Daily Construction Report (DCR) WTG Type: Qty: Time: Wind: Temp.: Company Quantity Quantity 1 0 1 3 1 2 1 2 18 2 0 3 0 0 3 0 1 0 0 0 0 0 0 0 0 0 TOTAL: 26 12 Parts PMT Lift DTA Base S4 S3 S2 S1 Nacelle Hub/Nose Blades Total 11 6 1 2 1 2 0 1 1 2 3 Parts PMT Lift DTA Base S4 S3 S2 S1 Nacelle Rotor IIP TOTAL 1 0 1 1 1 1 0 1 1 0 0 Installation Lead Generator Installation TA Chery picker Commissioning TA 0 1.4 SCADA and Wind Control: 0 Truck driver 0 B 8 1.3 Commissioned: Components Status arrived Status received Installed Activated ATP Components Activities MCC Energized Turbine Delivery B 6 B 7 0 CCC Start Reliability Run Completed Reliability Run 0 2.0 Overall Project Status: SCADA 0 0 0 Visitor Commissioning Lead Receiver Other Other Other I 1 17-Jul-2014 Project Name: I 2 Installation End IIP CCT 1.0 Status of components on Site: 1.1 Delivered: 1.2 Installed: TOTAL TR/RR Completion Wind Control 0 0 0 0 General Site Information Weather conditions that affect activities on site Date: Forklift Truck GE Site Manager: Precipitation: Manpower Equipment Category Specification Site Manager Crawler crane EHS Manager Truck crane Crane driver 0 0 I 3 B 1 B 2 B 3 B 4 B 5 240487773.xls.ms_office Page 1 of 5

Upload: rochdibahiri4184

Post on 20-Jul-2016

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DCR 20140721

Daily Construction Report

(DCR)

WTG Type: Qty:

Time: Wind: Temp.:

Company Quantity Quantity

1 0

1 3

1 2

1 2

18 2

0 3

0 0

3 0

1 0

0 0

0 0

0 0

0 0

TOTAL: 26 12

Parts PMT Lift DTA Base S4 S3 S2 S1 Nacelle Hub/Nose BladesTotal 11 6 1 2 1 2 0 1 1 2 3

Parts PMT Lift DTA Base S4 S3 S2 S1 Nacelle Rotor IIP

TOTAL 1 0 1 1 1 1 0 1 1 0 0

Installation Lead Generator

Installation TA Chery picker

Commissioning TA

0

1.4 SCADA and Wind Control:

0

Truck driver

0

B 8

1.3 Commissioned:

Components Status arrived Status received Installed Activated ATP

Components

Activities MCC Energized

Turbine Delivery

B 6

B 7

0

CCC Start Reliability Run Completed Reliability Run

0

2.0 Overall Project Status:

SCADA 0 0 0

Visitor

Commissioning Lead

Receiver

Other

Other

Other

I 1 17-Jul-2014

Project Name:

I 2

Installation End IIP CCT

1.0 Status of components on Site:1.1 Delivered:

1.2 Installed:

TOTAL

TR/RR Completion

Wind Control 0 0 0 0

General Site Information Weather conditions that affect activities on site

Date:

Forklift

Truck

GE Site Manager: Precipitation:

Manpower EquipmentCategory Specification

Site Manager Crawler crane

EHS Manager Truck crane

Crane driver

0 0

I 3

B 1

B 2

B 3

B 4

B 5

240487773.xls.ms_office Page 1 of 5

Page 2: DCR 20140721

Daily Construction Report

(DCR)

Turbine

I 3 Rotor

I 3

I 2 S5 S3

Pad

I 3 Rotor

I 3 Rotor

I 3

I 2

Where What Who When Why Comments

Pad Company Manpower Start time End time Total time Work / Activities planned but not possible to perform

Comments:

7.0 Signatures

Internal work

complete rotor assemblyAssemble

3.0 Description of Todays' Work:3.1 Daily Progress Report - Today

Install

Internal work

Activity Components Comment

4.0 Work schedule:

Prepare

This document shall be signed by both Customer and GE Site Manager within one week from the Date of the report above, else shall be deemed as accepted by both Parties.

6.0 Supporting evidences / Comments

Customer Site Manager: GE Site Manager:

Date: Date:

General ElectricEnex

Signature Signature

5.0 Areas of Concern / Issues (where, what, who, when, why)

1-Ja

n-1

900

0-Ja

n-1

900

Activity

Crane assembly

Crane disassembly

Components Comment

4.1 Work planned for next working day

complete rotor assembly

240487773.xls.ms_office Page 2 of 5

Page 3: DCR 20140721

1.0 Components status:

1.1 WTG components delivered on site: 1.2 WTG components received on sitePa

d

PMT

Lift

DTA

Bas

e

S4 S3 S2 S1

Nac

elle

Hu

b/N

ose

Bla

des

PMT

Lift

DTA

Bas

e

S4 S3

I 3 1 1 1 1 1 1 N/A 1 1 1 3 1 1 1 1 1 1

I 2 1 1 1 1 N/A 1 1

I 1 1 1 N/A 1

B 4 1 1 N/A 1

B 3 1 1 N/A 1

B 2 1 1 N/A 1

B 1 1 N/A 1

B 5 1 N/A 1

B 6 1 N/A 1

B 7 1 N/A 1

B 8 1 N/A 1

TOTAL 11 6 1 2 1 2 0 1 1 2 3 11 1 1 1 1 1

Components

3.0 SCADA and Wind Control status:Arrived Received Installed Activated ATP

Wind Control

SCADA

Page 4: DCR 20140721

1.0 Components status: 2.0 Installation and Commissioning status:

1.2 WTG components received on site 2.1 WTG installation status: 2.2 WTG commissioning status:

S4 S3 S2 S1

Nac

elle

Hu

b/N

ose

Bla

des

PMT

Lift

DTA

Bas

e

S4 S3 S2 S1

Nac

elle

Ro

tor

IIP

Ener

gize

d

CC

CSt

art

Rel

iab

ility

Ru

n

N/A 1 1 1 2 1 1 1 1 1 N/A 1 1

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A N/A

0 1 1 1 2 1 0 1 1 1 1 0 1 1 0 0 0 0 0

Page 5: DCR 20140721

2.0 Installation and Commissioning status:

2.2 WTG commissioning status:

CC

CSt

art

Rel

iab

ility

Ru

nR

elia

bili

ty R

un

co

mp

lete

dH

and

ed o

ver

to s

ervi

ce

0 0