PM CHECK LIST..2. Carry out the power measurements through OMT Tool Answer CommentCustomer Name AIRTEL
Circle Name : DEL.Zone : Del_DT.Site ID : 5548.2. Carry out the power measurements through OMT Tool Answer CommentTown SC
Date of PM : 02-09-2015 03:04:00 PM.
GPS Lat Long :Location Lat / Long : 28.3395192/77.2993998
.2. Carry out the power measurements through OMT Tool Answer CommentSite Type: ( Critical >10/ Major ,<10 &> 1/ Minor=1) MINOR
Note: 1. Check all the feeder cables, Radio cables for any physicaldamage.
.
2. Carry out the power measurements through OMT Tool.No of sites dependent : 1.BSC Name : 47.Cabinet Type (Select no. of cabinet type) : 6.2. Carry out the power measurements through OMT Tool Answer Comment
Choose BTS - 1BTS1CABINETTYPE (2G)
Cabinet Type - 2 2964
Choose BTS - 3BTS1CABINETTYPE (2G)
Cabinet Type - 4 2964
Choose BTS - 5BTS1CABINETTYPE (3G)
Cabinet Type - 6 6201
BTS (Select no. of BTS) : 39.2. Carry out the power measurements through OMT Tool Answer CommentBTS - 1 1Choose Cell - 2 CELL A
VSWR Settings (as per standard value should be Class 1=1.8,Class 2 = 1.5 ) - 3
CLASS1=1.8&CLASS 2 =1.58
ASM Settings( Time 1440, Samples 7000 ) - ON -Screen print shotto be attached ( Antenna 1 ) - 4
TIME 1440,SAMPLES7000
ASM Settings( Time 1440, Samples 7000 ) - ON -Screen print shotto be attached ( Antenna 2 ) - 5
TIME 1440,SAMPLES7000
ASM Setting for alarm supervision ( Class 2 -5 dBm & Class 1 -8dBm) - 6
CLASS 2 -5DBM&CLASS 1 -8DBM
VSWR Values ( DX1 ) - 7 : 1.13.VSWR Values ( DX2 ) - 8 : 1.15
.VSWR Values ( TX1 ) - 9 : 1.12.2. Carry out the power measurements through OMT Tool Answer Comment3G Antenna Threshold Value (50 / Not OK ) - 10 50
Colocated 3G BTS - VSWR ( DX1 ) - 11 : 1.13.Colocated 3G BTS - VSWR ( DX2 ) - 12 : 1.18.Colocated 3G BTS - VSWR ( TX1 ) - 13 : 1.14.2. Carry out the power measurements through OMT Tool Answer CommentBTS - 14 1Choose Cell - 15 CELL B
VSWR Settings (as per standard value should be Class 1=1.8,Class 2 = 1.5 ) - 16
CLASS1=1.8&CLASS 2 =1.58
ASM Settings( Time 1440, Samples 7000 ) - ON -Screen print shotto be attached ( Antenna 1 ) - 17
TIME 1440,SAMPLES7000
ASM Settings( Time 1440, Samples 7000 ) - ON -Screen print shotto be attached ( Antenna 2 ) - 18
TIME 1440,SAMPLES7000
ASM Setting for alarm supervision ( Class 2 -5 dBm & Class 1 -8dBm) - 19
CLASS 2 -5DBM&CLASS 1 -8DBM
VSWR Values ( DX1 ) - 20 : 1.12.VSWR Values ( DX2 ) - 21 : 1.19.VSWR Values ( TX1 ) - 22 : 1.17.2. Carry out the power measurements through OMT Tool Answer Comment3G Antenna Threshold Value (50 / Not OK ) - 23 50
Colocated 3G BTS - VSWR ( DX1 ) - 24 : 1.16.Colocated 3G BTS - VSWR ( DX2 ) - 25 : 1.12.Colocated 3G BTS - VSWR ( TX1 ) - 26 : 1.15.2. Carry out the power measurements through OMT Tool Answer Comment
BTS - 27 1Choose Cell - 28 CELL C
VSWR Settings (as per standard value should be Class 1=1.8,Class 2 = 1.5 ) - 29
CLASS1=1.8&CLASS 2 =1.58
ASM Settings( Time 1440, Samples 7000 ) - ON -Screen print shotto be attached ( Antenna 1 ) - 30
TIME 1440,SAMPLES7000
ASM Settings( Time 1440, Samples 7000 ) - ON -Screen print shotto be attached ( Antenna 2 ) - 31
TIME 1440,SAMPLES7000
ASM Setting for alarm supervision ( Class 2 -5 dBm & Class 1 -8dBm) - 32
CLASS 2 -5DBM&CLASS 1 -8DBM
VSWR Values ( DX1 ) - 33 : 1.12.VSWR Values ( DX2 ) - 34 : 1.15.VSWR Values ( TX1 ) - 35 : 1.17.2. Carry out the power measurements through OMT Tool Answer Comment3G Antenna Threshold Value (50 / Not OK ) - 36 50
Colocated 3G BTS - VSWR ( DX1 ) - 37 : 1.12.Colocated 3G BTS - VSWR ( DX2 ) - 38 : 1.14.Colocated 3G BTS - VSWR ( TX1 ) - 39 : 1.18.2. Carry out the power measurements through OMT Tool Answer CommentDOOR OPEN NAMAINS FAIL OKDG ON NADG FAILS TO START NADG FAILS TO STOP NADG FUEL LEVEL LOW NARECTIFER FAIL OKSITE ON BATTERY NABATTERY FUSE FAIL NALOAD FUSE FAIL NAHIGH TEMP OKFIRE & SMOKE NALOW BATTERY VOLTAGE OKAC-1 FAULTY NA
BOTH AC FAULTY NADG FAULTY NA
Link (Select no. of link) : 17.Far End Site ID - 1 : 130.2. Carry out the power measurements through OMT Tool Answer CommentType of Link PDH/SDH - (TN / MLE / Hicap ) - 2 MLTNNMS Visibility Status - 3 YES
Alarms on TXMN Eqpt. - 4 : no.Rcv Level [ Actual ] (RX1 / RX2 ) - 5 : 36.3/35.7.Rcv Level [PLANNED] - 6 : 42.30.Tx Power Planned - 7 : 6.Tx Power Actual - 8 : 0.Radio Index ( Type of Radio ) - 9 :.2. Carry out the power measurements through OMT Tool Answer CommentLink capacity (4E1/8E1/16E1/32E1/63E1/75E1) (1+1/1+0) - 10 4E1lINK rEMARKS (1+1/1+0) - 11 1+0Link Type (Ring/ Star/ Linear) - 12 RING
MW Antenna Size ( Planned/ Installed ) - 13 : 0.6.MW Antenna Height ( Plan v/s Actual ) - 14 : 22m.Tx Frequency ( Planned ) - 15 : 22060.5.Tx Frequency ( Actual ) - 16 : 21938/23170.2. Carry out the power measurements through OMT Tool Answer CommentODU Earthing - 17 NOT OK Missing
2. Carry out the power measurements through OMT Tool Answer CommentWeather proofing tap quality OKMW / IF Connectors weather proofing at all MW ODUs [ OK / NOTOK ] OK
All Feeder cable & Jumper connectors weather proofing at GSMantenna interface & feeder-Jumper interface. [ OK / NOT OK ] OK
Weather proofing of IF cable grounding point & feeder cablegrounding points. [ OK / NOT OK ] OK
Earthing of all MW ODUs NOT OK MissingCheck Antennae Mountings and Fixtures ( GSM & MW) tightening& installation as per guidelines. OK
Tightning of all MW antenna & GSM antenna & installation as perguidelines OK
MW Coupler/Strut rods fixing for 1.2,1.8 Mtr MW Antenna as perinstallation guidelines ( 90 degree +- 15 degree ) OK
GSM antenna orientation & tilt as per the design : 30.2. Carry out the power measurements through OMT Tool Answer CommentRF/ IF cable is free from damages. OKIf site is monkey impacted then protection of weather proofing byany type of covering & protection of IF cable by condute pipe. (OK/ NOT OK/ NA)
OK
Whether GSM/Microwave Antenna being obstructed by third partyinstallations/Buildings [ YES/ NO ] OK
Routing of IF/ Feeder/ OFC cables(Tied with Tie /Clamp) & entry toroxtek. In Snake shape OK
Is there any rusting of EGB/IGB/strips? OKIs EGB/IGB is connected to earthing Pits OK
Earth Resistance Value : .9.2. Carry out the power measurements through OMT Tool Answer CommentLabeling on Mw antennas/ RAUs for far end ID & feeder cables forcell identification. OK
There is no extra antenna/ radio/ material on the tower which is notin use. OK
TMA installed on site : 7.TMA working on site : 7.TMA lying on site : 7.2. Carry out the power measurements through OMT Tool Answer CommentMetallic cable tie for outdoor & plastic tie for indoor is used. OKEMF Danger Signage Boards Present on site OKEMF Caution Signage Boards Present on site OKEMF Warning Signage Boards Present on site OKRoxtek Sealing & any other sepagae sealing. ( OK/ NOT OK) OKTransmission Eqpts supply on critical LVD OKGrouting of MW & BTS rack is proper. OK
Grounding of telecom equipments. OKa)-MW rack OKb) MW Magzines OKc) BTS Eqpt. OKd) IGB to EGB & Earth pit connectivity OKe) Fan Units OKAll cables routing ( Jumpers, Feeder, PCM/E1, alarm, power ), dcpower cable ( OK/ Not OK) OK
All cables labelling ( Jumpers, Feeder, PCM/E1, alarm, power ),IDUs for far end, dc power cable in SMPS ( OK/ Not OK) OK
All the PCM/E1 / Patch cord cables in Transmission rack arerouted properly. OK
BTS door fitted properly & door filter is clean. OKBTS & Tx cabinet is cleaned. OKDummy plates are present in all empty slots - BTS OKDummy plates are present in all empty slots - Tx equipments (AXX/ TN) OK
All Fan units installed & working for Hi CAP/ MLE above the AMM ,TN & BTS. OK
Is there any extra material kept on site OK1+1 power card availability of Tx equipments ( AXX/ TN etc) OKInfra issues observations- ( AC Faulty/ Less than requiredcapacity/ High Temp/ Door Open/ Missing earthings, Battery cellleakage Any other issue etc)
OK
Take photo of O/D :
.
Take photo of I/D :
.
Take photo of Issue :
.Issue details : battery bank Cover missing.