Pre-course learning
Introduction
Welcome to this pre-course learning pack for the re-designed Defects Prevention
training course. We have been running this course for 22 years – in fact it was the first
formal training course we offered to the industry when we launched the training service.
Of course it has been up-dated continually over that time.
Contents of this pack page
Objectives for the Defects Prevention course 3
Outline of the course 3
How to use the learning pack 4
Section 1 - Rules for Registered Builders 5
Section 2 - NHBC Technical Standards 13
Section 3 - Claims against the warranty 18
Section 4 - The most common causes of resolutions 19
Section 5 - Common defects during construction 20
Section 6 – Other reading 22
NHBC publications (included at the end of this pack)
Why Buy This Home – HB 1022 05/16
Information about the warranty
Damage Potential Rating – Explained – HB 2557 03/10
A guide to the risk assessment rating of all Reportable Items
Page 3 of 22
© Copyright NHBC 2018
Pre-course learning
Objectives for the Defects Prevention course
At the end of the course site managers will:
Be able to identify the major areas of construction which generate the most costly claims and complaints.
Be able to understand the detailed technical requirements and guidance for those areas.
Be able to identify quality construction and describe their contribution to its achievement on site.
Have considered how the most common defects occur and how to prevent them in the future.
Have undertaken a more general examination of construction best practice and content, operation and significance of each of the NHBC Standards.
Outline of the course
Pre-course pack Day 1
Introduction, Objectives and outline of
the course
Rules for Registered Builders
NHBC Technical Standards
Claims against the warranty
The most common causes of
resolutions
Common defects during construction
Review of pre-course pack
Site investigations
Engineering conditions
Site clearance
Foundations
Substructure
Drainage
Ground floors
Day 21 Day 3
Superstructure walls with a focus on
either masonry construction or
Timberframe
Chimneys and flues
Intermediate floors
Air-tightness
Sound insulation
Fire stopping
Common defects in timber frame
Roof structures and coverings
Render
First fix
Plastering and dry-lining
Second fix
External works
Post construction testing
End-of-course assessment
1 This day may be replaced by a day covering timber frame or light steel frame construction. Alternately those additional days may be included in the course to supplement the standard day two shown with a further additional day covering modular/framed construction and external cladding also available.
Page 4 of 22
© Copyright NHBC 2018
Pre-course learning
How to use the Learning Pack
Please make sure you have worked your way through the contents of this
pack before attending the course. You will use some of the information
during the course and the trainer may even question you on it. There will be
reference to the pre-course information in the course assessment on the
last day.
ACTION
As you read through the pack you will see this image and
instructions in red about the actions that are required at
that point.
Page 5 of 22
© Copyright NHBC 2018
Pre-course learning
Section 1 - Rules for Registered builders (hb1 12/10)
The following extracts from the rules for builders and developers registered with NHBC
are the ones that are most relevant to site managers. Where the word ‘You’ is used this
refers to the registered builder.
Registration
10 Building Standards
a You must ensure that every Home for which you submit a Site Notification or an
Application for NHBC Cover is designed and built in accordance with the
applicable NHBC Requirements.
b If NHBC Building Control Services Limited is appointed by you to act as the
Approved Inspector (in England and Wales) for any Home, you must comply with
the applicable terms and conditions as notified to you by NHBC Building Control
Services Limited.
11 Specialist professional information
a In Scotland, NHBC may require you to provide specialist information from
consultants of a particular profession. If so, you must advise them of NHBC’s
involvement and if requested by NHBC ensure that they are bound to NHBC in
respect of their duty of care as if they had been instructed by NHBC in the first
instance.
b NHBC may require you to have the Structure of a Home designed and inspected
during construction by an independent professional acceptable to NHBC, in which
case you must follow any instructions given by that professional.
ACTION
Read through the rules and make notes in the box at the end of the table summarising what you believe are the rules that affect your work the most.
Page 6 of 22
© Copyright NHBC 2018
Pre-course learning
Requirement to submit Site Notifications and Applications for NHBC Cover
12 Stage One: Site Notification
a You must submit to NHBC a Site Notification for each home built or to be built by
you, or on your behalf, to be sold by you to the first owner.
d If you submit a Site Notification under Rules 12) a) you must:
i) Include in the Site Notification particulars of all of the homes built or to be built or
sold by you or on your behalf at the relevant Site; and
ii) If after submission of the Site Notification any of the notified particulars change,
you must promptly notify NHBC of the changes.
e Rule 12) a) applies if you acquire a home or Site which is partially built and in such
cases you must submit to NHBC a Site Notification together with a location plan for
all of the planned homes on the Site before any further substantial building work is
carried out to the home and/or Site.
f Each Site Notification that you are required to submit must be received by NHBC
fully completed at least:
i) 8 weeks before work starts on a Hazardous Site or where non-conventional or
complex construction methods are to be used;
ii) 28 days before work starts in any other case.
g Following receipt of a Site Notification, NHBC will send you a Product Plot
Schedule which must be used under Stage Two (Rule 13) below.
i NHBC may accept a Site Notification subject to Conditions or NHBC may reject it.
NHBC will give you reasons in writing if a Site Notification is accepted subject to
Conditions or is rejected. NHBC may in its absolute discretion give or withhold its
authorisation to a third party referred to in a Site Notification made under Rule 12)
c).
13 Stage Two: Application for NHBC Cover
a You must:
i) At least 21 days before work starts on a Home; or
ii) Before you enter into a Contract for a Home
whichever is the earlier, make an Application for NHBC Cover accompanied by
payment to NHBC of the charges for NHBC Cover and any other services
(including, if you appoint NHBC Building Control Services Limited as the Approved
Inspector (in England and Wales) or an NHBC Company as Certifier (in Scotland)
the charges for those services) as advised to you by NHBC for each Home for
which you have submitted a Site Notification.
Page 7 of 22
© Copyright NHBC 2018
Pre-course learning
15 Testing and inspection
a NHBC may inspect and carry out technical investigations of any Home in a manner
and at a frequency to be determined by NHBC. For the purposes of such
inspections and investigations, you must carry out any work or tests that NHBC
may require you to carry out and provide any facilities, documents or information
that NHBC may require you to provide. NHBC’s inspections and technical
investigations are for the purpose of enabling NHBC to decide whether to provide
NHBC Cover for a Home. Any information shared with you arising from NHBC’s
Inspections and technical investigations in no way relieves you of your obligations
under Rule 10) a) to design and build each Home in accordance with the
applicable NHBC Requirements.
16 Hazardous Sites and Non-Conventional Methods of Construction
a If a Home is to be built on a Hazardous Site or where non-conventional and/or
complex construction methods are
to be used:
i) You must (8 weeks before work starts) submit with the Site Notification the
design details showing how the hazards, non-conventional construction methods
and/or complex construction methods are to be dealt with and in particular you
must show to NHBC in detail (by submission of drawings, calculations, soil
investigations, environmental reports and any other relevant information) how
hazards, non-conventional construction methods and/or complex construction
methods are to be dealt with so as to enable the building of the Home to be
completed in accordance with NHBC Requirements;
ii) You must provide NHBC with any information pertaining to the Home and the
relevant Site that NHBC may reasonably request from time to time.
b NHBC may cancel an Application for NHBC Cover and the NHBC Cover for any
Home on the basis of information submitted or not submitted by you or on your
behalf under Rule 16) a) if NHBC is not satisfied that building of the Home will be
completed in accordance with NHBC Requirements.
24 Notices of Cover
c NHBC may in its sole discretion agree in writing that you need not comply with all
of the applicable NHBC Requirements concerning the design and construction of a
particular Home, in which case you must obtain the first Owner’s written agreement
to accept that non-compliance. In such circumstances, NHBC may in its sole
discretion issue a Notice of Cover in respect of the Home containing an
endorsement excluding the relevant items from cover.
Page 8 of 22
© Copyright NHBC 2018
Pre-course learning
Claims and Work required by NHBC
27 Tests, investigations and work required by NHBC
a i) NHBC may give you written notice of tests and/or investigations that NHBC
requires you to carry out in order to investigate any suspected non-compliance with
NHBC Requirements.
ii) NHBC may give you written notice of work that NHBC requires you to have
carried out in order to remedy any non-compliance with NHBC Requirements.
b Following receipt of a notice under Rule 27) a) you must:
i) Inform NHBC in writing within seven (7) days of any difficulties that may prevent
the completion of the tests, investigations and/or work specified in the notice by the
date required and NHBC may (in its absolute discretion) agree to vary that date;
ii) At your own expense carry out or have carried out the tests and/or investigations
specified in the notice and report the outcome or results to NHBC in writing by the
date specified in the notice or by any later date agreed under Rule 27)b)i) or, if no
date was specified or agreed, within a reasonable period of time;
iii) At your own expense carry out or have carried out any work specified in the
notice (together with any additional work necessary in connection with the work
specified in the notice) so that the Home complies with the applicable NHBC
Requirements by the date specified in the notice or by any later date agreed under
Rule 27) b) i) or, if no date was specified or agreed, within a reasonable period of
time.
c If you do not complete any tests, investigations and/or work that you are required
to carry out or have carried out under Rules 27) a) and 27) b) within the time
allowed, NHBC may (in its absolute discretion):
i) Have appropriate tests, investigations and/or work, carried out; or
ii) Assess the costs of carrying out such tests, investigations and/or work and pay
that sum to the Owner.
d If, in its absolute discretion, NHBC deems it appropriate to do so (for instance
because of (i) the history of any dealings between you and the Owner and/or
NHBC (ii) NHBC’s assessment of any work previously carried out by you (iii) your
financial position or (iv) an emergency) NHBC may, instead of or in addition to
serving a notice under Rule 27) a):
i) Arrange itself for tests, investigations and/or work to be carried out; or
ii) Assess the costs of having such tests, investigations and/or work carried out and
pay that sum to the Owner.
f If NHBC exercises its rights under Rules 27) c) or d) NHBC will notify you in writing
and following service of such a notice you must not undertake the tests,
investigations and/or work referred to in the notice yourself, nor arrange for any
other person to undertake them.
Page 9 of 22
© Copyright NHBC 2018
Pre-course learning
g If NHBC exercises its rights under Rules 27) c) or d) NHBC will be entitled to
require you to stop work on the Home concerned (as specified in the notice, along
with particulars of the work that must be stopped) and following service of that
notice:
i) You must stop work on the Home as required under the notice; except that
ii) You must take all steps necessary to ensure that the Home is secure and
watertight.
h Where tests, investigations and/or work are required to be carried out to a Home
under Rule 27) you must at your expense:
i) Allow or obtain access to the premises referred to in the notice for you, NHBC
and/or any contractors for the purpose of allowing tests, investigations and/or work
to be done;
ii) Arrange for any damage to the Home resulting from the carrying out of tests,
investigations and/or work to be repaired and for the affected parts of the Home to
be re-decorated and left in a clean and tidy condition;
iii) Arrange for the removal and storage of the Owner’s possessions, and/or for the
provision of suitable alternative accommodation for the Owner and/or anyone else
who normally lives in the Home with the Owner’s permission.
Alternatively, in the case of Rules 27) h) ii) and 27) h) iii) NHBC may either make
any of the above tests, investigations, work and/or arrangements at your expense
or, in its absolute discretion, assess the cost of making any of the above tests,
investigations, work and/or arrangements and pay that sum to the Owner.
i If NHBC exercises its rights under Rule 27) you must immediately on demand (and
without deduction or set off) indemnify NHBC in respect of all costs and expenses
incurred by NHBC in connection with doing so. Such costs and expenses may
include administration costs, the cost of settlement of claims under NHBC Cover
and the costs and disbursements incurred in obtaining professional advice and
assistance.
j NHBC may apply Rule 27) at any time in connection with any Home and any
obligation or liability that you have under the relevant NHBC Cover and/or the
Rules and which you have not discharged in full and at the due time.
k If you dispute any action taken by NHBC under Rule 27) that dispute may be
referred to arbitration subject to and in accordance with Rule 55). If a dispute is
referred to arbitration:
i) NHBC shall continue to be entitled to carry out or make a payment in respect of
any tests, investigations and/or work specified in a notice served under Rule 27);
and
ii) The Arbitrator will not have the power to order you to carry out any tests,
investigations and/or work.
Page 10 of 22
© Copyright NHBC 2018
Pre-course learning
Claims and Resolutions
28 Investigation of claims and complaints by NHBC
a If an Owner makes any claim or complaint to NHBC in respect of a Home, NHBC
may undertake its own tests and/or investigations and may require that you attend
and/or assist NHBC with those tests and/or investigations (whether or not you are
obliged to respond to the claim or complaint under the NHBC Cover for the Home).
b If NHBC requires you to attend and/or assist under Rule 28) a), NHBC will notify
you in writing (setting out particulars of the Home and the date and time of the
planned tests and/or investigations) and following service of that notice:
i) You must at your own expense make a representative available to attend and/or
assist NHBC with those tests and/or investigations;
ii) You must allow or procure access to the relevant premises for NHBC and its
contractors for the purpose of allowing NHBC or its contractors to carry out the
tests and/or investigations.
c Following tests and/or investigations carried out under Rule 28) a) NHBC will:
i) Notify you in writing of the outcome of the tests and/or investigations;
ii) Notify you of the costs and expenses incurred by NHBC in connection with the
tests and/or investigations. Such costs and expenses may include administration
costs and the costs and disbursements incurred in obtaining professional advice
and assistance.
d Following receipt of a notice under Rule 28) c) ii) you must immediately pay to
NHBC (without deduction or set off) an amount equal to the amount of the costs
stated in the notice, unless:
i) The outcome of all of the tests and/or investigations is that there has been no
failure by you to comply with your obligations under the relevant NHBC Cover and
Rules in connection with the matters tested and/or investigated; or
ii) With NHBC’s written agreement (in its absolute discretion) within a reasonable
time at your own expense you carry out all of the work that NHBC would otherwise
have to pay for or carry out under the relevant NHBC Cover in connection with the
claim or complaint.
e NHBC may apply Rules 28) a) to 28) d) at any time in connection with NHBC’s
response to any claim or complaint made in connection with NHBC Cover for a
Home built or sold by you or on your behalf.
Page 11 of 22
© Copyright NHBC 2018
Pre-course learning
Resolution Service
f If an Owner makes a claim or complaint to NHBC under or in connection with
NHBC Cover and NHBC decides to provide the Resolution Service then:
i) Rules 27) and 28) will apply in respect of any tests, investigations and/or work
which NHBC requires you to carry out or arrange and/or which NHBC carries out
or arranges;
ii) NHBC may charge you a fee for providing the Resolution Service.
g NHBC may apply Rule 28) f) at any time in connection with NHBC’s response to
any claim or complaint made in connection with NHBC Cover for a Home built or
sold by you or on your behalf.
Common Parts
j If a claim is made under NHBC Cover by two or more Owners in connection with
any Common Parts (the use or enjoyment of which is shared by them) then in
respect of such Common Parts NHBC may proceed against you as if all of the
relevant Owners who share the use or enjoyment of those Common Parts and who
are also entitled to claim under NHBC Cover in connection with those Common
Parts, had made claims under their NHBC Cover.
Page 12 of 22
© Copyright NHBC 2018
Pre-course learning
Notes
Page 13 of 22
© Copyright NHBC 2018
Pre-course learning
Section 2 - NHBC Technical Standards
NHBC has always issued Standards, but they have evolved over the years as methods
of construction have changed, such as the significant growth in the use of thermal
insulation materials and greater use of factory-made components such as roof trusses.
Changes to the Standards are highly significant for NHBC's registered builders as they
potentially affect the construction of 80% of homes built every year.
For this reason all changes need to be very carefully considered and this is the job of
NHBC's Standards Committee, which includes a range of interested groups, including
consumers, the Housing Corporation, professional institutions and house builders.
Once the Standards Committee has approved a new Standard or amendment to an
existing Standard, the industry is advised of the forthcoming change and the relevant
information is mailed to every registered builder. Builders are then given a lead-in period
to adjust their working practices, before NHBC's building inspectors begin to check the
new requirements on site.
You will be required to have access to a copy of the NHBC Technical Standards in
order to help complete this section.
The online version of the NHBC Standards 2018 – Standards Plus – is freely available
to all visitors to the NHBC website.
Visit: www.nhbc.co.uk/Standardsplus2018
COMPOSITION OF THE STANDARDS
The Standards are divided into 10 Parts, each covering a particular aspect. The Parts
follow the usual construction process; from design through to construction on site.
NHBC Standards do not cover aspects of health and safety relating to building
operations and to the handling and use of certain building materials. Such matters are
covered by the statutory requirements.
TECHNICAL REQUIREMENTS (2018 Standards)
In Chapter 2.1, The Technical Requirements which MUST be met by the Builder are in
red text.
PERFORMANCE STANDARDS
Most of the Chapters consist of detailed Performance Standards in bold black text with
purple shaded background.
Alternative standards of performance will be acceptable ONLY if, in the opinion of
NHBC, the Technical Requirements are met and the standard achieved is not lower
than the stated Performance Standard.
Page 14 of 22
© Copyright NHBC 2018
Pre-course learning
GUIDANCE
Guidance on how the performance standard may be met is shown in black text and is
based on normal construction procedures and recommended practices which have
been shown as satisfactory and acceptable over time. NHBC will consider alternative
methods to meet specific requirements, subject to prior consultation and evaluation.
Guidance is also contained in illustrations and 3D models.
Guidance is provided to demonstrate specific technical principles, and should not be
used as working construction details.
Standards questions
Starting on the next page are five questions relating to the NHBC Standards.
When answering them please bear in mind the information above, namely that the
Standards are mainly made up of guidance and performance standards. Builders are
NOT required to comply with the guidance but, if they choose to do things in a different
way they may need to prove to NHBC that their method will perform at least as well as
the guidance.
Page 15 of 22
© Copyright NHBC 2018
Pre-course learning
Question 1
A lead lined valley has been formed using code 4 lead in 1.4m lengths.
Is this acceptable? Please explain your decision.
Answer
Question 2 According to NHBC Standards what is the maximum amount of concrete that can be cast in one action when reinforcement and unreinforced?
Answer
ACTION By referring to the NHBC Standards answer each question in the box provided. Please make a note of the
appropriate Standards clause with your answer.
Page 16 of 22
© Copyright NHBC 2018
Pre-course learning
Question 3 A trussed rafter roof has been tiled but all the braces omitted. Can they be put in now? Please explain your decision.
Answer
The following questions relate to a development of a small site of three and four bedroom detached houses. You discover the problems described in the scenarios which follow. Record whether you find them acceptable or not. Give your reasons and note any other considerations you may need to take into account.
Question 4
Shrinkable soils require suspended floor construction, what is the minimum void
dimension under the ground floor when building in medium shrinkage soils?
Answer
Page 17 of 22
© Copyright NHBC 2018
Pre-course learning
Question 5
On another house plot you see that the wall cavities to the whole of one gable wall are
only 35mm wide and the brickwork/blockwork has just been completed.
The wall ties are correctly spaced and staggered with the drip in the centre of the cavity and are sloping slightly to the outer leaf. The cavities appear to be reasonably clean and the face brickwork is of a good standard. Is this acceptable to NHBC?
Answer
Page 18 of 22
© Copyright NHBC 2018
Pre-course learning
Section 3 – Claims against the Warranty Section 3 of the Buildmark Warranty covers major damage in years 3 To 10. The pie
chart shows the percentages for the major areas of construction that caused Section 3
claims by frequency in 2017 – but the category designations have been removed.
Category Percentage?
Foundations
Substructure and ground floors
Superstructure
Roofs including roof coverings
Services, fixtures and finishes
Ancillary buildings and external works
Others
ACTION
In the table below use your judgement to show which
category should have which percentage against it
Page 19 of 22
© Copyright NHBC 2018
Pre-course learning
Section 4 – The most common causes of Resolutions Section 2 of the Buildmark Warranty covers the Builder’s Obligations after Completion
(with NHBC protecting home buyers if the builder should default). During this period
NHBC offers a Resolution Service if a builder and home owner are in dispute.
The pie chart shows the percentages for the major areas of complaint raised through
resolutions during the first two years by frequency in 2017 – but the category
designations have again been removed.
Category Percentage?
Foundations
Substructure and ground floors
Superstructure
Roofs including roof coverings
Services, fixtures and finishes
Ancillary buildings and external works
Others
ACTION In the table below again use your judgement to show which
category should have which percentage against it
Page 20 of 22
© Copyright NHBC 2018
Pre-course learning
Section 5 – Common defects during construction
The course will concentrate on common defects and their prevention across all the main stages of construction. It will be really useful to have your feedback at the course on your experiences.
Construction stage Common defects
Foundations
Substructure and ground
floors
Drainage
Superstructure – brickwork
and blockwork
ACTION
In the table below, based on your experience, list four of the most common defects (or issues that could lead to defects) you have found at each of the major construction stages.
Page 21 of 22
© Copyright NHBC 2018
Pre-course learning
Construction stage Common defects
Superstructure – timber
frame
Superstructure –
intermediate floors
Roof structure – including
GRP Chimneys and
Dormers
Roof coverings
First fix/carcassing
Plastering and dry lining
Page 22 of 22
© Copyright NHBC 2018
Pre-course learning
Construction stage Common defects
Second fix and finishings
External Works including
retaining and free-standing
walls
Section 6 – Other reading
Included in this pack are three NHBC publications:
Why Buy This Home
Information about the warranty
Damage Potential Rating – Explained
A guide to the risk assessment rating for all Reportable Items
NHBC Technical Extra
A sample of the latest Technical Extra giving information and updates to the industry
ACTION
Before the start of the course, make sure you have read through the NHBC publications – you can be sure that information from them will be included in the course assessment