    Decision making factors whenmoving to SAP NetWeaver ProcessIntegration 7.3

    Patrick Kelleher, Regional Implementation Group

    April, 2011

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    2/41

    SAP 2007 / Page 2

    Agenda

    1. Overview2. Performing a PI 7.3 Upgrade3. Creating a new PI 7.3 Installation4. Decision making factors to take into consideration

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    3/41

    Overview

    SAP 2008 / Page 3

    1. Preparation Phase1.1 Reasons to move to PI 7.31.2 Overview of new features1.3 Technical prerequisites

    2. Upgrade Options

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    4/41

    Evaluate your reasons for moving to SAPNetWeaver PI 7.3

    Ensure your Future:The SAP NW PI 7.3 release will be the release of choice.

    Improved SOA Infrastructure:Central Monitoring, Better Federation Support

    Enhanced Integrated Configuration:Option of choice for new content development.

    Advanced Adapter Engine Extended (AEX)Is a more feature complete single stack option for SAP NW PI 7.3.

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    5/41

    Overview

    SAP 2008 / Page 5

    1. Preparation Phase1.1 Reasons to move to PI 7.31.2 Overview of new features1.3 Technical prerequisites

    2. Upgrade Options

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    6/41

    Elevator Pitch SAP NetWeaver PI 7.3Centralized Monitoring, Single Stack ESB, Reduced TCO

    Major Improvements for

    Reduced cost of operations viaincreased fault toleranceDesign governanceStandards based interoperability

    and connectivity

    Centralized monitoring via SAP Solution

    Manager 7.1- Good morning page- Monitor multiple PI domains- Reduced time for root cause analysis

    Single stack ESB capabilities through Advanced Adapter Engine- Up to 60% less energy consumption- Lower footprint, easy maintenance:

    1h installation*, HW requirements*comp. to double stack, 90 sec restart*

    *Hardware dependent

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    7/41

    Overview

    SAP 2008 / Page 7

    1. Preparation Phase1.1 Reasons to move to PI 7.31.2 Overview of new features1.3 Technical prerequisites

    2. Upgrade Options

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    8/41 SAP 2008 Page 8

    Technical prerequisites that need to beevaluated before an Upgrade

    Check Product Availability Matrix for SAP NetWeaver Process Integration 7.3http://service.sap.com/pam

    Requires a 64-bit Operating SystemCompatible with certain database releases

    Check SAP Software Cataloghttp://www.sap.com/ecosystem/customers/directories/SearchSolution.epx

    Not all 3 rd-party Adapters are certified on SAP NW PI 7.3

    Check for SAP Business Content availabilityCheck for 3rd-party PI Content availability from your 3rd-party solution providers

    http://service.sap.com/swdc

    http://service.sap.com/pamhttp://www.sap.com/ecosystem/customers/directories/SearchSolution.epxhttp://service.sap.com/swdchttp://service.sap.com/swdchttp://www.sap.com/ecosystem/customers/directories/SearchSolution.epxhttp://www.sap.com/ecosystem/customers/directories/SearchSolution.epxhttp://service.sap.com/pamhttp://service.sap.com/pam
  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    9/41 SAP 2008 Page 9

    PI constraints that need to be evaluatedbefore an Upgrade

    Minimum SP requirements:XI 3.0 requires minimum SP15PI 7.0 requires minimum SP09 (SR1)PI 7.1 requires minimum SP01 (RTC)PI 7.11 requires minimum SP01 (RTC)

    Single usage type?

    Additional components?

    Non-Central Adapter EngineJ2SE Adapter EnginePCK (Migration to AEX)

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    10/41

    Overview

    SAP 2008 / Page 10

    1. Preparation Phase1.1 Reasons to move to PI 7.31.2 Overview of new features1.3 Technical prerequisites

    2. Upgrade Options

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    11/41 SAP 2008 Page 11

    Upgrade paths will be offered for

    SAP NetWeaver 2004 (XI 3.0)

    SAP NetWeaver 7.0 (2004s) (PI 7.0)

    XI 3.0 and PI 7.0

    PI 7.1 and 7.11

    SAP NetWeaver PI 7.3

    U p g r a d e

    Upgrade Paths to SAP NetWeaver Process Integration 7.3

    Update paths will be offered for SAP NetWeaver PI 7.1

    EHP1 for SAP NetWeaver PI 7.1 (PI 7.11)

    U p d

    a t e

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    12/41 SAP 2008 Page 12

    Options How to Get to SAP PI 7.1

    Two options exist to go from XI/PI to SAP PI 7.3:

    Option 1: Technical UpgradeUpgrade of existing XI/PI system32 Bit Operating System is not supported

    SAP JVM is installed during upgrade process

    Option 2: New Installation and Phase-outNew SAP PI 7.3 InstallationUse SAP PI 7.3 for new integration scenarios

    Phased migration of application systems

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    13/41 SAP 2007 / Page 13

    Agenda

    1. Overview2. Performing a PI 7.3 Upgrade3. Creating a new PI 7.3 Installation4. Decision making factors to take into consideration

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    14/41

    Overview

    SAP 2008 / Page 14

    1. Performing a PI 7.3 UpgradeSLD ConsiderationsUpgrade Project Steps

    Adjust Scenarios to SAP PI 7.3 capabilities

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    15/41

    PI

    PI

    SLD ConsiderationsExample migration from a SAP NW PI 7.0

    PI 7.0Registered in Central SLD

    Central SLD (7.0)Running Stand-Alone

    AS Java 7.0 in HA

    SAP ApplicationsExternal Accounting andEmail based Applications

    Are registered in theCentral SLD

    And communicate withPI and SolMan

    Solution Manager 7.0With Local SLD 7.0

    Upgrade to PI 7.3Use Central SLD

    Upgrade to PI 7.3Use Local PI 7.3 SLD

    SLD

    SLD

    SLD

    SLD

    SLD

    SLD

    SLD

    PI

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    16/41

    SLD ConsiderationsExample migration from a SAP NW PI 7.0

    PI 7.0Registered in Central SLD

    Central SLD (7.0)

    Solution Manager 7.0With Local SLD 7.0

    Upgrade to PI 7.3 and use the Central SLD:PI 7.3 can run as client of a 7.0 SLD (SAP Note 954820)

    SLD

    SLD

    SLD

    PI

    SLD

    PI

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    17/41

    SLD ConsiderationsExample migration from a SAP NW PI 7.0

    PI 7.0Registered in Central SLD

    Central SLD (7.0)

    Solution Manager 7.0With Local SLD 7.0

    SLD

    SLD

    SLD

    PI

    SLD

    Upgrade to PI 7.3 with local (7.3) SLD: Improved performance of SLD 7.3 2 parallel SLD versions Full automatic synchronization

    SLD

    PI

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    18/41

    Overview

    SAP 2008 Page 18

    1. Performing a PI 7.3 UpgradeSLD ConsiderationsUpgrade Project Steps

    Adjust Scenarios to SAP PI 7.3 capabilities

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    19/41

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    20/41 SAP 2008 Page 20

    Upgrade Steps

    Upgrade Operating System to 64Bit and Database (see PAM)Clean-up XI/PI

    Get rid of erroneous messagesReducing latency periodClear open change lists

    Upgrade to PI 7.3Configure new features of PI 7.3Test your business scenarios

    Repeat for Test and Production system

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    21/41

    DEV 7.X

    Option 2:Upgrade with a Development Sandbox

    SAP 2007 Page 21

    PI

    QA 7.X

    PI

    Prod 7.X

    PI

    DEV 7.3

    PI

    QA 7.3

    PI

    Prod 7.3

    PI

    4 & 5

    DEV 7.X

    PI

    DEV 7.X

    PI

    QA 7.X

    PI

    Prod 7.X

    PI

    DEV 7.3

    PI

    DEV 7.X

    PI

    QA 7.X

    PI

    Prod 7.X

    PI

    QA 7.3

    PI

    14 days 2 days

    3

    14 days

    21

    2 days

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    22/41

    Overview

    SAP 2008 Page 22

    1. Performing a PI 7.3 UpgradeSLD ConsiderationsUpgrade Project StepsAdjust Scenarios to SAP PI 7.3 capabilities

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    23/41 SAP 2008 Page 23

    Post Upgrade Steps

    Adjust and redeploy adapter modules and Java Proxies

    Custom adapter modules3 rd-party adapters and modules3 rd-party dependant content

    Deploy J2EE5 compliant JDBC/JMS driversCheck that message packaging is switched on globallyXSLT and Java Mappings might have to be adjusted due to changes

    in the JVM and built-in XSLT processor

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    24/41 SAP 2007 Page 24

    Agenda

    1. Overview2. Performing a PI 7.3 Upgrade3. Creating a new PI 7.3 Installation4. Decision making factors to take into consideration

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    25/41

    Prod ECC

    New Installation of SAP PI 7.3

    SAP 2007 Page 25

    DEV 7.X

    PI

    QA 7.X

    PI

    Prod 7.X

    PI

    DEV 7.3

    PI

    QA 7.3

    PI

    Prod 7.3

    PI

    Existing XI/PI Track PI 7.3 Track

    Prod FIN

    QA ECC QA FIN

    DEV ECC DEV FIN

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    26/41

    SAP 2008 Page 26

    Migration: Pre-flight Checklist

    Check PI 7.3 PAM and Sizing Guide

    Evaluate HA setup

    Install PI 7.3 development system

    Create/Transfer communication users

    Optional: Setup new SLD 7.3

    Optional: Transport selected SLD content

    Transport selected basic and operations relevantconfiguration (Alerts, archiving, ABAP transports, etc)

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    27/41

    Prod ECC

    Transition from existing PI to new PI 7.3installation

    SAP 2007 Page 27

    DEV 7.X

    PI

    QA 7.X

    PI

    Prod 7.X

    PI

    DEV 7.3

    PI

    QA 7.3

    PI

    Prod 7.3

    PI

    Existing XI/PI Track PI 7.3 Track

    Prod FIN

    QA ECC QA FIN

    DEV ECC DEV FIN

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    28/41

    SAP 2008 Page 28

    Migration to PI 7.3

    Move Selected Scenarios to PI 7.3Transport selected Integration Repository contentTransport selected Integration DirectoryConfigure Communication ChannelsTransport Custom ABAP Development

    Perform Post-Upgrade stepsUpdate Adapter, Modules, and ProxiesDeploy JMS/JDBC Drivers

    Switch on message packagingUpdate XSLT and Java Mappings

    Test MigrationMigrate QA and Production

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    29/41

    Prod ECC

    Gradual phase-out of existing PI.

    SAP 2007 Page 29

    DEV 7.X

    PI

    QA 7.X

    PI

    Prod 7.X

    PI

    DEV 7.3

    PI

    QA 7.3

    PI

    Prod 7.3

    PI

    Existing XI/PI Track PI 7.3 Track

    Prod FIN

    QA ECC QA FIN

    DEV ECC DEV FIN

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    30/41

    SAP 2008 Page 30

    Phase-out Steps

    Execute Final Testing of all migrated interfaces on Dev and QA

    Disconnect Remaining Systems/Components from existing PI

    Optional: Create a final Backup of the existing production PI

    Transport remaining scenarios from QA to Production

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    31/41

    SAP 2007 Page 31

    Agenda

    1. Overview2. Performing a PI 7.3 Upgrade3. Creating a new PI 7.3 Installation4. Decision making factors to take into consideration

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    32/41

    SAP 2008 Page 32

    Upgrade: Pros and Cons

    Upgrade

    ProsLess effort because no redirection of the business scenarios are requiredNo adjustment of the Sending/Receiving systemsExisting basis customization can be reused after upgrade

    ConsHigh risk (no fallback XI/PI solution available, only restore possible)Higher downtime compared to new installation and phase-outExisting limitations for upgrade SAP Note 1407530 : Release restrictions for SAP NetWeaver 7.3 - Process Integration SAP Note 1403832 : Central Note: Upgrade Systems on SAP NetWeaver 7.3

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    33/41

    SAP 2008 Page 33

    New Install: Pros and Cons

    New Installation and Phase-out

    ProsLow riskPhased approach for interface implementationLower downtime compared to upgrade

    ConsMore effort because XI/PI scenarios have to be transported to the SAP PI 7.3system and communication channels have to be changed manuallyExisting basis has to be incorporated in the new SAP PI 7.3 system

    Additional hardware is required

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    34/41

    SAP 2008 Page 34

    Major Decision Factors

    OptionsDecision Factors Upgrade New Installation &Phaseout

    Is XI/PI the onlyusage type installed? Yes No

    Is your current OS version

    and/or DB version supported?(Check PAM for PI 7.3) Yes No

    What is the maximum alloweddowntime of your productive

    PI system (in hours)?> 12h < 12h

    As soon as you answer one of the major questions with No or withl es s t h a n 1 2 h o u r s d o w n t i m e , you should go with a new installationof SAP NetWeaver PI 7.3

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    35/41

    SAP 2008 Page 35

    Technology/Operation Related DecisionFactors

    OptionsDecision Factors Upgrade New Installation &

    Phaseout

    Are you already using theHA setup with ASCS/SCS?

    Have your third-partyadapters/contents alreadybeen released for PI 7.3.?

    Do you require XI/PI runtimeinformation for auditing?

    Is your productive system well-customized and optimized with

    regard to Monitoring Setup,

    Alerting Setup, and OperationsSetup?

    Do you have many long-running ccBPM processes?

    1 72 3 4 5 6

    ASCS/SCS SCS/CI

    Yes No

    Yes No

    Yes No

    Many Few

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    36/41

    SAP 2008 Page 36

    Interface Related Decision Factors

    OptionsDecision Factors Upgrade New Installation &

    Phaseout

    Do you want to use onlylimited new PI 7.3 features and

    functions?

    Which types of high-volumescenarios do you run?

    Do you have many businesssystems connected to your

    XI/PI system?

    Do you have many SAPsystems connected by proxy?

    Do you have many live

    interfaces?

    1 72 3 4 5 6

    Limited Intensive

    NormalEO/EOIO

    ccBPM/ AAE

    Many BS Few BS

    Many SAPProxies

    Few SAPProxies

    Many Few

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    37/41

    SAP 2008 / SAP TechEd 08 / SOA213 Page

    Decision Example

    h l O i l d i i

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    38/41

    SAP 2008 Page 38

    Technology/Operation Related DecisionFactors Customer Example for Decisions

    OptionsDecision Factors Upgrade New Installation &

    Phaseout

    1 72 3 4 5 6

    ASCS/SCS SCS/CI

    Yes No

    Yes No

    Yes No

    Many Few

    4.8

    6.0

    5.5

    2.0

    5.0

    Are you already using theHA setup with ASCS/SCS?

    Have your third-partyadapters/contents alreadybeen released for PI 7.3.?

    Do you require XI/PI runtimeinformation for auditing?

    Is your productive system well-customized and optimized with

    regard to Monitoring Setup,

    Alerting Setup, and OperationsSetup?

    Do you have many long-running ccBPM processes?

    I f R l d D i i F

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    39/41

    SAP 2008 Page 39

    Interface Related Decision Factors Customer Example for Decisions

    OptionsDecision Factors Upgrade New Installation &

    Phaseout

    1 72 3 4 5 6

    Limited Intensive

    NormalEO/EOIO

    ccBPM/ AAE

    Many BS Few BS

    Many SAPProxies

    Few SAPProxies

    Many Few

    5.0

    2.5

    6.2

    1.5

    3.5

    Do you want to use onlylimited new PI 7.3 features and

    functions?

    Which types of high-volumescenarios do you run?

    Do you have many businesssystems connected to your

    XI/PI system?

    Do you have many SAPsystems connected by proxy?

    Do you have many live

    interfaces?

    E l R i f D i i

  • 7/27/2019 Decision Making Factors When Moving to PI 7.3 - Webinar Presentation

    40/41

    SAP 2008 Page 40

    Example Rating for Decision

    Factor Rating

    HA Setup 4.8

    Auditing Required 6.0

    Long-Running ccBPM Processes 5.5

    Well-Configured Productive System 2.0

    Third-Party Adapters / Content 5.0Usage of New PI 7.3 Functionality 5.0

    Many Connected Business Systems 2.5

    Many SAP Systems Connected ByProxies

    6.2

    Many Live Interfaces 1.5Types of High-Volume Scenarios 3.5

    Customer-own KPIs For ExampleSkills, Operations Costs, and so on

    tbd

    Summary Rating 4,2

    Rating is done by customer

    Customer own factors haveto be taken into account

    Final decision has to betaken by the customer