool* - Sometimes Useful

    B- BrainstormingF- Fishbone Diagram

    C- Critical Path Analysis flow diagramG- Gantt Charts

    *****Format for communications, presentations, updates, progress reports,etc

    *****'Snapshot' or 'map' overview - non-sequential, non-scheduled

    ********Troubleshooting, problem identification, diagnosis and solutions

    ******Monitoring, forecasting, reporting

    *******Financials - costing, budgets, revenues, profits, variances, etc

    *****Identifying and sequencing parallel and interdependent activities and stages

    *****Scheduling and timescales

    ******Gathering and identifying all elements, especially causal and hidden factors

    *****Project brainstorming and initial concepts, ideas, structures, aims, etc

    GCFBTasks

    TOOLS FOR PROJECT MANAGEMENT

  • 7/28/2019 Delegation Notes 1

    11/28

    DQS-ULManagementSystemsSolutions

    WRITE A PROJECT PLAN USING ANY TOOL FOR THE

    FOLLOWING CASE

    EXERCISE

    Requirements

    -Delivery with in 30 days

    of receiving the PO

    -Lead time for

    procurement is 2 weeks

    -Involves mechanicalassembly (machining, HT,

    Painting), electrical assy

    and then testing .

    DQS-ULManagementSystemsSolutions

    RISK MANAGEMENT

    The organization shall establish, implement and maintain a process

    for managing risk to the achievement of applicable requirements,

    that includes as appropriate to the organization and the product

    a) assignment of responsibilities for risk management,

    b) definition of risk criteria (e.g., likelihood, consequences, risk

    acceptance),

    c) identification, assessment and communication of risks throughout

    product realization,

    d) identification, implementation and management of actions to

    mitigate risks that exceed the defined risk acceptance

    criteria, and

    e) acceptance of risks remaining after implementation of mitigating

    actions.

  • 7/28/2019 Delegation Notes 1

    12/28

    DQS-ULManagementSystemsSolutions

    RISK MANAGEMENT PROCESSRISK MANAGEMENT PROCESS

    DQS-ULManagementSystemsSolutions

    RISK MANAGEMENT PROCESSRISK MANAGEMENT PROCESS

    Risk Planning

    The step of developing and documenting comprehensive and interactive strategiesand methods for identifying and tracking risk areas, training, developing riskmitigation plans, performing risk assessments to determine how risks havechanged, and planning/obtaining adequate resources.

    Risk Identification

    The step of discovering and defining all risks inherent in your program or project.

    Risk Assessment

    The process of analyzing and prioritizing program and process risks against cost,schedule and/or performance criteria.

    Risk Handling The step that identifies, evaluates, selects, and implements actions in order to

    reduce risk likelihood or consequence to an acceptable level.

    Risk Monitoring

    The step that systematically tracks and evaluates the performance of Risk Handlingactions against established metrics throughout the acquisition process.

  • 7/28/2019 Delegation Notes 1

    13/28

    DQS-ULManagementSystemsSolutions

    Complexity of Design

    Criticality of Product for End Use

    New or Unproven Process or Technology

    Organizational Capability to Design or Build Product

    New or Unproven Process to Organization

    New Technology to Company

    Items or Requirements That are Candidates for Risk

    Management Processes

    Others??

    RISK MANAGEMENT PROCESSRISK MANAGEMENT PROCESS

    DQS-ULManagementSystemsSolutions

    Identification

    Discovering and defining all risks inherent in your program,project, process, or task.

    Communication

    Communicating Risks to all Relevant Individuals andProcesses

    Risk Understanding

    Understanding the Risks and How they affect your Function orProcess

    Decision Making (Risk Based)

    Making Choices on application of Individual Options and

    Process Options Risk Behaviors

    Knowledge of Identified Risks

    Knowledge of Process Options

    Application of Identified Risk Topics to Process Options

    RISK MANAGEMENT PROCESSRISK MANAGEMENT PROCESS

  • 7/28/2019 Delegation Notes 1

    14/28

    DQS-ULManagementSystemsSolutions

    Proposal Contract Design Manufact.ProductDelivery

    Integrate

    Purchasing

    All Requirements are not created equal

    Monitoring and Inspection Activities

    Operational Options that Need RiskOriented Decisions associated withCritical Requirements

    Design Approach

    V&V Approach

    Monitor & Insp. Approach

    Supplier Oversight

    RFQ

    Suppliers

    Communication ofSupplier Requirements

    -Key Characteristics-

    WhereIdentified

    HowCommunicated

    WhatDecisions

    RISK MANAGEMENT PROCESSRISK MANAGEMENT PROCESS

    DQS-ULManagementSystemsSolutions

    Identify risk in the following areas/process/ functions:

    HR, Purchase, Supplier, Manufacturing, Process

    Engineering, Design & development, Quality, Dispatch

    And identify mitigation plan for them.

    EXERCISE

  • 7/28/2019 Delegation Notes 1

    15/28

    DQS-ULManagementSystemsSolutions

    The organization shall establish, implement and maintain a

    configuration management process that includes, as

    appropriate to the product

    a) configuration management planning,

    b) configuration identification,

    c) change control,

    d) configuration status accounting, and

    e) configuration audit.

    CONFIGURATION MANAGEMENT

    DQS-ULManagementSystemsSolutions

    Identify configurable items in your organization and prepare a

    plan for configuration management

    (Configuration management plan is a document defining how

    configuration management will be implemented including

    policies and procedures for a particular acquisition

    or program)

    EXERCISE

  • 7/28/2019 Delegation Notes 1

    16/28

    DQS-ULManagementSystemsSolutions

    PROCEDURAL REQUIREMENTS FOR AS9100 Rev C

    DQS-ULManagementSystemsSolutions

    STEP-I

    Revise Manual to AS9100 rev C

    Revisit to manual for various new clause requirements ,

    relocations and deletion with respect to Rev C of the standard

  • 7/28/2019 Delegation Notes 1

    17/28

    DQS-ULManagementSystemsSolutions

    STEP-II

    MODIFY PROCESS AS PER AS9101 Rev D

    DQS-ULManagementSystemsSolutions

    a) are identified and appropriately defined;

    Should be based on Process and not on departments

    Eg: Purchase department can be

    - Purchase process,

    - Supplier management Process (selection, evaluation and re

    evaluation)

    PROCESS REQUIREMENTS

  • 7/28/2019 Delegation Notes 1

    18/28

    DQS-ULManagementSystemsSolutions

    LIST THE PROCESS IN YOUR ORGANIZATION

    EXERCISE

    DQS-ULManagementSystemsSolutions

    b) are sequenced and interactions are defined

    (see 9100-series standards, clause 4.1.b);

    PROCESS REQUIREMENTS

  • 7/28/2019 Delegation Notes 1

    19/28

    DQS-ULManagementSystemsSolutions

    FOR THE LISTED PROCESS MAP THE INTERACTIONS

    EXERCISE

    DQS-ULManagementSystemsSolutions

    c) have responsibilities assigned and responsible functions identified;

    PROCESS REQUIREMENTS

  • 7/28/2019 Delegation Notes 1

    20/28

    DQS-ULManagementSystemsSolutions

    SELECT ONE ACTIVITY LIKE WRITING PROCESS

    SHEET AND WRITE THE REPONSIBILITY OF EACH

    PROCESS INVOVLED

    EXERCISE

    DQS-ULManagementSystemsSolutions

    d) have relevant process controls defined;

    E.g.:

    1. Assembly Process :First Time Pass in Final Testing

    2. Assembly Inspection : Cycle time for inspection

    3. Recruitment Process : To hire the specified man power

    in a year = (No. Hired / no.

    Planned) x 100Target: >90%

    PROCESS REQUIREMENTS

  • 7/28/2019 Delegation Notes 1

    21/28

    DQS-ULManagementSystemsSolutions

    Try to keep the controls (Objectives/ Targets) SMART

    1. Specific Objectives should specify what they want to

    achieve.

    2. Measurable You should be able to measure whether you are

    meeting the objectives or not.

    3. Achievable - Are the objectives you set, achievable and

    attainable?

    4. Realistic Can you realistically achieve the objectives with

    the resources you have?5. Time When do you want to achieve the set objectives?

    PROCESS REQUIREMENTS

    DQS-ULManagementSystemsSolutions

    e) have the availability of resources and information required to

    operate and support associated activities, including appropriate

    training and competency of personnel;

    Eg: For Configuration Management Process the resources are

    Configuration Management tool for version controlling

    CSRM & List of CI template

    CR Log, PCA/FCA

    Traceability Matrix

    Personnel with training on Configuration Management

    PROCESS REQUIREMENTS

  • 7/28/2019 Delegation Notes 1

    22/28

    DQS-ULManagementSystemsSolutions

    f) are monitored, measured, and analyzed against planned results(determination of process effectiveness);

    Eg: 1.To hire the specified man power in a year = (No. Hired / no.

    Planned) x 100

    Target: >90% actual : 100%

    2. No. of Projects delivered on time to total no. of projects

    should be >85% actual 86%

    This should be defined for all the process identified in the QMS

    and need to be monitored, measured and analyzed against planned

    result.

    PROCESS REQUIREMENTS

    DQS-ULManagementSystemsSolutions

    g) have actions implemented to achieve planned results and

    to promote continual improvement; and

    Eg : No. of Projects delivered on time to total no. of projects should

    be >85%

    Actual : Q1 : 84% Q2 : 75%

    Then need to take a action

    option 1: out source some of the activity,Option 2: have an extra shift for completion of task

    And have a follow up regularly as per the project plan

    PROCESS REQUIREMENTS

  • 7/28/2019 Delegation Notes 1

    23/28

    DQS-ULManagementSystemsSolutions

    h) are effective in achieving the desired results (e.g., verifyperformance information available - percentage of nonconforming

    parts/products, percentage OTD).

    PROCESS REQUIREMENTS

    DQS-ULManagementSystemsSolutions

    TOOL which can help in defining the process as per Rev C

    and a tool for conducting internal audit.

  • 7/28/2019 Delegation Notes 1

    24/28

    DQS-ULManagementSystemsSolutions

    SAMPLE TURTLE

    DQS-ULManagementSystemsSolutions

    SELECT A PROCESS AND COMPLETE THE PROCESS

    TURTLE, COMPELTING ALL THE FIELDS IN THE

    TURTLE

    EXERCISE

  • 7/28/2019 Delegation Notes 1

    25/28

    DQS-ULManagementSystemsSolutions

    A tool which helps in rating my process performance

    PEAR

    DQS-ULManagementSystemsSolutions

    Example

    PEAR

  • 7/28/2019 Delegation Notes 1

    26/28

    DQS-ULManagementSystemsSolutions

    EXERCISE

    Try to complete the PEAR for the process for which you

    completed the turtle

    DQS-ULManagementSystemsSolutions

    1. Check the QMS by answering OER of AS9101 D

    2. Release the revised QMS for use.

    3. Conduct an internal audit using turtles as tools

    4. Try to collect previous 12months data for process

    and do a analysis as per set controls.

    5. Close all the NCs by correcting the process and try

    to rate the NCs as defined in AS9101D

    STEP-III

  • 7/28/2019 Delegation Notes 1

    27/28

    DQS-ULManagementSystemsSolutions

    That completes the implementation of AS9100 Rev C

    DQS-ULManagementSystemsSolutions

    BRAINSTROMING SESSIONBRAINSTROMING SESSIONBRAINSTROMING SESSIONBRAINSTROMING SESSION

  • 7/28/2019 Delegation Notes 1

    28/28

    DQS-ULManagementSystemsSolutions

    THANK YOUTHANK YOUTHANK YOUTHANK YOU