ARIEL Facility
TRIUMF Accelerators
SRF Linac
DTL
ISAC Targets
500MeV H-
cyclotron since 1974
Only ISOL facility in North America
Highest power Isotope Separation On-Line (ISOL) facility worldwide
ISOL with > 5 MeV/u accelerated beams
Adding 50MeV 500kW e-Linac
RFQ
Nordion
500 MeVCyclotron
ISAC-II
Meson Hall
ISAC-I
50 MeVElectron
LinacDecember 14, 2014 2SCRIBE-2014 ARIEL
December 14, 2014 3
December 14, 2014 4
Cyclotron Availability in 2013Availability : Actual 95.7%Goal >90%
December 14, 2014 5
Cyclotron Annual Peak Production
0
50
100
150
200
250
300
350
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010Year
Inte
nsity
(µA
)
Dose during Shutdowns
6December 14, 2014
Tota
l dos
e (m
Sv)
Improvement mostly due to:
operating at 480 MeVreducing tank spills2014 reduced # of tank jobs
ARIEL: Advanced Rare IsotopE Laboratory
December 14, 2014 7
ARIEL e-linac
December 14, 2014 8
9
ISIS New Vertical Injection Line
9
3-year project, successfully completed in May 2011
December 14, 2014
December 14, 2014 10
Trim and Harmonic Power Supplies
11
Upgrade was completed in 2 winter shutdowns, initially a 5-year projectDecember 14, 2014
Vault Cabling Project
December 14, 2014 12
Cyclotron Upper Bearing Maintenance Fall Protection System
Cyclotron Beam Developments
• Achieved beam intensity stability ±1% in BL2A and ± 2% in BL1A by suppressing νr = 3/2 resonance, and introducing active regulation
14
BL1A
BL2A
December 14, 2014
December 14, 2014 15
3/2 Resonance Correction in the CyclotronProblem: Radial variation of the current density was strongly modulated due to 3/2 resonance crossing.
Resonance correction: Simulation
Problem
Resonance correction: Measurements
Solution: A linear combination of two HCs, displaced azimuthally, provided full correction.
December 14, 2014 16
Cyclotron Main Magnet Power Supply
Number 1 item based on Risk Assessment analysis of accelerator infrastructure
“άμμες δε γ' εσόμεθα πολλώ κάρρονες”Πλούταρχος, Λυκούργος, 21
“we shall become much better (than you)”
The Ancient Spartan youth pledge
December 14, 2014 17
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada
Propriété d’un consortium d’universités canadiennes, géré en co-entreprise à partir d’une contribution administrée par le Conseil national de recherches Canada
Canada’s national laboratory for particle and nuclear physics Laboratoire national canadien pour la recherche en physique nucléaire
et en physique des particules
Thank you!Merci!
TRIUMF: Alberta | British Columbia | Calgary | Carleton | Guelph | Manitoba | McMaster | Montréal | Northern British Columbia | Queen’s | Regina | Saint Mary’s | Simon Fraser | Toronto | Victoria | York