deepwater advanced 1
TRANSCRIPT
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 18
Ultra deepwater drillingand development
Deepwater Advanced
MaerskViking
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 28
Maersk Drilling MaerskViking
TYPE
Samsung 96K drillship
BUILT
Samsung Heavy Indusries 2014
CLASS
American Bureau of Shipping
FLAG
Singapore
WATER DEPT H
3600 m (12000 f)
bull Muli Machine Conrol o allow all sandard operaions
such as sand building and ripping o be conduced
wihou personnel on he drill floor Tis ensures a high
level of safet as well as consisency across crews
bull Upime and efficiency are maximized hrough dual pipe
handling While one sring is working in he main well cenre
a second sring of eg casing drill pipe or boom hole
assembly in he auxiliary well cenre can be eiher assembled
and racked back in he seback area for laer use in he main
well cenre or disassembled and laid ou on he deck
bull Dual mud sysem ensuring efficien change beween mud
tpes and compleion fluids Increased mud sorage capacit
bull Te ravelling sysem crown sheaves ravelling block and
main well cenre op drive is raed for 1250 ons enabling
a oal drilling deph of up o 40000 f Te equipmen is
fully inerchangable
bull Dedicaed guided ganry cranes for BOP and subsea rees
handling
Main advantages
Maersk
Viking Maersk Drilling is a considerable player in he ulra deepwaer
marke wih four newbuilding drillships and hree ulra
deepwaer developmen semi-submersibles
Te design and capaciies of he drillships include feaures
for high efficiency operaion Feauring dual derrick and
large subsea work and sorage areas he design allows for
efficien well consrucion and field developmen aciviies
hrough parallel and offline aciviies
Special aenion has been given o he safet on board
Equipped wih Muli Machine Conrol on he drill floor he
large degree of auomaion ensures a safe operaion and
consisen performance
bull Minimize overhead crane acivit Fork-lif access on
several decks
bull Riser inspecionmainenance baske allowing access o
all risers
bull Gas handler for safe evacuaion hrough choke of gas
rapped in marine riser
bull Prepared for 2nd BOP Dedicaed BOP pod workshop
bull Large accommodaion for 230 people and considerabl e
sorage and ank capaciies for long range and ex ended
ime operaional capabiliies
bull Black ou recovery less han 10 sec
bull Opimised fuel consumpion Five procen less fuel
consumpion in main load area
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 38
Maersk Drilling MaerskViking
DIMENSIONS IMPERIAL METRIC
Length overall 748 f 228 m
Width overall 138 f 42 m
Depth 62 f 19 m
Moonpool opening 84 f x 41 f 256 m x 125 m
PARTICULARS IMPERIAL METRIC
Rated drilling depth 40000 f 12000 m
Displacement operational 211650000 lbs 96000
Displacement transit 146600000 lbs 66500
Total payload (maxtr ansit) 44100000 lbs 36350000 lbs 20000 16500
Riser tensioner load 3600000 lbs 1633
Vertical DPCS6 setback load 2650000 lbs 1200
Horizontal riser rack area 135 x 90 f 135 x 274 m
Horizontal pipe rack area 17000 f983090 1600 m983090
WEATHER DESIGN CRITERIA (SURVIVAL) IMPERIAL METRIC
Water depth 12000 f 3600 m
Wind speed 100 knos 515 msec
Wave height 47 f 144 m
Wave period 17 sec 17 sec
Surface current 11 knos 06 msec
CAPACITIES IMPERIAL METRIC
Drill water 84755 fsup3 2400 msup3
Potable water 42377 fsup3 1200 msup3
Fuel oil 211888 fsup3 6000 msup3
Brine 26486 fsup3 750 msup3
Base oil 34961 fsup3 990 msup3
Liquid mud (active) 6030 bbl 960 msup3
Liquid mud (reserve) 5980 bbl 950 msup3
Bulk mud 15962 fsup3 452 msup3
Bulk cement 15962 fsup3 452 msup3
Waste mud (slop tank) 16880 fsup3 480 msup3
Accommodation 230 people 230 people
Main particulars
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 48
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 58
Maersk Drilling MaerskViking
MULTI MA CHINE CONTROLTe drillships feaure Muli Machine Conrol (MMC) a
compuerized conrol sysem which ogeher wih a
fully remoe operaed pipe handling sysem allows all
sandard operaions such as sand building and ripping
o be conduced wi hou personnel on he drill floor hus
ensuring a high level of consisency across he crew s Tis
represens a fur her developmen of MMC firs inroduced
by Maersk Drilling on he ulra deepwaer semi-submersible
now in operaion Duplicae equipmen on boh well c enres
adds redundancy o he operaion Tere are wo operaor
chairs available for each of he well cenr es however some
of he operaions can be performed by one man only due o
he MMC
ACTIVE HEAVE DRAWWORK
Acive Heave compensaion is provided by 1250 on raed
acive heave compensaing drawworks
DERRICK AND HOISTING SYSTEMS
Te main well cenre derrick capacit is raed o 25 million
pounds Te crown sheaves ravelling block and main well
cenre op drive is raed for 1250 ons Tis enables a oal
drilling deph of up o 40000 f
TUBULAR HANDLING SYSTEMS
Wihin he derrick seback area range 2 drill pipe can be
racked back in quads or range 3 drill pipe in riples up o
135 f lengh Casing of up o 16rdquo diameer can be racked
back in riples Over 50000 f of drill pipe can be r acked
including a heavy dut drill pipe casing landing sring
MARINE RISER AND TENSIONING SYSTEMS
In keeping wih he safe handling sand building philosophy
he rig is equipped wih hands free fas make up o 90 f
long MR 6H-SE riser joins raed for 12000 f waer deph
allowing efficien riser and BOP running Te ensioning
sysem consiss of eigh dual wire line ensioners giving a
oal op ension of 36 million pounds
CRANESHANDLING SYSTEMS
In addiion o he four main hydraulic knuckle boom deck
cranes a dedicaed pipe handling crane will cover he drill
pipe and casing sorage deck and a ganry crane will cover
he riser bays and slip join o ensure safe and efficien
handling Boh he BOP and subsea rees will be handled by
dedicaed guided ganry cranes and carriers
Key features
WELL CONTROL EQUIPMENTTe 15000 psi BOP sack is equipped wih six ram caviies
Te lower ram invered o allow BOP esing wihou he
requiremen o run a es ool and a 27rdquo SHD wellhead
connecor Te Lower Marine Riser Package [LMRP] has wo
10000 psi raed annulars and high angle release connecor
Te MUX conrol sysem has boh copper and fiber
communicaion enhancing redundancy
HP MUD SYSTEM
Te rig is equipped wih five mud pumps raed o 7500 psi
Max oupu f or he 5 HP mud pumps wih 8rdquo liners and max
speed 105 RPM is 4800 GPM
MUD RETURN SYSTEM
A dual drilling fluid sysem ensures an efficien change
beween mud tpes and compleion fluids Main shakers
include auomaic Shaker Load Conrol Sysem Tere is
a dedicaed and separae on line condiioning shaker for
reserve mud while circulaing on he well and a dedicaed
and separae compleion fluid shaker Full capacit cuings
blower sysem and dual rip anks are also incorporaed
MUD ACTIVE SYSTEMAcive mud pis and mud mixing sysem fully spli beween
waer based and oil based mud sysems wih 4 mixing
hoppers and five mixing pumps Including auomaic mud
chemical addiive sysem and ank washing sysem for all
mud pis
POWER MANAGEMENT SYSTEMS
Te updaed Power Managemen Sysem has he mos
efficien Black-ou Recovery configuraion available oday
as proven on Maersk Drillingrsquos ulra deepwaer semi-
submersibles Tis will ensure grealy enhanced overall
safet
POSITIONING SYSTEMS
Te drillship is designed wih a DP-3 Dynamic Posiioning
Sysem which is he highes cl ass Addiional buil
in redundancy in criical sysems will allow normal
mainenance wih no or limied impac on he safe t and
efficiency of he operaion Six 55MW hrusers will provide
adequae hrus and an increased heading conrol olerance
ACCOMMODATION
Te modern accommodaion is laid ou for 230 people inone- and wo-man cabins Separaion beween he busy
areas such as offices mess galley change rooms recreaion
rooms cinema ec and sleeping areas will furher enhance
he working environmen onboard
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 68
Maersk Drilling MaerskViking
LARGE CAPACI TY HORIZONTAL PIPE RACKS WITH DEDICATED PIPE HANDLING CRANE
RISER HANDLING GANTRY CRANE WITH SERVICE BASKET FOR INSPECTION AND MAINTENANCE OF RISER CONNECTORS
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 78
Maersk Drilling MaerskViking
OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES
HANDS FREE RISER RUNNING OPERATION
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 88
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 28
Maersk Drilling MaerskViking
TYPE
Samsung 96K drillship
BUILT
Samsung Heavy Indusries 2014
CLASS
American Bureau of Shipping
FLAG
Singapore
WATER DEPT H
3600 m (12000 f)
bull Muli Machine Conrol o allow all sandard operaions
such as sand building and ripping o be conduced
wihou personnel on he drill floor Tis ensures a high
level of safet as well as consisency across crews
bull Upime and efficiency are maximized hrough dual pipe
handling While one sring is working in he main well cenre
a second sring of eg casing drill pipe or boom hole
assembly in he auxiliary well cenre can be eiher assembled
and racked back in he seback area for laer use in he main
well cenre or disassembled and laid ou on he deck
bull Dual mud sysem ensuring efficien change beween mud
tpes and compleion fluids Increased mud sorage capacit
bull Te ravelling sysem crown sheaves ravelling block and
main well cenre op drive is raed for 1250 ons enabling
a oal drilling deph of up o 40000 f Te equipmen is
fully inerchangable
bull Dedicaed guided ganry cranes for BOP and subsea rees
handling
Main advantages
Maersk
Viking Maersk Drilling is a considerable player in he ulra deepwaer
marke wih four newbuilding drillships and hree ulra
deepwaer developmen semi-submersibles
Te design and capaciies of he drillships include feaures
for high efficiency operaion Feauring dual derrick and
large subsea work and sorage areas he design allows for
efficien well consrucion and field developmen aciviies
hrough parallel and offline aciviies
Special aenion has been given o he safet on board
Equipped wih Muli Machine Conrol on he drill floor he
large degree of auomaion ensures a safe operaion and
consisen performance
bull Minimize overhead crane acivit Fork-lif access on
several decks
bull Riser inspecionmainenance baske allowing access o
all risers
bull Gas handler for safe evacuaion hrough choke of gas
rapped in marine riser
bull Prepared for 2nd BOP Dedicaed BOP pod workshop
bull Large accommodaion for 230 people and considerabl e
sorage and ank capaciies for long range and ex ended
ime operaional capabiliies
bull Black ou recovery less han 10 sec
bull Opimised fuel consumpion Five procen less fuel
consumpion in main load area
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 38
Maersk Drilling MaerskViking
DIMENSIONS IMPERIAL METRIC
Length overall 748 f 228 m
Width overall 138 f 42 m
Depth 62 f 19 m
Moonpool opening 84 f x 41 f 256 m x 125 m
PARTICULARS IMPERIAL METRIC
Rated drilling depth 40000 f 12000 m
Displacement operational 211650000 lbs 96000
Displacement transit 146600000 lbs 66500
Total payload (maxtr ansit) 44100000 lbs 36350000 lbs 20000 16500
Riser tensioner load 3600000 lbs 1633
Vertical DPCS6 setback load 2650000 lbs 1200
Horizontal riser rack area 135 x 90 f 135 x 274 m
Horizontal pipe rack area 17000 f983090 1600 m983090
WEATHER DESIGN CRITERIA (SURVIVAL) IMPERIAL METRIC
Water depth 12000 f 3600 m
Wind speed 100 knos 515 msec
Wave height 47 f 144 m
Wave period 17 sec 17 sec
Surface current 11 knos 06 msec
CAPACITIES IMPERIAL METRIC
Drill water 84755 fsup3 2400 msup3
Potable water 42377 fsup3 1200 msup3
Fuel oil 211888 fsup3 6000 msup3
Brine 26486 fsup3 750 msup3
Base oil 34961 fsup3 990 msup3
Liquid mud (active) 6030 bbl 960 msup3
Liquid mud (reserve) 5980 bbl 950 msup3
Bulk mud 15962 fsup3 452 msup3
Bulk cement 15962 fsup3 452 msup3
Waste mud (slop tank) 16880 fsup3 480 msup3
Accommodation 230 people 230 people
Main particulars
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 48
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 58
Maersk Drilling MaerskViking
MULTI MA CHINE CONTROLTe drillships feaure Muli Machine Conrol (MMC) a
compuerized conrol sysem which ogeher wih a
fully remoe operaed pipe handling sysem allows all
sandard operaions such as sand building and ripping
o be conduced wi hou personnel on he drill floor hus
ensuring a high level of consisency across he crew s Tis
represens a fur her developmen of MMC firs inroduced
by Maersk Drilling on he ulra deepwaer semi-submersible
now in operaion Duplicae equipmen on boh well c enres
adds redundancy o he operaion Tere are wo operaor
chairs available for each of he well cenr es however some
of he operaions can be performed by one man only due o
he MMC
ACTIVE HEAVE DRAWWORK
Acive Heave compensaion is provided by 1250 on raed
acive heave compensaing drawworks
DERRICK AND HOISTING SYSTEMS
Te main well cenre derrick capacit is raed o 25 million
pounds Te crown sheaves ravelling block and main well
cenre op drive is raed for 1250 ons Tis enables a oal
drilling deph of up o 40000 f
TUBULAR HANDLING SYSTEMS
Wihin he derrick seback area range 2 drill pipe can be
racked back in quads or range 3 drill pipe in riples up o
135 f lengh Casing of up o 16rdquo diameer can be racked
back in riples Over 50000 f of drill pipe can be r acked
including a heavy dut drill pipe casing landing sring
MARINE RISER AND TENSIONING SYSTEMS
In keeping wih he safe handling sand building philosophy
he rig is equipped wih hands free fas make up o 90 f
long MR 6H-SE riser joins raed for 12000 f waer deph
allowing efficien riser and BOP running Te ensioning
sysem consiss of eigh dual wire line ensioners giving a
oal op ension of 36 million pounds
CRANESHANDLING SYSTEMS
In addiion o he four main hydraulic knuckle boom deck
cranes a dedicaed pipe handling crane will cover he drill
pipe and casing sorage deck and a ganry crane will cover
he riser bays and slip join o ensure safe and efficien
handling Boh he BOP and subsea rees will be handled by
dedicaed guided ganry cranes and carriers
Key features
WELL CONTROL EQUIPMENTTe 15000 psi BOP sack is equipped wih six ram caviies
Te lower ram invered o allow BOP esing wihou he
requiremen o run a es ool and a 27rdquo SHD wellhead
connecor Te Lower Marine Riser Package [LMRP] has wo
10000 psi raed annulars and high angle release connecor
Te MUX conrol sysem has boh copper and fiber
communicaion enhancing redundancy
HP MUD SYSTEM
Te rig is equipped wih five mud pumps raed o 7500 psi
Max oupu f or he 5 HP mud pumps wih 8rdquo liners and max
speed 105 RPM is 4800 GPM
MUD RETURN SYSTEM
A dual drilling fluid sysem ensures an efficien change
beween mud tpes and compleion fluids Main shakers
include auomaic Shaker Load Conrol Sysem Tere is
a dedicaed and separae on line condiioning shaker for
reserve mud while circulaing on he well and a dedicaed
and separae compleion fluid shaker Full capacit cuings
blower sysem and dual rip anks are also incorporaed
MUD ACTIVE SYSTEMAcive mud pis and mud mixing sysem fully spli beween
waer based and oil based mud sysems wih 4 mixing
hoppers and five mixing pumps Including auomaic mud
chemical addiive sysem and ank washing sysem for all
mud pis
POWER MANAGEMENT SYSTEMS
Te updaed Power Managemen Sysem has he mos
efficien Black-ou Recovery configuraion available oday
as proven on Maersk Drillingrsquos ulra deepwaer semi-
submersibles Tis will ensure grealy enhanced overall
safet
POSITIONING SYSTEMS
Te drillship is designed wih a DP-3 Dynamic Posiioning
Sysem which is he highes cl ass Addiional buil
in redundancy in criical sysems will allow normal
mainenance wih no or limied impac on he safe t and
efficiency of he operaion Six 55MW hrusers will provide
adequae hrus and an increased heading conrol olerance
ACCOMMODATION
Te modern accommodaion is laid ou for 230 people inone- and wo-man cabins Separaion beween he busy
areas such as offices mess galley change rooms recreaion
rooms cinema ec and sleeping areas will furher enhance
he working environmen onboard
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 68
Maersk Drilling MaerskViking
LARGE CAPACI TY HORIZONTAL PIPE RACKS WITH DEDICATED PIPE HANDLING CRANE
RISER HANDLING GANTRY CRANE WITH SERVICE BASKET FOR INSPECTION AND MAINTENANCE OF RISER CONNECTORS
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 78
Maersk Drilling MaerskViking
OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES
HANDS FREE RISER RUNNING OPERATION
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 88
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 38
Maersk Drilling MaerskViking
DIMENSIONS IMPERIAL METRIC
Length overall 748 f 228 m
Width overall 138 f 42 m
Depth 62 f 19 m
Moonpool opening 84 f x 41 f 256 m x 125 m
PARTICULARS IMPERIAL METRIC
Rated drilling depth 40000 f 12000 m
Displacement operational 211650000 lbs 96000
Displacement transit 146600000 lbs 66500
Total payload (maxtr ansit) 44100000 lbs 36350000 lbs 20000 16500
Riser tensioner load 3600000 lbs 1633
Vertical DPCS6 setback load 2650000 lbs 1200
Horizontal riser rack area 135 x 90 f 135 x 274 m
Horizontal pipe rack area 17000 f983090 1600 m983090
WEATHER DESIGN CRITERIA (SURVIVAL) IMPERIAL METRIC
Water depth 12000 f 3600 m
Wind speed 100 knos 515 msec
Wave height 47 f 144 m
Wave period 17 sec 17 sec
Surface current 11 knos 06 msec
CAPACITIES IMPERIAL METRIC
Drill water 84755 fsup3 2400 msup3
Potable water 42377 fsup3 1200 msup3
Fuel oil 211888 fsup3 6000 msup3
Brine 26486 fsup3 750 msup3
Base oil 34961 fsup3 990 msup3
Liquid mud (active) 6030 bbl 960 msup3
Liquid mud (reserve) 5980 bbl 950 msup3
Bulk mud 15962 fsup3 452 msup3
Bulk cement 15962 fsup3 452 msup3
Waste mud (slop tank) 16880 fsup3 480 msup3
Accommodation 230 people 230 people
Main particulars
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 48
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 58
Maersk Drilling MaerskViking
MULTI MA CHINE CONTROLTe drillships feaure Muli Machine Conrol (MMC) a
compuerized conrol sysem which ogeher wih a
fully remoe operaed pipe handling sysem allows all
sandard operaions such as sand building and ripping
o be conduced wi hou personnel on he drill floor hus
ensuring a high level of consisency across he crew s Tis
represens a fur her developmen of MMC firs inroduced
by Maersk Drilling on he ulra deepwaer semi-submersible
now in operaion Duplicae equipmen on boh well c enres
adds redundancy o he operaion Tere are wo operaor
chairs available for each of he well cenr es however some
of he operaions can be performed by one man only due o
he MMC
ACTIVE HEAVE DRAWWORK
Acive Heave compensaion is provided by 1250 on raed
acive heave compensaing drawworks
DERRICK AND HOISTING SYSTEMS
Te main well cenre derrick capacit is raed o 25 million
pounds Te crown sheaves ravelling block and main well
cenre op drive is raed for 1250 ons Tis enables a oal
drilling deph of up o 40000 f
TUBULAR HANDLING SYSTEMS
Wihin he derrick seback area range 2 drill pipe can be
racked back in quads or range 3 drill pipe in riples up o
135 f lengh Casing of up o 16rdquo diameer can be racked
back in riples Over 50000 f of drill pipe can be r acked
including a heavy dut drill pipe casing landing sring
MARINE RISER AND TENSIONING SYSTEMS
In keeping wih he safe handling sand building philosophy
he rig is equipped wih hands free fas make up o 90 f
long MR 6H-SE riser joins raed for 12000 f waer deph
allowing efficien riser and BOP running Te ensioning
sysem consiss of eigh dual wire line ensioners giving a
oal op ension of 36 million pounds
CRANESHANDLING SYSTEMS
In addiion o he four main hydraulic knuckle boom deck
cranes a dedicaed pipe handling crane will cover he drill
pipe and casing sorage deck and a ganry crane will cover
he riser bays and slip join o ensure safe and efficien
handling Boh he BOP and subsea rees will be handled by
dedicaed guided ganry cranes and carriers
Key features
WELL CONTROL EQUIPMENTTe 15000 psi BOP sack is equipped wih six ram caviies
Te lower ram invered o allow BOP esing wihou he
requiremen o run a es ool and a 27rdquo SHD wellhead
connecor Te Lower Marine Riser Package [LMRP] has wo
10000 psi raed annulars and high angle release connecor
Te MUX conrol sysem has boh copper and fiber
communicaion enhancing redundancy
HP MUD SYSTEM
Te rig is equipped wih five mud pumps raed o 7500 psi
Max oupu f or he 5 HP mud pumps wih 8rdquo liners and max
speed 105 RPM is 4800 GPM
MUD RETURN SYSTEM
A dual drilling fluid sysem ensures an efficien change
beween mud tpes and compleion fluids Main shakers
include auomaic Shaker Load Conrol Sysem Tere is
a dedicaed and separae on line condiioning shaker for
reserve mud while circulaing on he well and a dedicaed
and separae compleion fluid shaker Full capacit cuings
blower sysem and dual rip anks are also incorporaed
MUD ACTIVE SYSTEMAcive mud pis and mud mixing sysem fully spli beween
waer based and oil based mud sysems wih 4 mixing
hoppers and five mixing pumps Including auomaic mud
chemical addiive sysem and ank washing sysem for all
mud pis
POWER MANAGEMENT SYSTEMS
Te updaed Power Managemen Sysem has he mos
efficien Black-ou Recovery configuraion available oday
as proven on Maersk Drillingrsquos ulra deepwaer semi-
submersibles Tis will ensure grealy enhanced overall
safet
POSITIONING SYSTEMS
Te drillship is designed wih a DP-3 Dynamic Posiioning
Sysem which is he highes cl ass Addiional buil
in redundancy in criical sysems will allow normal
mainenance wih no or limied impac on he safe t and
efficiency of he operaion Six 55MW hrusers will provide
adequae hrus and an increased heading conrol olerance
ACCOMMODATION
Te modern accommodaion is laid ou for 230 people inone- and wo-man cabins Separaion beween he busy
areas such as offices mess galley change rooms recreaion
rooms cinema ec and sleeping areas will furher enhance
he working environmen onboard
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 68
Maersk Drilling MaerskViking
LARGE CAPACI TY HORIZONTAL PIPE RACKS WITH DEDICATED PIPE HANDLING CRANE
RISER HANDLING GANTRY CRANE WITH SERVICE BASKET FOR INSPECTION AND MAINTENANCE OF RISER CONNECTORS
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 78
Maersk Drilling MaerskViking
OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES
HANDS FREE RISER RUNNING OPERATION
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 88
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 48
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 58
Maersk Drilling MaerskViking
MULTI MA CHINE CONTROLTe drillships feaure Muli Machine Conrol (MMC) a
compuerized conrol sysem which ogeher wih a
fully remoe operaed pipe handling sysem allows all
sandard operaions such as sand building and ripping
o be conduced wi hou personnel on he drill floor hus
ensuring a high level of consisency across he crew s Tis
represens a fur her developmen of MMC firs inroduced
by Maersk Drilling on he ulra deepwaer semi-submersible
now in operaion Duplicae equipmen on boh well c enres
adds redundancy o he operaion Tere are wo operaor
chairs available for each of he well cenr es however some
of he operaions can be performed by one man only due o
he MMC
ACTIVE HEAVE DRAWWORK
Acive Heave compensaion is provided by 1250 on raed
acive heave compensaing drawworks
DERRICK AND HOISTING SYSTEMS
Te main well cenre derrick capacit is raed o 25 million
pounds Te crown sheaves ravelling block and main well
cenre op drive is raed for 1250 ons Tis enables a oal
drilling deph of up o 40000 f
TUBULAR HANDLING SYSTEMS
Wihin he derrick seback area range 2 drill pipe can be
racked back in quads or range 3 drill pipe in riples up o
135 f lengh Casing of up o 16rdquo diameer can be racked
back in riples Over 50000 f of drill pipe can be r acked
including a heavy dut drill pipe casing landing sring
MARINE RISER AND TENSIONING SYSTEMS
In keeping wih he safe handling sand building philosophy
he rig is equipped wih hands free fas make up o 90 f
long MR 6H-SE riser joins raed for 12000 f waer deph
allowing efficien riser and BOP running Te ensioning
sysem consiss of eigh dual wire line ensioners giving a
oal op ension of 36 million pounds
CRANESHANDLING SYSTEMS
In addiion o he four main hydraulic knuckle boom deck
cranes a dedicaed pipe handling crane will cover he drill
pipe and casing sorage deck and a ganry crane will cover
he riser bays and slip join o ensure safe and efficien
handling Boh he BOP and subsea rees will be handled by
dedicaed guided ganry cranes and carriers
Key features
WELL CONTROL EQUIPMENTTe 15000 psi BOP sack is equipped wih six ram caviies
Te lower ram invered o allow BOP esing wihou he
requiremen o run a es ool and a 27rdquo SHD wellhead
connecor Te Lower Marine Riser Package [LMRP] has wo
10000 psi raed annulars and high angle release connecor
Te MUX conrol sysem has boh copper and fiber
communicaion enhancing redundancy
HP MUD SYSTEM
Te rig is equipped wih five mud pumps raed o 7500 psi
Max oupu f or he 5 HP mud pumps wih 8rdquo liners and max
speed 105 RPM is 4800 GPM
MUD RETURN SYSTEM
A dual drilling fluid sysem ensures an efficien change
beween mud tpes and compleion fluids Main shakers
include auomaic Shaker Load Conrol Sysem Tere is
a dedicaed and separae on line condiioning shaker for
reserve mud while circulaing on he well and a dedicaed
and separae compleion fluid shaker Full capacit cuings
blower sysem and dual rip anks are also incorporaed
MUD ACTIVE SYSTEMAcive mud pis and mud mixing sysem fully spli beween
waer based and oil based mud sysems wih 4 mixing
hoppers and five mixing pumps Including auomaic mud
chemical addiive sysem and ank washing sysem for all
mud pis
POWER MANAGEMENT SYSTEMS
Te updaed Power Managemen Sysem has he mos
efficien Black-ou Recovery configuraion available oday
as proven on Maersk Drillingrsquos ulra deepwaer semi-
submersibles Tis will ensure grealy enhanced overall
safet
POSITIONING SYSTEMS
Te drillship is designed wih a DP-3 Dynamic Posiioning
Sysem which is he highes cl ass Addiional buil
in redundancy in criical sysems will allow normal
mainenance wih no or limied impac on he safe t and
efficiency of he operaion Six 55MW hrusers will provide
adequae hrus and an increased heading conrol olerance
ACCOMMODATION
Te modern accommodaion is laid ou for 230 people inone- and wo-man cabins Separaion beween he busy
areas such as offices mess galley change rooms recreaion
rooms cinema ec and sleeping areas will furher enhance
he working environmen onboard
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 68
Maersk Drilling MaerskViking
LARGE CAPACI TY HORIZONTAL PIPE RACKS WITH DEDICATED PIPE HANDLING CRANE
RISER HANDLING GANTRY CRANE WITH SERVICE BASKET FOR INSPECTION AND MAINTENANCE OF RISER CONNECTORS
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 78
Maersk Drilling MaerskViking
OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES
HANDS FREE RISER RUNNING OPERATION
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 88
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 58
Maersk Drilling MaerskViking
MULTI MA CHINE CONTROLTe drillships feaure Muli Machine Conrol (MMC) a
compuerized conrol sysem which ogeher wih a
fully remoe operaed pipe handling sysem allows all
sandard operaions such as sand building and ripping
o be conduced wi hou personnel on he drill floor hus
ensuring a high level of consisency across he crew s Tis
represens a fur her developmen of MMC firs inroduced
by Maersk Drilling on he ulra deepwaer semi-submersible
now in operaion Duplicae equipmen on boh well c enres
adds redundancy o he operaion Tere are wo operaor
chairs available for each of he well cenr es however some
of he operaions can be performed by one man only due o
he MMC
ACTIVE HEAVE DRAWWORK
Acive Heave compensaion is provided by 1250 on raed
acive heave compensaing drawworks
DERRICK AND HOISTING SYSTEMS
Te main well cenre derrick capacit is raed o 25 million
pounds Te crown sheaves ravelling block and main well
cenre op drive is raed for 1250 ons Tis enables a oal
drilling deph of up o 40000 f
TUBULAR HANDLING SYSTEMS
Wihin he derrick seback area range 2 drill pipe can be
racked back in quads or range 3 drill pipe in riples up o
135 f lengh Casing of up o 16rdquo diameer can be racked
back in riples Over 50000 f of drill pipe can be r acked
including a heavy dut drill pipe casing landing sring
MARINE RISER AND TENSIONING SYSTEMS
In keeping wih he safe handling sand building philosophy
he rig is equipped wih hands free fas make up o 90 f
long MR 6H-SE riser joins raed for 12000 f waer deph
allowing efficien riser and BOP running Te ensioning
sysem consiss of eigh dual wire line ensioners giving a
oal op ension of 36 million pounds
CRANESHANDLING SYSTEMS
In addiion o he four main hydraulic knuckle boom deck
cranes a dedicaed pipe handling crane will cover he drill
pipe and casing sorage deck and a ganry crane will cover
he riser bays and slip join o ensure safe and efficien
handling Boh he BOP and subsea rees will be handled by
dedicaed guided ganry cranes and carriers
Key features
WELL CONTROL EQUIPMENTTe 15000 psi BOP sack is equipped wih six ram caviies
Te lower ram invered o allow BOP esing wihou he
requiremen o run a es ool and a 27rdquo SHD wellhead
connecor Te Lower Marine Riser Package [LMRP] has wo
10000 psi raed annulars and high angle release connecor
Te MUX conrol sysem has boh copper and fiber
communicaion enhancing redundancy
HP MUD SYSTEM
Te rig is equipped wih five mud pumps raed o 7500 psi
Max oupu f or he 5 HP mud pumps wih 8rdquo liners and max
speed 105 RPM is 4800 GPM
MUD RETURN SYSTEM
A dual drilling fluid sysem ensures an efficien change
beween mud tpes and compleion fluids Main shakers
include auomaic Shaker Load Conrol Sysem Tere is
a dedicaed and separae on line condiioning shaker for
reserve mud while circulaing on he well and a dedicaed
and separae compleion fluid shaker Full capacit cuings
blower sysem and dual rip anks are also incorporaed
MUD ACTIVE SYSTEMAcive mud pis and mud mixing sysem fully spli beween
waer based and oil based mud sysems wih 4 mixing
hoppers and five mixing pumps Including auomaic mud
chemical addiive sysem and ank washing sysem for all
mud pis
POWER MANAGEMENT SYSTEMS
Te updaed Power Managemen Sysem has he mos
efficien Black-ou Recovery configuraion available oday
as proven on Maersk Drillingrsquos ulra deepwaer semi-
submersibles Tis will ensure grealy enhanced overall
safet
POSITIONING SYSTEMS
Te drillship is designed wih a DP-3 Dynamic Posiioning
Sysem which is he highes cl ass Addiional buil
in redundancy in criical sysems will allow normal
mainenance wih no or limied impac on he safe t and
efficiency of he operaion Six 55MW hrusers will provide
adequae hrus and an increased heading conrol olerance
ACCOMMODATION
Te modern accommodaion is laid ou for 230 people inone- and wo-man cabins Separaion beween he busy
areas such as offices mess galley change rooms recreaion
rooms cinema ec and sleeping areas will furher enhance
he working environmen onboard
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 68
Maersk Drilling MaerskViking
LARGE CAPACI TY HORIZONTAL PIPE RACKS WITH DEDICATED PIPE HANDLING CRANE
RISER HANDLING GANTRY CRANE WITH SERVICE BASKET FOR INSPECTION AND MAINTENANCE OF RISER CONNECTORS
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 78
Maersk Drilling MaerskViking
OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES
HANDS FREE RISER RUNNING OPERATION
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 88
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 68
Maersk Drilling MaerskViking
LARGE CAPACI TY HORIZONTAL PIPE RACKS WITH DEDICATED PIPE HANDLING CRANE
RISER HANDLING GANTRY CRANE WITH SERVICE BASKET FOR INSPECTION AND MAINTENANCE OF RISER CONNECTORS
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 78
Maersk Drilling MaerskViking
OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES
HANDS FREE RISER RUNNING OPERATION
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 88
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 78
Maersk Drilling MaerskViking
OVERHEAD CR ANE FOR HANDLING AND GUIDANCE OF X-MASS TREES
HANDS FREE RISER RUNNING OPERATION
8102019 Deepwater Advanced 1
httpslidepdfcomreaderfulldeepwater-advanced-1 88