dct analysis. concepts: uml-like class model of essential classes and actions
TRANSCRIPT
DCT Analysis
Concepts:
Ship Container
... ...
Sea-Transpt
...
Truck
...
Bringingunload
Fetchingload
Jobcheck
0..1
0..1
1..1
1..1
0..*
0..*
0..* 0..*
UML-like class model of essential classesand actions.
Conceptual model:
keeper
crane
Simplest model: connected queues.More advanced models differ between 3 classesof trucks and various actions of crane.
keeper crane
Essence: 2 connected queues.(only 8 exceptions out of 500)
Most important parameters:k (keeper occupation rate)c (crane occupation rate)
Assume M/D/1 queues (exp arrival, const processing)if k ≥c, then crane queue empty.If k < c, then average queue length keeper: C/(1-k)average queue length crane+keeper: C/(1-c)(approximately for some constant C)
If e.g. k = 0.9 and c = 0.91,then keeper queue 10C and crane queue C.Greatest capacity problem with crane, though!c.f. Arena model DCT.doe in "examples" directory.
Problem: large queues; keeper queue largest.
Causes: keeper occupation rate too high, also crane capacity?
Crane queue waiting time 35% of keeper waiting time,so crane capacity is an issue!
Solutions: increase keeper productivity.Investigate crane occupation rate.Increase crane productivity also.
Short-term temporary solution: increase working hours.Cost: extra payment to workers, which is manageable("business is booming").Benefits: less dissatisfaction of customers.
Longer term solution for keeper problem: use IT!
Crane solutions (in any combination):- faster crane- double queue- improve container storage
Assignments
• 4-5 assignments throughout the course
• Bonus for exam: max. 2 points
• Bonuses awarded for overall qualityand nice parts (e.g. concepts, problem analysis and suggestions).
• This assignment:score ≥ 8: full bonus (.4)OK(7): small bonus (.2)
Impression
• Much enthousiasm and hard work.
• Some reports were very good (talent or experience). Need course?
• Others need not despair.Hopefully course will help you.