Outline
• introduction
• case study
– modelling process
– sample results
• future work
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
What is the Production Management Tool (PMT)?
• simulation tool that can be used for:
– viewing and analyzing the current and future state of a training pipeline
– identifying existing or arising scheduling problems (i.e. bottlenecks, empty seats, etc.)
• conducting “what if?” testing by changing pipeline parameters (e.g. course capacities, number or timing of serials, streaming, intake, etc.)
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
What is the Production Management Tool (PMT)?
• three major components:
– Arena model
• event-driven simulation model
• generic (can be used for any CF occupation)
– database
• contains the information required by the simulation (basic scenario parameters, information on course flow, entry plans and courses, course serials, and personnel)
• after running, contains text file with output results
• includes extensive set of queries for analyzing results
– Graphical User Interface (GUI)
• used for entering data, generating charts and reports
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Top-Level View of Arena Model
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
ANAV Test Case
• Step 1: Gather Information
• Step 2: Generate Credit Matrix
• Step 3: Clean Data
• Step 4: Set Up Scenario in GUI and Run
• Step 5: Analyze Data
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Step 1: Gather Information (with SME support)
• develop training pipeline
– establish course flow from recruitment to graduation for each possible entry plan
• obtain current pipeline status
– past, current, and planned course schedules
– course history for each student
– most data can be imported from the Military Individual Training & Education (MITE) database extract
• determine whether course failure results in re-course or transfer out of occupation
• determine overall attrition rate
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
ANAV Training PipelineCFR
DEOCEOTP
UTPNCM
COR (pilot)
OTBOTP
AMT
Sea Surv
BSERE
BANCCP-140 N/C
CC-130 Nav
CH-124 TCO
BOTP
CP-140 ASO
ROTP RMC
SLT
(if req’d)
BOTP
IAP
COR (unrelated)
ROTP CIV
Civ Univ
IAP
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Step 2: Generate Credit Matrix
• completing a course gives a specified number of credits (0 to 1) toward eligibility for other courses
• student is eligible for a course when he/she earns a total of 1.0 credits for that course
• alternatively, students can be streamed into one of a set of courses according to specified proportions
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Step 3: Clean Data
• MITE Extract contains several data tables
– OP_COURSE_TBL
• general high-level details for each course
– OP_CRSE_SESSN_TBL
• details for every course serial, e.g. start/end dates, min/max capacity
– OP_TRAINING
• course/serial registration and attendance results for each student
– POPULATION
• each student’s Service Number, name, rank, hire date, occupation, entry plan
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Data Cleaning Issues – Examples
• adjust serial capacity (OP_CRSE_SESSN_TBL)
– change min capacity to 1 for courses that are shared with other occupations
• update course codes and serials (OP_TRAINING)
– course will not be recognized if individual took it under earlier code
• validate/update entry plans (POPULATION)
– often unknown or named differently in MITE Extract; OT/COR is never indicated
– check each individual’s course history to infer entry plan and update if required
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Step 4-1: Enter Scenario Information
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Step 4-2: Enter Course Information
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Step 4-3: Import or Enter Serial Data
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Step 4-4: Import or Enter Population Data
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Step 4-5: Run Scenario
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Step 5: Analyze Data
• many types of charts and reports can be produced easily by the user at the course, serial, or person level
• time period for analysis can be selected by user so that different time segments of the simulation can be compared
• the charts shown in the following slides represent a five year period beginning on the simulation start date (14 Feb 2008)
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
5
6 6 6 6
4 4 4 4
2
8 8
7
8
4
9 9
8
9
8
0
1
2
3
4
5
6
7
8
9
10
08/09 09/10 10/11 11/12 12/13
Fiscal Year
Nu
mb
er
of
Ind
ivid
ua
ls
CH-124 TCO CP-140 N/C CP-140 ASO CC-130 Nav
Graduates by Fiscal Year
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Demand and Attendance Ratios Relative to Capacity
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
IAP
BO
TP
SLT
RM
C
CIV
UN
IV
AM
T
SE
A S
UR
V
BS
ER
E
BA
NC
CH
-124
TC
O
CP
-140
N/C
CP
-140
AS
O
CC
-130
Nav
Rat
io w
.r.t
Cap
acity
Demand Attendace Capacity
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Demand and Attendance for the BANC
0
5
10
15
20
25
30
18-F
eb-2
008
07-A
pr-2
008
12-M
ay-2
008
11-A
ug-2
008
27-O
ct-2
008
23-F
eb-2
009
06-A
pr-2
009
19-M
ay-2
009
17-A
ug-2
009
26-O
ct-2
009
22-F
eb-2
010
09-A
pr-2
010
19-M
ay-2
010
17-A
ug-2
010
26-O
ct-2
010
22-F
eb-2
011
09-A
pr-2
011
19-M
ay-2
011
17-A
ug-2
011
26-O
ct-2
011
22-F
eb-2
012
09-A
pr-2
012
19-M
ay-2
012
17-A
ug-2
012
26-O
ct-2
012
Serial Date
Nu
mb
er o
f In
div
idu
als
Demand Attendance Min Cap Max Cap
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Person Gantt Chart
1-J
an
-07
1-J
an
-08
1-J
an
-09
1-J
an
-10
1-J
an
-11
DEO (Entry Plan)
IAP
BOTP
AMT
BSERE
SEA SURV
BANC
CC-130 Nav
Date
Wait Attend Sim. Wait Sim. Attend
Defence R&D Canada – CORA • R & D pour la défense Canada – CARO
Future Work
• case study for multiple related occupations
– e.g. ANAV and pilots
• probability-based recourse/transfer on fail
• add flexibility to attrition parameter
• improve handling of entry plans