DD Phase – Client Coordination Meeting – Finishes & Site MCC Student Activity Space, SUNY Oswego The following report was prepared by the Architect and will be assumed to be correct unless written exceptions are received within two weeks
of the publication date, 10/03/17.
Page 1 of 2
Meeting Date: October 03, 2017 Meeting Location: 201 MCC HOLT #2016007
Attendees:
SUNY Oswego Mitch Fields Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon Barbara St. Michel Jennifer Wescott Tedra Marshall
[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]
HOLT Architects Appel Osborne
Quay Thompson Cate Blakemore Ryan Ball Katy Jacobs
[email protected] [email protected] [email protected] [email protected]
607-273-7600
315-312-6602
Discussion Action
1. Meeting objective:
a. Review each space in terms of function and review finish options
b. Discuss site improvements and requirement for catering access and use of outdoor plaza space
2. Presentation (attached)
a. Gerflor Saga LVT flooring has been used in other campus buildings. Maintenance is familiar with manufacturer and product line. Cate/Ryan to investigate Gerflor LVT flooring http://www.gerflorusa.com/product-ranges/lvt.html ..................................................................... HOLT
3. Vestibule:
a. Change doors from single to double doors.
b. Wall paint should be a darker gray, but not as gray as event space
c. Walk-off mat with drain is preferred if connection to sanitary is nearby
4. Lobby:
a. Flooring should be a medium gray, quarry embossing
b. Columns to match walls
5. Event Space:
a. Change exterior doors to double doors.
b. Darker floor with homogenous tone/pattern, quarry embossing
6. Kitchen:
a. Change exterior and interior doors to double doors.
b. Add (2) 3-foot wall cabinets with doors
c. Counter: Stainless steel is preferred; no dishwasher
d. Power for hot boxes on separate circuits.
7. Event Toilet Rooms
![Page 2: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from](https://reader036.vdocuments.us/reader036/viewer/2022071113/5fe9d3e13576fe46e45f4445/html5/thumbnails/2.jpg)
Meeting Report 1 – DD Phase Student Activity Center
Page 2 of 2
a. Omit door to toilet room corridor
b. Wall coverings difficult to maintain, omit
c. Ceramic floor tile and wall base, color can match corridor color
d. Full-height wall tile on wet wall, if budget allows. Tile should be something that has a contemporary, edgy aesthetic that speaks to both formal and dance party events.
e. Toilet Corridor: Consider adding graphic that covers entire wall
f. Add coat hooks to back of door
g. Add full-height mirror on side wall
h. Vanity mirror can be extended across entire back wall
i. Change rooms names to: Toilet Room.
j. Hardware: Provide push plate with key on exterior side; latch with lock interior side with closer
8. Coat Room: Consider omitting self above coat rod to prevent items from being stored in coat room. Shelf unit needs to be coordinated with existing piping.
9. Green Room
a. Add power above counter or recessed countertop power/data
b. Add power to west wall between dressing room doors at 18” a.f.f.
c. No sink needed
d. Add blocking, power, data cable for wall-mounted TV at west wall.
10. Green Room Dressing: No comments offered
11. Green Room Toilets: Wait until MEP meeting to discuss shower control locations and adding second set of controls on end wall and if both will be designed for accessibility
12. 1st Floor: Corridor finishes to match existing; ceramic tile in shower rooms; Wall tile scope can be scaled back if needed to maintain budget
13. Site
a. Use of Plaza Space: Can be used by students and also for specialized events
- Add power for outdoor speakers/music: Discuss during AV meeting
b. Catering Kitchen is adjacent to plaza to allow for event staging of buffet and bar setup
c. 10-foot path access to all for truck access to catering kitchen and snow plowing along building
d. Built-ins (artwork bases & benches) should be kept away from sidewalk edges to allow for ease of sidewalk maintenance
e. Lighting: Ground lighting; pole lighting tends to be more expensive
f. Add Art/Sculpture Base: 6ft square or round concrete for student installation
g. Add bike rack mounted on concrete not grass
h. Benches: Wood (teak) or stone; removable with flush mounting hardware
i. Base Bid: Provide sidewalk to exterior doors to egress from basement spaces, should be open-ended at west end to allow for future connection of drive path
j. Alternate: Plaza Design
Respectfully Submitted by:
HOLT Architects, P.C.
Cate Blakemore, AIA, Project Architect
Prepared by: Cate Blakemore
Attachments: Presentation from 10/03/17
![Page 3: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from](https://reader036.vdocuments.us/reader036/viewer/2022071113/5fe9d3e13576fe46e45f4445/html5/thumbnails/3.jpg)
010 - EVENT SPACE
002 - ENTRY LOBBY
014 - EVENT SPACE TOILET ROOMS
CORRIDOR
015 - GREEN ROOM + DRESSING
Neutral grey finishes create a blank canvas for individual event transfor-mation. Uni-strut system provides frame work for custom lighting, pro-jections, and hung-graphic displays.
Clean, open and airy finishes create a fresh entry point into the building. The lighter hues of finishes contrast the neighboring event space and provide a neutral transition to the warmth of the dressing room.
The green room is designed to be cozy and contemporary with feature accent wall and warmer finish palate.
Proposed Graphic ZonesEvent CirculationCampus Circulation
Vibrant color zones create unique and memorable experiences in toilet rooms without distracting from main event space.
Event space finishes extend into this transitional space. Low lighting provides for dramatic transition into vibrant toilet rooms.
full color enclosure
wrapping feature wall
GRAPHICS////
GRAPHICS////
GRAPHICS////
![Page 4: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from](https://reader036.vdocuments.us/reader036/viewer/2022071113/5fe9d3e13576fe46e45f4445/html5/thumbnails/4.jpg)
122 SF
001
VESTIBULE
258 SF
002
ENTRY
LOBBY
Not Enclosed
002A
STANDPIPE
ROOM
001-1
001-2 002A
010-1
002B
172 SF
002B
CIRCULATION/
COATS
EV
EN
T S
PA
CE
WA
LL G
RA
PH
IC A
LL
1/4" = 1'-0"
10/03/17
2016007
AP101Student Activity Center
7060 State Rt. 104 Oswego, NY 13126
SUNY Oswego ENTRANCE VESTIBULE 001
1/4" = 1'-0"1
ENTRANCE VESTIBULE 001
1/4" = 1'-0"2
VESTIBULE - 001 - EAST
1/4" = 1'-0"3
VESTIBULE - 001 - WEST
1/4" = 1'-0"4
VESTIBULE - 001 - NORTH
![Page 5: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from](https://reader036.vdocuments.us/reader036/viewer/2022071113/5fe9d3e13576fe46e45f4445/html5/thumbnails/5.jpg)
122 SF
001
VESTIBULE
258 SF
002
ENTRY
LOBBY
133 SF
042
STAIR
62 SF
002E
ELEV
001-2 002A
002B
002A001-2
1/4" = 1'-0"
10/03/17
2016007
AP102Student Activity Center
7060 State Rt. 104 Oswego, NY 13126
SUNY Oswego LOBBY 002
1/4" = 1'-0"1
ENTRY VESTIBULE 002
1/4" = 1'-0"2
ENTRY LOBBY - 002 - SOUTH
1/4" = 1'-0"3
ENTRY LOBBY - 002 - NORTH 1/4" = 1'-0"
4ENTRY LOBBY - 002
1/4" = 1'-0"5
ENTRY LOBBY - 002 - WEST
![Page 6: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from](https://reader036.vdocuments.us/reader036/viewer/2022071113/5fe9d3e13576fe46e45f4445/html5/thumbnails/6.jpg)
122 SF
001
VESTIBULE
258 SF
002
ENTRY
LOBBY
133 SF
042
STAIR
1868 SF
010
EVENT
SPACE
015-2
248 SF
011
STORAGE /
CATERING
2629 SF
008
MECHANICAL
ROOM
010-3 010-2
014
1/4" = 1'-0"
10/03/17
2016007
AP103Student Activity Center
7060 State Rt. 104 Oswego, NY 13126
SUNY Oswego EVENT SPACE
1/4" = 1'-0"1
EVENT SPACE - 010
1/4" = 1'-0"3
EVENT SPACE - 010 - WEST
1/4" = 1'-0"4
EVENT SPACE - 010 - SOUTH
1/4" = 1'-0"5
EVENT SPACE - 010 - EAST 1/4" = 1'-0"6
EVENT SPACE - 010 - NORTH
![Page 7: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from](https://reader036.vdocuments.us/reader036/viewer/2022071113/5fe9d3e13576fe46e45f4445/html5/thumbnails/7.jpg)
E EE E E
E E
248 SF
011
STORAGE /
CATERING
270 SF
009
STORAGE
011-2
10' - 0"
1868 SF
010
EVENT
SPACE
2' -
6"
1/4" = 1'-0"
10/03/17
2016007
AP104Student Activity Center
7060 State Rt. 104 Oswego, NY 13126
SUNY Oswego STORAGE / CATERING
1/4" = 1'-0"1
STORAGE / CATERING - 011
1/4" = 1'-0"2
STORAGE / CATERING - 011 - WEST 1/4" = 1'-0"
3STORAGE / CATERING - 011 - NORTH
1/4" = 1'-0"4
STORAGE / CATERING - 011 - EAST 1/4" = 1'-0"
5STORAGE / CATERING - 011 - SOUTH
![Page 8: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from](https://reader036.vdocuments.us/reader036/viewer/2022071113/5fe9d3e13576fe46e45f4445/html5/thumbnails/8.jpg)
S69 SF
014A
ALL-GENDER
TOILET
38 SF
014B
JC CLOSET88 SF
014
CORRIDOR
35 SF
014C
ALL-GENDER
TOILET
30 SF
014D
ALL-GENDER
TOILET
33 SF
014E
ALL-GENDER
TOILET
014E
014D
014C
014B
004
014
1/4" = 1'-0"
09/28/17
2016007
AP105Student Activity Center
7060 State Rt. 104 Oswego, NY 13126
SUNY Oswego TYPICAL EVENT SPACE TOILET ROOMS
1/4" = 1'-0"1
EVENT SPACE TOILET ROOMS
1/4" = 1'-0"2
CORRIDOR - 014 - EAST 1/4" = 1'-0"
3CORRIDOR - 014 - SOUTH
1/4" = 1'-0"4
CORRIDOR - 014 - WEST
1/4" = 1'-0"5
TOILET - EAST, TYP 1/4" = 1'-0"
6TOILET - SOUTH, TYP
1/4" = 1'-0"7
TOILET - WEST, TYP 1/4" = 1'-0"
8TOILET - NORTH, TYP
![Page 9: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from](https://reader036.vdocuments.us/reader036/viewer/2022071113/5fe9d3e13576fe46e45f4445/html5/thumbnails/9.jpg)
172 SF
002B
CIRCULATION/
COATS
133 SF
042
STAIR
258 SF
002
ENTRY
LOBBY
002B
015-1
002C
241 SF
015
GREEN
ROOM
AC
CE
NT
/ F
EA
TU
RE
WA
LL
WA
LL-M
OU
NT
ED
CO
AT
RA
CK
015-1
1/4" = 1'-0"
10/03/17
2016007
AP106Student Activity Center
7060 State Rt. 104 Oswego, NY 13126
SUNY Oswego COAT ROOM
1/4" = 1'-0"1
CIRCULATION / COATS 002B 1/4" = 1'-0"
3CIRCULATION / COATS - 002B - EAST
1/4" = 1'-0"2
CIRCULATION / COATS - 002B - WEST
METAL COAT ROD & SHELF
TYPICAL COAT RACK
![Page 10: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from](https://reader036.vdocuments.us/reader036/viewer/2022071113/5fe9d3e13576fe46e45f4445/html5/thumbnails/10.jpg)
E
S
E E E
E
015A
015B
241 SF
015
GREEN
ROOM
WALL-MOUNTED COAT RACK & SHELF
SOLID SURFACE COUNTER
MIRROR UNIT
92 SF
002C
VESTIBULE
172 SF
002B
CIRCULATION/
COATS1868 SF
010
EVENT
SPACE
015-2
015-1
002C
AC
CE
NT
/ F
EA
TU
RE
WA
LL
UNDER-COUNTER REFRIGERATOR
ARTWORK, NIC (OFCI)
WALL SCONCE
015A015B 015-2
METAL COAT RACK AND SHELF
SOLID SURFACE COUNTER UNDERCOUNTER REFRIGERATOR, NIC (OFOI)
015-1
2' -
10"
MIRROR GLASS
4' - 1 7/8" MIRROR GLASS
1/4" = 1'-0"
09/28/17
2016007
AP107Student Activity Center
7060 State Rt. 104 Oswego, NY 13126
SUNY Oswego GREEN ROOM
1/4" = 1'-0"1
GREEN ROOM - 015
1/4" = 1'-0"2
GREEN ROOM - 015 - WEST 1/4" = 1'-0"
3GREEN ROOM - 015 - NORTH
1/4" = 1'-0"4
GREEN ROOM - 015 - EAST 1/4" = 1'-0"
5GREEN ROOM - 015 - SOUTH
TYPICAL COAT RACK
![Page 11: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from](https://reader036.vdocuments.us/reader036/viewer/2022071113/5fe9d3e13576fe46e45f4445/html5/thumbnails/11.jpg)
S
E
EE
E
MIRROR GLASS
MIRROR GLASS
METAL COAT RACK AND SHELF
ILLUMINATED MIRROR UNIT
SOLID SURFACE VANITY
67 SF
015B-T
BATHROOM
59 SF
015B
DRESSING
241 SF
015
GREEN
ROOM
WALL-MOUNTED COAT RACK & SHELF
SOLID SURFACE LAVATORY WITH INTEGRAL SINK,
BACKSPLASH & SIDESPLASHESWALL-MOUNTED SOLID SURFACE VANITY
MIRROR GLASS
SHOWER CURTAIN ROD, ABOVE
ILLUMINATED MIRROR UNIT
1/4" = 1'-0"
10/03/17
2016007
AP108Student Activity Center
7060 State Rt. 104 Oswego, NY 13126
SUNY Oswego GREEN ROOM - DRESSING - TYPICAL
4DRESSING ROOM - 015B - EAST
5DRESSING ROOM - 015B - SOUTH
2DRESSING ROOM - 015B - WEST
3DRESSING ROOM - 015B - NORTH
1/4" = 1'-0"1
TYPICAL GREEN ROOM - DRESSING
TYPICAL COAT RACK
ILLUMINATED MIRROR UNIT
![Page 12: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from](https://reader036.vdocuments.us/reader036/viewer/2022071113/5fe9d3e13576fe46e45f4445/html5/thumbnails/12.jpg)
S
E S
015B-T015B
67 SF
015B-T
BATHROOM
59 SF
015B
DRESSING
241 SF
015
GREEN
ROOM
SOLID SURFACE LAVATORY WITH INTEGRAL SINK, BACKSPLASH & SIDESPLASHES
SHOWER CURTAIN ROD, ABOVE
SHOWER CURTAIN AND ROD
ROBE HOOK
MIRROR GLASS
SOLID SURFACE LAVATORY WITH INTEGRAL SINK, BACKSPLASH & SIDESPLASHES
SHOWER CURTAIN ROD
2' -
10"
1' -
6"
SHOWER SEAT
SHOWER CONTROL UNIT SHOWER CURTAIN ROD
TOILET TISSUE DISPENSER, NIC (OFCI)
SHOWER CURTAIN AND ROD
ROBE HOOK
SOAP DISPENSER, NIC (OFCI)
PAPER TOWEL DISPENSER, NIC (OFCI)
SHOWER CURTAIN ROD
1/4" = 1'-0"
10/03/17
2016007
AP109Student Activity Center
7060 State Rt. 104 Oswego, NY 13126
SUNY Oswego GREEN ROOM - TOILET - TYPICAL
1/4" = 1'-0"1
TYPICAL GREEN ROOM - TOILLET
1/4" = 1'-0"2
TOILET - 015B-T - WEST 1/4" = 1'-0"
3TOILET - 015B-T - NORTH
1/4" = 1'-0"4
TOILET - 015B-T - EAST 1/4" = 1'-0"
5TOILET - 015B-T - SOUTH
1/4" = 1'-0"6
TOILET - 015B-T - WEST - VANITY 1/4" = 1'-0"
7TOILET - 015B-T - EAST - VANITY
![Page 13: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from](https://reader036.vdocuments.us/reader036/viewer/2022071113/5fe9d3e13576fe46e45f4445/html5/thumbnails/13.jpg)
N/7 Q
NH
NF
NE
ND
NC
N/8
NG
N/8'
N/11
N/20
N/17
N/14
N/23
N/32
147D
GYM
STORAGE
147E
SEATING
AREA
100V
ALL
GENDER
TOILET020
OFFICE
021
JC
100N
CORRIDOR
100O
LOBBY
100P
LOBBY
STA-CNN
STAIR
100R
ALL
GENDER
TOILET
100S
CHANGING
100T
CHANGING
020
100V
100R
100E
ELEVATOR
147D
GYM
STORAGE
1/8" = 1'-0"
10/03/17
2016007
AP110Student Activity Center
7060 State Rt. 104 Oswego, NY 13126
SUNY Oswego
FIRST FLOOR IMPROVEMENTS
1/8" = 1'-0"1
PARTIAL FIRST FLOOR FURNITURE PLAN (ADD-ADLTERNATE 01)