Guidelines for Home Energy Professionals

Ruby Nahan National Renewable Energy LaboratoryOctober 14, 2011

Defining Quality Work and Enhancing Consistency in the Home Performance Industry

2 eere.energy.gov

Project goals: – Document industry-defined quality work and

its outcomes– Certify a highly-skilled workforce– Build a stable, growing industry

To meet the goal we must: – Define quality work– Train workers on what they should know

and be capable of doing– Provide professional certifications that

verify worker qualifications

Project Overview

3 eere.energy.gov

• Collaborative effort between DOE and the home performance industry– Experience from 30 years of DOE’s

Weatherization Assistance Program (WAP)– Extensive industry input—2,000+ industry

members, thus far

• Consists of three components1. Guidelines for Quality Work2. Guidelines for Effective Training3. Guidelines for Professional Certifications

Project Overview

4 eere.energy.gov

Standard work specifications: – Define minimum requirements for and expected

outcomes of high quality work – Reference relevant codes and standards

For:– Single-family homes– Multifamily dwellings– Manufactured housing

Guidelines for Quality Work

5 eere.energy.gov

Example: Standard Work Specification

Row Title Specification(s) Objective(s)

1. Hazardous material 

removal

Health concerns in the removal and 

replacement of equipment (e.g., 

asbestos, other hazardous 

materials) will be identified

Written notification will be 

provided to occupants of the 

discovery of hazardous material, 

including contact information for 

regional EPA asbestos coordinator

Occupant will be asked to contract 

with an EPA‐certified asbestos 

contractor to conduct abatement 

before equipment removal and 

replacement (occupant is 

responsible for abatement or 

remediation)

Remediate health 

hazards using EPA‐

certified contractors

Topic: Water Heating Subtopic: Installation and Replacement

1. Detail Name: Storage Type Appliance

Desired OutcomeSafe and reliable hot water source provided that meets occupant needs at lowest possible cost of ownership

6 eere.energy.gov

Example: Standard Work Specification

1.Equipment removal 

Accepted industry procedures and practices will 

be followed to:

Remove old water heater and associated 

components Seal any unused chimney openings Remove unused oil tank, lines, valves, and 

associated equipment 

Ensure the safety of the workers 

and occupants

Preserve integrity of the building

Remove old equipment in a 

timely and efficient manner

1. New equipment 

installation

New water heater and associated components 

will be installed according to accepted industry 

standards and practices, and manufacturer 

specifications 

The system will be installed to be freeze 

resistant

Any existing water leaks will be repaired before 

installation begins 

Any penetrations to the exterior of the home 

created by the installation of the equipment 

will be sealed 

Ensure the safety of the workers 

and occupants

Preserve integrity of the building

Remove old equipment in a 

timely and efficient manner

[1]

ASTM C1193 - 09[2]

NFPA 54, ANSI/AGA Z223.1[3]

NFPA 54, ANSI/AGA Z223.1[4]

ASTM C1193 - 09

7 eere.energy.gov

Example: Standard Work Specification

1.Emergency drain pan

An emergency drain pan will be installed a 

minimum of 4”

above floor if leakage would 

cause damage to the home

A ¾”

drainline or larger will be connected to 

tapping on pan and run to drain or pumped 

to daylight

Collect and safely dispose of 

water escaping from the 

storage tank

1.Expansion tank

A stainless steel bladder expansion tank will 

be installed on the cold water side 

A direct connection with no valves between 

the storage tank and expansion tank will be 

installed 

Protect the storage tank from 

expansion

1. Temperature and pressure 

relief valve

Correct temperature and pressure relief 

valve will be installed according to 

manufacturer specifications

Temperature and pressure relief valve 

discharge tube will terminate within 6”

of 

the floor,  or as prescribed by local code 

Discharge excessive energy 

(pressure or temperature) from 

storage tank to safe location

[1]

NFPA 54, ANSI/AGA Z223.1[2]

NFPA 54, ANSI/AGA Z223.1[3]

NFPA 54, ANSI/AGA Z223.1

8 eere.energy.gov

Example: Standard Work Specification

1.Di‐electric unions

Di‐electric unions will be installed according to 

manufacturer specifications Break the stray voltage electrical 

circuit through the storage tank

1.Backflow prevention

Backflow prevention will be installed according to 

manufacturer specifications and all applicable 

codes 

Protect water supply from 

contamination

1.Thermal efficiency

Additional tank insulation (R‐11) will be provided 

when necessary and where not prohibited by 

manufacturer

If additional insulation is installed, it will be 

installed based on fuel type, making sure not to 

obstruct draft diverter, pressure relief valve, 

thermostats, hi‐limit switch, plumbing pipes or 

elements, and thermostat access plates

The first 6’

of inlet and outlet piping will be 

insulated according to manufacturer 

specifications

Pipe insulation must remain 3’’

from gas water 

heater vent

Heat traps will be installed on the inlet and outlet 

piping where not provided by manufacturer

Reduce standby loss from near tank 

piping and storage tank

Ensure insulation does not make 

contact with flue gas venting

[1]

NFPA 54, ANSI/AGA Z223.1

9 eere.energy.gov

Standard Work Specifications:

• For single-family homes – Comments from second industry review are being integrated– Final codes & standards review in coming months– Additional public comment period expected in late 2011/early 2012

• For multifamily dwellings– Draft being prepared for first industry review in late 2011

(November/December)

• For manufactured housing – Draft being prepared for industry review in late 2011

(November/December)

Sign up for project updates at wip.energy.gov/retrofit_guidelines.html

What’s Next: Guidelines for Quality Work

10 eere.energy.gov

• Based on four Job Task Analyses:– Energy Auditor– Installer/Technical– Crew Leader– Quality Control Inspector

• DOE enlisted the Interstate Renewable Energy Council (IREC) to accredit training programs that equip workers with strong skills

• Accreditation ensures consistency and third-party validation across all training providers and programs

Guidelines for Effective Training

11 eere.energy.gov

• Training providers can begin developing training programs for accreditation based on Guidelines materials– Additional information available at http://irecusa.org/

• IREC is accepting applications for training provider accreditations at ww.ispqusa.org

Sign up for project updates at wip.energy.gov/retrofit_guidelines.html

What’s Next: Guidelines for Effective Training

12 eere.energy.gov

• Certifications create nationally-consistent credentials that employers and consumers can trust

• Four certifications are under development:– Energy Auditor– Installer/Technical– Crew Leader– Quality Control Inspector

• The certifications will require:– Experience in the field– Written and practical exams– Continuing education to maintain the certification

Guidelines for Professional Certifications

13 eere.energy.gov

• NREL issued a competitive solicitation and selected the Building Performance Institute to administer the initial certifications

• Certifications will roll out in 2012

• DOE welcomes other certifying bodies to administer certifications too. NREL exploring ways to make multiple licenses for the certifications schemes available

• DOE exploring opportunities to support and strengthen other energy- efficiency related certifications in home performance industry

Sign up for project updates at wip.energy.gov/retrofit_guidelines.html

What’s Next: Professional Certifications

14 eere.energy.gov

• Workers

• Training Providers

• Consumers

• For Program Administrators, the project can:

– Provide a comprehensive set of work quality specifications– Reference relevant codes and technical standards– Provide a clear baseline for quality assurance that delivers expected

energy savings and reduce call-backs, risk, and program costs– Prevent the need for each program administrator to re-create a new set

of program technical requirements.

This Project Benefits

15 eere.energy.gov

• Guidelines for Home Energy Professionals www.wip.energy.gov/retrofit_guidelines.html

• DOE Weatherization and Intergovernmental Program (WIP) www.wip.energy.gov

• National Renewable Energy Laboratory (NREL) www.nrel.gov

• Interstate Renewable Energy Council (IREC) www.irecusa.org

• Building Performance Institute (BPI) www.bpi.org

Resources and Links

16 eere.energy.gov

• Questions?

• Contact information:– Ruby Nahan

Project [email protected]

– Amy HollanderProject Manager, Industry and WAP [email protected]

Guidelines for Home Energy Professionals