Page 1: DB Yurra SMP Capability Statement

DB YURRA

SMP CAPABILITY

STATEMENT

DBYURRA.COM

STRUCTURAL MECHANICAL & PIPING

Page 2: DB Yurra SMP Capability Statement

Contents

Company Overview

Our People

DB Capabilities Chart

About Us

What we do

Mechanical Solutions

Access Solutions

BLH Dropped Object Prevention System

How we operate

Local Content & Indigenous Engagement

Safety & Training

Projects

3

4

5

6

7

8

10

13

15

16

18

20

Testimonials22

Page 3: DB Yurra SMP Capability Statement

Company Overview

DB Yurra is your trade and business service specialists with

a social conscience.

Created in 2014, DB Yurra is a unique collaboration between

two organisations that share a common goal: a commitment

to building a secure future for Indigenous and non-Indigenous

communities.

Delivering high quality, tailor-made construction and business

services across a range of projects, DB provides local Indigenous

and non-Indigenous people unrivalled access to skilled

employment opportunities within the mining, mechanical,

structural and electrical sectors. We have the capability to deliver

on any project regardless of size, location or complexity.

At DB we work hard to deliver you with cost effective, sustainable

solutions, without compromising standard or safety. We use our

collaborative capacity to provide clients with fast, efficient and cost

effective solutions tailor-made to meet the specific requirements.

Our services represent industry best practice in our core service

areas of safety, sustainability and reliability. We are here to provide

you with the Superior solution.

3

Page 4: DB Yurra SMP Capability Statement

At DB Yurra our philosophy is that the professionalism and strength

of our company is due to the quality of our people. From senior

management right through to our branch and site management teams,

our technical expertise and comprehensive range of capabilities ensure

consistency of performance. Low staff turnover supported by ongoing

training and a commitment to career development has made DB an

employer of choice.

DB is committed to developing a diversified workforce whereby

recognising the diversity and skills of the Aboriginal and Torres Strait

Islander cultures and the unique skills and knowledge that indigenous

staff bring to our workforce, whilst giving back to the community.

DB is committed to the principles of non-discrimination, providing all

employees with a work environment that is safe, equitable and free from

harassment.

At DB we believe that expertise and leadership in any field should be

shared and therefore, have developed a mentoring and succession

planning program whereby staff are identified and encouraged to

participate in a training framework with the view that they could develop

into the future leaders of the company.

Our senior management team, have all had a long association with

the group, many of which have numerous years’ experience within the

industry. From management to site staff, all our people are committed

to treating your business with the utmost respect and are committed to

delivering the highest levels of service possible.

Our People

From senior management right through to our branch and site management teams, our technical expertise and comprehensive range of capabilities ensure consistency of performance.

4

Page 5: DB Yurra SMP Capability Statement

DB Yurra has the combined capacity of several business units working together to provide services to clients

both domestically and internationally, offering clients fast, efficient and cost effective solutions tailored to

meet the specific demands of their customers and projects. Because of the unique DB structure we can deliver

services across multiple industries in house, allowing our clients to be supported from project design through to

commissioning without the need to engage multiple companies.

DB Capabilities Chart

Project Management

Safety Compliance

MaintenanceMining

Access ServicesTraining Services

Labour HireStructural

Construction Civil Works

5

Page 6: DB Yurra SMP Capability Statement

Welcome to DB Yurra SMP Services

We are a specialist in the SMP sector of Construction, Maintenance, Mining and Infrastructure, providing strength,

stability and cost saving initiatives to our clients.

With proven capacity for providing technical capabilities to clients for Project, Shutdown & Maintenance

downtime of critical operational equipment and areas.

DB practises Safety First & Raising the Standards – ensuring clients Golden Rules are adhered to and by strictly

conforming to lockout and Riske assessment procedures when conducting work on any site.

including:

• Maintenance Services

• Sustaining and minor capital works

• Shutdowns

Our multidisciplinary services cover structural and mechanical capabilities, supported by Access, Protective

Coatings and Concrete remediation management.

We have extensive experience in:

• Large Infrastructure

• Large Commercial Buildings

• Power stations

• Tunnels

• Wharfs

• Bridges

• Desalination Plants

• Water Retaining Structures “e.g. reservoir’s and dams”

• Heritage Buildings

The experienced and trusted team at DB is here to provide you with the optimal solution in even the most

complex and challenging situations.

About us

6

Page 7: DB Yurra SMP Capability Statement

Specialised areas include the technical expertise in Processing and Milling systems, fixed plant

maintenance including Management, Supervision and required experienced trades;

• Fitters

• Boilermaker welders

• Riggers

• Crane operators

• Scaffolders

Our services range from supplying supervised and experienced shutdown teams, through to complete

shutdown support;

• Scoping and planning of work

• Critical path tracking

• Fully supervised and managed work teams

• Specialised tooling and logistics

• Contractor and supplier Management

What we do

7

Page 8: DB Yurra SMP Capability Statement

Mechanical Solutions

Conveyor SystemsThe importance of conveyor maintenance and

quick repair can mean the difference of costly

downtime via effective planned maintenance

schedules and shutdowns. DB can assist in

providing experienced resources for scheduled

& non-scheduled maintenance & breakdown to

reduce downtime and continued productivity.

Experienced tradesmen and supervisors have the

knowledge in the following systems that make the

difference;

• Trough

• Chain

• Bucket

• Screw

• Overland

• Roller inspection & replacement

• Drive end & Tail end maintenance & replacement

• Bearing replacement

• Belt tracking

• Belt Take - Up maintenance

• On site repairs & fabrication to conveyor

beds & steelwork

• Hopper wear plate replacement

Management & supervision experience includes

BHPB Olympic Dam, Xstrata Copper-Lomas Bayas

(Chile), Newcrest Cadia East, BHPB TEMCO.

Processing/Floatation SystemsDB has worked in conjunction with other

major service providers such as BLH Group, in

providing knowledge with processing equipment

maintenance & repair for heavy industry. This has

resulted in ensuring on time-on budget shutdowns

and projects with outstanding safety standards.

examples include;

• Valve replacement

• Pump maintenance & change out

• Pipe spool replacement

• Tank Agitator replacement

• Thickener tank rake arm repairs

• Agitator drive & gearbox replacement

• Minor onsite tank repairs

• Onsite structural welding/repairs

88

Page 9: DB Yurra SMP Capability Statement

CrushersCrusher shutdown support, supplying supervised

and experienced shutdown teams, to provide

knowledge in maintenance and repair of crushing

plant is vital. Identifying failed wear parts and

operative equipment can reduce inefficiency

and costly outcomes by engaging dedicated

maintenance & shutdown personnel to combat

downtime with crushing plants

• Cone crushers

• Jaw crushers

• Grizzly

• Wear plate/part replacement

• Hydraulic ram replacements

• Apron feeder and discharge chute repairs

• Crusher house repairs

• Onsite fabrication & steelwork

• Maintenance schedule inspections/repairs

• Shutdown repairs

As with all crushers, the maintenance of a crusher

depends on how it is applied and taking a proactive

approach to maintenance items like wear parts.

Replacing wear parts before they are worn out

costs less and improves the crusher’s performance,

ultimately saving money, increasing uptime, and

providing crusher longevity.

MillsDB provides the necessary experience to ensure

Mill shutdown execution is carried out safely, timely

and effectively. Tasks grouped according to their

importance (low, medium, critical) to the continued

mill operation and used to prioritise objectives with

budgetary and time constraints. Mill shutdowns are

too often extended through one task taking more

time and resources than expected, but if properly

understood tasks can be prioritised and critical

tasks assigned more resources.

• Slurry pipe inspections

• Pipe spool replacement

• Mantle and Throat liner changes

• Pipe & bearing hotspot inspection

& maintenance

• Feed & discharge seal replacement

• Gearbox & Head pulley inspections

• Cyclone feed pump inspection/repair

• Shutdown maintenance repairs

Page 10: DB Yurra SMP Capability Statement

Access Solutions

DB Yurra provides comprehensive

support structures, cantilevered and suspended

access, temporary buildings, covered structures,

bridges and more. DB engineers provide technical

knowledge necessary to ensure you get a structure

designed to help you achieve your operational

our tried and tested request and planning systems

that keeps onsite alterations to a minimum.

DB has the capacity to provide safe and practical

can customize a solution to give cost saving

DB’s precise placement of yards and choice of

gives an advantage to all our clients in both

maintenance, shutdown and construction works

system for the environment, works undertaken

and project size gives short notice logistical

your operational and project schedules are not

to customers, we regularly bring on board new

products and systems that improve on safety and

reduce costs and time on site. As an example,

lighter takes less time to erect and dismantle and

typically achieves cost savings of 60% against

conventional systems. Innovations also include the

LGS “Lattice Girder System” It has a unique versatile

design which allows it to be used individually as

a walkway, side by side as staging, suspended

on rails and used in conjunction with all types

covers” or mobile platform.

service, reliability and professionalism. We are

renowned for maintaining a high standard of safety

and our commitment to achieving zero harm is

evident across all facets o our company.

DB is committed to providing ongoing skills

development and continuous improvement

with the latest techniques

and safety standards.

DB’s national data base of highly multi-disciplined

medicals, VOC’s and strict screening processes prior

to employment ensuring the right candidates are

selected for the project.

Page 11: DB Yurra SMP Capability Statement

Ropes Access SolutionsDB Yurra is a national leader

in the provision of alternative access

and safe working at height solutions.

Our unique industrial ropes access

techniques and innovations have

enabled us to deliver many cost

Industrial Ropes Access is fast becoming

the preferred method of access and

accompanied by our other access

systems puts DB Group Global in front of

our competitors.

DB provide innovative solutions

for inspection, construction and

maintenance services nationally

including expert advice from trained

the project from planning through to

completion to provide and suggest

solutions for your access problems.

We are dedicated to providing high

that are tailored to individual client’s

highly skilled trade competent teams

supported by management.

Page 12: DB Yurra SMP Capability Statement

Access Solutions

Mast ClimbersApplying HEK’s latest mast climbing technologies,

DB Yurra utilises the MS Compact work

platform to access even the most challenging

variety of uses at every construction site, in

industry, power plants, process plants, mining

operations and special events, the MS Compact

work platform is capable of delivering heavy

machinery, tools and personnel with precision

architectural layouts.

Overcoming access limitations previously

experienced by the standard range of mast

climbing work platforms, the MS Compact work

platform allows DB to provide extensive logistical

advantages by delivering a full day’s production

With carrying capacity of 4000kg, up to a height of

200m, the MSM Super work platforms are capable

of being adjusted in both length and height to cater

for low-rise and high-rise projects and are able

to deliver and position all types of loads within a

centimetre of the location required.

Originally intended to provide access to power

plant boilers during maintenance shutdowns

where entry point sizes are limited, the innovative

design of the MS Compact work platform allows

the passing of spaces just 84cm or 34 inches wide.

With demonstrated capabilities now extending

beyond power plants, the innovative MS Compact

work platform is widely used to overcome

during installation, and pulp mills where access is

challenging and highly congested.

The MS Compact work platform provides

ergonomic working conditions for employees,

heavy tools and machinery are always within easy

reach. Additionally, the use of steel pins instead of

nuts and bolts substantially decreases assembly

and dismantling times compared to traditional

access increases productivity on-site and provides

With a focus on safety, DB operate mast

climbing technologies according to the strictest

requirements in terms of safety and quality and

only work with high grade, galvanised structural

materials, which comply with

the latest standards.

Training opportunities are provided to ensure

personnel remain up-to-date on the latest

advances within the mast climbing industry. With

over 40 years’ experience in the development and

manufacture of mast climbing work platforms,

transport platform and material hoists, HEK

provides a range of technical and commercial

courses covering application possibilities, logistics,

operation of machinery, all of which are available

through DB.

Page 13: DB Yurra SMP Capability Statement

DB Yurra has developed a close working

relationship with the BLH Group, in mechanical

support and assistance in the execution of projects

maintenance and shutdowns. Understanding the

priority of personal safety and the global issue

of injuries from dropped objects, BLH Safety

Solutions International has awarded DB Yurra the

distributorship of the BLH STOP DROP Barricading

& Guarding system for the Pilbara and outlying

regions, to improve protection for Employees and

Clients from Dropped Object injuries.

DB Yurra provides awareness presentations of

this unique product, full support of sales and

installation for plant and machinery – both

permanent and temporary installations for

shutdowns projects and high risk dropped object

areas. This unique purpose –designed polymer

system includes multiple advantages over steel,

timber, shade cloth and other improvised systems

in multiple industries around the world both On &

BLH STOP DROP barricading system is

independently tested

• Lightweight

• Flame resistant

• Impact resistant

• Acid & Caustic resistant

• UV stabilised

• No Glare

• Non heat conductive

• Corrosion resistant in harsh environments

• Minimal wind loading on installed structures

• Reusable

• No hot work permits required

• Permanent or temporary installations

• Recyclable polymers for a greener environment

• Fast and easy to install and remove

• No painting or maintenance required

• DIY Installation

• Long life compared to steel alternatives

• Impact rated

• Wind rated to CAT 3 cyclone

BLH Dropped Object Prevention System

13

Page 14: DB Yurra SMP Capability Statement

How we operate

DB Yurra is dedicated in minimising our environmental footprint.

and professionalism. We are renowned for maintaining a high standard

of safety and our commitment to achieving zero harm in the workforce is

evident across all facets of our company.

remain up-to-date with the latest techniques and safety standards.

• Project management

• Site Supervision

• Working at Heights

• High risk licence

• Electrical testing and tagging

• Elevated work platform

DB is committed to meeting strict Australian Health and Safety

requirements working in line with and “Raising the Standard”. Employees

of the DB induction process, this ensures only an experienced, capable

and safety conscious workgroup are engaged.

Page 15: DB Yurra SMP Capability Statement

How we operate

DB Yurra is dedicated in minimising our environmental footprint.

and professionalism. We are renowned for maintaining a high standard

of safety and our commitment to achieving zero harm in the workforce is

evident across all facets of our company.

remain up-to-date with the latest techniques and safety standards.

• Project management

• Site Supervision

• Working at Heights

• High risk licence

• Electrical testing and tagging

• Elevated work platform

DB is committed to meeting strict Australian Health and Safety

requirements working in line with and “Raising the Standard”. Employees

of the DB induction process, this ensures only an experienced, capable

and safety conscious workgroup are engaged.

15

Page 16: DB Yurra SMP Capability Statement

Local Content & Indigenous Engagement

DB Yurra has an international presence, delivering SMP services specialising in Access,

Structural and Mechanical Systems across the Australasian region for the past

industry-leading materials, technologies and processes to all of our clients.

DB JV as part of DB is 50% owned by the Yindjibarndi Aboriginal Corporation

(YAC), a traditional owner from the Pilbara, WA.

The DB team knows from experience that community engagement and cultural

consultation with local community members. This approach ensures that our

value add to the community is not a cookie cutter approach and that our team

not only delivers quality construction outcomes but does so in a way that leaves

a lasting impression on the community

As noted above DB is a majority traditional owner owned business and through

the engagement of regional communities in order to deliver training, education

and employment strategies for local and indigenous people. This experience

extends from communities in Western Australia’s Pilbara region, the Kimberly,

Northern Territory and Queensland.

We believe that the DB team has a unique value to provide clients in that our

team has extensive experience in the engagement and involvement of local

community members. We believe that infrastructure projects and long term

maintenance programs should seek to provide opportunity and economic legacy

to regional areas and that working to develop a highly skilled local Indigenous

workforce where possible.

DB believe that our involvement in all projects will not only deliver quality, cost

1216

Page 17: DB Yurra SMP Capability Statement

DB Yurra each project in consultation with local community members.

Page 18: DB Yurra SMP Capability Statement

Safety & Training

DB Yurra is committed to protecting the welfare and safety of all parties

within our projects, including our staff, contractors, clients and

members of the community. As part of our commitment a Health and

Safety Management System has been developed and implemented

across all facets of the business. The Health and Safety Management

System comprises of policies, procedures, safe work method

statements, safe work instructions and training packages.

All employees are introduced to these elements at the commencement

of employment and are bound to work within the guidelines of the

management system throughout their term of employment. Ongoing

training is given to employees when changes are made within the system

such as changes to policies or procedures.

Elements include procedures such as:

• Risk Management

• Safe Work Instructions

• Fatigue Management

• Safe Work at Heights

• Drug & Alcohol

• Manual Handling

• Hazardous Substances

The health and safety management system has been externally audited

and certified to AS/NZS 4801:2001.

To gain and maintain this certification DB have:

• Complied with all relevant state Legislation and Codes of Practice;

• Identified and established health and safety objectives and targets

for individual tasks;

• Ensured all employees and contractors are adequately trained

to complete the tasks they are employed to do;

• Delivered ongoing training and upskilling to employees;

• Completed ongoing monitoring and auditing of the

OHS Management System.

1418

Page 19: DB Yurra SMP Capability Statement

Safety & Training

DB Yurra is committed to protecting the welfare and safety of all parties

within our projects, including our staff, contractors, clients and

members of the community. As part of our commitment a Health and

Safety Management System has been developed and implemented

across all facets of the business. The Health and Safety Management

System comprises of policies, procedures, safe work method

statements, safe work instructions and training packages.

All employees are introduced to these elements at the commencement

of employment and are bound to work within the guidelines of the

management system throughout their term of employment. Ongoing

training is given to employees when changes are made within the system

such as changes to policies or procedures.

Elements include procedures such as:

• Risk Management

• Safe Work Instructions

• Fatigue Management

• Safe Work at Heights

• Drug & Alcohol

• Manual Handling

• Hazardous Substances

The health and safety management system has been externally audited

and certified to AS/NZS 4801:2001.

To gain and maintain this certification DB have:

• Complied with all relevant state Legislation and Codes of Practice;

• Identified and established health and safety objectives and targets

for individual tasks;

• Ensured all employees and contractors are adequately trained

to complete the tasks they are employed to do;

• Delivered ongoing training and upskilling to employees;

• Completed ongoing monitoring and auditing of the

OHS Management System.

14

DB Yurra continues to improve its safety performance as it grows. We are committed

to monitoring safety performance, ensuring the provision of safe work practices and

providing training and initiatives that keep safety at the forefront of everything we do.

At DB we understand that delivering ongoing operational training and maintenance

programs is vital to a sustainable business.

We offer a robust operational training program that includes analysis, consultative

services, safety and compliance auditing.

We regularly implement training plans for pre-operational readiness while developing

and implementing operational packages for the life of the project or program. This

includes tailor making operational training and maintenance packages, providing

audit reports, and creating site specific procedures and compliance documentation

for our clients, when required.

Page 20: DB Yurra SMP Capability Statement

HIDDEN VALLEY PNG - Morobe Province

In 2011 OSM with the support of DB was contracted by mine operators at

Hidden Valley to recover a 1.5kms of conveyor belt that had failed and fallen

down a mountain. Site teams developed an innovative solution to recovering

the conveyor belt based on advanced mine recovery techniques. The original

estimate for project completion was eight months, but the site team was

able to complete recovery, repair and recommissioning completed within six

months.

The Hidden Valley crusher station returned to full production efficiency two

months earlier than the original project estimate, creating significant savings

for the joint-venture operator.

LIHER ISLAND – Newcrest

During 2012 Newcrest mine contacted OSM group to identify and help

implement new systems to increase gold production. OSM Group with the

support of DB secured a contract with the MOPU (million ounce plant upgrade)

project in addition to constructing new leaching tanks for the NCA -1 project.

DB supplied experienced employees from QLD while also utilising a large

number of local nationals to create a project team with the abilities to

complete the project. During the time at Liher Island the group also created

a welding school to train our national employees to complete welding

operations to Australian standards.

GLNG JETTY CURTIS ISLAND – John Holland Group/ Bechtel

In 2013 John Holland Group engaged DB to supply support services across

multiple scopes of works to be completed on the GLNG Jetty project. Minimal

access to works and multiple work-fronts spread across land and water

was identified as a key issue which utilising DB’s multidiscipline workforce

complimented John Hollands management and program requirements the

project team were able to completing on time the following key milestones:

• Roadway concrete precast install

• Module install and handover to Bechtel SMP teams

• 4 loading Arms installed in 1 shift

• Dolphin and Jetty link

• Cable tray and power install

DBs SMP team were complemented with excellence in Safety and Commitment

to the John Holland GLNG Jetty project with over 20,000hrs LTI free by the

Safety, Project & Construction Managers.

Projects

16

HAY POINT EXPANSION “HPX3” – Bechtel / McConnell Dowell

DB was engaged to supply top up Sca olding labour to complete the necessary workson the o shore jetty expansion. Looking a�er the Berth 3 link and a small section onBerth 3 DB sca olders improved on productivity and “Raised the Standard” of access tothe project.Objectives• Install tube and coupler handrails• Installing hanging & cantilevered sca olds to install and paint headstocks and installation of concrete precast spans.• Install complex and intricate sca olds following the angle and design of Piles & Headstocks• Mobilising sca old to the 3km roadway jettySolutions• DB Group’s highly skilled Sca olders and Supervisor designed sca olds utilising the Layher sca old system to its highest potential with no modifications for di erent trades and complete temporary works able to be removed minimizing the duration of Jack up Barges and Cranes where required.• All sca olding was primarily transported by barge to the awaiting jack up barges and loading platform that would mobilise as close and practical to the required location. Over the duration of the project DB obtained zero LTI’s and MTI’s and were asked to return for completions of other sections and demobilisation of Sc a olding equipment.

AGL WALLUMBILLA LNG PLANT – Bellis & Contract Resources

DB was engaged to supply, and Install 140 tonnes of sca old for muchneeded upgrades.Objectives• Full Perimeter access to the debutanizer stack including Loading Platforms and Rope access support bracing.• Full Perimeter access to the De-Ethanizer and De-Propanizer Towers including full access and Loading Platforms. Solution• DB’s highly skilled team of Management, Sca olders and Engineering associates had the 34m high De-Ethanizer stack engineered to withstand the wind loads of the area.• Ample positioning of support towers gained structural integrity to free stand the sca old to 26m and eliminated the competitor’s solution of gie ropes which would have interfered with the rest of the sites operations. DB completed this project incident and injury free whilst maintaining all scope items in the requested budget.

LUCINDA BULK SUGAR TERMINAL – Uni-Span

DB was engaged to supply all labour to complete the necessary repairs a�ersevere tropical cyclone Yasi collapsed and damaged 20% of the concrete, steelstructures, roadway and strongpoints.Objectives• Install 5km of tube and coupler handrails• Install over 400 lineal meters of Tube and coupler hanging sca olds• Install complex and intricate sca olds following the angle and design of existing piles.• All sca olds were required to be moved with ease from their holding points for painting and blasting to be completed.• Mobilising sca old to the 6km roadway jettySolutions• DB’s highly skilled Sca olders and Supervisors tackled the project task by task and utilised any structurally sound steel and concrete to support the hanging sca olds.• All sca olding was primarily transported by barge to the awaiting jack up barge that would mobilise as close and practical to the required location. Over the duration of the project DB maintained at a minimum 2 days ahead of any required contractors to eliminate any undue lost time to our client.

20

Page 21: DB Yurra SMP Capability Statement

HAY POINT EXPANSION “HPX3” – Bechtel / McConnell Dowell

DB was engaged to supply top up Sca olding labour to complete the necessary workson the o shore jetty expansion. Looking a�er the Berth 3 link and a small section onBerth 3 DB sca olders improved on productivity and “Raised the Standard” of access tothe project.Objectives• Install tube and coupler handrails• Installing hanging & cantilevered sca olds to install and paint headstocks and installation of concrete precast spans.• Install complex and intricate sca olds following the angle and design of Piles & Headstocks• Mobilising sca old to the 3km roadway jettySolutions• DB Group’s highly skilled Sca olders and Supervisor designed sca olds utilising the Layher sca old system to its highest potential with no modifications for di erent trades and complete temporary works able to be removed minimizing the duration of Jack up Barges and Cranes where required.• All sca olding was primarily transported by barge to the awaiting jack up barges and loading platform that would mobilise as close and practical to the required location. Over the duration of the project DB obtained zero LTI’s and MTI’s and were asked to return for completions of other sections and demobilisation of Sc a olding equipment.

AGL WALLUMBILLA LNG PLANT – Bellis & Contract Resources

DB was engaged to supply, and Install 140 tonnes of sca old for muchneeded upgrades.Objectives• Full Perimeter access to the debutanizer stack including Loading Platforms and Rope access support bracing.• Full Perimeter access to the De-Ethanizer and De-Propanizer Towers including full access and Loading Platforms. Solution• DB’s highly skilled team of Management, Sca olders and Engineering associates had the 34m high De-Ethanizer stack engineered to withstand the wind loads of the area.• Ample positioning of support towers gained structural integrity to free stand the sca old to 26m and eliminated the competitor’s solution of gie ropes which would have interfered with the rest of the sites operations. DB completed this project incident and injury free whilst maintaining all scope items in the requested budget.

LUCINDA BULK SUGAR TERMINAL – Uni-Span

DB was engaged to supply all labour to complete the necessary repairs a�ersevere tropical cyclone Yasi collapsed and damaged 20% of the concrete, steelstructures, roadway and strongpoints.Objectives• Install 5km of tube and coupler handrails• Install over 400 lineal meters of Tube and coupler hanging sca olds• Install complex and intricate sca olds following the angle and design of existing piles.• All sca olds were required to be moved with ease from their holding points for painting and blasting to be completed.• Mobilising sca old to the 6km roadway jettySolutions• DB’s highly skilled Sca olders and Supervisors tackled the project task by task and utilised any structurally sound steel and concrete to support the hanging sca olds.• All sca olding was primarily transported by barge to the awaiting jack up barge that would mobilise as close and practical to the required location. Over the duration of the project DB maintained at a minimum 2 days ahead of any required contractors to eliminate any undue lost time to our client.

Page 22: DB Yurra SMP Capability Statement

Testimonials

DB’ Yurras enthusiasm to develop the Pilbara distribution of the BLH

STOP DROP Barricading and Guarding systems obviously indicated to

BLH Safety Solutions the safety consciousness of the organisation.

The understanding of Dropped Object protection has been strongly

demonstrated by DB Yurra Management & we share the excitement

incorporating an indigenous distributor for our product and services.

Not only are DB Yurra offering solutions for dropped objects they are

also utilising their work force to complete external training for install,

site assessments to identify possible risks and hazards and complete

installation supervision and installation teams.

BLH Safety Solutions looks forward to future business with DB Yurra in

the Pilbara & surrounding region in protecting personnel from Dropped

Objects through providing best practises.

Mark Austin – Manager BLH Safety Solutions

1822

Page 23: DB Yurra SMP Capability Statement

Early this year, DB Yurra was engaged by RCR to erect safe access to the Power

Station Boiler 3B Duct for the lagging & cladding replacement project of the

duct. Communication with myself & other contractors through to completion

was a key success to the project, completing the access to requirement within

schedule.

I was satisfied with the safety, professionalism & communication of design

modifications to ensure the safety of other contractors, still allowing access for

Operational staff – resulting in completion with zero incidents during the course

of execution.

Thank you for the work performed & best of luck to DB Yurra in the future.

Geoff Marsh – Project Manager RCR Energy

Communication through to completion was a key success to the project, completing the access to requirement within schedule.

Page 24: DB Yurra SMP Capability Statement

DBYURRA.COM