June 19, 2014
TO: Bloomingdale and LeDroit Park Communities & First Street Tunnel Stakeholders
RE: Community Concerns Regarding the First Street Tunnel Project
Dear Community Members/Residents:
The purpose of this letter is to provide an update on DC Waters continuing efforts to minimize the
construction impact of the First Street Tunnel Project on your community. While this project is critical to
address the flooding that has historically plagued Bloomingdale and LeDroit Park, we know that the
construction will be in close proximity to many homes and will pose unique challenges for the people who
live there.
At our most recent meeting on May 29, 2014, the community raised several concerns related to our traffic
plan at the intersection of First and V Streets NW. Those concerns included the proximity of traffic to
sidewalks and homes, the safety of pedestrians along First Street NW, and the loss of tree box space.
In response to these concerns, DC Water has revised its plan to now request closure of First Street NW for
two months. This full closure will reduce impacts to the existing pedestrian walkways along First Street
NW. Further, the revised plan now provides a 6-foot wide sidewalk along the east side of First Street
throughout the construction period of approximately 20 months. As part of our traffic plan, safety
lik d d d li it t b i d ti b ff l th b li ill b
-
8/12/2019 DC Water FST Community Letter 2014 06 19
2/13
lik d d d li it t b i d ti b ff l th b li ill b
-
8/12/2019 DC Water FST Community Letter 2014 06 19
3/13
11
V St NW
N
Revised First Street NW Traffic Plan
Phase 1West Construction Staging Area
FirstStNW N
B
NB
SB
SB
AL
LEYWAY
**Approx. 3 Month Duration**
Tree Box Removed
Tree BoxesRemoved
6'-0" Sidewalk Width
At least one sidewalk will remainopen at all times along V Street NW
Temporary Concrete Barrier
Construction Lane Closures
Construction Staging Area
Construction Traffic Flow Direction
Vehicular Traffic Flow Direction
LEGEND
Perspective
for conceptual
rendering
-
8/12/2019 DC Water FST Community Letter 2014 06 19
4/13
22
Revised First Street NW Traffic Plan
Phase 1West Construction Staging Area
**Conceptual Rendering: details of construction may differ from appearance depicted**
-
8/12/2019 DC Water FST Community Letter 2014 06 19
5/13
33
V St NW
N
Revised First Street NW Traffic Plan
Phase 2Intersection Closed
FirstStNW
AL
LEYWAY
**Approx. 2 Month Duration**
6'-0" sidewalk widthConstruction Lane Closures
Construction Staging Area
Construction Traffic Flow Direction
LEGEND
At least one sidewalk will remainopen at all times along V Street NW
Perspective
for conceptual
rendering
-
8/12/2019 DC Water FST Community Letter 2014 06 19
6/13
44
Revised First Street NW Traffic Plan
Phase 2Intersection Closed
**Conceptual Rendering: details of construction may differ from appearance depicted**
-
8/12/2019 DC Water FST Community Letter 2014 06 19
7/1355
V St NW
N
10
Revised First Street NW Traffic Plan
Phase 3One Way Northbound
Extends to 2025 First St NW
Extends to2113 First St NW
FirstStNW
CrosswalkClosed
RelocatedCrosswalk
NB
NB
**Approx. 6 Month Duration**
Tree BoxesRemoved
Tree BoxesRemoved
At least one sidewalk will remainopen at all times along V Street NW
Temporary Concrete BarrierConstruction Lane Closures
Construction Staging Area
Vehicular Traffic Flow Direction
Construction Traffic Flow Direction
Pedestrian Traffic Flow Direction
LEGEND
6'-0"sidewalkwidth
100
Tree BoxRemoved(Restored atProject
Completion)
Perspective
for conceptual
rendering
-
8/12/2019 DC Water FST Community Letter 2014 06 19
8/1366
Revised First Street NW Traffic Plan
Phase 3One Way Northbound
**Conceptual Rendering: details of construction may differ from appearance depicted**
-
8/12/2019 DC Water FST Community Letter 2014 06 19
9/1377
V St NW
N11
Revised First Street NW Traffic Plan
Phase 4One-Way Northbound & Separation Buffer
NB
Extends to2025 First St NW
Extends to2113 First St NW 6'-0" sidewalk width
FirstStNW
NB
CrosswalkRestored
4'-0" separationbuffer
ALLEYWAY
**Approx. 12 Month Duration**
Temporary Concrete BarrierConstruction Lane Closures
Construction Staging Area
Construction Traffic Flow Direction
Vehicular Traffic Flow Direction
Channelizing Device
LEGEND
At least one sidewalk will remainopen at all times along V Street NW
Perspective
for conceptual
rendering
-
8/12/2019 DC Water FST Community Letter 2014 06 19
10/13
88
Revised First Street NW Traffic Plan
Phase 4One-Way Northbound & Separation Buffer
**Conceptual Rendering: details of construction may differ from appearance depicted**
-
8/12/2019 DC Water FST Community Letter 2014 06 19
11/13
V St NW
New Tree
Existing Tree
TREES
ACPLNorway Maple
ACSASugar Maple ACRURed Maple
LAINCrepe Myrtle
PLHYLondon Planetree
SHRUBS
AZGPPink Azalea
GAJADwarf Gardenia
New Planter Box
FirstStNW
GrassLiriope Muscari Big Blue
Revised First Street NW Traffic Plan
Project CompletionSite Restoration Sheet 1
N
9
-
8/12/2019 DC Water FST Community Letter 2014 06 19
12/13
New Tree
Existing Tree
TREES
ACNIBlack Maple
ACRURed Maple
ACSASugar Maple LAIN Crepe Myrtle
PLHYLondon Planetree
SHRUBS
AZGWWhite Gumpo
Azalea
GAJADwarf Gardenia
HOPAPatriot Hosta
HYQUOak Leaf
Hydrangea
GRASSES
HEMIPurple Palace
Coral Bells
IRVEBlueflag Iris
SEAJAutumn Joy
Stonecrop
New Planter Box
GrassKentucky Bluegrass, Fescue, Red TopGrassLiriope Muscari Big Blue
V St NW
F
irstStNW
Revised First Street NW Traffic Plan
Project CompletionSite Restoration Sheet 2
N
10
-
8/12/2019 DC Water FST Community Letter 2014 06 19
13/13
1111
Revised First Street NW Traffic Plan
Project CompletionSite Restoration
**Conceptual Rendering: details of plantings may differ from appearance depicted**