deepwater advanced 1

9
Ultra deepwater drilling and development Deepwater Advanced Maersk Viking 

Upload: jrladdu

Post on 02-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 18

Ultra deepwater drillingand development

Deepwater Advanced

MaerskViking

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 28

Maersk Drilling MaerskViking

TYPE

Samsung 96K drillship

BUILT

Samsung Heavy Indusries 2014

CLASS

American Bureau of Shipping

FLAG

Singapore

WATER DEPT H

3600 m (12000 f)

bull Muli Machine Conrol o allow all sandard operaions

such as sand building and ripping o be conduced

wihou personnel on he drill floor Tis ensures a high

level of safet as well as consisency across crews

bull Upime and efficiency are maximized hrough dual pipe

handling While one sring is working in he main well cenre

a second sring of eg casing drill pipe or boom hole

assembly in he auxiliary well cenre can be eiher assembled

and racked back in he seback area for laer use in he main

well cenre or disassembled and laid ou on he deck

bull Dual mud sysem ensuring efficien change beween mud

tpes and compleion fluids Increased mud sorage capacit

bull Te ravelling sysem crown sheaves ravelling block and

main well cenre op drive is raed for 1250 ons enabling

a oal drilling deph of up o 40000 f Te equipmen is

fully inerchangable

bull Dedicaed guided ganry cranes for BOP and subsea rees

handling

Main advantages

Maersk

Viking Maersk Drilling is a considerable player in he ulra deepwaer

marke wih four newbuilding drillships and hree ulra

deepwaer developmen semi-submersibles

Te design and capaciies of he drillships include feaures

for high efficiency operaion Feauring dual derrick and

large subsea work and sorage areas he design allows for

efficien well consrucion and field developmen aciviies

hrough parallel and offline aciviies

Special aenion has been given o he safet on board

Equipped wih Muli Machine Conrol on he drill floor he

large degree of auomaion ensures a safe operaion and

consisen performance

bull Minimize overhead crane acivit Fork-lif access on

several decks

bull Riser inspecionmainenance baske allowing access o

all risers

bull Gas handler for safe evacuaion hrough choke of gas

rapped in marine riser

bull Prepared for 2nd BOP Dedicaed BOP pod workshop

bull Large accommodaion for 230 people and considerabl e

sorage and ank capaciies for long range and ex ended

ime operaional capabiliies

bull Black ou recovery less han 10 sec

bull Opimised fuel consumpion Five procen less fuel

consumpion in main load area

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 38

Maersk Drilling MaerskViking

DIMENSIONS IMPERIAL METRIC

Length overall 748 f 228 m

Width overall 138 f 42 m

Depth 62 f 19 m

Moonpool opening 84 f x 41 f 256 m x 125 m

PARTICULARS IMPERIAL METRIC

Rated drilling depth 40000 f 12000 m

Displacement operational 211650000 lbs 96000

Displacement transit 146600000 lbs 66500

Total payload (maxtr ansit) 44100000 lbs 36350000 lbs 20000 16500

Riser tensioner load 3600000 lbs 1633

Vertical DPCS6 setback load 2650000 lbs 1200

Horizontal riser rack area 135 x 90 f 135 x 274 m

Horizontal pipe rack area 17000 f983090 1600 m983090

WEATHER DESIGN CRITERIA (SURVIVAL) IMPERIAL METRIC

Water depth 12000 f 3600 m

Wind speed 100 knos 515 msec

Wave height 47 f 144 m

Wave period 17 sec 17 sec

Surface current 11 knos 06 msec

CAPACITIES IMPERIAL METRIC

Drill water 84755 fsup3 2400 msup3

Potable water 42377 fsup3 1200 msup3

Fuel oil 211888 fsup3 6000 msup3

Brine 26486 fsup3 750 msup3

Base oil 34961 fsup3 990 msup3

Liquid mud (active) 6030 bbl 960 msup3

Liquid mud (reserve) 5980 bbl 950 msup3

Bulk mud 15962 fsup3 452 msup3

Bulk cement 15962 fsup3 452 msup3

Waste mud (slop tank) 16880 fsup3 480 msup3

Accommodation 230 people 230 people

Main particulars

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 48

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 58

Maersk Drilling MaerskViking

MULTI MA CHINE CONTROLTe drillships feaure Muli Machine Conrol (MMC) a

compuerized conrol sysem which ogeher wih a

fully remoe operaed pipe handling sysem allows all

sandard operaions such as sand building and ripping

o be conduced wi hou personnel on he drill floor hus

ensuring a high level of consisency across he crew s Tis

represens a fur her developmen of MMC firs inroduced

by Maersk Drilling on he ulra deepwaer semi-submersible

now in operaion Duplicae equipmen on boh well c enres

adds redundancy o he operaion Tere are wo operaor

chairs available for each of he well cenr es however some

of he operaions can be performed by one man only due o

he MMC

ACTIVE HEAVE DRAWWORK

Acive Heave compensaion is provided by 1250 on raed

acive heave compensaing drawworks

DERRICK AND HOISTING SYSTEMS

Te main well cenre derrick capacit is raed o 25 million

pounds Te crown sheaves ravelling block and main well

cenre op drive is raed for 1250 ons Tis enables a oal

drilling deph of up o 40000 f

TUBULAR HANDLING SYSTEMS

Wihin he derrick seback area range 2 drill pipe can be

racked back in quads or range 3 drill pipe in riples up o

135 f lengh Casing of up o 16rdquo diameer can be racked

back in riples Over 50000 f of drill pipe can be r acked

including a heavy dut drill pipe casing landing sring

MARINE RISER AND TENSIONING SYSTEMS

In keeping wih he safe handling sand building philosophy

he rig is equipped wih hands free fas make up o 90 f

long MR 6H-SE riser joins raed for 12000 f waer deph

allowing efficien riser and BOP running Te ensioning

sysem consiss of eigh dual wire line ensioners giving a

oal op ension of 36 million pounds

CRANESHANDLING SYSTEMS

In addiion o he four main hydraulic knuckle boom deck

cranes a dedicaed pipe handling crane will cover he drill

pipe and casing sorage deck and a ganry crane will cover

he riser bays and slip join o ensure safe and efficien

handling Boh he BOP and subsea rees will be handled by

dedicaed guided ganry cranes and carriers

Key features

WELL CONTROL EQUIPMENTTe 15000 psi BOP sack is equipped wih six ram caviies

Te lower ram invered o allow BOP esing wihou he

requiremen o run a es ool and a 27rdquo SHD wellhead

connecor Te Lower Marine Riser Package [LMRP] has wo

10000 psi raed annulars and high angle release connecor

Te MUX conrol sysem has boh copper and fiber

communicaion enhancing redundancy

HP MUD SYSTEM

Te rig is equipped wih five mud pumps raed o 7500 psi

Max oupu f or he 5 HP mud pumps wih 8rdquo liners and max

speed 105 RPM is 4800 GPM

MUD RETURN SYSTEM

A dual drilling fluid sysem ensures an efficien change

beween mud tpes and compleion fluids Main shakers

include auomaic Shaker Load Conrol Sysem Tere is

a dedicaed and separae on line condiioning shaker for

reserve mud while circulaing on he well and a dedicaed

and separae compleion fluid shaker Full capacit cuings

blower sysem and dual rip anks are also incorporaed

MUD ACTIVE SYSTEMAcive mud pis and mud mixing sysem fully spli beween

waer based and oil based mud sysems wih 4 mixing

hoppers and five mixing pumps Including auomaic mud

chemical addiive sysem and ank washing sysem for all

mud pis

POWER MANAGEMENT SYSTEMS

Te updaed Power Managemen Sysem has he mos

efficien Black-ou Recovery configuraion available oday

as proven on Maersk Drillingrsquos ulra deepwaer semi-

submersibles Tis will ensure grealy enhanced overall

safet

POSITIONING SYSTEMS

Te drillship is designed wih a DP-3 Dynamic Posiioning

Sysem which is he highes cl ass Addiional buil

in redundancy in criical sysems will allow normal

mainenance wih no or limied impac on he safe t and

efficiency of he operaion Six 55MW hrusers will provide

adequae hrus and an increased heading conrol olerance

ACCOMMODATION

Te modern accommodaion is laid ou for 230 people inone- and wo-man cabins Separaion beween he busy

areas such as offices mess galley change rooms recreaion

rooms cinema ec and sleeping areas will furher enhance

he working environmen onboard

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 68

Maersk Drilling MaerskViking

LARGE CAPACI TY HORIZONTAL PIPE RACKS WITH DEDICATED PIPE HANDLING CRANE

RISER HANDLING GANTRY CRANE WITH SERVICE BASKET FOR INSPECTION AND MAINTENANCE OF RISER CONNECTORS

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 78

Maersk Drilling MaerskViking

OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES

HANDS FREE RISER RUNNING OPERATION

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 88

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 28

Maersk Drilling MaerskViking

TYPE

Samsung 96K drillship

BUILT

Samsung Heavy Indusries 2014

CLASS

American Bureau of Shipping

FLAG

Singapore

WATER DEPT H

3600 m (12000 f)

bull Muli Machine Conrol o allow all sandard operaions

such as sand building and ripping o be conduced

wihou personnel on he drill floor Tis ensures a high

level of safet as well as consisency across crews

bull Upime and efficiency are maximized hrough dual pipe

handling While one sring is working in he main well cenre

a second sring of eg casing drill pipe or boom hole

assembly in he auxiliary well cenre can be eiher assembled

and racked back in he seback area for laer use in he main

well cenre or disassembled and laid ou on he deck

bull Dual mud sysem ensuring efficien change beween mud

tpes and compleion fluids Increased mud sorage capacit

bull Te ravelling sysem crown sheaves ravelling block and

main well cenre op drive is raed for 1250 ons enabling

a oal drilling deph of up o 40000 f Te equipmen is

fully inerchangable

bull Dedicaed guided ganry cranes for BOP and subsea rees

handling

Main advantages

Maersk

Viking Maersk Drilling is a considerable player in he ulra deepwaer

marke wih four newbuilding drillships and hree ulra

deepwaer developmen semi-submersibles

Te design and capaciies of he drillships include feaures

for high efficiency operaion Feauring dual derrick and

large subsea work and sorage areas he design allows for

efficien well consrucion and field developmen aciviies

hrough parallel and offline aciviies

Special aenion has been given o he safet on board

Equipped wih Muli Machine Conrol on he drill floor he

large degree of auomaion ensures a safe operaion and

consisen performance

bull Minimize overhead crane acivit Fork-lif access on

several decks

bull Riser inspecionmainenance baske allowing access o

all risers

bull Gas handler for safe evacuaion hrough choke of gas

rapped in marine riser

bull Prepared for 2nd BOP Dedicaed BOP pod workshop

bull Large accommodaion for 230 people and considerabl e

sorage and ank capaciies for long range and ex ended

ime operaional capabiliies

bull Black ou recovery less han 10 sec

bull Opimised fuel consumpion Five procen less fuel

consumpion in main load area

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 38

Maersk Drilling MaerskViking

DIMENSIONS IMPERIAL METRIC

Length overall 748 f 228 m

Width overall 138 f 42 m

Depth 62 f 19 m

Moonpool opening 84 f x 41 f 256 m x 125 m

PARTICULARS IMPERIAL METRIC

Rated drilling depth 40000 f 12000 m

Displacement operational 211650000 lbs 96000

Displacement transit 146600000 lbs 66500

Total payload (maxtr ansit) 44100000 lbs 36350000 lbs 20000 16500

Riser tensioner load 3600000 lbs 1633

Vertical DPCS6 setback load 2650000 lbs 1200

Horizontal riser rack area 135 x 90 f 135 x 274 m

Horizontal pipe rack area 17000 f983090 1600 m983090

WEATHER DESIGN CRITERIA (SURVIVAL) IMPERIAL METRIC

Water depth 12000 f 3600 m

Wind speed 100 knos 515 msec

Wave height 47 f 144 m

Wave period 17 sec 17 sec

Surface current 11 knos 06 msec

CAPACITIES IMPERIAL METRIC

Drill water 84755 fsup3 2400 msup3

Potable water 42377 fsup3 1200 msup3

Fuel oil 211888 fsup3 6000 msup3

Brine 26486 fsup3 750 msup3

Base oil 34961 fsup3 990 msup3

Liquid mud (active) 6030 bbl 960 msup3

Liquid mud (reserve) 5980 bbl 950 msup3

Bulk mud 15962 fsup3 452 msup3

Bulk cement 15962 fsup3 452 msup3

Waste mud (slop tank) 16880 fsup3 480 msup3

Accommodation 230 people 230 people

Main particulars

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 48

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 58

Maersk Drilling MaerskViking

MULTI MA CHINE CONTROLTe drillships feaure Muli Machine Conrol (MMC) a

compuerized conrol sysem which ogeher wih a

fully remoe operaed pipe handling sysem allows all

sandard operaions such as sand building and ripping

o be conduced wi hou personnel on he drill floor hus

ensuring a high level of consisency across he crew s Tis

represens a fur her developmen of MMC firs inroduced

by Maersk Drilling on he ulra deepwaer semi-submersible

now in operaion Duplicae equipmen on boh well c enres

adds redundancy o he operaion Tere are wo operaor

chairs available for each of he well cenr es however some

of he operaions can be performed by one man only due o

he MMC

ACTIVE HEAVE DRAWWORK

Acive Heave compensaion is provided by 1250 on raed

acive heave compensaing drawworks

DERRICK AND HOISTING SYSTEMS

Te main well cenre derrick capacit is raed o 25 million

pounds Te crown sheaves ravelling block and main well

cenre op drive is raed for 1250 ons Tis enables a oal

drilling deph of up o 40000 f

TUBULAR HANDLING SYSTEMS

Wihin he derrick seback area range 2 drill pipe can be

racked back in quads or range 3 drill pipe in riples up o

135 f lengh Casing of up o 16rdquo diameer can be racked

back in riples Over 50000 f of drill pipe can be r acked

including a heavy dut drill pipe casing landing sring

MARINE RISER AND TENSIONING SYSTEMS

In keeping wih he safe handling sand building philosophy

he rig is equipped wih hands free fas make up o 90 f

long MR 6H-SE riser joins raed for 12000 f waer deph

allowing efficien riser and BOP running Te ensioning

sysem consiss of eigh dual wire line ensioners giving a

oal op ension of 36 million pounds

CRANESHANDLING SYSTEMS

In addiion o he four main hydraulic knuckle boom deck

cranes a dedicaed pipe handling crane will cover he drill

pipe and casing sorage deck and a ganry crane will cover

he riser bays and slip join o ensure safe and efficien

handling Boh he BOP and subsea rees will be handled by

dedicaed guided ganry cranes and carriers

Key features

WELL CONTROL EQUIPMENTTe 15000 psi BOP sack is equipped wih six ram caviies

Te lower ram invered o allow BOP esing wihou he

requiremen o run a es ool and a 27rdquo SHD wellhead

connecor Te Lower Marine Riser Package [LMRP] has wo

10000 psi raed annulars and high angle release connecor

Te MUX conrol sysem has boh copper and fiber

communicaion enhancing redundancy

HP MUD SYSTEM

Te rig is equipped wih five mud pumps raed o 7500 psi

Max oupu f or he 5 HP mud pumps wih 8rdquo liners and max

speed 105 RPM is 4800 GPM

MUD RETURN SYSTEM

A dual drilling fluid sysem ensures an efficien change

beween mud tpes and compleion fluids Main shakers

include auomaic Shaker Load Conrol Sysem Tere is

a dedicaed and separae on line condiioning shaker for

reserve mud while circulaing on he well and a dedicaed

and separae compleion fluid shaker Full capacit cuings

blower sysem and dual rip anks are also incorporaed

MUD ACTIVE SYSTEMAcive mud pis and mud mixing sysem fully spli beween

waer based and oil based mud sysems wih 4 mixing

hoppers and five mixing pumps Including auomaic mud

chemical addiive sysem and ank washing sysem for all

mud pis

POWER MANAGEMENT SYSTEMS

Te updaed Power Managemen Sysem has he mos

efficien Black-ou Recovery configuraion available oday

as proven on Maersk Drillingrsquos ulra deepwaer semi-

submersibles Tis will ensure grealy enhanced overall

safet

POSITIONING SYSTEMS

Te drillship is designed wih a DP-3 Dynamic Posiioning

Sysem which is he highes cl ass Addiional buil

in redundancy in criical sysems will allow normal

mainenance wih no or limied impac on he safe t and

efficiency of he operaion Six 55MW hrusers will provide

adequae hrus and an increased heading conrol olerance

ACCOMMODATION

Te modern accommodaion is laid ou for 230 people inone- and wo-man cabins Separaion beween he busy

areas such as offices mess galley change rooms recreaion

rooms cinema ec and sleeping areas will furher enhance

he working environmen onboard

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 68

Maersk Drilling MaerskViking

LARGE CAPACI TY HORIZONTAL PIPE RACKS WITH DEDICATED PIPE HANDLING CRANE

RISER HANDLING GANTRY CRANE WITH SERVICE BASKET FOR INSPECTION AND MAINTENANCE OF RISER CONNECTORS

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 78

Maersk Drilling MaerskViking

OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES

HANDS FREE RISER RUNNING OPERATION

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 88

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 38

Maersk Drilling MaerskViking

DIMENSIONS IMPERIAL METRIC

Length overall 748 f 228 m

Width overall 138 f 42 m

Depth 62 f 19 m

Moonpool opening 84 f x 41 f 256 m x 125 m

PARTICULARS IMPERIAL METRIC

Rated drilling depth 40000 f 12000 m

Displacement operational 211650000 lbs 96000

Displacement transit 146600000 lbs 66500

Total payload (maxtr ansit) 44100000 lbs 36350000 lbs 20000 16500

Riser tensioner load 3600000 lbs 1633

Vertical DPCS6 setback load 2650000 lbs 1200

Horizontal riser rack area 135 x 90 f 135 x 274 m

Horizontal pipe rack area 17000 f983090 1600 m983090

WEATHER DESIGN CRITERIA (SURVIVAL) IMPERIAL METRIC

Water depth 12000 f 3600 m

Wind speed 100 knos 515 msec

Wave height 47 f 144 m

Wave period 17 sec 17 sec

Surface current 11 knos 06 msec

CAPACITIES IMPERIAL METRIC

Drill water 84755 fsup3 2400 msup3

Potable water 42377 fsup3 1200 msup3

Fuel oil 211888 fsup3 6000 msup3

Brine 26486 fsup3 750 msup3

Base oil 34961 fsup3 990 msup3

Liquid mud (active) 6030 bbl 960 msup3

Liquid mud (reserve) 5980 bbl 950 msup3

Bulk mud 15962 fsup3 452 msup3

Bulk cement 15962 fsup3 452 msup3

Waste mud (slop tank) 16880 fsup3 480 msup3

Accommodation 230 people 230 people

Main particulars

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 48

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 58

Maersk Drilling MaerskViking

MULTI MA CHINE CONTROLTe drillships feaure Muli Machine Conrol (MMC) a

compuerized conrol sysem which ogeher wih a

fully remoe operaed pipe handling sysem allows all

sandard operaions such as sand building and ripping

o be conduced wi hou personnel on he drill floor hus

ensuring a high level of consisency across he crew s Tis

represens a fur her developmen of MMC firs inroduced

by Maersk Drilling on he ulra deepwaer semi-submersible

now in operaion Duplicae equipmen on boh well c enres

adds redundancy o he operaion Tere are wo operaor

chairs available for each of he well cenr es however some

of he operaions can be performed by one man only due o

he MMC

ACTIVE HEAVE DRAWWORK

Acive Heave compensaion is provided by 1250 on raed

acive heave compensaing drawworks

DERRICK AND HOISTING SYSTEMS

Te main well cenre derrick capacit is raed o 25 million

pounds Te crown sheaves ravelling block and main well

cenre op drive is raed for 1250 ons Tis enables a oal

drilling deph of up o 40000 f

TUBULAR HANDLING SYSTEMS

Wihin he derrick seback area range 2 drill pipe can be

racked back in quads or range 3 drill pipe in riples up o

135 f lengh Casing of up o 16rdquo diameer can be racked

back in riples Over 50000 f of drill pipe can be r acked

including a heavy dut drill pipe casing landing sring

MARINE RISER AND TENSIONING SYSTEMS

In keeping wih he safe handling sand building philosophy

he rig is equipped wih hands free fas make up o 90 f

long MR 6H-SE riser joins raed for 12000 f waer deph

allowing efficien riser and BOP running Te ensioning

sysem consiss of eigh dual wire line ensioners giving a

oal op ension of 36 million pounds

CRANESHANDLING SYSTEMS

In addiion o he four main hydraulic knuckle boom deck

cranes a dedicaed pipe handling crane will cover he drill

pipe and casing sorage deck and a ganry crane will cover

he riser bays and slip join o ensure safe and efficien

handling Boh he BOP and subsea rees will be handled by

dedicaed guided ganry cranes and carriers

Key features

WELL CONTROL EQUIPMENTTe 15000 psi BOP sack is equipped wih six ram caviies

Te lower ram invered o allow BOP esing wihou he

requiremen o run a es ool and a 27rdquo SHD wellhead

connecor Te Lower Marine Riser Package [LMRP] has wo

10000 psi raed annulars and high angle release connecor

Te MUX conrol sysem has boh copper and fiber

communicaion enhancing redundancy

HP MUD SYSTEM

Te rig is equipped wih five mud pumps raed o 7500 psi

Max oupu f or he 5 HP mud pumps wih 8rdquo liners and max

speed 105 RPM is 4800 GPM

MUD RETURN SYSTEM

A dual drilling fluid sysem ensures an efficien change

beween mud tpes and compleion fluids Main shakers

include auomaic Shaker Load Conrol Sysem Tere is

a dedicaed and separae on line condiioning shaker for

reserve mud while circulaing on he well and a dedicaed

and separae compleion fluid shaker Full capacit cuings

blower sysem and dual rip anks are also incorporaed

MUD ACTIVE SYSTEMAcive mud pis and mud mixing sysem fully spli beween

waer based and oil based mud sysems wih 4 mixing

hoppers and five mixing pumps Including auomaic mud

chemical addiive sysem and ank washing sysem for all

mud pis

POWER MANAGEMENT SYSTEMS

Te updaed Power Managemen Sysem has he mos

efficien Black-ou Recovery configuraion available oday

as proven on Maersk Drillingrsquos ulra deepwaer semi-

submersibles Tis will ensure grealy enhanced overall

safet

POSITIONING SYSTEMS

Te drillship is designed wih a DP-3 Dynamic Posiioning

Sysem which is he highes cl ass Addiional buil

in redundancy in criical sysems will allow normal

mainenance wih no or limied impac on he safe t and

efficiency of he operaion Six 55MW hrusers will provide

adequae hrus and an increased heading conrol olerance

ACCOMMODATION

Te modern accommodaion is laid ou for 230 people inone- and wo-man cabins Separaion beween he busy

areas such as offices mess galley change rooms recreaion

rooms cinema ec and sleeping areas will furher enhance

he working environmen onboard

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 68

Maersk Drilling MaerskViking

LARGE CAPACI TY HORIZONTAL PIPE RACKS WITH DEDICATED PIPE HANDLING CRANE

RISER HANDLING GANTRY CRANE WITH SERVICE BASKET FOR INSPECTION AND MAINTENANCE OF RISER CONNECTORS

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 78

Maersk Drilling MaerskViking

OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES

HANDS FREE RISER RUNNING OPERATION

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 88

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 48

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 58

Maersk Drilling MaerskViking

MULTI MA CHINE CONTROLTe drillships feaure Muli Machine Conrol (MMC) a

compuerized conrol sysem which ogeher wih a

fully remoe operaed pipe handling sysem allows all

sandard operaions such as sand building and ripping

o be conduced wi hou personnel on he drill floor hus

ensuring a high level of consisency across he crew s Tis

represens a fur her developmen of MMC firs inroduced

by Maersk Drilling on he ulra deepwaer semi-submersible

now in operaion Duplicae equipmen on boh well c enres

adds redundancy o he operaion Tere are wo operaor

chairs available for each of he well cenr es however some

of he operaions can be performed by one man only due o

he MMC

ACTIVE HEAVE DRAWWORK

Acive Heave compensaion is provided by 1250 on raed

acive heave compensaing drawworks

DERRICK AND HOISTING SYSTEMS

Te main well cenre derrick capacit is raed o 25 million

pounds Te crown sheaves ravelling block and main well

cenre op drive is raed for 1250 ons Tis enables a oal

drilling deph of up o 40000 f

TUBULAR HANDLING SYSTEMS

Wihin he derrick seback area range 2 drill pipe can be

racked back in quads or range 3 drill pipe in riples up o

135 f lengh Casing of up o 16rdquo diameer can be racked

back in riples Over 50000 f of drill pipe can be r acked

including a heavy dut drill pipe casing landing sring

MARINE RISER AND TENSIONING SYSTEMS

In keeping wih he safe handling sand building philosophy

he rig is equipped wih hands free fas make up o 90 f

long MR 6H-SE riser joins raed for 12000 f waer deph

allowing efficien riser and BOP running Te ensioning

sysem consiss of eigh dual wire line ensioners giving a

oal op ension of 36 million pounds

CRANESHANDLING SYSTEMS

In addiion o he four main hydraulic knuckle boom deck

cranes a dedicaed pipe handling crane will cover he drill

pipe and casing sorage deck and a ganry crane will cover

he riser bays and slip join o ensure safe and efficien

handling Boh he BOP and subsea rees will be handled by

dedicaed guided ganry cranes and carriers

Key features

WELL CONTROL EQUIPMENTTe 15000 psi BOP sack is equipped wih six ram caviies

Te lower ram invered o allow BOP esing wihou he

requiremen o run a es ool and a 27rdquo SHD wellhead

connecor Te Lower Marine Riser Package [LMRP] has wo

10000 psi raed annulars and high angle release connecor

Te MUX conrol sysem has boh copper and fiber

communicaion enhancing redundancy

HP MUD SYSTEM

Te rig is equipped wih five mud pumps raed o 7500 psi

Max oupu f or he 5 HP mud pumps wih 8rdquo liners and max

speed 105 RPM is 4800 GPM

MUD RETURN SYSTEM

A dual drilling fluid sysem ensures an efficien change

beween mud tpes and compleion fluids Main shakers

include auomaic Shaker Load Conrol Sysem Tere is

a dedicaed and separae on line condiioning shaker for

reserve mud while circulaing on he well and a dedicaed

and separae compleion fluid shaker Full capacit cuings

blower sysem and dual rip anks are also incorporaed

MUD ACTIVE SYSTEMAcive mud pis and mud mixing sysem fully spli beween

waer based and oil based mud sysems wih 4 mixing

hoppers and five mixing pumps Including auomaic mud

chemical addiive sysem and ank washing sysem for all

mud pis

POWER MANAGEMENT SYSTEMS

Te updaed Power Managemen Sysem has he mos

efficien Black-ou Recovery configuraion available oday

as proven on Maersk Drillingrsquos ulra deepwaer semi-

submersibles Tis will ensure grealy enhanced overall

safet

POSITIONING SYSTEMS

Te drillship is designed wih a DP-3 Dynamic Posiioning

Sysem which is he highes cl ass Addiional buil

in redundancy in criical sysems will allow normal

mainenance wih no or limied impac on he safe t and

efficiency of he operaion Six 55MW hrusers will provide

adequae hrus and an increased heading conrol olerance

ACCOMMODATION

Te modern accommodaion is laid ou for 230 people inone- and wo-man cabins Separaion beween he busy

areas such as offices mess galley change rooms recreaion

rooms cinema ec and sleeping areas will furher enhance

he working environmen onboard

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 68

Maersk Drilling MaerskViking

LARGE CAPACI TY HORIZONTAL PIPE RACKS WITH DEDICATED PIPE HANDLING CRANE

RISER HANDLING GANTRY CRANE WITH SERVICE BASKET FOR INSPECTION AND MAINTENANCE OF RISER CONNECTORS

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 78

Maersk Drilling MaerskViking

OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES

HANDS FREE RISER RUNNING OPERATION

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 88

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 58

Maersk Drilling MaerskViking

MULTI MA CHINE CONTROLTe drillships feaure Muli Machine Conrol (MMC) a

compuerized conrol sysem which ogeher wih a

fully remoe operaed pipe handling sysem allows all

sandard operaions such as sand building and ripping

o be conduced wi hou personnel on he drill floor hus

ensuring a high level of consisency across he crew s Tis

represens a fur her developmen of MMC firs inroduced

by Maersk Drilling on he ulra deepwaer semi-submersible

now in operaion Duplicae equipmen on boh well c enres

adds redundancy o he operaion Tere are wo operaor

chairs available for each of he well cenr es however some

of he operaions can be performed by one man only due o

he MMC

ACTIVE HEAVE DRAWWORK

Acive Heave compensaion is provided by 1250 on raed

acive heave compensaing drawworks

DERRICK AND HOISTING SYSTEMS

Te main well cenre derrick capacit is raed o 25 million

pounds Te crown sheaves ravelling block and main well

cenre op drive is raed for 1250 ons Tis enables a oal

drilling deph of up o 40000 f

TUBULAR HANDLING SYSTEMS

Wihin he derrick seback area range 2 drill pipe can be

racked back in quads or range 3 drill pipe in riples up o

135 f lengh Casing of up o 16rdquo diameer can be racked

back in riples Over 50000 f of drill pipe can be r acked

including a heavy dut drill pipe casing landing sring

MARINE RISER AND TENSIONING SYSTEMS

In keeping wih he safe handling sand building philosophy

he rig is equipped wih hands free fas make up o 90 f

long MR 6H-SE riser joins raed for 12000 f waer deph

allowing efficien riser and BOP running Te ensioning

sysem consiss of eigh dual wire line ensioners giving a

oal op ension of 36 million pounds

CRANESHANDLING SYSTEMS

In addiion o he four main hydraulic knuckle boom deck

cranes a dedicaed pipe handling crane will cover he drill

pipe and casing sorage deck and a ganry crane will cover

he riser bays and slip join o ensure safe and efficien

handling Boh he BOP and subsea rees will be handled by

dedicaed guided ganry cranes and carriers

Key features

WELL CONTROL EQUIPMENTTe 15000 psi BOP sack is equipped wih six ram caviies

Te lower ram invered o allow BOP esing wihou he

requiremen o run a es ool and a 27rdquo SHD wellhead

connecor Te Lower Marine Riser Package [LMRP] has wo

10000 psi raed annulars and high angle release connecor

Te MUX conrol sysem has boh copper and fiber

communicaion enhancing redundancy

HP MUD SYSTEM

Te rig is equipped wih five mud pumps raed o 7500 psi

Max oupu f or he 5 HP mud pumps wih 8rdquo liners and max

speed 105 RPM is 4800 GPM

MUD RETURN SYSTEM

A dual drilling fluid sysem ensures an efficien change

beween mud tpes and compleion fluids Main shakers

include auomaic Shaker Load Conrol Sysem Tere is

a dedicaed and separae on line condiioning shaker for

reserve mud while circulaing on he well and a dedicaed

and separae compleion fluid shaker Full capacit cuings

blower sysem and dual rip anks are also incorporaed

MUD ACTIVE SYSTEMAcive mud pis and mud mixing sysem fully spli beween

waer based and oil based mud sysems wih 4 mixing

hoppers and five mixing pumps Including auomaic mud

chemical addiive sysem and ank washing sysem for all

mud pis

POWER MANAGEMENT SYSTEMS

Te updaed Power Managemen Sysem has he mos

efficien Black-ou Recovery configuraion available oday

as proven on Maersk Drillingrsquos ulra deepwaer semi-

submersibles Tis will ensure grealy enhanced overall

safet

POSITIONING SYSTEMS

Te drillship is designed wih a DP-3 Dynamic Posiioning

Sysem which is he highes cl ass Addiional buil

in redundancy in criical sysems will allow normal

mainenance wih no or limied impac on he safe t and

efficiency of he operaion Six 55MW hrusers will provide

adequae hrus and an increased heading conrol olerance

ACCOMMODATION

Te modern accommodaion is laid ou for 230 people inone- and wo-man cabins Separaion beween he busy

areas such as offices mess galley change rooms recreaion

rooms cinema ec and sleeping areas will furher enhance

he working environmen onboard

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 68

Maersk Drilling MaerskViking

LARGE CAPACI TY HORIZONTAL PIPE RACKS WITH DEDICATED PIPE HANDLING CRANE

RISER HANDLING GANTRY CRANE WITH SERVICE BASKET FOR INSPECTION AND MAINTENANCE OF RISER CONNECTORS

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 78

Maersk Drilling MaerskViking

OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES

HANDS FREE RISER RUNNING OPERATION

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 88

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 68

Maersk Drilling MaerskViking

LARGE CAPACI TY HORIZONTAL PIPE RACKS WITH DEDICATED PIPE HANDLING CRANE

RISER HANDLING GANTRY CRANE WITH SERVICE BASKET FOR INSPECTION AND MAINTENANCE OF RISER CONNECTORS

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 78

Maersk Drilling MaerskViking

OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES

HANDS FREE RISER RUNNING OPERATION

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 88

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 78

Maersk Drilling MaerskViking

OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES

HANDS FREE RISER RUNNING OPERATION

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 88

8102019 Deepwater Advanced 1

httpslidepdfcomreaderfulldeepwater-advanced-1 88