DD Phase – Client Coordination Meeting – Finishes & Site MCC Student Activity Space, SUNY Oswego The following report was prepared by the Architect and will be assumed to be correct unless written exceptions are received within two weeks of the publication date, 10/03/17. Page 1 of 2 Meeting Date: October 03, 2017 Meeting Location: 201 MCC HOLT #2016007 Attendees: SUNY Oswego Mitch Fields Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon Barbara St. Michel Jennifer Wescott Tedra Marshall [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] HOLT Architects Appel Osborne Quay Thompson Cate Blakemore Ryan Ball Katy Jacobs [email protected] [email protected] [email protected] [email protected] 607-273-7600 315-312-6602 Discussion Action 1. Meeting objective: a. Review each space in terms of function and review finish options b. Discuss site improvements and requirement for catering access and use of outdoor plaza space 2. Presentation (attached) a. Gerflor Saga LVT flooring has been used in other campus buildings. Maintenance is familiar with manufacturer and product line. Cate/Ryan to investigate Gerflor LVT flooring http://www.gerflorusa.com/product-ranges/lvt.html ..................................................................... HOLT 3. Vestibule: a. Change doors from single to double doors. b. Wall paint should be a darker gray, but not as gray as event space c. Walk-off mat with drain is preferred if connection to sanitary is nearby 4. Lobby: a. Flooring should be a medium gray, quarry embossing b. Columns to match walls 5. Event Space: a. Change exterior doors to double doors. b. Darker floor with homogenous tone/pattern, quarry embossing 6. Kitchen: a. Change exterior and interior doors to double doors. b. Add (2) 3-foot wall cabinets with doors c. Counter: Stainless steel is preferred; no dishwasher d. Power for hot boxes on separate circuits. 7. Event Toilet Rooms

Upload: others

Post on 07-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from

DD Phase – Client Coordination Meeting – Finishes & Site MCC Student Activity Space, SUNY Oswego The following report was prepared by the Architect and will be assumed to be correct unless written exceptions are received within two weeks

of the publication date, 10/03/17.

Page 1 of 2

Meeting Date: October 03, 2017 Meeting Location: 201 MCC HOLT #2016007

Attendees:

SUNY Oswego Mitch Fields Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon Barbara St. Michel Jennifer Wescott Tedra Marshall

[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]

HOLT Architects Appel Osborne

Quay Thompson Cate Blakemore Ryan Ball Katy Jacobs

[email protected] [email protected] [email protected] [email protected]

607-273-7600

315-312-6602

Discussion Action

1. Meeting objective:

a. Review each space in terms of function and review finish options

b. Discuss site improvements and requirement for catering access and use of outdoor plaza space

2. Presentation (attached)

a. Gerflor Saga LVT flooring has been used in other campus buildings. Maintenance is familiar with manufacturer and product line. Cate/Ryan to investigate Gerflor LVT flooring http://www.gerflorusa.com/product-ranges/lvt.html ..................................................................... HOLT

3. Vestibule:

a. Change doors from single to double doors.

b. Wall paint should be a darker gray, but not as gray as event space

c. Walk-off mat with drain is preferred if connection to sanitary is nearby

4. Lobby:

a. Flooring should be a medium gray, quarry embossing

b. Columns to match walls

5. Event Space:

a. Change exterior doors to double doors.

b. Darker floor with homogenous tone/pattern, quarry embossing

6. Kitchen:

a. Change exterior and interior doors to double doors.

b. Add (2) 3-foot wall cabinets with doors

c. Counter: Stainless steel is preferred; no dishwasher

d. Power for hot boxes on separate circuits.

7. Event Toilet Rooms

Page 2: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from

Meeting Report 1 – DD Phase Student Activity Center

Page 2 of 2

a. Omit door to toilet room corridor

b. Wall coverings difficult to maintain, omit

c. Ceramic floor tile and wall base, color can match corridor color

d. Full-height wall tile on wet wall, if budget allows. Tile should be something that has a contemporary, edgy aesthetic that speaks to both formal and dance party events.

e. Toilet Corridor: Consider adding graphic that covers entire wall

f. Add coat hooks to back of door

g. Add full-height mirror on side wall

h. Vanity mirror can be extended across entire back wall

i. Change rooms names to: Toilet Room.

j. Hardware: Provide push plate with key on exterior side; latch with lock interior side with closer

8. Coat Room: Consider omitting self above coat rod to prevent items from being stored in coat room. Shelf unit needs to be coordinated with existing piping.

9. Green Room

a. Add power above counter or recessed countertop power/data

b. Add power to west wall between dressing room doors at 18” a.f.f.

c. No sink needed

d. Add blocking, power, data cable for wall-mounted TV at west wall.

10. Green Room Dressing: No comments offered

11. Green Room Toilets: Wait until MEP meeting to discuss shower control locations and adding second set of controls on end wall and if both will be designed for accessibility

12. 1st Floor: Corridor finishes to match existing; ceramic tile in shower rooms; Wall tile scope can be scaled back if needed to maintain budget

13. Site

a. Use of Plaza Space: Can be used by students and also for specialized events

- Add power for outdoor speakers/music: Discuss during AV meeting

b. Catering Kitchen is adjacent to plaza to allow for event staging of buffet and bar setup

c. 10-foot path access to all for truck access to catering kitchen and snow plowing along building

d. Built-ins (artwork bases & benches) should be kept away from sidewalk edges to allow for ease of sidewalk maintenance

e. Lighting: Ground lighting; pole lighting tends to be more expensive

f. Add Art/Sculpture Base: 6ft square or round concrete for student installation

g. Add bike rack mounted on concrete not grass

h. Benches: Wood (teak) or stone; removable with flush mounting hardware

i. Base Bid: Provide sidewalk to exterior doors to egress from basement spaces, should be open-ended at west end to allow for future connection of drive path

j. Alternate: Plaza Design

Respectfully Submitted by:

HOLT Architects, P.C.

Cate Blakemore, AIA, Project Architect

Prepared by: Cate Blakemore

Attachments: Presentation from 10/03/17

Page 3: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from

010 - EVENT SPACE

002 - ENTRY LOBBY

014 - EVENT SPACE TOILET ROOMS

CORRIDOR

015 - GREEN ROOM + DRESSING

Neutral grey finishes create a blank canvas for individual event transfor-mation. Uni-strut system provides frame work for custom lighting, pro-jections, and hung-graphic displays.

Clean, open and airy finishes create a fresh entry point into the building. The lighter hues of finishes contrast the neighboring event space and provide a neutral transition to the warmth of the dressing room.

The green room is designed to be cozy and contemporary with feature accent wall and warmer finish palate.

Proposed Graphic ZonesEvent CirculationCampus Circulation

Vibrant color zones create unique and memorable experiences in toilet rooms without distracting from main event space.

Event space finishes extend into this transitional space. Low lighting provides for dramatic transition into vibrant toilet rooms.

full color enclosure

wrapping feature wall

GRAPHICS////

GRAPHICS////

GRAPHICS////

Cate Blakemore
Callout
double doors
Cate Blakemore
Callout
sidewalk with curb cut connecting to parking
Cate Blakemore
Rectangle
Cate Blakemore
Callout
wind break if budget allows
Cate Blakemore
Callout
switch to double doors
Cate Blakemore
Text Box
gerfloor saga 2
Page 4: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from

122 SF

001

VESTIBULE

258 SF

002

ENTRY

LOBBY

Not Enclosed

002A

STANDPIPE

ROOM

001-1

001-2 002A

010-1

002B

172 SF

002B

CIRCULATION/

COATS

EV

EN

T S

PA

CE

WA

LL G

RA

PH

IC A

LL

1/4" = 1'-0"

10/03/17

2016007

AP101Student Activity Center

7060 State Rt. 104 Oswego, NY 13126

SUNY Oswego ENTRANCE VESTIBULE 001

1/4" = 1'-0"1

ENTRANCE VESTIBULE 001

1/4" = 1'-0"2

VESTIBULE - 001 - EAST

1/4" = 1'-0"3

VESTIBULE - 001 - WEST

1/4" = 1'-0"4

VESTIBULE - 001 - NORTH

Page 5: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from

122 SF

001

VESTIBULE

258 SF

002

ENTRY

LOBBY

133 SF

042

STAIR

62 SF

002E

ELEV

001-2 002A

002B

002A001-2

1/4" = 1'-0"

10/03/17

2016007

AP102Student Activity Center

7060 State Rt. 104 Oswego, NY 13126

SUNY Oswego LOBBY 002

1/4" = 1'-0"1

ENTRY VESTIBULE 002

1/4" = 1'-0"2

ENTRY LOBBY - 002 - SOUTH

1/4" = 1'-0"3

ENTRY LOBBY - 002 - NORTH 1/4" = 1'-0"

4ENTRY LOBBY - 002

1/4" = 1'-0"5

ENTRY LOBBY - 002 - WEST

Page 6: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from

122 SF

001

VESTIBULE

258 SF

002

ENTRY

LOBBY

133 SF

042

STAIR

1868 SF

010

EVENT

SPACE

015-2

248 SF

011

STORAGE /

CATERING

2629 SF

008

MECHANICAL

ROOM

010-3 010-2

014

1/4" = 1'-0"

10/03/17

2016007

AP103Student Activity Center

7060 State Rt. 104 Oswego, NY 13126

SUNY Oswego EVENT SPACE

1/4" = 1'-0"1

EVENT SPACE - 010

1/4" = 1'-0"3

EVENT SPACE - 010 - WEST

1/4" = 1'-0"4

EVENT SPACE - 010 - SOUTH

1/4" = 1'-0"5

EVENT SPACE - 010 - EAST 1/4" = 1'-0"6

EVENT SPACE - 010 - NORTH

Page 7: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from

E EE E E

E E

248 SF

011

STORAGE /

CATERING

270 SF

009

STORAGE

011-2

10' - 0"

1868 SF

010

EVENT

SPACE

2' -

6"

1/4" = 1'-0"

10/03/17

2016007

AP104Student Activity Center

7060 State Rt. 104 Oswego, NY 13126

SUNY Oswego STORAGE / CATERING

1/4" = 1'-0"1

STORAGE / CATERING - 011

1/4" = 1'-0"2

STORAGE / CATERING - 011 - WEST 1/4" = 1'-0"

3STORAGE / CATERING - 011 - NORTH

1/4" = 1'-0"4

STORAGE / CATERING - 011 - EAST 1/4" = 1'-0"

5STORAGE / CATERING - 011 - SOUTH

Page 8: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from

S69 SF

014A

ALL-GENDER

TOILET

38 SF

014B

JC CLOSET88 SF

014

CORRIDOR

35 SF

014C

ALL-GENDER

TOILET

30 SF

014D

ALL-GENDER

TOILET

33 SF

014E

ALL-GENDER

TOILET

014E

014D

014C

014B

004

014

1/4" = 1'-0"

09/28/17

2016007

AP105Student Activity Center

7060 State Rt. 104 Oswego, NY 13126

SUNY Oswego TYPICAL EVENT SPACE TOILET ROOMS

1/4" = 1'-0"1

EVENT SPACE TOILET ROOMS

1/4" = 1'-0"2

CORRIDOR - 014 - EAST 1/4" = 1'-0"

3CORRIDOR - 014 - SOUTH

1/4" = 1'-0"4

CORRIDOR - 014 - WEST

1/4" = 1'-0"5

TOILET - EAST, TYP 1/4" = 1'-0"

6TOILET - SOUTH, TYP

1/4" = 1'-0"7

TOILET - WEST, TYP 1/4" = 1'-0"

8TOILET - NORTH, TYP

Page 9: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from

172 SF

002B

CIRCULATION/

COATS

133 SF

042

STAIR

258 SF

002

ENTRY

LOBBY

002B

015-1

002C

241 SF

015

GREEN

ROOM

AC

CE

NT

/ F

EA

TU

RE

WA

LL

WA

LL-M

OU

NT

ED

CO

AT

RA

CK

015-1

1/4" = 1'-0"

10/03/17

2016007

AP106Student Activity Center

7060 State Rt. 104 Oswego, NY 13126

SUNY Oswego COAT ROOM

1/4" = 1'-0"1

CIRCULATION / COATS 002B 1/4" = 1'-0"

3CIRCULATION / COATS - 002B - EAST

1/4" = 1'-0"2

CIRCULATION / COATS - 002B - WEST

METAL COAT ROD & SHELF

TYPICAL COAT RACK

Page 10: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from

E

S

E E E

E

015A

015B

241 SF

015

GREEN

ROOM

WALL-MOUNTED COAT RACK & SHELF

SOLID SURFACE COUNTER

MIRROR UNIT

92 SF

002C

VESTIBULE

172 SF

002B

CIRCULATION/

COATS1868 SF

010

EVENT

SPACE

015-2

015-1

002C

AC

CE

NT

/ F

EA

TU

RE

WA

LL

UNDER-COUNTER REFRIGERATOR

ARTWORK, NIC (OFCI)

WALL SCONCE

015A015B 015-2

METAL COAT RACK AND SHELF

SOLID SURFACE COUNTER UNDERCOUNTER REFRIGERATOR, NIC (OFOI)

015-1

2' -

10"

MIRROR GLASS

4' - 1 7/8" MIRROR GLASS

1/4" = 1'-0"

09/28/17

2016007

AP107Student Activity Center

7060 State Rt. 104 Oswego, NY 13126

SUNY Oswego GREEN ROOM

1/4" = 1'-0"1

GREEN ROOM - 015

1/4" = 1'-0"2

GREEN ROOM - 015 - WEST 1/4" = 1'-0"

3GREEN ROOM - 015 - NORTH

1/4" = 1'-0"4

GREEN ROOM - 015 - EAST 1/4" = 1'-0"

5GREEN ROOM - 015 - SOUTH

TYPICAL COAT RACK

Page 11: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from

S

E

EE

E

MIRROR GLASS

MIRROR GLASS

METAL COAT RACK AND SHELF

ILLUMINATED MIRROR UNIT

SOLID SURFACE VANITY

67 SF

015B-T

BATHROOM

59 SF

015B

DRESSING

241 SF

015

GREEN

ROOM

WALL-MOUNTED COAT RACK & SHELF

SOLID SURFACE LAVATORY WITH INTEGRAL SINK,

BACKSPLASH & SIDESPLASHESWALL-MOUNTED SOLID SURFACE VANITY

MIRROR GLASS

SHOWER CURTAIN ROD, ABOVE

ILLUMINATED MIRROR UNIT

1/4" = 1'-0"

10/03/17

2016007

AP108Student Activity Center

7060 State Rt. 104 Oswego, NY 13126

SUNY Oswego GREEN ROOM - DRESSING - TYPICAL

4DRESSING ROOM - 015B - EAST

5DRESSING ROOM - 015B - SOUTH

2DRESSING ROOM - 015B - WEST

3DRESSING ROOM - 015B - NORTH

1/4" = 1'-0"1

TYPICAL GREEN ROOM - DRESSING

TYPICAL COAT RACK

ILLUMINATED MIRROR UNIT

Page 12: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from

S

E S

015B-T015B

67 SF

015B-T

BATHROOM

59 SF

015B

DRESSING

241 SF

015

GREEN

ROOM

SOLID SURFACE LAVATORY WITH INTEGRAL SINK, BACKSPLASH & SIDESPLASHES

SHOWER CURTAIN ROD, ABOVE

SHOWER CURTAIN AND ROD

ROBE HOOK

MIRROR GLASS

SOLID SURFACE LAVATORY WITH INTEGRAL SINK, BACKSPLASH & SIDESPLASHES

SHOWER CURTAIN ROD

2' -

10"

1' -

6"

SHOWER SEAT

SHOWER CONTROL UNIT SHOWER CURTAIN ROD

TOILET TISSUE DISPENSER, NIC (OFCI)

SHOWER CURTAIN AND ROD

ROBE HOOK

SOAP DISPENSER, NIC (OFCI)

PAPER TOWEL DISPENSER, NIC (OFCI)

SHOWER CURTAIN ROD

1/4" = 1'-0"

10/03/17

2016007

AP109Student Activity Center

7060 State Rt. 104 Oswego, NY 13126

SUNY Oswego GREEN ROOM - TOILET - TYPICAL

1/4" = 1'-0"1

TYPICAL GREEN ROOM - TOILLET

1/4" = 1'-0"2

TOILET - 015B-T - WEST 1/4" = 1'-0"

3TOILET - 015B-T - NORTH

1/4" = 1'-0"4

TOILET - 015B-T - EAST 1/4" = 1'-0"

5TOILET - 015B-T - SOUTH

1/4" = 1'-0"6

TOILET - 015B-T - WEST - VANITY 1/4" = 1'-0"

7TOILET - 015B-T - EAST - VANITY

Page 13: DD Phase – Client Coordination Meeting – Finishes & Site · 2017. 10. 9. · Scott DuBois Michael Lotito Holli Stone Earnest Washington Lori Cook Mark Dixon ... Presentation from

N/7 Q

NH

NF

NE

ND

NC

N/8

NG

N/8'

N/11

N/20

N/17

N/14

N/23

N/32

147D

GYM

STORAGE

147E

SEATING

AREA

100V

ALL

GENDER

TOILET020

OFFICE

021

JC

100N

CORRIDOR

100O

LOBBY

100P

LOBBY

STA-CNN

STAIR

100R

ALL

GENDER

TOILET

100S

CHANGING

100T

CHANGING

020

100V

100R

100E

ELEVATOR

147D

GYM

STORAGE

1/8" = 1'-0"

10/03/17

2016007

AP110Student Activity Center

7060 State Rt. 104 Oswego, NY 13126

SUNY Oswego

FIRST FLOOR IMPROVEMENTS

1/8" = 1'-0"1

PARTIAL FIRST FLOOR FURNITURE PLAN (ADD-ADLTERNATE 01)