delegated decisions cen - araco.org 08. 2016/05/cen dispatch... · subject: cen/tc 127 - adoption...

24
DDD 33 2016 2016-08-16 Page 1 CEN System – Delegated Decisions Dispatch 33:2016 1 CEN/TC 127 – Correspondence ............................................................................................................ 1 2 CEN/TC 147 – Correspondence ............................................................................................................ 9 3 CEN/TC 160 – Correspondence .......................................................................................................... 10 4 CEN/TC 182 – Correspondence .......................................................................................................... 12 5 CEN/TC 278 – Correspondence .......................................................................................................... 12 6 CEN/TC 286 – Correspondence .......................................................................................................... 13 7 CEN/TC 317 – Correspondence .......................................................................................................... 16 8 CEN/TC 413 – Correspondence .......................................................................................................... 16 9 CEN/TC 434 – Correspondence .......................................................................................................... 18 10 CEN/TC 444 – Correspondence .......................................................................................................... 24 1 CEN/TC 127 – Correspondence Decision CEN/TC 127 927/2016 taken on 2016-05-19 Subject: CEN/TC 127 - Adoption of a New Work Item CEN/TC 127 - Fire safety in buildings having considered the proposal for a new work item as documented in CEN/TC 127 N 2947 having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS confirming that the new work item falls within its scope confirming that the new work item corresponds to real market needs confirming that the resources to complete the work below are available decides to register the work item described below in its active programme of work Section Details 1. Deliverable EN 2. This item corresponds to the revision of an EN. EN 1366-3:2009 3. Document developed in drafting body CEN/TC 127/WG 2 - Services 4. Title Fire resistance tests for service installations - Part 3: Penetration seals 5. Scope This Part of EN 1366 specifies a method of test and criteria for the evaluation (including field of application rules) of the ability of a penetration seal to maintain the fire resistance of a separating element at the position at which it has been penetrated by a service. Penetration seals used to seal gaps around chimneys, air ventilation systems, fire rated ventilation ducts, fire rated service ducts, shafts and smoke extraction ducts are excluded from this standard except for mixed penetration seals. The fire resistance of those services itself cannot be assessed with the methods described in this standard. Supporting constructions are used in

Upload: phungminh

Post on 15-Jul-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

DDD 33 2016

2016-08-16 Page 1

CEN System – Delegated Decisions Dispatch 33:2016

1 CEN/TC 127 – Correspondence ............................................................................................................ 1 2 CEN/TC 147 – Correspondence ............................................................................................................ 9 3 CEN/TC 160 – Correspondence .......................................................................................................... 10 4 CEN/TC 182 – Correspondence .......................................................................................................... 12 5 CEN/TC 278 – Correspondence .......................................................................................................... 12 6 CEN/TC 286 – Correspondence .......................................................................................................... 13 7 CEN/TC 317 – Correspondence .......................................................................................................... 16 8 CEN/TC 413 – Correspondence .......................................................................................................... 16 9 CEN/TC 434 – Correspondence .......................................................................................................... 18 10 CEN/TC 444 – Correspondence .......................................................................................................... 24

1 CEN/TC 127 – Correspondence

Decision CEN/TC 127 927/2016 taken on 2016-05-19

Subject: CEN/TC 127 - Adoption of a New Work Item

CEN/TC 127 - Fire safety in buildings

• having considered the proposal for a new work item as documented in CEN/TC 127 N 2947

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN.

EN 1366-3:2009

3. Document developed in drafting body

CEN/TC 127/WG 2 - Services

4. Title Fire resistance tests for service installations - Part 3: Penetration seals

5. Scope This Part of EN 1366 specifies a method of test and criteria for the evaluation (including field of application rules) of the ability of a penetration seal to maintain the fire resistance of a separating element at the position at which it has been penetrated by a service. Penetration seals used to seal gaps around chimneys, air ventilation systems, fire rated ventilation ducts, fire rated service ducts, shafts and smoke extraction ducts are excluded from this standard except for mixed penetration seals. The fire resistance of those services itself cannot be assessed with the methods described in this standard. Supporting constructions are used in

DDD 33 2016 Page 2

Section Details

this standard to represent separating elements such as walls or floors. These simulate the interaction between the test specimen and the separating element into which the sealing system is to be installed in practice. This European Standard is used in conjunction with EN 1363-1. The purpose of this test described in this standard is to assess: a) the effect of such penetrations on the integrity and insulation performance of the separating element concerned; b) the integrity and insulation performance of the penetration seal; c) the insulation performance of the penetrating service or services, and where necessary, the integrity failure of a service. No information can be implied by the test concerning the influence of the inclusion of such penetrations and sealing systems on the loadbearing capacity of the separating element. It is not the intention of this test to provide quantitative information on the rate of leakage of smoke and/or hot gases or on the transmission or generation of fumes. Such phenomena are only to be noted in describing the general behaviour of test specimens during the test. This test is not intended to supply any information on the ability of the penetration seal to withstand stress caused by movements or displacements of the penetrating services.

6. Environmental aspects

Other effects on biodiversity Use of materials Waste Risk to the environment from accidents/misuse

7. How do you plan to address these environmental aspects?

Other: WG experts

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

Yes

M/117

12. Related directive(s)

Yes

Directive reference For citation in Official Journal

305/2011 No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR BSI DIN DS NBN NEN SFS SIS SN UNMZ

14. The decision was taken by

Weighted vote and simple majority Percentage of positive weighted votes (min. 71%): 100 Number of positive votes: 10 Number of negative votes: 0 Number of abstentions: 0

DDD 33 2016 Page 3

Decision CEN/TC 127 928/2016 taken on 2016-05-19

Subject: CEN/TC 127 - Adoption of a New Work Item

CEN/TC 127 - Fire safety in buildings

• having considered the proposal for a new work item as documented in CEN/TC 127 N 2947

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN.

EN 1366-5:2010

3. Document developed in drafting body

CEN/TC 127/WG 2 - Services

4. Title Fire resistance tests for service installations - Part 5: Service ducts and shafts

5. Scope This European Standard specifies a method for determining the fire resistance of horizontal service ducts and vertical service shafts, which pass through walls or floors and enclose pipes and cables. The test examines the behaviour of ducts and shafts exposed to fire from outside and from inside the duct. This European Standard is intended to be read in conjunction with EN 1363-1. This European Standard does not examine the risk of fire spread as a result of thermal conduction along the piping installed in service ducts or shafts, or thermal conduction through the media these pipes carry. It does not cover the risk of damage produced by thermal elongation or shortening of tubes and cables as a result of fire, or damaged pipe suspensions. This European Standard does not give guidance on how to test one, two or three sided service ducts or shafts. NOTE Guidance on testing service ducts and shafts of less than four sides will be covered in the extended field of application rules being developed by CEN/TC 127. This test is unsuitable for evaluating service ducts with internal barriers at walls and floors. Whilst the walls of service ducts or shafts tested to this method may provide specified levels of integrity or insulation, testing to this European Standard does not replace the testing of the functional endurance of small electrical cables which is covered in EN 50200. Fire resistance testing of ducts for air distribution systems is covered in EN 1366-1.

6. Environmental aspects

Other effects on biodiversity Use of materials Waste Risk to the environment from accidents/misuse

7. How do you plan to address these environmental aspects?

Other: WG experts

8.Vienna Agreement No or expected CEN lead

9.The project is linked No document from another organization

DDD 33 2016 Page 4

Section Details

to

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

Yes

M/117

12. Related directive(s)

Yes

Directive reference For citation in Official Journal

305/2011 No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR BSI DIN DS NBN NEN SFS SIS SN UNMZ

14. The decision was taken by

Weighted vote and simple majority Percentage of positive weighted votes (min. 71%): 100 Number of positive votes: 10 Number of negative votes: 0 Number of abstentions: 0

Decision CEN/TC 127 929/2016 taken on 2016-05-19

Subject: CEN/TC 127 - Adoption of a Preliminary Work Item

CEN/TC 127 - Fire safety in buildings

• having considered the proposal for a new work item as documented in CEN/TC 127 N 2947

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• decides to register the subject described below as a potential future new work item in its programme of work (at the preliminary stage (00.60 = date of decision)).

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN.

EN 15882-3:2009

3. Document developed in drafting body

CEN/TC 127/WG 2 - Services

4. Title Extended applications of results from fire resistance tests for service installations - Part 3: Penetration seals

5. Scope The purpose of this European Standard is to provide the principles and guidance for the preparation of extended application documents for penetration sealing

DDD 33 2016 Page 5

Section Details

systems tested in accordance with EN 1366-3. The field of the extended application document is additional to the direct field of application given within EN 1366-3 and may be applied to or based on a single test, or a number of tests, which provide the relevant information for the formulation of an extended application. It should be noted that this European Standard provides general guidance on the likely effects of a change. It gives no guidance as to the magnitude, nor how this magnitude is evaluated. Composite pipes comprising both metallic and plastics components are not covered by this European Standard.

6. Environmental aspects - OPTIONAL

Other effects on biodiversity Use of materials Waste Risk to the environment from accidents/misuse

7. How do you plan to address these environmental aspects? - OPTIONAL

Other: WG experts

8. Track Enquiry + Formal Vote (ENQ+FV)

9. Related Mandate(s) Yes

M/117

10. Related Directive(s) Yes

Directive Reference For Citation in Official Journal

305/2011 No

11. The decision was taken by

Simple majority Number of positive votes: 10 Number of negative votes: 0 Number of abstentions: 0

Decision CEN/TC 127 934/2016 taken on 2016-05-19

Subject: CEN/TC 127 - Adoption of a New Work Item

CEN/TC 127 - Fire safety in buildings

• having considered the proposal for a new work item as documented in CEN/TC 127 N 2947

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN.

DDD 33 2016 Page 6

Section Details

EN 13501-1:2007+A1:2009

3. Document developed in drafting body

CEN/TC 127/WG 7 - Classification

4. Title Fire classification of construction products and building elements - Part 1: Classification using data from reaction to fire tests

5. Scope This European Standard provides the reaction to fire classification procedure for all construction products, including products incorporated within building elements. Products are considered in relation to their end use application. This document applies to three categories, which are treated separately in this European Standard: - construction products, excluding floorings and linear pipe thermal insulation products; - floorings; - linear pipe thermal insulation products. NOTE The treatment of some families of products is still under review and can necessitate amendments to this European Standard (see European Commission Decision 2000/147/EC).

6. Environmental aspects

Other effects on biodiversity Use of materials Waste Risk to the environment from accidents/misuse

7. How do you plan to address these environmental aspects?

Other: WG experts

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

Yes

M/117

12. Related directive(s)

Yes

Directive reference For citation in Official Journal

305/2011 No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR BSI DIN DS NBN NEN SFS SIS SN UNMZ

14. The decision was taken by

Weighted vote and simple majority Percentage of positive weighted votes (min. 71%): 100 Number of positive votes: 10 Number of negative votes: 0 Number of abstentions: 0

DDD 33 2016 Page 7

Decision CEN/TC 127 935/2016 taken on 2016-05-19

Subject: CEN/TC 127 - Adoption of a New Work Item

CEN/TC 127 - Fire safety in buildings

• having considered the proposal for a new work item as documented in CEN/TC 127 N 2947

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN.

EN 13501-6:2014

3. Document developed in drafting body

CEN/TC 127/WG 7 - Classification

4. Title Fire classification of construction products and building elements - Part 6: Classification using data from reaction to fire tests on electric cables

5. Scope This European Standard provides the reaction to fire classification procedure for electric cables. NOTE For the purpose of this European Standard the term "electric cables" covers all power, control and communication cables, including optical fibre cables.

6. Environmental aspects Other effects on biodiversity Use of materials Waste Risk to the environment from accidents/misuse

7. How do you plan to address these environmental aspects?

Other: WG experts

8.Vienna Agreement No or expected CEN lead

9.The project is linked to No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s) Yes

M/117

12. Related directive(s) Yes

Directive reference For citation in Official Journal

305/2011 No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project:

DDD 33 2016 Page 8

Section Details

AFNOR BSI DIN DS NBN NEN SFS SIS SN UNMZ

14. The decision was taken by

Weighted vote and simple majority Percentage of positive weighted votes (min. 71%): 100 Number of positive votes: 10 Number of negative votes: 0 Number of abstentions: 0

Decision CEN/TC 127 936/2016 taken on 2016-05-19

Subject: CEN/TC 127 - Adoption of a Preliminary Work Item

CEN/TC 127 - Fire safety in buildings

• having considered the proposal for a new work item as documented in CEN/TC 127 N 2947

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• decides to register the subject described below as a potential future new work item in its programme of work (at the preliminary stage (00.60 = date of decision)).

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN.

EN 15725:2010

3. Document developed in drafting body

CEN/TC 127/WG 7 - Classification

4. Title Extended application reports on the fire performance of construction products and building elements

5. Scope This European Standard gives the procedures for preparing reports on the extended application process using the results of reaction to fire tests, fire resistance tests and external fire exposure to roof tests undertaken for fire classification of products and product families in accordance with the various parts of EN 13501. This standard makes reference to ‘extended application standards’ throughout; wherever this term is used it refers to either a standard prepared by CEN/TC 127 ‘Fire safety in buildings’ or the relevant product standard which includes information on extended application. In some cases, where a standard is not yet published, relevant bodies may issue recommendations for use by Notified Bodies in attestation procedures for CE marking under the Construction Products Directive (CPD), http://ec.europa.eu/enterprise/newapproach/nando/. The European system currently permits extended application rules to be included in technical specifications. CEN Technical Committees and EOTA Working groups producing these rules are asked to seek the guidance of CEN/TC 127 to ensure that their rules comply with standards prepared by CEN/TC 127. In cases where extended application rules in harmonised

DDD 33 2016 Page 9

Section Details

EN product standards and ETAs do not comply with standards prepared by CEN/TC 127 the CEN BT shall be informed.

6. Environmental aspects - OPTIONAL

Other effects on biodiversity Use of materials Waste Risk to the environment from accidents/misuse

7. How do you plan to address these environmental aspects? - OPTIONAL

Other: WG experts

8. Track Enquiry + Formal Vote (ENQ+FV)

9. Related Mandate(s)

Yes

M/117

10. Related Directive(s)

Yes

Directive Reference For Citation in Official Journal

305/2011 No

11. The decision was taken by

Simple majority Number of positive votes: 10 Number of negative votes: 0 Number of abstentions: 0

2 CEN/TC 147 – Correspondence

Decision CEN/TC 147 336/2016 taken on 2016-06-20

Subject: CEN/TC 147 - Activation of preliminary Work Item 00147135

CEN/TC 147 - Cranes - Safety

• having considered the proposal for the activation of work item 00147135 currently registered at preliminary stage 00.60 as documented in CEN/TC 147 N 1005

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to a new project

3. Document developed in drafting body CEN/TC 147/WG 12 - Tower cranes

4. Title Anti - collision devices

DDD 33 2016 Page 10

Section Details

5. Scope Interface between the tower crane and anti - collision devices

6. Environmental aspects Discharges to soil Emissions to air Heat Noise/Vibration Use of energy Use of materials Risk to the environment from accidents/misuse

7. How do you plan to address these environmental aspects?

Use of environmental checklist Other: To be determined by the WG

8.Vienna Agreement No or expected CEN lead

9.The project is linked to No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s) No

12. Related directive(s) No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AENOR AFNOR BSI DIN DS NBN SIS

14. The decision was taken by Weighted vote and simple majority Percentage of positive weighted votes (min. 71%): 100 Number of positive votes: 14 Number of negative votes: 0 Number of abstentions: 7

3 CEN/TC 160 – Correspondence

Decision CEN/TC 160 91/2016 taken on 2016-08-09

Subject: CEN/TC 160 - Adoption of a New Work Item

CEN/TC 160 - Protection against falls from height including working belts

• having considered the proposal for a new work item as documented in CEN/TC 160 N 1366

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

DDD 33 2016 Page 11

Section Details

1. Deliverable EN

2. This item corresponds to

an amendment to an EN. EN 353-1:2014

3. Document developed in drafting body

CEN/TC 160/WG 2 - Personal fall arresting systems, components and systems

4. Title Personal fall protection equipment - Guided type fall arresters including an anchor line - Part 1: Guided type fall arresters including a rigid anchor line

5. Scope This European Standard specifies the requirements, test methods, marking, information supplied by the manufacturer and packaging for guided type fall arresters including a rigid anchor line. This anchor line is usually attached to or integrated in ladders or rungs adequately fixed to suitable structures. Guided type fall arresters including a rigid anchor line conforming to this European Standard are components of one of the fall arrest systems covered by EN 363. This European Standard applies to rigid anchor lines which are intended to be installed vertically and/or with a combination of forward-leaning angle and/or sideways leaning angle between the true vertical and the vertical +15° (see Figure 2). Multi-user applications, i.e. rigid anchor lines that allow more than one user to be attached at any one time, are not addressed in this document.

6. Environmental aspects

Use of materials

7. How do you plan to address these environmental aspects?

Contact EHD for help / support ([email protected])

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s)

Yes

M/472

M/031

12. Related directive(s)

Yes

Directive reference For citation in Official Journal

89/686/EEC Yes

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR BSI DIN NEN SIS

14. The decision was taken by

Simple majority Number of positive votes: 15 Number of negative votes: 0 Number of abstentions: 4

DDD 33 2016 Page 12

4 CEN/TC 182 – Correspondence

Decision C590/2016 taken by CEN/TC 182 on 2016-08-04

Subject: CEN/TC 182 - Participation of EPEE

The CEN/TC 182 "Refrigerating systems, safety and environmental requirements,

• considering the CEN/CENELEC Internal Regulations - Part 2, subclause 4.3.2, which lays down the conditions for external liaisons;

• considering that the conditions laid down in CEN/CENELEC Guide 25 "The concept of partnership with European organizations and other stakeholders" are fulfilled;

• agrees to the participation of the European Partnership for Energy and the Environment in CEN/TC 182

• requests the CEN/CENELEC Management Centre to inform EPEE accordingly of this decision.

The decision was taken by simple majority with 10 positive vote(s), 1 negative vote(s) and 8 abstention(s).

5 CEN/TC 278 – Correspondence

Decision CEN/TC 278 019/2016 taken on 2016-07-18

Subject: CEN/TC 278 - Adoption of a New Work Item

CEN/TC 278 - Intelligent transport systems

• having considered the proposal for a new work item as documented in CEN/TC 278 N 3371

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable TS

2. This item corresponds to

the revision of a CEN/TS.

CEN/TS 16331:2012

3. Document developed in drafting body

CEN/TC 278/WG 1 - Electronic fee collection and access control (EFC)

4. Title Electronic fee collection - Interoperable application profiles for autonomous systems

5. Scope This technical specification shall facilitate interoperability between Toll Service Providers and Toll Chargers in autonomous EFC systems by providing interoperable application profiles (IAP) built on base standards. Base standards for these IAPs are - EN ISO 12855 and its profile standard CEN/TS 16986 for back office data exchange, - EN ISO 17575 suite for interfacing between Front-Ends and Back-Ends, - EN ISO 12813 for Compliance Check Communication, - CEN/TS 16702-1/2 for

DDD 33 2016 Page 13

Section Details

Secure Monitoring and - EN ISO 13141 for the optional Location Augmentation Communication. This technical specification shall complement the defintions in CEN/TS 16986 with profiling for the interface specification elements imported from EN ISO 17575, mainly providing suitable profiles for Charge Reports and Context Data This technical specification shall also cover compliance checks of road users. The specifications of the profiles shall be introduced and embedded into a modular approach that takes the different needs and nature of individual toll systems into account and simplifies later extensions and upgrades. An informative annex shall outline the relevance and application of this technical specification in regards to EETS

6. Environmental aspects

Other: n/a

7. How do you plan to address these environmental aspects?

Other: n/a

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track TC Approval (TCA) by correspondence

11. Related mandate(s)

Yes

M/338

12. Related directive(s)

Yes

Directive reference For citation in Official Journal

2004/52/EC No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR ASI DIN SIS SNV

14. The decision was taken by

Weighted vote and simple majority Percentage of positive weighted votes (min. 71%): 100 Number of positive votes: 10 Number of negative votes: 0 Number of abstentions: 10

6 CEN/TC 286 – Correspondence

Decision CEN/TC 286 C02/2016 taken on 2016-05-10

Subject: CEN/TC 286 - Adoption of a New Work Item

CEN/TC 286 - Liquefied petroleum gas equipment and accessories

• having considered the proposal for a new work item as documented in CEN/TC 286 N 1760

DDD 33 2016 Page 14

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN.

EN 16125:2015

3. Document developed in drafting body

CEN/TC 286/WG 8 - LPG pipework

4. Title LPG Equipment and Accessories - Pipework systems and supports - LPG in liquid phase and vapour pressure phase

5. Scope This European Standard specifies the requirements for the design, construction, testing, commissioning, operation and maintenance of LPG pipework in both the liquid phase and at full vapour pressure. This European Standard is applicable to LPG pipework having a maximum allowable pressure of less than or equal to 25 bar. This European Standard is applicable to new LPG pipework as well as to replacements of, or extensions to, existing LPG pipework. This European Standard is not applicable to: - pipelines and their accessories; - pipework for the propulsion systems of road vehicles or boats; and - pipework on ships.

6. Environmental aspects

Discharges to soil Discharges to water Emissions to air Heat Use of energy Use of materials Waste

7. How do you plan to address these environmental aspects?

Bring in environmental expertise to the WG

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s) No

12. Related directive(s) No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR BSI DIN NBN

DDD 33 2016 Page 15

Section Details

NSAI SFS SIS

14. The decision was taken by

Simple majority Number of positive votes: 7 Number of negative votes: 6 Number of abstentions: 6

Decision CEN/TC 286 C06/2016 taken on 2016-06-02

Subject: CEN/TC 286 - Adoption of a New Work Item

CEN/TC 286 - Liquefied petroleum gas equipment and accessories

• having considered the proposal for a new work item as documented in CEN/TC 286 N 1749

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

the revision of an EN.

EN 12817:2010

3. Document developed in drafting body

CEN/TC 286/WG 7 - Operational requirements - Transportable LPG cylinders and static LPG tanks

4. Title LPG Equipment and accessories - Inspection and requalification of LPG tanks up to and including 13 m³

5. Scope This European Standard specifies requirements for: a) routine inspection, periodic inspection and requalification of fixed LPG storage tanks of sizes from 150 l up to and including 13 m³, and associated fittings; b) marking tanks and/or keeping records, as appropriate, as a result of routine inspection, periodic inspection and requalification. This European Standard excludes refrigerated storage.

6. Environmental aspects

Noise/Vibration Use of energy

7. How do you plan to address these environmental aspects?

Bring in environmental expertise to the WG

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s) No

DDD 33 2016 Page 16

Section Details

12. Related directive(s) No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR BDS BSI DIN LST NQIS/ELOT NSAI UNI UNMZ

14. The decision was taken by

Simple majority Number of positive votes: 10 Number of negative votes: 0 Number of abstentions: 9

7 CEN/TC 317 – Correspondence

DECISION C01/2016 taken by CEN/TC 317 on 2016-08-01

Subject: CEN/TC 317 - Appointment of Chairperson

The CEN/TC 317, Derivatives from coal pyrolysis,

- considering the CEN/CENELEC Internal Regulations - Part 2, subclause 3.2.2, which lays down the

rules for nomination, appointment and responsibilities of Chairpersons;

- noting the nomination by the Technical Committee Secretariat;

- noting the commitment of the applicant to the responsibilities and duties of a Technical Committee

Chairperson as given in the CEN BOSS;

decides to appoint Dr. Markus Braun as Chairperson of CEN/TC 317 for a period of 3 years applicable from

2016-08-01.

The decision was taken by simple majority with 9 positive votes, 0 negative vote(s) and 7 abstention(s).

8 CEN/TC 413 – Correspondence

Decision CEN/TC 413 42/2016 taken on 2016-07-29

Subject: CEN/TC 413 - Activation of preliminary Work Item 00413009

CEN/TC 413 - Insulated means of transport for temperature sensitive goods with or without cooling and/or heating device

• having considered the proposal for the activation of work item 00413009 currently registered at preliminary stage 00.60 as documented in CEN/TC 413 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

DDD 33 2016 Page 17

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable EN

2. This item corresponds to

a new project

3. Document developed in drafting body

CEN/TC 413/WG 1 - Insulated means of transport for temperature sensitive goods - Equipment

4. Title Insulated means of transport for temperature sensitive goods - Requirements and testing - Part 1: Container

5. Scope The standard applies to thermally insulated means of transport used for temperature sensitive goods in order to limit the heat exchange to the external conditions. If certain temperatures have to be maintained, the above means of transport could be additionally provided with a cooling and/or heating device. This standard specifies the terminology, the requirements for thermal insulation, air tightness, test provisions, dimensioning of equipment with cooling and/or heating device. This standard specifies also the test provisions for new and in service equipment(s). This part specifies the terminology, the requirements for thermal insulation, air tightness, test provisions for k-coefficient. This standard does not specify further land transport requirements with regard to dimensions, weights, etc. This standard does not cover safety requirements. This standard does not specify special requirements for sea containers covered by ISO 1496-2. The series of standards consist of the following parts: Part 1: Container; Part 2: Equipment; Part 3: Small containers

6. Environmental aspects

Use of energy

7. How do you plan to address these environmental aspects?

Bring in environmental expertise to the WG

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track Enquiry + Formal Vote (ENQ+FV)

11. Related mandate(s) No

12. Related directive(s) No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR BSI DIN SFS UNI

14. The decision was taken by

Weighted vote and simple majority Percentage of positive weighted votes (min. 71%): 100 Number of positive votes: 7 Number of negative votes: 0 Number of abstentions: 8

DDD 33 2016 Page 18

9 CEN/TC 434 – Correspondence

Decision CEN/TC 434 09/2015 taken on 2015-08-31

Subject: CEN/TC 434 - Activation of preliminary Work Item 00434002 - prCEN/TS

CEN/TC 434 - Electronic Invoicing

• having considered the proposal for the activation of work item 00434002 currently registered at preliminary stage 00.60 as documented in CEN/TC 434 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable TS

2. This item corresponds to

a new project

3. Document developed in drafting body

CEN/TC 434/WG 4 - List of syntaxes

4. Title Electronic invoicing - List of syntaxes that comply with the EN on the semantic data model for the core elements of an electronic invoice

5. Scope This Technical Specification establishes a list with a limited number of syntaxes which comply with: a) the European Norm on the semantic data model for the core elements of an electronic invoice (WI001); b )the appropriate syntax bindings (WI003); c )the appropriate guidelines on transmission interoperability (WI004). The list will facilitate the use of the European Norm.

6. Environmental aspects

None of the above. Not applicable

7. How do you plan to address these environmental aspects?

Other: Not applicable

8.Vienna Agreement No or expected CEN lead

9.The project is linked to

No document from another organization

10. Track TC Approval (TCA) by correspondence

11. Related mandate(s)

Yes

M/528

12. Related directive(s)

Yes

Directive reference For citation in Official Journal

DDD 33 2016 Page 19

Section Details

2014/55/EU Yes

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AFNOR ASI BSI DIN DS NEN SN UNI UNMZ

14. The decision was taken by

Weighted vote and simple majority Percentage of positive weighted votes (min. 71%): 100 Number of positive votes: 19 Number of negative votes: 0 Number of abstentions: 0

Decision CEN/TC 434 09b/2015 taken on 2015-08-31

Subject: CEN/TC 434 - Activation of preliminary Work Item 00434003 - prCEN/TS

CEN/TC 434 - Electronic Invoicing

• having considered the proposal for the activation of work item 00434003 currently registered at preliminary stage 00.60 as documented in CEN/TC 434 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable TS

2. This item corresponds to

a new project

3. Document developed in drafting body

CEN/TC 434/WG 5 - Syntax bindings

4. Title Electronic invoicing - Syntax binding(s) - guidelines on how the semantic data model could be represented in the listed syntaxes (formats) and their automatic validation artefacts

5. Scope This Technical Specification gives guidelines on how the semantic data model for the core elements of an electronic invoice (WI001) could be represented in the listed syntaxes (formats) (WI002) and their automatic validation artefacts.

6. Environmental aspects Other: Not applicable

7. How do you plan to address these environmental aspects?

Other: Not applicable

DDD 33 2016 Page 20

Section Details

8.Vienna Agreement No or expected CEN lead

9.The project is linked to No document from another organization

10. Track TC Approval (TCA) by correspondence

11. Related mandate(s) Yes

M/528

12. Related directive(s) Yes

Directive reference For citation in Official Journal

2014/55/EU Yes

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: ASI DIN DS NEN NSAI SIS SN UNI

14. The decision was taken by

Weighted vote and simple majority Percentage of positive weighted votes (min. 71%): 100 Number of positive votes: 19 Number of negative votes: 0 Number of abstentions: 0

Decision CEN/TC 434 09c/2015 taken on 2015-08-31

Subject: CEN/TC 434 - Activation of preliminary Work Item 00434004 - prCEN/TR

CEN/TC 434 - Electronic Invoicing

• having considered the proposal for the activation of work item 00434004 currently registered at preliminary stage 00.60 as documented in CEN/TC 434 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable TR

2. This item corresponds to a new TR

3. Document developed in drafting body

CEN/TC 434/WG 6 - Guidelines at transmission level

4. Title Electronic invoicing - Guidelines on interoperability of electronic invoices at the

DDD 33 2016 Page 21

Section Details

transmission level

5. Scope This Technical Report gives guidelines on interoperability of electronic invoices at the transmission level, taking into account the need of ensuring the authenticity of the origin and the integrity of the electronic invoices.

6. Environmental aspects None of the above. Not applicable

7. How do you plan to address these environmental aspects?

Other: Not applicable

8.Vienna Agreement No or expected CEN lead

9.The project is linked to No document from another organization

10. Track TC Approval (TCA) by correspondence

11. Related mandate(s) Yes

M/528

12. Related directive(s) Yes

Directive reference For citation in Official Journal

2014/55/EU No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: AENOR AFNOR ASI DIN DS NSAI SIS SN UNI

14. The decision was taken by

Simple majority Number of positive votes: 19 Number of negative votes: 0 Number of abstentions: 0

Decision CEN/TC 434 09d/2015 taken on 2015-08-31

Subject: CEN/TC 434 - Activation of preliminary Work Item 00434005 - prCEN/TR

CEN/TC 434 - Electronic Invoicing

• having considered the proposal for the activation of work item 00434005 currently registered at preliminary stage 00.60 as documented in CEN/TC 434 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

DDD 33 2016 Page 22

Section Details

1. Deliverable TR

2. This item corresponds to

a new TR

3. Document developed in drafting body

CEN/TC 434/WG 7 - Extension methodology

4. Title Electronic invoicing - Guidelines on the use of sector or country extensions in conjunction with the European standard, including a methodology to be applied in the real environment

5. Scope This Technical Report gives guidelines on the optional use of sector or country extensions in conjunction with the European Norm on the semantic data model for the core elements of an electronic invoice, including a methodology to be applied in the real environment.

6. Environmental aspects None of the above. Not applicable

7. How do you plan to address these environmental aspects?

Other: Not applicable

8.Vienna Agreement No or expected CEN lead

9.The project is linked to No document from another organization

10. Track TC Approval (TCA) by correspondence

11. Related mandate(s) Yes

M/528

12. Related directive(s) Yes

Directive reference For citation in Official Journal

2014/55/EU No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: ASI DIN NEN PKN SN UNI

14. The decision was taken by

Simple majority Number of positive votes: 19 Number of negative votes: 0 Number of abstentions: 0

Decision CEN/TC 434 09e/2015 taken on 2015-08-31

Subject: CEN/TC 434 - Activation of preliminary Work Item 00434006 - prCEN/TR

CEN/TC 434 - Electronic Invoicing

• having considered the proposal for the activation of work item 00434006 currently registered at preliminary stage 00.60 as documented in CEN/TC 434 N

• having considered the Guidance - Adoption of a new work item in a CEN Technical Committee as documented in the BOSS

DDD 33 2016 Page 23

• confirming that the new work item falls within its scope

• confirming that the new work item corresponds to real market needs

• confirming that the resources to complete the work below are available

• decides to register the work item described below in its active programme of work

Section Details

1. Deliverable TR

2. This item corresponds to a new TR

3. Document developed in drafting body

CEN/TC 434/WG 8 - Test methodology and test results

4. Title Electronic invoicing - Result of the test of the European standard with respect to its practical application for an end user

5. Scope This Technical Report specifies the result of the test of the European standard on the semantic data model for the core elements of an electronic invoice. The test focusses on its practical application for an end user.

6. Environmental aspects None of the above. Not applicable

7. How do you plan to address these environmental aspects?

Other: Not applicable

8.Vienna Agreement No or expected CEN lead

9.The project is linked to No document from another organization

10. Track TC Approval (TCA) by correspondence

11. Related mandate(s) Yes

M/528

12. Related directive(s) Yes

Directive reference For citation in Official Journal

2014/55/EU No

13. Commitment The following CEN members (at least five) are committed to participate in the development of the project: DIN NEN NSAI SN UNI

14. The decision was taken by

Simple majority Number of positive votes: 19 Number of negative votes: 0 Number of abstentions: 0

DDD 33 2016 Page 24

10 CEN/TC 444 – Correspondence

Decision 44 taken by TC 444 on 2016-07-07

Subject : Decision on the future of prEN 15308 after CEN Enquiry

TC 444,

• considering the results of the Enquiry ballot;

• considering the table of decisions and the formal written proposals as distributed after the comments decision meeting;

• considering the CEN/CENELEC Internal Regulations - Part 2, clause 11.2.3;

• considering Decisions BT 34/2002, BT 42/2003 and related document BT N 6962 concerning timeframes for the development of ENs;

• considering Decision BT 35/2014 to associate a vote to the CEN Enquiry and to allow Technical Bodies to decide to skip the Formal Vote

• considering Decision 49/2014 to allow Technical Bodies to decide to skip the Formal Vote through a TC decision based on simple majority only;

• noting that CEN/TC 292 and CEN/TC 444 agreed to transfer EN 15308 to the work programme of CEN/TC 444 and that the process to transfer this work item is ongoing and will be finalized by CCMC at short notice.

decides;

to skip the Formal Vote and proceed with the publication of EN 15308 'Characterization of waste - Determination of selected polychlorinated biphenyls (PCB) in solid waste by gas chromatography with electron capture or mass spectrometric detection'

The decision was taken by unanimity or simple majority with 9 positive votes, 1 negative vote(s) and 6 abstention(s).