dedea strategic framework stakeholder briefing 12 october 2010
TRANSCRIPT
DEDEA STRATEGIC FRAMEWORK
STAKEHOLDER BRIEFING
12 OCTOBER 2010
• The Province has clustered the necessary infrastructure investments into:– Logistics; – Water and Energy; – Telecommunications; – Renewable Energy; – Forestry and Agriculture; and – Environmental Management.
BACKGROUND
• Strategic projects in each cluster are further organised into four geographic development zones:
– Port Elizabeth and surrounds (Coega Industrial Development Zone); – East London and surrounds (East London Industrial Development Zone); – the Wild Coast Development Zone; and – the Central hinterland.
• Green initiatives are also clustered geographically
BACKGROUND…cont
WILD COAST PORT ELIZABETH EAST LONDON HINTERLAND
LOGISTICS
1. Integrated Transport Hub
2. Provincial Parks infrastructure
3. Twinned Gateways4. Relocation of Tank
Farm and Manganese Terminal to Coega
5. Upgrade of EL Harbour
6. R72-N2-N6 Link
2. Provincial Parks infrastructure
WATER & ENERGY
7. Ntabelanga Multi Purpose Water Resource Development
8. Project Mthombo9. CCGT Power Station
10. Bulk Water Transfer from Ntabelanga
TELECOMMS 11. SeaCom cable 11. SeaCom cable
RENEWABLE ENERGY
12. Electric Vehicle Project
13. Bio-fuels Industry Development
14. Enabling Support for Alternative Energy Source Industries
FORESTRY & AGRICULTURE
15. Forestry Development16. Agricultural
Development
13. Bio-fuels Industry Development
ENVIRONMENTAL MANAGEMENT
17. Environmental Management Framework (EMF) for Wild Coast
18. Wild Coast Illegal Cottages Investigations
17. EMF for Buffalo City Municipality
19. Operationalisation of landfill sites
20. Peddie Revitalisation Programme
21. Environment Sector EPWP Projects
INTEGRATED WILD COAST TRANSPORT HUB
INTEGRATED WILD COAST TRANSPORT HUBN2 TOLL ROAD APPROVED
INTEGRATED WILD COAST TRANSPORT HUB
KEI-RAIL EXTENSION TO KOKSTAD PROPOSAL
INTEGRATED WILD COAST TRANSPORT HUBMTHATHA AIRPORT REFURBISHED
TWINNED GATEWAYS COEGA TO TAMBO SPRINGSPort of Ngqura, Coega IDZ
Twinned Gateways Coega to Tambo SpringsPort of Ngqura, Coega IDZ to/from Tambo Springs
RELOCATION OF “OLD PORT” INFRASTRUCTURE
PORT OF PE AND PORT OF NGQURA
REMOVE OLDFACILITIES
RELOCATE FACILITES
REHABILITATELAND
UPGRADE OF EAST LONDON HARBOUREAST LONDON PORT EXPANSION AND UPGRADING
EXPAND AND UPGRADE
SERVING
R72 / N2 / N6 LINKR72 / N2 BUFFALO RIVER CROSSING AND N6 UPGRADE
NTABELANGA MULTI PURPOSE WATER RESOURCE DEVELOPMENT
HYDROPOWER AND IRRIGATION
HYDROPOWER AND IRRIGATION
PROJECT MTHOMBO OF PETROSA
PETRO CHEMICAL REFINERY AT COEGA IDZ
COEGA CCGT POWER STATIONCOASTAL POWER GENERATION, NETWORK STABILITY, REDUCED TRANSMISSION LOSSES,
SECURITY OF SUPPLY, PRIMARY ENERGY DIVERSITY, REDUCED CARBON FOOTPRINT
UNDERSEA CABLESBROADBAND ACCESS FOR THE EASTERN CAPE
UNDERSEA CABLESBROADBAND ACCESS FOR THE EASTERN CAPE
RENEWABLE ENERGY – ELECTRIC VEHICLEMANUFACTURING FACILITY FOR SA’S FIRST LOCALLY DESIGNED ELECTRIC VEHICLE – THE JOULE
THE KEY ARGUMENT
• The Eastern Cape still remains vulnerable – Lagging behind in delivering critical Capital
Investments, with further reduction in government spending on key catalytic interventions planned and a Provincial Budget deficit = slowed economic recovery
• Thus, national intervention and private sector lobbying is key in realising these strategic interventions
THANK YOU