declararlon - andhra pradesh...declararlon rc.5794/2015-g1 date :02--12-2017. whereas it appears to...
TRANSCRIPT
FORM No.VII
(Under Section 119 (1) of the Act read with Sub Rule (1) of Rule 25)
DECLARArlON
Rc.5794/2015-G1 Date :02--12-2017.
Whereas it appears to the Appropriate Government and District Collector, Guntur
that a total extent of Ac. 98.0575 cents of land is required in LlNGAYAPALEMvillage,
Thullur Mandai of Guntur District for the purpose of construction of Capital City
Development Project by Andhra Pradesh Capital Region Development Authority,
Vijayawada, the District Collector having been satisfied that the lands specified in the
schedule below have to be acquired for public purpose, as objection have been received
from the persons interested and after due enquiry as provided Under Section 15 of Act 30
of 2013 and that the Requiring Body viz. Andhra Pradesh Capital Region Development
Authority, Vijayawada has deposited the amount towards the cost of acquisition of the
lands, the following Declaration is made Under Section 19 (1) of the Act 30 of 2013
(Central Act 30 of 2013).
DECLARATION
Under Section 19 (1) of the Act 30 of 2013 (Central Act 30 of 2013), the District
Collector, Guntur District, hereby, declares that the lands specified in the Schedule below
and measuring 98.0575 cents, be same a little more or less, are needed for a public
purpose for construction of Capital City Development Project by Andhra Pradesh Capital
Region Development Authority, Vijayawada.
SCHEDULE
Name of the Project: Capital City Development Project. Vijayawada
District : Guntur Mandai: Thullur Village: Lingayapalem
Extent Cia Boundaries
SI. Sy. S.D. Total covered Cate ssif Names of the persons Details of Trees.Extent by Land ica Structures. CropNo No NoAc. Cts acquisitio gory tio interested
etc., if anyn n
North East South West
Sy.No Sy.No Sy.No Sy.No
1 2 3 4 5 6 7 8 9 10 11 12 13
0.35 Pat Dr Moparthi Siva Velag1 7 B 0.3500 apudi Coconut00 ta y Sankara Rao 8 7/C Villag 7/A Tree-1
e
A21.760
1.7600Pat Dr Karumanchi
2 170 Rangarao 17/A1 17/B1 18 19 Palm Trees-4ta y
0.30 Pat DrAbburi Venkata
3 17 B200
0.3000 Ramakrishna17/B1 17/B1 17/B1 17/B1 ---ta y
Chowdary
~~i' 1Velag
.....
0.50 Pat Dr Karumanchiapudi Curry Leaf4 18 1 0.5000
Rangarao 17 18/2 Villag 19Crop
00 ta y
e
CoconutTree-l, Palm0.5000Trees-S,
pump shedKolli AnjammaVelag with
1.000 Pat Drapudi asbestos5 18 3
17 18/4 18/2 room &a ta yVillag
Bore witheMotor
Mallisetti YugandharJonna Crop
0.5000Babu
Jonna Crop.Velag0.47 Pat Dr Dasariapudi Bore with6 18 5 0.4700
ta Veeranjaneyulu 18/6 18/6Villag 18/4
Motor &00 y
e shed-ICurry LeafCrop. PalmTrees-36. I
I1.6500 Karumanchi KotaiahAmla Tree-1. NeemTree -1.
Curry LeafCrop. Palm
Velag Trees-14. II.14.64 Pat Dr Karumanchi 20 & 17 & apudi 23 & Neem Tree-7 19 200 4.8600 ta y
18 Villag 22 1. Teak Tree5ambasivarao 19/1e -1. Amla
Tree-l, Bore II;shed in
dilapalated.Karumanchi Bore with2.5300
Motor &RangaraoPalm Trees-5
5.6000 Bore with
IiiKarumanchi Apparao
Motor
Asbestassheetsshed.Toilet-I with
in thecompoundwall. Bore1.4200 Badeti Dharma Rao with motor.TeakTrees-
Velag 26. CoconutPat Dr Trees-25.6.77
24& apudi Amla Trees-8 26 2
26/1 2700 ta y25 Villag 8. Palmtrees
e - 4. & Soap-nut Trees-2
2.0000Badeti Dharma Rao ---
Badeti3.3500
Venkatalakshmi ---Kondamma
0.50 Pat Dr Madala Venkata27/B9 27 B2 0.5000
5eshagiri Rao 27/B1 26 32 ---00 ta y3
0.35 Pat Dr Vemparala10 31 B2 0.350030 27 31/B1 31/B1 ---00 ta y Venkateswara Rao
,.,--
Velag0.150 Pat Dr apudi
33 &11 32 A2 0.1500 Kanneganti Gandhi 32/A32/A1 Villag
32/A ---0 ta y1 e&
32/A 3
30.59 Pat Dr Vemparala12 32 B200
0.5900Venkateswara Rao 31 27 32/B1 32/B1 ---ta y
Bore withMotor -1.
Meka Venkata Coconut1.9250Reddy Trees-4
3.26 Pat Dr46 & and13 43 2
43/1 44 43/1 Neem Tree-00 ta y45
1Coconut
1.3350 Guntaka Sudeshna Trees 3 &Bore withMotor
1.740 Pat Dr Meka Venkata14 44 10
1.7400Reddy 43 44/2 21 42 ---ta y
1.000 Pat Dr Bore with15 44 3 1.0000 Meka Subba Reddy43 45 21 44/2 Motor, Shed0 ta y
& NeemTree-1
0.155 Pat Dr Narne I16 46 1 0.1550 ---0 ta y Venkateswarao 47 46/2 46/2 43
1.450 Pat Dr Jonnalagadda17 48 2 1.450048/1 48/1 48/1 48/1 ---0 ta y Seshagiri Rao
B11.445
1.4450Pat Dr III18 61
Aluri Tulasi & 63 61/B2 53 61/A ---0 ta yJonnalagaddaSatyanarayana
C21.490
1.4900Pat Dr
Murakonda 78 & 74/D 74/C19 74 ---0 ta y Sambasivarao 77 & 75 651
A2 0.50 Pat DrMurakonda Srihari 77/A20 77 0.5000 77/A2 77/A 77/A ---B 00 ta y
Rao 2A A 2A 2A
21 20.50
0.5000Pat Dr
Anumolu Sri Harirao Donda Crop11400 114/1 116 115 199 & Teak Tree-ta y
1Coconut
0.5450 Anumolu Srimukhi Trees-5 &Compound
wallPat DrCoconut22 115 A 1.09
ta y114 116 115/B 199 Trees-5 &
0.5450 Anumolu Venkata Pump houseNagasriharsha with
asbestossheetswithbrick wallsDonda
1162.05 Pat Dr Anumolu Venkata
114& Crop. Neem23 1 2.050000 ta y Nagasriharsha118 117 116/2 114 Tree-1. Drip
& Motor.
Donda3.0750 Anumolu Srimukhi Crop. Drip4.09 Pat Dr118& with motor24 117 1
50 127 117/2 116 & shedta y125
1.0200 Anumolu VenkataDonda CropNagasriharshaand Drip
~.Bore with
2.4000 Anumolu Venkata Motor &2.62 Pat Dr Nagasriharsha Neem Tree-25 123 A 121 123/B 124 118 100 ta y
0.2200 Anumolu Venkata Bore withTiruchan Gandhi Motor
0.60 Pat Dr127 125/ Bore with26 125 C2 0.6000
Anumolu Subbarao 124 12600 ta y& 117 C1 Motor
0.7700Anumolu Subbarao 122,1.100 Pat Dr 126/227 126 1
0 124 126/A& 125 ---ta y Anumolu Purna 2A&0.3300 127Chandra rao 2B
0.42 Pat Dr Anumolu Purna 126/28 126 2A
000.4200
Chandra rao1, 122
128 126/2126/1 ---ta y
& B128
29 127 B21.040
1.0400Pat Dr
Gettam Rojanamma 127/B 127/B 127/B Maize Crop0 ta y
1 1281 1 & Bore with
Motor1.4700 Chintala Srikanth Bore with
Motor8.39 Pat Dr Chintala Sri 129 127,
30 128 1 1.4700 128/2 126 Bore with00 ta y Ramamurthy 132&.129 &
& Motor165122
5.4500 Chintala Apparao ---
2.3000 KoyyaguraAbsalomu Donda Crop
. 0.3100 Koyyagura JayammaDonda Crop102,
A1 5.130 Pat Dr 139/140 & 139/31 139
A 0 0.8400 Gundapu Chandra AlB142 A2 136ta y
Sekhar &140
0.8400 Gundapu RajeshKumar ---
0.8400 GundapuIIRamanamma ---
0.2200 GundapuRamanamma
/l32 139
A3 0.66 Pat DrGundapu ChandraB 00 0.2200 139/
142 139/ta y Sekhar A2 139/BA3A ---
III
·0.2200 Gundapu RajeshKumar
0.4600 Gundapu Chandra1.370 Pat Dr Sekhar ---33 140 2 202/ 1390 ta y
2 141 142 &0.9100 Gundapu Rajesh 140/1
Kumar ---0.8700 Gundapu
In side DripRamanamma
34 141 12.69
0.9100Pat Dr
Gundapu Chandra 141/2 142202/00 ta y Sekhar 2 95 & & ---142 140
0.9100 Gundapu Rajesh---Kumar
35 152 1 1.500 1.5000 Pat Dr Madala Bharathi 152/2 152/2 150150 ---I\, -"i-'--- L______
0 ta y
0.74 Pat Dr36 155 200
0.7400 Anumolu Subbarao 155/1 154 155/3 156 ---ta y
0.1650Chintala Apparao
0.47 Pat Dr 176/30.1650 Chintala ,17737 176 2
178 176/3 176/350 ta y Udayalakshmi & ---0.1450 Chintala Sri Rama 178
Murthy
Bore withMadala Siva Motor &1.1900
Ramakrisnaiah BananaGarden
1.1900 Madala Mahendra BananaGarden
Madala Banana1.7000Bhuvaneswar Garden
176/5 Bore withMadala Kishore & Motor &
8.120 1.6200Pat Dr Babu 178
Raya Banana38 176 4 & 175pudi 176/3 Garden0 ta y
176/1Villag
0.1600 Madala Swarajyam e ---
Madala Banana0.0700Vigneswararao Garden
1.1800 Madala Giridhar ---
1.0100 Madala Rambabu Bore withMotor
181/BB2 Pat Dr 177 & 2B &
181 0.910 Anumolu Raya 181/B Bore with39 A 00.9100 ta y Vijayalakshmi 178 181/B2
pudi 1 Motor.BVillag
e
Teak Trees-
Raya 4, PalmPat Dr Trees-5140 184 4.03 Anumolu Venkata pudi
2 Bore with004.0300 ta y Tiruchan Gandhi Villag 185 183 183
2 motors,ePump shed-
1.
Raya 187&0.58 Pat Dr pudi
Raya41 188 2 0.5800 ta Kondepati Subbarao Villag 188/1 188/1 ---00 Ypudie&Villag188/1
e
190 0.0500 Vemparala ---Samabasiva raot----
Teak Trees-190/ 178 5, Coconut
11.135 Pat Dr 190/1
1A & &190/1 Trees 8,42
0 ta y Vemparala A186
A Cattle sheds190 1C- 2 with1.0850 Venkateswararao &
others asbestossheets roofwithoutwalls andone h;::mri
~
pump.
1. Pat Dr Anumolu Venkata 17843 191 2 1.15002500 ta y 194 191/3 & 190 ---siva Sankara Prasad
191/10.07 Pat Dr Muthavarapu44 191 400
0.0700191/3 192 178 178 ---ta y Padmavathi
0.560.5625
Pat Dr199 & 192/245 192 1
25 Anumolu Sri Harirao 193 & 191 ---ta y192/2
178Donda
Anurnolu Venkata Crop.2.0000 Nagavardhana Sai Coconut
Trees-44.00 Pat Dr Bipin Kumar 193/3 193/3 193/3 Bore with46 193 3A00 ta y Al 199
B B& drip. Tombs194 (Sniall)-2
2.0000 Anumolu Surya ---Thirupathi Rayadu
0.03 Pat Dr Anumolu Venkata47 194 1
000.0300
Nagavardhana Sai 196 194/2 194/2 195ta y ---Bipin Kumar
Bore with3A 3.33 Pat Dr Anumolu Venkata 188 Motor.48 194lAl 00
3.3300 Nagavardhana Sai 194/2 194/3 194/3& Drip-l,ta y A2 A1A2Bipin Kumar 195 . Neam Tree-
1.
0.6000 Chanumolu Sailaja1.250 Pat Dr
202/49 198 20 199 198/1 198/1 ---ta y 20.6500 Jammula Kishore
Babu
TOTAL 98.0575...
A plan of the lands is kept in the office of the LandAcquisition Officer & SpecialDeputy
Collector (LA). Lingayapalemand may be inspectedon any working day during office hours.
The Number of families likely to be affectedare 63 and henceResettlementarea identified.
A summary of the Rehabilitation and ResettlementSchemeis kept available in the office of the
Land Acquisition Officer of Lingayapalem and website of the APCRDA. www.crda.ap.gov.in
and website of the District Collector. Guntur www.guntur.ap.gov.in.
Mines of coal; iron/stone. slate or other minerals lying under the said land or any
particular portion of the said land. except such parts of the mines and minerals which may be
required to be dug or removed or used during the construction phase of the project for the
purposeof which the land is being acquired are not needed.
Place: GunturDate :02.:12-2017.
/(~(ZqUiSit:A:ffiJ;&SpecialDeputy Collector
APCRDA.Unit -16. Lingayapalem.
DISTRICTCOLLECTOR~ GUNTUR.