dea 1511 dea 151: qualconn modernization of connection performance properties ppippi technology...

12
DEA 151 1 DEA 151: QUALCONN Modernization of Connection Performance Properties P P I TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling Engineering Association

Upload: gwen-mcbride

Post on 01-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling

DEA 151 1

DEA 151: QUALCONNModernization of Connection Performance Properties

PPI

TECHNOLOGY SERVICES

Brian Schwind, PEPPI Technology Services

Drilling Engineering Association

Page 2: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling

DEA 151 2

Introduction: Need

1990's

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

FailureRate

Failure Mode

TimePeriod

Casing Field Failure History

1990's

1980's

Page 3: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling

DEA 151 3

Introduction: Industry Need

1. Unknown Performance of Connections• Pipe Performance exceeding connection ratings

2. Supply Requirements: Competition • Multi-source for meeting schedule requirements

3. Cost: Competition As important as the tubular Failure- Financial Loss Liability- life and property

Page 4: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling

DEA 151 4

Introduction: Operator Experience

1. Failures are found two ways:• Laboratory- Rare for a test to go without performance issue• Field -Most costly / HSE implications

2. Operators have: Totally Eliminated Field Failures through an integrated

Qualification Program Program involves applying what was tested, running per test,

and applying within the limits of qualification Independent verification of test results

Page 5: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling

DEA 151 5

Connection Reliability

Foundation: Design Related (FEA, ISO 13679, Design Calcs)

Manufacturing (Complete Specifications)

Installation: Torque, RPM, Thread Compound Application, running spec.

Environment: Test Load Envelope/ cycling, SLE, Failure Points, Temperature

Design: Test to Dimensional, Makeup, and Load ExtremesDatabase Provides Dimensional specifications.

Run Per Specification, within Service Load EnvelopeQualification has Eliminated Failures!

Page 6: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling

DEA 151 6

Product Line Qualification Tubing & Casing:HPHT: Asia, Europe, North AmericaCRA: 13% Cr, 22% Cr, 28 Cr, C-276, high nickelDeep Water: Large Diameter/ high rate wells

Cutting Edge and Conventional Wells

Test Data: $50 Million invested

Page 7: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling

DEA 151 7

Connection Test DataCasing Design: Detailed Graphical Results

-12500

-10000

-7500

-5000

-2500

0

2500

5000

7500

10000

12500

-2,000 -1,750 -1,500 -1,250 -1,000 -750 -500 -250 0 250 500 750 1,000 1,250 1,500 1,750 2,000

TensionCompression

Inte

rnal

Pre

ssu

re (

psi

)

9-5/8" AB TC-II Connection Qualification9.625" 53.5# L-80 Test & Service Load Envelope

Axial Load (kips )

Service Load Envelope

Test Load Envelope

Failure Load

Page 8: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling

DEA 151 8

Project Concern: Resolved

Concern QUALCONN ISO implication

Data Control BP-PPI Controlled Document Controlled Document

Confidentiality Distributed via Suppliers

Performance Presented in QUALCONN Annex (Revised)Normalization Repository Defining Minimum Req't

Product Line Referenced in QUALCONN Annex (Revised)Repository- user defined Defining Minimum Req't

Alternate Test Included on both a specimen Annex (new)Procedures and set basis Defining Minimum Req't

Page 9: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling

DEA 151 9

Project Schedule:

Finalize Database Structure Finalizing

Acquire test data June-November

Coordinate Software June- December

Coordinate Suppliers June-December

Review/ authenticate data June- December

Request additional data September- December

QC QUALCONN /review October-December

Finalize data presentation November-January

Page 10: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling

DEA 151 10

Project BenefitsShort Term:• Profit from $50 MM Testing performed over 15+ years• Performance Options, Delivery Requirements• Save Time: One Stop for Objective Connection Data• Address Deepwater, Modern Performance PropertiesLong Term:• Network, Leverage, and Direct $7MM Product

Development Effort• Upgrade Casing Design Program: Include Connectors• Lower Procurement Cost/ Reduced Trouble Time

Page 11: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling

DEA 151 11

QUALCONN Suppliers Objectives

Highly Leveraged Project Cost- Capture Learnings

Unified Customer Voice

Access to new markets- new users

Emphasize the importance of connection performance

Reliability Testing- Available to entire company-MEM

Page 12: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling

DEA 151 12

Operator Objectives

Save Money!Quantify Connection Performance- Capture LearningsIntegrate into Well Design: Schlumberger/LandmarkPrimary Cause of Failure- Eliminate!

Available to entire company-EPOM Access to new sources- schedule & performanceEmphasize the importance of connection performanceBenefit from experience of others- do not re-invent the wheel!