dea 1511 dea 151: qualconn modernization of connection performance properties ppippi technology...
TRANSCRIPT
![Page 1: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling](https://reader036.vdocuments.us/reader036/viewer/2022082711/56649ebd5503460f94bc6ed3/html5/thumbnails/1.jpg)
DEA 151 1
DEA 151: QUALCONNModernization of Connection Performance Properties
PPI
TECHNOLOGY SERVICES
Brian Schwind, PEPPI Technology Services
Drilling Engineering Association
![Page 2: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling](https://reader036.vdocuments.us/reader036/viewer/2022082711/56649ebd5503460f94bc6ed3/html5/thumbnails/2.jpg)
DEA 151 2
Introduction: Need
1990's
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
FailureRate
Failure Mode
TimePeriod
Casing Field Failure History
1990's
1980's
![Page 3: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling](https://reader036.vdocuments.us/reader036/viewer/2022082711/56649ebd5503460f94bc6ed3/html5/thumbnails/3.jpg)
DEA 151 3
Introduction: Industry Need
1. Unknown Performance of Connections• Pipe Performance exceeding connection ratings
2. Supply Requirements: Competition • Multi-source for meeting schedule requirements
3. Cost: Competition As important as the tubular Failure- Financial Loss Liability- life and property
![Page 4: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling](https://reader036.vdocuments.us/reader036/viewer/2022082711/56649ebd5503460f94bc6ed3/html5/thumbnails/4.jpg)
DEA 151 4
Introduction: Operator Experience
1. Failures are found two ways:• Laboratory- Rare for a test to go without performance issue• Field -Most costly / HSE implications
2. Operators have: Totally Eliminated Field Failures through an integrated
Qualification Program Program involves applying what was tested, running per test,
and applying within the limits of qualification Independent verification of test results
![Page 5: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling](https://reader036.vdocuments.us/reader036/viewer/2022082711/56649ebd5503460f94bc6ed3/html5/thumbnails/5.jpg)
DEA 151 5
Connection Reliability
Foundation: Design Related (FEA, ISO 13679, Design Calcs)
Manufacturing (Complete Specifications)
Installation: Torque, RPM, Thread Compound Application, running spec.
Environment: Test Load Envelope/ cycling, SLE, Failure Points, Temperature
Design: Test to Dimensional, Makeup, and Load ExtremesDatabase Provides Dimensional specifications.
Run Per Specification, within Service Load EnvelopeQualification has Eliminated Failures!
![Page 6: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling](https://reader036.vdocuments.us/reader036/viewer/2022082711/56649ebd5503460f94bc6ed3/html5/thumbnails/6.jpg)
DEA 151 6
Product Line Qualification Tubing & Casing:HPHT: Asia, Europe, North AmericaCRA: 13% Cr, 22% Cr, 28 Cr, C-276, high nickelDeep Water: Large Diameter/ high rate wells
Cutting Edge and Conventional Wells
Test Data: $50 Million invested
![Page 7: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling](https://reader036.vdocuments.us/reader036/viewer/2022082711/56649ebd5503460f94bc6ed3/html5/thumbnails/7.jpg)
DEA 151 7
Connection Test DataCasing Design: Detailed Graphical Results
-12500
-10000
-7500
-5000
-2500
0
2500
5000
7500
10000
12500
-2,000 -1,750 -1,500 -1,250 -1,000 -750 -500 -250 0 250 500 750 1,000 1,250 1,500 1,750 2,000
TensionCompression
Inte
rnal
Pre
ssu
re (
psi
)
9-5/8" AB TC-II Connection Qualification9.625" 53.5# L-80 Test & Service Load Envelope
Axial Load (kips )
Service Load Envelope
Test Load Envelope
Failure Load
![Page 8: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling](https://reader036.vdocuments.us/reader036/viewer/2022082711/56649ebd5503460f94bc6ed3/html5/thumbnails/8.jpg)
DEA 151 8
Project Concern: Resolved
Concern QUALCONN ISO implication
Data Control BP-PPI Controlled Document Controlled Document
Confidentiality Distributed via Suppliers
Performance Presented in QUALCONN Annex (Revised)Normalization Repository Defining Minimum Req't
Product Line Referenced in QUALCONN Annex (Revised)Repository- user defined Defining Minimum Req't
Alternate Test Included on both a specimen Annex (new)Procedures and set basis Defining Minimum Req't
![Page 9: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling](https://reader036.vdocuments.us/reader036/viewer/2022082711/56649ebd5503460f94bc6ed3/html5/thumbnails/9.jpg)
DEA 151 9
Project Schedule:
Finalize Database Structure Finalizing
Acquire test data June-November
Coordinate Software June- December
Coordinate Suppliers June-December
Review/ authenticate data June- December
Request additional data September- December
QC QUALCONN /review October-December
Finalize data presentation November-January
![Page 10: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling](https://reader036.vdocuments.us/reader036/viewer/2022082711/56649ebd5503460f94bc6ed3/html5/thumbnails/10.jpg)
DEA 151 10
Project BenefitsShort Term:• Profit from $50 MM Testing performed over 15+ years• Performance Options, Delivery Requirements• Save Time: One Stop for Objective Connection Data• Address Deepwater, Modern Performance PropertiesLong Term:• Network, Leverage, and Direct $7MM Product
Development Effort• Upgrade Casing Design Program: Include Connectors• Lower Procurement Cost/ Reduced Trouble Time
![Page 11: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling](https://reader036.vdocuments.us/reader036/viewer/2022082711/56649ebd5503460f94bc6ed3/html5/thumbnails/11.jpg)
DEA 151 11
QUALCONN Suppliers Objectives
Highly Leveraged Project Cost- Capture Learnings
Unified Customer Voice
Access to new markets- new users
Emphasize the importance of connection performance
Reliability Testing- Available to entire company-MEM
![Page 12: DEA 1511 DEA 151: QUALCONN Modernization of Connection Performance Properties PPIPPI TECHNOLOGY SERVICES Brian Schwind, PE PPI Technology Services Drilling](https://reader036.vdocuments.us/reader036/viewer/2022082711/56649ebd5503460f94bc6ed3/html5/thumbnails/12.jpg)
DEA 151 12
Operator Objectives
Save Money!Quantify Connection Performance- Capture LearningsIntegrate into Well Design: Schlumberger/LandmarkPrimary Cause of Failure- Eliminate!
Available to entire company-EPOM Access to new sources- schedule & performanceEmphasize the importance of connection performanceBenefit from experience of others- do not re-invent the wheel!