The differences between AS9100 Rev B & C.
Required changes for the current Quality Manual.
Road map for Upgrading to Rev C.
Procedural requirements for Rev C.
PROGRAM CONTENT
-
7/28/2019 Delegation Notes 1
3/28
DQS-ULManagementSystemsSolutions
AS9100 REVISION OBJECTIVES
Incorporate ISO 9001 :2008 changes
Expand the scope to include Land and Sea based systems
for defense applications
Ensure alignment with IAQG strategy (On time , on quality
performance)
Adopt new requirements based on stakeholder needs
Improve existing requirements where stakeholders
identified need for clarification, including when a
documented procedure is required.
DQS-ULManagementSystemsSolutions
The Establishment of common requirements, for useThe Establishment of common requirements, for use
at all levels of the supply chain, by the organizations around tat all levels of the supply chain, by the organizations around thehe
globe, should result in:globe, should result in:
Improved QualityImproved Quality
Improved SafetyImproved Safety
Decreased CostsDecreased Costs
Reduction in customer specific requirementsReduction in customer specific requirements Reduce variationReduce variation
AS9100 REVISION OBJECTIVES
-
7/28/2019 Delegation Notes 1
4/28
DQS-ULManagementSystemsSolutions
AS9100 Rev CAS9100 Rev CAS9100 Rev CAS9100 Rev C
OverviewOverviewOverviewOverview
DQS-ULManagementSystemsSolutions
SUMMARY OF THE CHANGES
6 ADDITIONS
8 REVISIONS / RELOCATIONS
3 DELETIONS
AND AS9101D REQUIREMENTS
-
7/28/2019 Delegation Notes 1
5/28
DQS-ULManagementSystemsSolutions
6 ADDITIONS IN AS9100
Clause 3.1 - Risk
Clause 3.2 -Special Requirements
Clause 3.3 - Critical Items
Clauses 5.2/8.2.1 Customer Focus/Satisfaction
Clause 7.1.1 - Project Management
Clause 7.1.2 - Risk Management
ADDITIONS
DQS-ULManagementSystemsSolutions
8 REVISIONS / RELOCATION IN AS9100
Clause 1 - 9100 Scope and Application
clause 4.1 QMS General requirements
Clause7.1.3- Configuration Management
Clause7.1.4 Work Transfer
Clause 7.4.1 Recognition of Supplier Quality Data
Clause 7.4.1 Approval status for suppliers
Clause 7.5.1.1 Production Process Verification
Clause 8.2.4 Sampling Inspection
REVISION / RELOCATION
-
7/28/2019 Delegation Notes 1
6/28
DQS-ULManagementSystemsSolutions
3 DELETIONS AS PER AS 9100
Clause 4.2.2 Quality Manual Relationships
(Still available in AS9101)
Clause 7.4.3 Validation of Test Reports
Clause 8.2.2 Detailed Tools and Techniques
(Process approach to be used for internal audit)
DELETIONS
DQS-ULManagementSystemsSolutions
CHANGES IN DETAILCHANGES IN DETAILCHANGES IN DETAILCHANGES IN DETAIL
-
7/28/2019 Delegation Notes 1
7/28
DQS-ULManagementSystemsSolutions
TIME FRAME
DQS-ULManagementSystemsSolutions
Risk
An undesirable situation or circumstance that has both a
likelihood of occurring and a potentially negative consequence
Special Requirements
Those requirements identified by customers or determined by the
organization, which have high risks to being achieved, thus
requiring their inclusion in the risk management process.
SOME IMPORTANT DEFINITIONS
-
7/28/2019 Delegation Notes 1
8/28
DQS-ULManagementSystemsSolutions
Critical Items
Those items having significant effect on the product realization
and use of the product; including safety, performance, form, fit,
function, producilbility, service life etc.; that require specific
actions to ensure they are adequately managed.
Key Characteristics
An attribute or feature whose variation has a significant effect on
the product fit, form, function, performance, service life or
producibility, that requires specific actions for the purpose ofcontrolling variations
SOME IMPORTANT DEFINITIONS
DQS-ULManagementSystemsSolutions
SOME NEW REQUIREMENTS INTRODUCED
IN AS9100 Rev C
-
7/28/2019 Delegation Notes 1
9/28
DQS-ULManagementSystemsSolutions
PROJECT MANAGEMENT
Project Management
As appropriate to the organization and the product, the
organization shall plan and manage product realization in
a structured and controlled manner to meet requirements at
acceptable risk, within resource and schedule
constraints.
DQS-ULManagementSystemsSolutions
1.Agree precise specification for the project - 'Terms of Reference'
2.Plan the Project - time, team, activities, resources, financials -
using suitable Project management tools
3. Communicate the project plan to your project team - and to any
other interested people and groups.
4. Agree and delegate project actions.
5. Manage and motivate - inform, encourage, enable the project
team.
6.Check, Measure, Monitor, Review project progress- adjust
project plans, and inform the project team and others.
7. Complete Project - review and report on project performance;
give praise and thanks to the project team.
8.Project followup - train, support, measure and report results and
benefits.
PROJECT MANAGEMENT PROCESS
-
7/28/2019 Delegation Notes 1
10/28
DQS-ULManagementSystemsSolutions
Critical path analysisGnatt Chart
Cause & Effect diagram Brainstorming
TOOLS FOR PROJECT MANAGEMENT
DQS-ULManagementSystemsSolutions
***- Main Tool
** - Optional / Secondary Tool* - Sometimes Useful
B- BrainstormingF- Fishbone Diagram
C- Critical Path Analysis flow diagramG- Gantt Charts
*****Format for communications, presentations, updates, progress reports,etc
*****'Snapshot' or 'map' overview - non-sequential, non-scheduled
********Troubleshooting, problem identification, diagnosis and solutions
******Monitoring, forecasting, reporting
*******Financials - costing, budgets, revenues, profits, variances, etc
*****Identifying and sequencing parallel and interdependent activities and stages
*****Scheduling and timescales
******Gathering and identifying all elements, especially causal and hidden factors
*****Project brainstorming and initial concepts, ideas, structures, aims, etc
GCFBTasks
TOOLS FOR PROJECT MANAGEMENT
-
7/28/2019 Delegation Notes 1
11/28
DQS-ULManagementSystemsSolutions
WRITE A PROJECT PLAN USING ANY TOOL FOR THE
FOLLOWING CASE
EXERCISE
Requirements
-Delivery with in 30 days
of receiving the PO
-Lead time for
procurement is 2 weeks
-Involves mechanicalassembly (machining, HT,
Painting), electrical assy
and then testing .
DQS-ULManagementSystemsSolutions
RISK MANAGEMENT
The organization shall establish, implement and maintain a process
for managing risk to the achievement of applicable requirements,
that includes as appropriate to the organization and the product
a) assignment of responsibilities for risk management,
b) definition of risk criteria (e.g., likelihood, consequences, risk
acceptance),
c) identification, assessment and communication of risks throughout
product realization,
d) identification, implementation and management of actions to
mitigate risks that exceed the defined risk acceptance
criteria, and
e) acceptance of risks remaining after implementation of mitigating
actions.
-
7/28/2019 Delegation Notes 1
12/28
DQS-ULManagementSystemsSolutions
RISK MANAGEMENT PROCESSRISK MANAGEMENT PROCESS
DQS-ULManagementSystemsSolutions
RISK MANAGEMENT PROCESSRISK MANAGEMENT PROCESS
Risk Planning
The step of developing and documenting comprehensive and interactive strategiesand methods for identifying and tracking risk areas, training, developing riskmitigation plans, performing risk assessments to determine how risks havechanged, and planning/obtaining adequate resources.
Risk Identification
The step of discovering and defining all risks inherent in your program or project.
Risk Assessment
The process of analyzing and prioritizing program and process risks against cost,schedule and/or performance criteria.
Risk Handling The step that identifies, evaluates, selects, and implements actions in order to
reduce risk likelihood or consequence to an acceptable level.
Risk Monitoring
The step that systematically tracks and evaluates the performance of Risk Handlingactions against established metrics throughout the acquisition process.
-
7/28/2019 Delegation Notes 1
13/28
DQS-ULManagementSystemsSolutions
Complexity of Design
Criticality of Product for End Use
New or Unproven Process or Technology
Organizational Capability to Design or Build Product
New or Unproven Process to Organization
New Technology to Company
Items or Requirements That are Candidates for Risk
Management Processes
Others??
RISK MANAGEMENT PROCESSRISK MANAGEMENT PROCESS
DQS-ULManagementSystemsSolutions
Identification
Discovering and defining all risks inherent in your program,project, process, or task.
Communication
Communicating Risks to all Relevant Individuals andProcesses
Risk Understanding
Understanding the Risks and How they affect your Function orProcess
Decision Making (Risk Based)
Making Choices on application of Individual Options and
Process Options Risk Behaviors
Knowledge of Identified Risks
Knowledge of Process Options
Application of Identified Risk Topics to Process Options
RISK MANAGEMENT PROCESSRISK MANAGEMENT PROCESS
-
7/28/2019 Delegation Notes 1
14/28
DQS-ULManagementSystemsSolutions
Proposal Contract Design Manufact.ProductDelivery
Integrate
Purchasing
All Requirements are not created equal
Monitoring and Inspection Activities
Operational Options that Need RiskOriented Decisions associated withCritical Requirements
Design Approach
V&V Approach
Monitor & Insp. Approach
Supplier Oversight
RFQ
Suppliers
Communication ofSupplier Requirements
-Key Characteristics-
WhereIdentified
HowCommunicated
WhatDecisions
RISK MANAGEMENT PROCESSRISK MANAGEMENT PROCESS
DQS-ULManagementSystemsSolutions
Identify risk in the following areas/process/ functions:
HR, Purchase, Supplier, Manufacturing, Process
Engineering, Design & development, Quality, Dispatch
And identify mitigation plan for them.
EXERCISE
-
7/28/2019 Delegation Notes 1
15/28
DQS-ULManagementSystemsSolutions
The organization shall establish, implement and maintain a
configuration management process that includes, as
appropriate to the product
a) configuration management planning,
b) configuration identification,
c) change control,
d) configuration status accounting, and
e) configuration audit.
CONFIGURATION MANAGEMENT
DQS-ULManagementSystemsSolutions
Identify configurable items in your organization and prepare a
plan for configuration management
(Configuration management plan is a document defining how
configuration management will be implemented including
policies and procedures for a particular acquisition
or program)
EXERCISE
-
7/28/2019 Delegation Notes 1
16/28
DQS-ULManagementSystemsSolutions
PROCEDURAL REQUIREMENTS FOR AS9100 Rev C
DQS-ULManagementSystemsSolutions
STEP-I
Revise Manual to AS9100 rev C
Revisit to manual for various new clause requirements ,
relocations and deletion with respect to Rev C of the standard
-
7/28/2019 Delegation Notes 1
17/28
DQS-ULManagementSystemsSolutions
STEP-II
MODIFY PROCESS AS PER AS9101 Rev D
DQS-ULManagementSystemsSolutions
a) are identified and appropriately defined;
Should be based on Process and not on departments
Eg: Purchase department can be
- Purchase process,
- Supplier management Process (selection, evaluation and re
evaluation)
PROCESS REQUIREMENTS
-
7/28/2019 Delegation Notes 1
18/28
DQS-ULManagementSystemsSolutions
LIST THE PROCESS IN YOUR ORGANIZATION
EXERCISE
DQS-ULManagementSystemsSolutions
b) are sequenced and interactions are defined
(see 9100-series standards, clause 4.1.b);
PROCESS REQUIREMENTS
-
7/28/2019 Delegation Notes 1
19/28
DQS-ULManagementSystemsSolutions
FOR THE LISTED PROCESS MAP THE INTERACTIONS
EXERCISE
DQS-ULManagementSystemsSolutions
c) have responsibilities assigned and responsible functions identified;
PROCESS REQUIREMENTS
-
7/28/2019 Delegation Notes 1
20/28
DQS-ULManagementSystemsSolutions
SELECT ONE ACTIVITY LIKE WRITING PROCESS
SHEET AND WRITE THE REPONSIBILITY OF EACH
PROCESS INVOVLED
EXERCISE
DQS-ULManagementSystemsSolutions
d) have relevant process controls defined;
E.g.:
1. Assembly Process :First Time Pass in Final Testing
2. Assembly Inspection : Cycle time for inspection
3. Recruitment Process : To hire the specified man power
in a year = (No. Hired / no.
Planned) x 100Target: >90%
PROCESS REQUIREMENTS
-
7/28/2019 Delegation Notes 1
21/28
DQS-ULManagementSystemsSolutions
Try to keep the controls (Objectives/ Targets) SMART
1. Specific Objectives should specify what they want to
achieve.
2. Measurable You should be able to measure whether you are
meeting the objectives or not.
3. Achievable - Are the objectives you set, achievable and
attainable?
4. Realistic Can you realistically achieve the objectives with
the resources you have?5. Time When do you want to achieve the set objectives?
PROCESS REQUIREMENTS
DQS-ULManagementSystemsSolutions
e) have the availability of resources and information required to
operate and support associated activities, including appropriate
training and competency of personnel;
Eg: For Configuration Management Process the resources are
Configuration Management tool for version controlling
CSRM & List of CI template
CR Log, PCA/FCA
Traceability Matrix
Personnel with training on Configuration Management
PROCESS REQUIREMENTS
-
7/28/2019 Delegation Notes 1
22/28
DQS-ULManagementSystemsSolutions
f) are monitored, measured, and analyzed against planned results(determination of process effectiveness);
Eg: 1.To hire the specified man power in a year = (No. Hired / no.
Planned) x 100
Target: >90% actual : 100%
2. No. of Projects delivered on time to total no. of projects
should be >85% actual 86%
This should be defined for all the process identified in the QMS
and need to be monitored, measured and analyzed against planned
result.
PROCESS REQUIREMENTS
DQS-ULManagementSystemsSolutions
g) have actions implemented to achieve planned results and
to promote continual improvement; and
Eg : No. of Projects delivered on time to total no. of projects should
be >85%
Actual : Q1 : 84% Q2 : 75%
Then need to take a action
option 1: out source some of the activity,Option 2: have an extra shift for completion of task
And have a follow up regularly as per the project plan
PROCESS REQUIREMENTS
-
7/28/2019 Delegation Notes 1
23/28
DQS-ULManagementSystemsSolutions
h) are effective in achieving the desired results (e.g., verifyperformance information available - percentage of nonconforming
parts/products, percentage OTD).
PROCESS REQUIREMENTS
DQS-ULManagementSystemsSolutions
TOOL which can help in defining the process as per Rev C
and a tool for conducting internal audit.
-
7/28/2019 Delegation Notes 1
24/28
DQS-ULManagementSystemsSolutions
SAMPLE TURTLE
DQS-ULManagementSystemsSolutions
SELECT A PROCESS AND COMPLETE THE PROCESS
TURTLE, COMPELTING ALL THE FIELDS IN THE
TURTLE
EXERCISE
-
7/28/2019 Delegation Notes 1
25/28
DQS-ULManagementSystemsSolutions
A tool which helps in rating my process performance
PEAR
DQS-ULManagementSystemsSolutions
Example
PEAR
-
7/28/2019 Delegation Notes 1
26/28
DQS-ULManagementSystemsSolutions
EXERCISE
Try to complete the PEAR for the process for which you
completed the turtle
DQS-ULManagementSystemsSolutions
1. Check the QMS by answering OER of AS9101 D
2. Release the revised QMS for use.
3. Conduct an internal audit using turtles as tools
4. Try to collect previous 12months data for process
and do a analysis as per set controls.
5. Close all the NCs by correcting the process and try
to rate the NCs as defined in AS9101D
STEP-III
-
7/28/2019 Delegation Notes 1
27/28
DQS-ULManagementSystemsSolutions
That completes the implementation of AS9100 Rev C
DQS-ULManagementSystemsSolutions
BRAINSTROMING SESSIONBRAINSTROMING SESSIONBRAINSTROMING SESSIONBRAINSTROMING SESSION
-
7/28/2019 Delegation Notes 1
28/28
DQS-ULManagementSystemsSolutions
THANK YOUTHANK YOUTHANK YOUTHANK YOU