Installation Instructions: DC6-48-60-18-8C-EV INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV www.raycap.com

Upload: others

Post on 20-Mar-2020

359 views

Category:

Documents


10 download

TRANSCRIPT

Page 1: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

Installation Instructions:

DC6-48-60-18-8C-EV

INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV

www.raycap.com

Page 2: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly
Page 3: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 1 of 26

Contents

Section Description Page

1 Copyright 2

1.1 Disclaimer 2

1.2 Warnings 2

2 Introduction 3

3 OVP Package Contents 3

3.1 Prerequisites 3

3.2 Tools 3

4 Mounting the Bracket - Options 4

5 Ground Cable Installation 4

6 Pre-wiring Preparation Procedure 5

7 PortDefinitions 6

8 Installing Oval Fiber Gasket 7

8.4 Securing Strain-Relief Plate 8

9 Installing Fiber Trunk 9

10 Installing Fiber Jumpers 12

11 Removing and Securing Touch Guards 14

12 Installing DC Trunk 15

13 Installing DC Jumpers 17

14 Installing Alarm Cable 18

15 Installing Touch Guards 19

16 Securing Fiber Wires, DC Cable to Mounting Base 20

17 Securing Dome Cover and Dome Base Clamp 21

Addendum 1: 4-AWG Cable Trunk 22

Page 4: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

DC6-48-60-18-8C-EV INSTALL INSTRUCTIONS

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 2 of 26

1.0 Copyright © Raycap, Inc. 2018 - All Rights Reserved

1.1 DisclaimerThe information in this document is subject to change without notice and describes only the product specified above. This documentation is intended for the use of Raycap customers only for the purposes of the agreement under which the document is submitted, and no part may be used, reproduced, modified or transmitted in any form or means without the prior written permission of Raycap. The documentation has been prepared to be used by professional and properly trained personnel, and the customer assumes full responsibility when using it. Raycap welcomes customer comments as part of the process of continuous development and improvement of the documentation.

Raycap has made all reasonable efforts to ensure that the instructions contained in this document are adequate and free of material errors and omissions. Raycap will, if deemed necessary, explain issues which may not be covered by this document.

The contents of this document are subject to revision without notice due to continued progress in methodology, design and manufacturing. Raycap shall have no liability for any damage of any kind resulting from the use of this document.

1.2 WarningsPlease read this manual prior to use to become familiar with the product’s numerous features and operating procedures. To maintain the maximum degree of safety, follow the sequences as outlined.

Before using the product, read all instructions and cautionary markings on the product and on any equipment connected to the product.

CAUTION:

Unless otherwise noted, product usage that is not recommended or sold by the product manufacturer can result in risk of fire, electric shock, or injury to persons.

Do not operate the product if it has been damaged in any way. Return damaged products to their manufacturer for repair or replacement.

Do not disassemble the product as incorrect reassembling can risk electrical shock or fire.

Do not bend fiber-optic cables beyond their minimum bend radius. Bending the cables beyond their minimum bend radius can damage the cables and cause problems that are difficult to diagnose.

Do not let fiber-optic cables hang free from the connector. Do not allow fastened loops of cables to dangle, which stresses the cables at the fastening point.

WARNING:

Do not look directly into a fiber-optic transceiver or into the ends of fiber-optic cables. Fiber-optic transceivers and fiber-optic cables connected to transceivers emit laser light that can damage your eyes.

Do not stare into the laser beam or view it directly with optical instruments even if the interface has been disabled.

Secure the cables so that they are not supporting their own weight. Place excess cable out of the way in a neatly coiled loop. Placing fasteners on a loop helps cables maintain their shape.

Disconnect or disable the DC power source to the product prior to beginning its installation. Ensure that the DC power source to the product remains de-energized until the completion of the installation and after all connections have been verified to be correctly configured.

Electrostatic sensitive devices. ESD mitigative procedures, such as wearing wriststraps are to be used during installation and maintenance.

For conditions other than those described above, please contact a Raycap Account Representative at (208) 777-1166, (800) 890-2569 or www.raycap.com

Thank you for choosing quality products from Raycap.

Page 5: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 3 of 26

2.0 IntroductionIn a split Radio Base Station (RBS) architecture the typical RBS consists of a Base Band Unit (BBU) and Remote Radio Heads (RRH) connected by cabling. Power to the RRH is provided through copper cables traveling from the DC power plant to the top of the tower or roof top. This creates a conductive path, making the active equipment at the top and the base of the site vulnerable to damage by direct lightning strikes. Protection systems installed in front of the PDU (DC power plant) and the RRH must be able to withstand direct lightning currents in order to protect the sensitive equipment. Raycap’s RRH solutions featuring Strikesorb® SPD technology significantly enhance the reliability & availability of the RRH site by providing superior electrical protection at the RRH and DC power plant, while providing flexible fiber optic and power cable management solutions.

3.0 OVP Package Contents1 each

Dome CoverDome BaseDome Base ClampSealing O-RingMetal Mounting Base (already attached to Dome Base)Pre-terminated LanyardCarabiner for LanyardSheet of 21 blank labels for installer useOval Gasket: Power (for 2 trunks) 8AWGOval Gasket: Power (for 2 trunks) 6AWGOval Gasket: Power (for 2 trunks) 4AWGOval Gasket: Fiber (1 trunk-18 pair)Oval Gasket: Fiber (2 trunks-12 pair + 6 pair)10-24 Hex Nut, Silicon Bronze, Qty 85Lockwasher #10, External Tooth, Silicon Bronze, Qty 85Flatwasher #10, Silicon Bronze, Qty 56Ground Lug - #2, Dual ¼" Stud, 1" P, Long, w/o window

3.1 PrerequisitesThis Document describes how to install the DC6-48-60-18-8C-EV on-site and how to mount, and connect it to external interfaces.

Installers of Raycap’s RRH surge protective and fiber/power management solutions must be industry professionals who have attended training on the proper handling, installation and cleaning of fiber-optic cable, and attended training on the installation of the equipment by Raycap and/or the mobile operator. Installers are required to read this installation guide thoroughly prior to installation of the Raycap RRH protection equipment.

3.2 Tools & Supplies

1/2" nut driver (oval gasket)7/16" Nut Driver to install ground lugTorque wrench/tool2 each 17mm open end wrench (one for each side on mounting bracket for mounting to 2"-4" pole)Recommended Banding Tools:

Site Pro: Strapping- part # WRL100 Site Pro: Clamps- part # BU254-25Site Pro: Heavy Banding Tool- part # T001

Page 6: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

DC6-48-60-18-8C-EV INSTALL INSTRUCTIONS

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 4 of 26

ProcedureMounting the Bracket

Dome unit is to be mounted at least 10' above ground.

4.1 Option 1: Pole Mount Using Pre-installed existing hardware, mount bracket to 2" to 4" diameter pole.

4.2 Option 2: Monopole Remove supplied nut and bolt pole Hardware from Bracket. Use 1" stainless steel bands (not supplied) through slots on bracket to mount to monopole.

4.3 Option 3: Unistrut Using hardware from mounting bracket, mount to Unistrut (not supplied).

Note: Port size and configuration of dome may vary from what is shown.

Ground Cable Installation

5.1 Attach #2 ground cable to #2, Dual 1/4" Stud, 1" P, Long, w/o window, ground lug on frame as shown. Ground lug can be mounted to either grounding location. Using the included lock washers, tighten nuts with a 7/16" nutdriver.

Note: Glands removed for clarity.

Torque: 65 in-lbs

5.2 Ground cable installation complete.

Page 7: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 5 of 26

Pre-wiring preparation procedure

6.1 Ensure the lanyard from dome to bracket base is secure.

6.2 Remove the clamp ring, secure around bracket.

6.3 Remove dome cover and set aside.

6.4 Verify the mounting bracket is secured to the plastic dome base in the two locations indicated.

Torque: 120 in-lbs

Page 8: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

DC6-48-60-18-8C-EV INSTALL INSTRUCTIONS

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 6 of 26

Procedure PortDefinitions

7.1 See picture to identify Base Port Assembly Definitions

7.2 See picture to identify Fiber Jumper Port Cap Assembly Definitions

Gaskets may vary in size and shape.

7.3 See picture to identify DC Power Jumper Port Cap Assembly Definitions

Gasket

Cap

Cap

Gasket

Fiber Jumper (5)

Fiber Jumper (4)

Fiber Trunk (18)

Fiber Jumper (4)

Fiber Jumper (5)

Fiber Trunk (6)

Fiber Trunk (12)

(Optional 6/12-pair fiber trunk ports)

DC Jumpers

Protective Vent

DC Trunk

Alarm

DC Jumpers

PortDefinitionsDC Trunk Ovals

8AWG 6AWG 4AWG

Note: when using the 6AWG gasket, use steel plates that come with the 8AWG gasket.

Page 9: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 7 of 26

Procedure Installing Fiber into Oval Fiber Gasket

8.1 Pull back gasket to feed fiber cable through slot.

Slots in bottom compression plate should face opposite directions.

8.2 Insert fiber cable through hole. Ensure bolt orientation is correct.

8.3 Feed cable through fiber oval port.

Note: Installations using one 18 pair fiber optic trunk cable will use the oval gasket with one hole in the center.

Installations using two fiber optic trunk cables will use the oval gasket with two slotted holes.

Page 10: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

DC6-48-60-18-8C-EV INSTALL INSTRUCTIONS

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 8 of 26

8.4 Insert strain relief plate in slotted grooves and pull cables through as illustrated so strain relief plate rests on base. Repeat for 2nd fiber trunk if needed.

8.5 Use ½" nut driver to tighten bolts creating a seal. (Oval gasket expands to create a seal)

Page 11: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 9 of 26

Procedure Installing Fiber Trunk

9.1 Open hinged fiber connection bar – loosen thumb screw (by hand or flat head screwdriver).

9.2 Remove plugs in fiber connectors that will be used – To avoid contamination, do not remove plugs until fiber is immediately ready to be installed. (pull one plug, plug in fiber, then do the next one, repeat).

Plugs

Page 12: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

DC6-48-60-18-8C-EV INSTALL INSTRUCTIONS

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 10 of 26

9.3 Loosely route fiber cables around cable guides.

9.4 Cable #s 4, 5, 6, 10, 11,12, 16, 17, and 18 are routed over upper right side cable guide (#2).

9.5 Cable #s 1, 2, 3, 7, 8, 9, 13, 14, and 15 are routed over upper left side cable guide (#1).

9.6 Cables are marked with a corresponding number to match the back plate label.

1

2

Page 13: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 11 of 26

9.7 Connect cables into the fiber connection bar starting with the row closest to the back plate.

Page 14: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

DC6-48-60-18-8C-EV INSTALL INSTRUCTIONS

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 12 of 26

Procedure Installing Fiber Jumpers

Note: Color of cables may vary

10.1 Remove port cap. Consists of 3 pieces: cap, clamping claw, and gasket.

Note: Clamping claw and base port may also be integrated.

Gaskets may vary in size and shape.

10.2 Feed cables through port cap assembly.

Feed through round fiber jumper port assembly as shown in picture.

(Four or Five RRH fiber jumpers per port depending on which gland is being installed)

Reconnect port cap assembly.

Clamping Claw

Gasket

Cap

Page 15: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 13 of 26

10.3 Remove plugs from fiber connector bar that will be used. (Always keep un-used connectors plugged).

10.4 Route cables as shown keeping bends minimal. Connect cables starting from row closest to back plate as shown in (9.7).

12

Plug

Page 16: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

DC6-48-60-18-8C-EV INSTALL INSTRUCTIONS

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 14 of 26

10.5 Connect cables as follows:

Fiber Pair RRH # Sector Freq/Band

1 A1 Alpha LTE/UMTS 1C

2 B1 Alpha LTE/UMTS 2C

3 C1 Alpha LTE/UMTS 3C

4 Alpha Spare

5 A2 Beta LTE/UMTS 1C

6 B2 Beta LTE/UMTS 2C

7 C2 Beta LTE/UMTS 3C

8 Beta Spare

9 A3 Gamma LTE/UMTS 1C

10 B3 Gamma LTE/UMTS 2C

11 C3 Gamma LTE/UMTS 3C

12 Gamma Spare

13 D1 Alpha Future/4C

14 D2 Beta Future/4C

15 D3 Gamma Future/4C

16 E1 Alpha Future/5C

17 E2 Beta Future/5C

18 E3 Gamma Future/5C

Procedure Removing and Securing Touch Guards

11.1 The touch guard is secured with a philips screw on each stand-off (4). Loosen each philips screw and slide touch guard up then off from each screw head.

11.2 Temporarily secure to unit as shown in the photo to the right.

Touch Guard

Page 17: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 15 of 26

Procedure Installing DC Trunk (6AWG and 8AWG)Note: See Addendum for installing 4 AWG Power Trunk (Pages 22 and 23)

12.1 Feed cable trunk through oval power gasket.

Note: Oval power gasket is not a strain relief device.

12.2 Feed enough of the trunk to strip and connect to the power connectors.

Allow extra length for some settling of power trunk due to weight.

Note: 6 AWG oval gasket will replace standard power gasket when installing 6 AWG trunks.

A3

A2

A1

B1

B2

B3

*Jumper Cables not shown for clarity

12.3 Insert and secure oval power gasket with ½" nut driver creating a tight seal.

Note: If only one DC trunk cable is installed, plug the remaining oval gasket hole with a short section of DC trunk cable and seal the cut end with tape.

Page 18: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

DC6-48-60-18-8C-EV INSTALL INSTRUCTIONS

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 16 of 26

*All lugs 5/8 pitch with #10 stud size

#8 Power Trunk RRH QTY Double Lugs for Power Double Lugs for Ground Lugs for Drain

6 12 Lugs (8AWG) 1 Lug (10-14AWG) 1 Lug (10-14AWG)

Burndy P/N # YA8CL-2TC10 YAV10-2TC10 YAV10-2TC10

Panduit P/N # LCD8-10A-L LCD10-10A-L LCD10-10A-L

#6 Power Trunk

6 12 Lugs (6AWG) 1 Lug (8AWG) 1 Lug (10-14AWG)

Burndy P/N # YA6CL-2TC10 YA8CL-2TC10 YAV10-2TC10

Panduit P/N # LCD6-10A-L LCD8-10A-L LCD10-10A-L

#4 Power Trunk

6 12 Lugs (4AWG) 1 Lug (8AWG) 1 Lug (10-14AWG)

Burndy P/N # YA4CL-2TC10 YA8CL-2TC10 YAV10-2TC10

Panduit P/N # LCD4-10A-L LCD8-10A-L LCD10-10A-L

#12 Power Jumper

1 2 Lugs (12AWG) 1 Lug (10-14AWG) 1 Lug (14-16AWG) Single Hole

Burndy P/N # YAV10-2TC10 YAV10-2TC10 TP14-10

Panduit P/N # LCD10-10A-L LCD10-10A-L PN14-10R-C

#10 Power Jumper

1 2 Lugs (10AWG) 1 Lug (10-14AWG) 1 Lug (14-16AWG) Single Hole

Burndy P/N # YAV10-2TC10 YAV10-2TC10 TP14-10

Panduit P/N # LCD10-10A-L LCD10-10A-L PN14-10R-C

12.4 Connect wires according to AT&T established color guide below. Note: For -48V and Return connections, use sil-bronze flat washer. For Ground and Shield connections, use external tooth lock washer combination.

Note: Wire from top down (A3-A1)

-48V Supply Red/Green WireA3

Return Black/Green Wire

-48V Supply Red/Orange WireA2

Return Black/Orange Wire

-48V Supply Red/Blue WireA1

Return Black/Blue Wire

-48V Supply Red/Blue WireB1 Return Black/Blue Wire

-48V Supply Red/Orange WireB2 Return Black/Orange Wire

-48V Supply Red/Green WireB3 Return Black/Green Wire

-48V In(from Trunk)

-48V Out(to Sector)

Drain (Jumper)

Return Out(to Sector)

Return In(from Trunk)

Ground(Jumper)

Page 19: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 17 of 26

Procedure Installing DC Jumpers

13.1 Feed jumpers through power gasket, clamping claw and cap.

13.2 Feed enough of the cable through to strip and connect to the power connectors.

13.3 Connect wires according to AT&T established color guide below.

13.4 Left side DC jumper installation complete. Repeat to install right side DC jumpers.

12.5 Left side DC trunk installation complete. Repeat to install right side DC trunk. Note: Wire from top down (B1-B3)

Close-up of DC trunk left side ground and drain installation.

Close-up of DC trunk right side ground and drain installation.

B1

B2

B3

-48V Supply Red WireA3

Return Black Wire

-48V Supply Red WireA2

Return Black Wire

-48V Supply Red WireA1

Return Black Wire

Drain (single lug)

Ground (double lug)

Page 20: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

DC6-48-60-18-8C-EV INSTALL INSTRUCTIONS

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 18 of 26

Bridge Clip

Procedure Installing Squid Alarm Cable

14.1 Feed alarm cable through alarm port and connect to alarm board as shown.

Alarm Cable Wiring for one or more Squids. See AT&T DOC: RF-HW-2014-214 NP&E National RAN Field Notice: Tower Top SQUID, Fiber and DC Trunk Cables.

14.2 The 1st Squid installed will be alarmed to the lowest band (or first installed) RRH/RRU on the Alpha sector.

In the event the alarm cable cannot be connected to Alpha, it will be acceptable to alarm to the closest physical sector on an exception basis.

14.3 The 2nd Squid installed will be alarmed to the lowest band (or first installed) RRH/RRU on the Beta sector.

14.4 The 3rd Squid installed will be alarmed to the lowest band (or first installed) RRH/RRU on the Gamma sector.

14.5 A RRH/RRU will never have more than one Squid alarmed on it.

14.6 Squid alarms are not to be daisy chained.

Note: Bridge clips are necessary on INPUT 1 and INPUT 2 when no cables are present.

Page 21: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 19 of 26

Procedure Installing Touch Guards

15.1 The touch guard is secured with a philips screw on each stand-off (4). Place touch guard into position over each screw head, slide touch guard down, then tighten each screw.

Note: Ensure ground wires are in front of the touch guard to prevent unwanted wire contact.

4 stand-offs

Page 22: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

DC6-48-60-18-8C-EV INSTALL INSTRUCTIONS

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 20 of 26

Procedure Securing Fiber and DC Cables to Mounting Base

16.1 The strain relief bar is designed to accept common cable snap in hangers.

16.2 Procedure hardware (hangers, clamps, grommets, etc.) from approved cable manufacturers

Page 23: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 21 of 26

Securing Dome Cover and Dome Base Clamp

17.1 Position o-ring to create seal for Cover as shown.

17.2 Secure dome cover and dome base clamp.

Note: It is recommended to lock the clamp to avoid unwanted or unauthorized access to the interior components.

17.3 Installation complete.

Lock Option

Page 24: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

DC6-48-60-18-8C-EV INSTALL INSTRUCTIONS

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 22 of 26

Addendum 1

4-AWG Trunk CableSeePage16forproperlugidentification

Procedure A1.1. Feed trunk cable through oval power gasket.

Note:4-AWG oval power gasket is required for proper installation. Oval power gasket is not a strain relief device.

Feed enough of the trunk to strip and connect to the power connectors.

A1. 2. Cut cable to where it inserts completely into lug barrel when lug is located at A3 -48 terminal of A3.

A1. 3. Strip outer jacket to the base of the dome. (Make sure not to damage jacket of inner conductors or ground and drain wires.)

A1. 4. Strip A3 outer cable jacket 3.875" - 4.00". (Make sure not to damage the wire strands under jacket)

Cut cable to top of lug of A3

Feed trunk cable through oval power gasket

-48V Supply

Return

-48V Supply

Trace Jacket Colors:

BlueOrangeGreen

Strip outer

jacket to dome

base

Strip A3 cable jacket 3.875"- 4.00"

A3: -48V Supply

Red

ReturnCopper Wrap

A2:-48V Supply

Red

ReturnCopper Wrap

A1: -48V Supply

Red

ReturnCopper Wrap

B1: -48V SupplyRed

ReturnCopper Wrap

B2:-48V SupplyRed

ReturnCopper Wrap

B3:-48V SupplyRed

ReturnCopper Wrap

Page 25: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

©Raycap • All rights reserved(320-1315) Rev.A

Page 23 of 26

INSTALL INSTRUCTIONS DC6-48-60-18-8C-EV

www.raycap.com

Strip 0.75" of insulation from the red -48V wire and trim the exposed Return wire to a length of 2.25"

Slide boot over cable

Attach

cable lugs to unit

-48V Supply

Return

3.87

5" -

4.0

0"

2.25"

.75"

A3

A2

A1

B1

B2

B3

Cut ground and drain wire to 4" and install as shown.

Procedure

A1.5. Unwrap Return-wires from A3 -48V insulated cable, fan out Return-wires then twist into bundle.

A1. 6. Strip 0.75" of insulation from the red -48V wire and trim the exposed Return wire to a length of 2.25".

A1. 7. Slide boot on over cable. Short end over -48V Supply, long end over Return. On the return side, the boot will need to be pulled back for lug crimping. After crimping, roll boot over lug barrel.

A1. 8. Attach lugs to both -48V and Return cables and crimp.

A1. 9. Attach cable lugs to unit.

A1. 10. Repeat all 4-AWG Trunk Cable instructions for additional cables (A2, A1, B1, B2 & B3).

A1. 11. Attach ground and drain wires to unit per standard installation instructions.

Page 26: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly

DC6-48-60-18-8C-EV INSTALL INSTRUCTIONS

www.raycap.com

©Raycap • All rights reserved(320-1315) Rev.A

Page 24 of 26

Notes

Page 27: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly
Page 28: DC6-48-60-18-8C-EV...DC6-48-60-18-8C-V INSTALL INSTRUCTIONS aap ll rits reserve (320-1315) Rev.A Page 6 of 26 Procedure Port Definitions 7.1 See picture to identify Base Port Assembly