c DIRECTOR: LIAM DUNFORD CLIENT: ASSERSON LAW DATE: DECEMBER 2016 VERSION: V1 PROJECT: P1191 BUTE MEWS, BARNET Daylight and Sunlight Report

Upload: vuongmien

Post on 11-Mar-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

c

DIRECTOR: LIAM DUNFORD CLIENT: ASSERSON LAW DATE: DECEMBER 2016 VERSION: V1 PROJECT: P1191

BUTE MEWS, BARNET

Daylight and Sunlight Report

Page 2: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

Page 2

Contents

1 Introduction .................................................................................................................................... 3

2 Planning Overview ........................................................................................................................... 3

3 Methodology ................................................................................................................................... 3

4 Sources of Information .................................................................................................................... 4

5 Standard Survey Limitations ............................................................................................................ 5

6 The Site ............................................................................................................................................ 5

7 The Proposed Scheme ..................................................................................................................... 6

8 The Surrounding Properties ............................................................................................................ 6

9 Conclusion ....................................................................................................................................... 7

-----------------------------------------------------------------------------------------------------------

Appendices

Appendix A – Drawings

Appendix B – Technical Analysis

Page 3: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

Page 3

1 Introduction

This report relates to the Richard Maltese Proposed Scheme for the development of Bute

Mews, Barnet insofar as it affects the daylight and sunlight amenity to the surrounding

residential properties.

2 Planning Overview

Through the planning process the local authority will wish to be reassured that the construction

of the new scheme will not materially harm the neighbours’ daylight and sunlight beyond BRE

and British Standard Guidance.

The Local Authority will be informed in this by the BRE document entitled Site Layout Planning

for Daylight and Sunlight – A Guide to Good Practice 2011 (the BRE guidelines). This document

is the principal guidance in this area and sets out the methodology for measuring light and

recommends what it considers to be permitted or unobtrusive levels of change.

The BRE guidelines are not mandatory, though local planning authorities and planning

inspectors will consider the suitability of a proposed scheme for a site within the context of BRE

guidance. Consideration will be given to the urban context within which a scheme is located

and the daylight and sunlight will be one of a number of planning considerations which the local

authority will weigh.

3 Methodology

To quantify the effects of the Proposed Scheme we have constructed a three dimensional

computer model of the site and relevant neighbouring properties. We have then undertaken

technical analysis to measure the light received by neighbouring properties both before and

after the Proposed Scheme is constructed.

Daylight

In accordance with the BRE Guidelines, only residential properties are considered for daylight

levels. Living rooms, kitchens and bedrooms are the primary focus of the guideline

recommendations.

The initial test proposed by the BRE Guidelines is to establish if the proposed massing subtends

above a 25° section line drawn from the centre of the window/room in question. If the angle is

breached, it is necessary to undertake more detailed technical calculations such as Vertical Sky

Component (VSC) and No Sky Line (NSL).

The Vertical Sky Component (VSC) analysis assesses the amount of sky visibility at the centre of

the outside of a window face. The No Sky Line (NSL) analysis assesses the extent of the area of

a room which can benefit from sky visibility at working plane height (850mm). These

measurements are taken both before and after the construction of the proposed development.

The BRE Guidelines permit a reduction of up to 20% of the existing VSC values in situations

where the retained VSC value falls below 27%, which is the BRE recommended VSC level for

adequate daylight amenity in a suburban environment. The 20% maximum recommended

reduction is based upon the BRE stating that a change up to this extent would remain

unnoticeable. The 20% reduction recommendation is also applicable to the NSL values.

Page 4: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

Page 4

Sunlight

Sunlight is measured using a sun indicator which contains 100 spots, each representing 1% of

Annual Probable Sunlight Hours (APSH). Where no obstruction exists the total Annual Probable

Sunlight Hours would amount to 1486 hours and therefore each spot equates to 14.86 hours

of the total annual sunlight hours.

British Standard 8206 part 2 (section 5.3) states that:

“Interiors in which the occupants have a reasonable expectation of direct sunlight should receive

at least 25% of probable sunlight hours. At least 5% of probable sunlight hours should be

received during the winter months, between 21 September and 21 March. Sunlight is taken to

enter an interior when it reaches one or more window reference points.”

When a room has multiple windows, not all may be located southwards and, therefore, they

may not meet the target criteria. However, these windows may contribute to the levels of

sunlight within the room even if by 1-2% APSH. On this basis the analysis results within this

report are presented on a room basis. This is calculated by giving a unique reference to each of

the sun spots and totalling the number of unique spots the windows within a room receive for

the year and during the winter period. If two windows can see the same sun spot, then this will

be counted as one to avoid double counting.

Only residential properties that face within 90º of due south are taken into account for sunlight

analysis, the BRE Guidelines considers that sunlight to main living room windows as the most

important.

For existing residential properties, the BRE Guidelines state in Section 3.2.3 that:

“all main living rooms of dwellings…should be checked if they have a window facing within 90°

of due south, kitchens and bedrooms are less important, although care should be taken not to

block too much sun.”

4 Sources of Information

Point 2 Surveyors - Site Photos

Plowman Craven - Survey Information (received 01/12/16)

Richard Maltease Architects - 33489E-01.dwg, 33489T-01A.dwg,

33489RoLM-01.dwg

Page 5: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

Page 5

5 Standard Survey Limitations

Although we have undertaken as detailed an inspection as possible, we are required by our

professional indemnity insurers to notify you that our report is based upon the Standard Terms

and Conditions provided along with our fee proposal. Our understanding of the existing

massing, including the surrounding context was established from a site visit and aerial

photography.

In addition to our standard limitations the following limitations and assumptions also apply.

Best estimates were made in establishing building use (residential or commercial) and room uses; generally, these were made from external observations and recourse to planning records where available.

When floor plans of surrounding properties were not available, room depths have been assumed from external observations. Where no indicators of room depth were available a standard of 4m, 6m or 8m depths have been used.

In accordance with BRE Guidelines1 balconies, where present have been removed from calculations.

6 The Site

The site is located in the London Borough of Barnet.

Drawing Number P1191/02 Existing Buildings

Our understanding of the site location and existing building that occupies the site can be seen

within drawings P1191/01-02 and can be found within Appendix A.

1 BRE Guideline 209 Site Layout & Planning A Guide to Good Practice (2011) Paragraph 2.2.11

Page 6: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

Page 6

7 The Proposed Scheme

Drawing Number P1191/04 Proposed Scheme

Our understanding of the proposed scheme is illustrated in drawings P1191/03-04 located

within Appendix A.

8 The Surrounding Properties

The following surrounding properties contain residential accommodation and, due to their

proximity to the development site, have been assessed in terms of the effects of the proposed

development upon their daylight and sunlight amenity:

- 14 Falloden Way

- 16-20 Falloden Way

- 22 Falloden Way

- 24 Falloden Way

- 26 Falloden Way

- 28 Falloden Way

- 30 Falloden Way

- 32 Falloden Way

- 34 Falloden Way

- 36 Falloden Way

- 38 Falloden Way

The location of these properties can be seen in the drawings within Appendix A.

Detailed results for each window/room assessed can be found in Appendix B and are

summarised below.

Page 7: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

Page 7

14, 16-20, 22, 24, 26, 28, 30, 32, 34, 36 and 38 Falloden Way

Located to the north of the development site this property appears, from external observation

and review of the local council tax registry, to contain residential accommodation. We have

only assessed windows/rooms up to first floor. The windows/rooms on the upper floors being

higher up and naturally receiving better levels of daylight and sunlight.

Daylight

There are 74 windows serving 39 site facing rooms. All windows and associated rooms

experience fully BRE compliant alterations in both VSC and NSL; the greatest alteration in VSC

being 1.97%.

BRE guidance provides that reductions up to 20% will be unnoticeable.

Sunlight

All rooms with site facing windows orientated within 90 degrees due south are fully BRE

compliant in terms of any alteration in Annual and Winter Probable Sunlight Hours.

In accordance with BRE guidance, the occupants will not notice a change in sunlight amenity.

9 Conclusion

Daylight to Surrounding Residential Properties

Full technical analysis indicates that all habitable rooms within residential properties

experience alterations in VSC and NSL well-within keeping of the BRE recommendations.,

meaning the occupants will not notice a change in their existing levels of daylight.

The proposed scheme demonstrates full compliance with BRE guidance in terms of daylight

amenity.

Sunlight to Surrounding Residential Properties

Full technical analysis indicates that all residential properties experience alterations in APSH

well-within keeping of the BRE recommendations, meaning the occupants will not notice a

change in their existing levels of sunlight.

The proposed scheme demonstrates full compliance with BRE guidance in terms of sunlight

amenity.

---

We fully support this planning application in terms of daylight and sunlight amenity.

Page 8: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

Page 8

Appendix A – Drawings

Page 9: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

Point 2 Surveyors Ltd,3rd Floor,

17 Slingsby Place, London WC2E 9AB

0207 836 5828www.point2surveyors.com

Sources: Key: Project: Title:

Date: Dwg No:Scale: Rel:Scheme Confirmed: Date : Drawn By:

Bute Mews Development

Barnet

London

Plowman Craven

Survey Info (received 01/12/16)

33489E-01.dwg , 33489T-01A.dwg, 33489RoLM-01.dwg

SDJ

P1191/

001--

Dec 161:250 @ A3

PLAN VIEW

EXISTING BUILDINGS

01

Existing Buildings

Proposed Scheme

B

U

T

E

M

E

W

S

N

O

R

T

H

W

A

Y

F

A

LLO

D

E

N

W

A

Y

38

36

34

32

30

28

26

24

22

16-20

14

Page 10: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

Point 2 Surveyors Ltd,3rd Floor,

17 Slingsby Place, London WC2E 9AB

0207 836 5828www.point2surveyors.com

Sources: Key: Project: Title:

Date: Dwg No:Scale: Rel:Scheme Confirmed: Date : Drawn By:

Bute Mews Development

Barnet

London

Plowman Craven

Survey Info (received 01/12/16)

33489E-01.dwg , 33489T-01A.dwg, 33489RoLM-01.dwg

SDJ

P1191/

001--

Dec 16NTS

3D VIEW

EXISTING BUILDINGS

02

Existing Buildings

Proposed Scheme

All Heights in mm AOD

Page 11: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

Point 2 Surveyors Ltd,3rd Floor,

17 Slingsby Place, London WC2E 9AB

0207 836 5828www.point2surveyors.com

Sources: Key: Project: Title:

Date: Dwg No:Scale: Rel:Scheme Confirmed: Date : Drawn By:

Bute Mews Development

Barnet

London

Plowman Craven

Survey Info (received 01/12/16)

33489E-01.dwg , 33489T-01A.dwg, 33489RoLM-01.dwg

SDJ

P1191/

001--

Dec 161:250 @ A3

PLAN VIEW

PROPOSED SCHEME 01/12/16

03

Existing Buildings

Proposed Scheme

14

16-20

22

24

26

28

30

32

34

36

38

F

A

LLO

D

E

N

W

A

Y

N

O

R

T

H

W

A

Y

B

U

T

E

M

E

W

S

Page 12: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

Point 2 Surveyors Ltd,3rd Floor,

17 Slingsby Place, London WC2E 9AB

0207 836 5828www.point2surveyors.com

Sources: Key: Project: Title:

Date: Dwg No:Scale: Rel:Scheme Confirmed: Date : Drawn By:

Bute Mews Development

Barnet

London

Plowman Craven

Survey Info (received 01/12/16)

33489E-01.dwg , 33489T-01A.dwg, 33489RoLM-01.dwg

SDJ

P1191/

001--

Dec 16NTS

3D VIEW

PROPOSED SCHEME 01/12/16

04

Existing Buildings

Proposed Scheme

All Heights in mm AOD

Page 13: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

Page 9

Appendix B – Technical Analysis

Page 14: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

DEC 2016BUTE MEWS DEVELOPMENT

BARNET

LONDON

DAYLIGHT ANALYSIS

PROPOSED SCHEME RECEIVED 01/12/16

EXISTING PROPOSED LOSS %LOSS EXISTING PROPOSED TOTAL %LOSS

Room Room Use Window VSC VSC VSC VSC Room Room Use Window ADF TOTAL ADF TOTAL LOSS ADF

14 FALLODEN WAY 14 FALLODEN WAY

R1/101 W3/101 39.54 39.51 0.03 0.08 R1/101 W3/101 1.38 1.38

R1/101 W4/101 17.01 16.77 0.24 1.41 R1/101 W4/101 0.30 1.68 0.30 1.68 0.00 0.24

R2/101 W5/101 15.29 15.04 0.25 1.64 R2/101 W5/101 0.26 0.26

R2/101 W6/101 15.70 15.39 0.31 1.97 R2/101 W6/101 0.35 0.35

R2/101 W7/101 14.92 14.68 0.24 1.61 R2/101 W7/101 0.26 0.87 0.25 0.86 0.01 1.15

R3/101 W8/101 14.11 13.93 0.18 1.28 R3/101 W8/101 0.42 0.42 0.42 0.42 0.00 0.95

R4/101 W9/101 13.83 13.66 0.17 1.23 R4/101 W9/101 0.25 0.25

R4/101 W10/101 14.26 14.06 0.20 1.40 R4/101 W10/101 0.34 0.33

R4/101 W11/101 13.57 13.42 0.15 1.11 R4/101 W11/101 0.25 0.83 0.24 0.82 0.01 0.84

16-20 FALLODEN WAY 16-20 FALLODEN WAY

R5/101 W12/101 13.18 13.03 0.15 1.14 R5/101 W12/101 0.42 0.42 0.42 0.42 0.00 0.72

R6/101 W13/101 10.14 10.14 0.00 0.00 R6/101 W13/101 0.21 0.21

R6/101 W14/101 14.13 14.13 0.00 0.00 R6/101 W14/101 0.26 0.26

R6/101 W15/101 4.91 4.90 0.01 0.20 R6/101 W15/101 0.26 0.73 0.26 0.73 0.00 0.14

R7/101 W16/101 11.41 11.32 0.09 0.79 R7/101 W16/101 0.40 0.40 0.40 0.40 0.00 0.50

R8/101 W17/101 10.75 10.65 0.10 0.93 R8/101 W17/101 0.19 0.19

R8/101 W18/101 10.80 10.69 0.11 1.02 R8/101 W18/101 0.27 0.26

R8/101 W19/101 9.88 9.79 0.09 0.91 R8/101 W19/101 0.19 0.65 0.19 0.65 0.00 0.46

R9/101 W20/101 7.03 6.96 0.07 1.00 R9/101 W20/101 0.15 0.14

R9/101 W21/101 5.78 5.68 0.10 1.73 R9/101 W21/101 0.20 0.19

R9/101 W22/101 4.21 4.13 0.08 1.90 R9/101 W22/101 0.12 0.46 0.12 0.46 0.00 0.87

R10/101 W23/101 4.19 4.11 0.08 1.91 R10/101 W23/101 0.18 0.18 0.18 0.18 0.00 0.54

R11/101 W24/101 9.38 9.27 0.11 1.17 R11/101 W24/101 0.25 0.25

R11/101 W25/101 10.89 10.79 0.10 0.92 R11/101 W25/101 0.32 0.57 0.32 0.56 0.00 0.70

APR011216.xls 14/12/2016 1

Page 15: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

DEC 2016BUTE MEWS DEVELOPMENT

BARNET

LONDON

DAYLIGHT ANALYSIS

PROPOSED SCHEME RECEIVED 01/12/16

EXISTING PROPOSED LOSS %LOSS EXISTING PROPOSED TOTAL %LOSS

Room Room Use Window VSC VSC VSC VSC Room Room Use Window ADF TOTAL ADF TOTAL LOSS ADF

R12/101 W26/101 11.49 11.39 0.10 0.87 R12/101 W26/101 0.48 0.48 0.47 0.47 0.00 0.63

R13/101 W27/101 7.73 7.70 0.03 0.39 R13/101 W27/101 0.20 0.20

R13/101 W28/101 2.37 2.37 0.00 0.00 R13/101 W28/101 0.03 0.03

R13/101 W29/101 34.23 34.09 0.14 0.41 R13/101 W29/101 1.02 1.26 1.02 1.25 0.00 0.24

22 FALLODEN WAY 22 FALLODEN WAY

R14/101 W30/101 35.69 35.52 0.17 0.48 R14/101 W30/101 1.04 1.04

R14/101 W31/101 7.93 7.85 0.08 1.01 R14/101 W31/101 0.18 0.17

R14/101 W32/101 11.27 11.13 0.14 1.24 R14/101 W32/101 0.24 1.46 0.24 1.45 0.01 0.55

R15/101 W33/101 13.78 13.62 0.16 1.16 R15/101 W33/101 0.49 0.49 0.49 0.49 0.00 0.81

R16/101 W34/101 12.63 12.51 0.12 0.95 R16/101 W34/101 0.35 0.35

R16/101 W35/101 10.24 10.12 0.12 1.17 R16/101 W35/101 0.24 0.59 0.24 0.59 0.01 0.84

24 FALLODEN WAY 24 FALLODEN WAY

R17/101 W36/101 11.97 11.79 0.18 1.50 R17/101 W36/101 0.26 0.25

R17/101 W37/101 14.30 14.12 0.18 1.26 R17/101 W37/101 0.36 0.62 0.35 0.61 0.01 1.14

R18/101 W38/101 14.69 14.51 0.18 1.23 R18/101 W38/101 0.51 0.51 0.51 0.51 0.01 0.98

R19/101 W39/101 10.30 10.19 0.11 1.07 R19/101 W39/101 0.24 0.23

R19/101 W40/101 6.02 6.00 0.02 0.33 R19/101 W40/101 0.13 0.13

R19/101 W41/101 38.57 38.37 0.20 0.52 R19/101 W41/101 1.11 1.48 1.11 1.47 0.01 0.54

26 FALLODEN WAY 26 FALLODEN WAY

R20/101 W42/101 38.74 38.52 0.22 0.57 R20/101 W42/101 1.11 1.11

R20/101 W43/101 7.92 7.88 0.04 0.51 R20/101 W43/101 0.17 0.17

R20/101 W44/101 11.27 11.13 0.14 1.24 R20/101 W44/101 0.24 1.52 0.23 1.51 0.01 0.53

R21/101 W45/101 15.23 15.01 0.22 1.44 R21/101 W45/101 0.51 0.51 0.50 0.50 0.01 1.18

R22/101 W46/101 14.06 13.88 0.18 1.28 R22/101 W46/101 0.37 0.36

R22/101 W47/101 11.67 11.47 0.20 1.71 R22/101 W47/101 0.28 0.64 0.27 0.64 0.01 1.09

APR011216.xls 14/12/2016 2

Page 16: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

DEC 2016BUTE MEWS DEVELOPMENT

BARNET

LONDON

DAYLIGHT ANALYSIS

PROPOSED SCHEME RECEIVED 01/12/16

EXISTING PROPOSED LOSS %LOSS EXISTING PROPOSED TOTAL %LOSS

Room Room Use Window VSC VSC VSC VSC Room Room Use Window ADF TOTAL ADF TOTAL LOSS ADF

28 FALLODEN WAY 28 FALLODEN WAY

R23/101 W48/101 11.09 10.95 0.14 1.26 R23/101 W48/101 0.27 0.26

R23/101 W49/101 13.60 13.44 0.16 1.18 R23/101 W49/101 0.36 0.62 0.35 0.62 0.01 0.80

R24/101 W50/101 14.67 14.50 0.17 1.16 R24/101 W50/101 0.50 0.50 0.49 0.49 0.00 0.80

R25/101 W51/101 10.72 10.57 0.15 1.40 R25/101 W51/101 0.23 0.23

R25/101 W52/101 7.44 7.35 0.09 1.21 R25/101 W52/101 0.16 0.16

R25/101 W53/101 39.16 38.95 0.21 0.54 R25/101 W53/101 1.07 1.47 1.07 1.46 0.01 0.55

30 FALLODEN WAY 30 FALLODEN WAY

R26/101 W54/101 39.19 38.99 0.20 0.51 R26/101 W54/101 1.11 1.10

R26/101 W55/101 8.32 8.32 0.00 0.00 R26/101 W55/101 0.18 0.18

R26/101 W56/101 11.39 11.32 0.07 0.61 R26/101 W56/101 0.24 1.52 0.24 1.51 0.01 0.39

R27/101 W57/101 15.76 15.59 0.17 1.08 R27/101 W57/101 0.52 0.52 0.52 0.52 0.00 0.58

R28/101 W58/101 14.75 14.59 0.16 1.08 R28/101 W58/101 0.38 0.37

R28/101 W59/101 13.06 12.83 0.23 1.76 R28/101 W59/101 0.34 0.71 0.33 0.71 0.01 0.84

32 FALLODEN WAY 32 FALLODEN WAY

R1/161 W1/161 39.45 39.42 0.03 0.08 R1/161 W1/161 10.27 10.27 10.26 10.26 0.01 0.06

R2/161 W2/161 39.46 39.44 0.02 0.05 R2/161 W2/161 2.07 2.07 2.07 2.07 0.00 0.10

34 FALLODEN WAY 34 FALLODEN WAY

R3/161 W3/161 39.47 39.44 0.03 0.08 R3/161 W3/161 2.06 2.05

R3/161 W4/161 8.48 8.48 0.00 0.00 R3/161 W4/161 0.24 2.29 0.24 2.29 0.00 0.04

R4/161 W5/161 15.27 15.27 0.00 0.00 R4/161 W5/161 0.56 0.56 0.56 0.56 0.00 0.00

R5/161 W6/161 16.59 16.58 0.01 0.06 R5/161 W6/161 0.46 0.46

R5/161 W7/161 14.37 14.34 0.03 0.21 R5/161 W7/161 0.38 0.84 0.37 0.84 0.00 0.12

APR011216.xls 14/12/2016 3

Page 17: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

DEC 2016BUTE MEWS DEVELOPMENT

BARNET

LONDON

DAYLIGHT ANALYSIS

PROPOSED SCHEME RECEIVED 01/12/16

EXISTING PROPOSED LOSS %LOSS EXISTING PROPOSED TOTAL %LOSS

Room Room Use Window VSC VSC VSC VSC Room Room Use Window ADF TOTAL ADF TOTAL LOSS ADF

36 FALLODEN WAY 36 FALLODEN WAY

R6/161 W8/161 14.22 14.22 0.00 0.00 R6/161 W8/161 0.40 0.40

R6/161 W9/161 16.78 16.78 0.00 0.00 R6/161 W9/161 0.53 0.93 0.53 0.93 0.00 0.00

R7/161 W10/161 15.75 15.74 0.01 0.06 R7/161 W10/161 0.64 0.64 0.64 0.64 0.00 0.00

R8/161 W11/161 8.62 8.59 0.03 0.35 R8/161 W11/161 0.22 0.22

R8/161 W12/161 39.47 39.46 0.01 0.03 R8/161 W12/161 2.05 2.27 2.04 2.27 0.00 0.09

38 FALLODEN WAY 38 FALLODEN WAY

R9/161 W13/161 39.45 39.44 0.01 0.03 R9/161 W13/161 2.07 2.06

R9/161 W14/161 8.66 8.66 0.00 0.00 R9/161 W14/161 0.25 2.32 0.25 2.32 0.00 0.04

R10/161 W15/161 15.52 15.52 0.00 0.00 R10/161 W15/161 0.57 0.57 0.57 0.57 0.00 0.00

R11/161 W16/161 16.94 16.94 0.00 0.00 R11/161 W16/161 0.45 0.45

R11/161 W17/161 14.50 14.50 0.00 0.00 R11/161 W17/161 0.39 0.85 0.39 0.85 0.00 0.00

APR011216.xls 14/12/2016 4

Page 18: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

DEC 2016BUTE MEWS DEVELOPMENT

BARNET

LONDON

DAYLIGHT DISTRIBUTION ANALYSIS

PROPOSED SCHEME RECEIVED 01/12/16

Room/ Whole Prev New Loss %Loss

Floor Room Use Room sq ft sq ft sq ft

14 FALLODEN WAY

R1/101 154.1 149.1 149.1 0.0 0.0

R2/101 88.6 87.8 87.8 0.0 0.0

R3/101 87.9 84.2 84.2 0.0 0.0

R4/101 88.6 87.6 87.6 0.0 0.0

16-20 FALLODEN WAY

R5/101 82.2 78.7 78.7 0.0 0.0

R6/101 71.4 70.8 70.8 0.0 0.0

R7/101 80.4 75.8 75.8 0.0 0.0

R8/101 102.4 100.2 100.2 0.0 0.0

R9/101 102.4 80.9 80.9 0.0 0.0

R10/101 84.4 52.2 52.2 0.0 0.0

R11/101 100.6 98.0 98.0 0.0 0.0

R12/101 56.9 53.9 53.9 0.0 0.0

R13/101 151.0 147.1 147.1 0.0 0.0

22 FALLODEN WAY

R14/101 152.8 148.5 148.5 0.0 0.0

R15/101 59.6 57.6 57.6 0.0 0.0

R16/101 105.2 102.0 102.0 0.0 0.0

24 FALLODEN WAY

R17/101 107.0 103.8 103.8 0.0 0.0

R18/101 58.8 56.8 56.8 0.0 0.0

R19/101 151.7 147.6 147.6 0.0 0.0

26 FALLODEN WAY

R20/101 152.9 148.7 148.7 0.0 0.0

R21/101 59.1 57.2 57.2 0.0 0.0

R22/101 102.7 100.1 100.1 0.0 0.0

28 FALLODEN WAY

R23/101 102.9 100.2 100.2 0.0 0.0

R24/101 59.2 57.3 57.3 0.0 0.0

R25/101 151.2 146.9 146.9 0.0 0.0

30 FALLODEN WAY

R26/101 155.4 151.0 151.0 0.0 0.0

R27/101 58.3 56.8 56.8 0.0 0.0

R28/101 102.7 101.2 101.2 0.0 0.0

DDPR011216.xls 14/12/2016 1

Page 19: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

DEC 2016BUTE MEWS DEVELOPMENT

BARNET

LONDON

DAYLIGHT DISTRIBUTION ANALYSIS

PROPOSED SCHEME RECEIVED 01/12/16

Room/ Whole Prev New Loss %Loss

Floor Room Use Room sq ft sq ft sq ft

32 FALLODEN WAY

R1/161 33.5 32.5 32.5 0.0 0.0

R2/161 148.4 146.5 146.5 0.0 0.0

34 FALLODEN WAY

R3/161 150.3 148.4 148.4 0.0 0.0

R4/161 67.3 64.3 64.3 0.0 0.0

R5/161 117.2 113.0 113.0 0.0 0.0

36 FALLODEN WAY

R6/161 106.4 103.9 103.9 0.0 0.0

R7/161 68.3 65.4 65.4 0.0 0.0

R8/161 151.3 149.4 149.4 0.0 0.0

38 FALLODEN WAY

R9/161 149.1 147.3 147.3 0.0 0.0

R10/161 68.5 65.5 65.5 0.0 0.0

R11/161 111.2 108.0 108.0 0.0 0.0

DDPR011216.xls 14/12/2016 2

Page 20: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

DEC 2016BUTE MEWS DEVELOPMENT

BARNET

LONDON

SUNLIGHT ANALYSIS

PROPOSED SCHEME RECEIVED 01/12/16

Window Room

Existing Proposed Existing Proposed

Room Winter Annual Winter Annual Winter Annual Winter Annual Winter Annual Winter Annual

Room Window Use APSH APSH APSH APSH %Loss %Loss APSH APSH APSH APSH %Loss %Loss

14 FALLODEN WAY

R1/101 W3/101 30 86 30 86 0.0 0.0

R1/101 W4/101 18 31 18 31 0.0 0.0 30 95 30 95 0.0 0.0

R2/101 W5/101 10 23 10 23 0.0 0.0

R2/101 W6/101 10 25 10 25 0.0 0.0

R2/101 W7/101 8 21 8 21 0.0 0.0 10 25 10 25 0.0 0.0

R3/101 W8/101 8 21 8 21 0.0 0.0 8 21 8 21 0.0 0.0

R4/101 W9/101 8 21 8 21 0.0 0.0

R4/101 W10/101 8 21 8 21 0.0 0.0

R4/101 W11/101 8 21 8 21 0.0 0.0 8 21 8 21 0.0 0.0

16-20 FALLODEN WAY

R5/101 W12/101 8 20 8 20 0.0 0.0 8 20 8 20 0.0 0.0

R6/101 W13/101 0 11 0 11 - 0.0

R6/101 W14/101 2 20 2 20 0.0 0.0

R6/101 W15/101 2 6 2 6 0.0 0.0 3 22 3 22 0.0 0.0

R7/101 W16/101 7 17 7 17 0.0 0.0 7 17 7 17 0.0 0.0

R8/101 W17/101 8 17 8 17 0.0 0.0

R8/101 W18/101 8 17 8 17 0.0 0.0

R8/101 W19/101 8 17 8 17 0.0 0.0 8 17 8 17 0.0 0.0

R9/101 W20/101 8 9 8 9 0.0 0.0

R9/101 W21/101 7 7 7 7 0.0 0.0

Page 21: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

DEC 2016BUTE MEWS DEVELOPMENT

BARNET

LONDON

SUNLIGHT ANALYSIS

PROPOSED SCHEME RECEIVED 01/12/16

Window Room

Existing Proposed Existing Proposed

Room Winter Annual Winter Annual Winter Annual Winter Annual Winter Annual Winter Annual

Room Window Use APSH APSH APSH APSH %Loss %Loss APSH APSH APSH APSH %Loss %Loss

R9/101 W22/101 5 5 5 5 0.0 0.0 8 9 8 9 0.0 0.0

R10/101 W23/101 6 6 6 6 0.0 0.0 6 6 6 6 0.0 0.0

R11/101 W24/101 13 13 13 13 0.0 0.0

R11/101 W25/101 16 16 16 16 0.0 0.0 16 16 16 16 0.0 0.0

R12/101 W26/101 17 17 17 17 0.0 0.0 17 17 17 17 0.0 0.0

R13/101 W27/101 10 10 10 10 0.0 0.0

R13/101 W28/101 5 11 5 11 0.0 0.0

R13/101 W29/101 23 71 23 71 0.0 0.0 23 71 23 71 0.0 0.0

22 FALLODEN WAY

R14/101 W30/101 26 76 26 76 0.0 0.0

R14/101 W31/101 17 21 17 21 0.0 0.0

R14/101 W32/101 15 15 15 15 0.0 0.0 26 76 26 76 0.0 0.0

R15/101 W33/101 18 18 18 18 0.0 0.0 18 18 18 18 0.0 0.0

R16/101 W34/101 16 16 16 16 0.0 0.0

R16/101 W35/101 12 12 12 12 0.0 0.0 16 16 16 16 0.0 0.0

24 FALLODEN WAY

R17/101 W36/101 15 15 15 15 0.0 0.0

R17/101 W37/101 19 19 19 19 0.0 0.0 19 19 19 19 0.0 0.0

R18/101 W38/101 19 19 19 19 0.0 0.0 19 19 19 19 0.0 0.0

Page 22: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

DEC 2016BUTE MEWS DEVELOPMENT

BARNET

LONDON

SUNLIGHT ANALYSIS

PROPOSED SCHEME RECEIVED 01/12/16

Window Room

Existing Proposed Existing Proposed

Room Winter Annual Winter Annual Winter Annual Winter Annual Winter Annual Winter Annual

Room Window Use APSH APSH APSH APSH %Loss %Loss APSH APSH APSH APSH %Loss %Loss

R19/101 W39/101 13 13 13 13 0.0 0.0

R19/101 W40/101 10 17 10 17 0.0 0.0

R19/101 W41/101 28 83 28 83 0.0 0.0 28 83 28 83 0.0 0.0

26 FALLODEN WAY

R20/101 W42/101 28 84 28 84 0.0 0.0

R20/101 W43/101 17 21 17 21 0.0 0.0

R20/101 W44/101 15 15 15 15 0.0 0.0 28 84 28 84 0.0 0.0

R21/101 W45/101 19 19 19 19 0.0 0.0 19 19 19 19 0.0 0.0

R22/101 W46/101 17 17 17 17 0.0 0.0

R22/101 W47/101 14 14 14 14 0.0 0.0 18 18 18 18 0.0 0.0

28 FALLODEN WAY

R23/101 W48/101 14 14 14 14 0.0 0.0

R23/101 W49/101 17 17 17 17 0.0 0.0 18 18 18 18 0.0 0.0

R24/101 W50/101 17 17 17 17 0.0 0.0 17 17 17 17 0.0 0.0

R25/101 W51/101 14 14 14 14 0.0 0.0

R25/101 W52/101 12 19 12 19 0.0 0.0

R25/101 W53/101 30 86 30 86 0.0 0.0 30 86 30 86 0.0 0.0

30 FALLODEN WAY

R26/101 W54/101 30 87 30 87 0.0 0.0

R26/101 W55/101 18 23 18 23 0.0 0.0

R26/101 W56/101 15 15 15 15 0.0 0.0 30 87 30 87 0.0 0.0

Page 23: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

DEC 2016BUTE MEWS DEVELOPMENT

BARNET

LONDON

SUNLIGHT ANALYSIS

PROPOSED SCHEME RECEIVED 01/12/16

Window Room

Existing Proposed Existing Proposed

Room Winter Annual Winter Annual Winter Annual Winter Annual Winter Annual Winter Annual

Room Window Use APSH APSH APSH APSH %Loss %Loss APSH APSH APSH APSH %Loss %Loss

R27/101 W57/101 19 19 19 19 0.0 0.0 19 19 19 19 0.0 0.0

R28/101 W58/101 19 19 19 19 0.0 0.0

R28/101 W59/101 18 18 18 18 0.0 0.0 22 22 22 22 0.0 0.0

32 FALLODEN WAY

R1/161 W1/161 30 87 30 87 0.0 0.0 30 87 30 87 0.0 0.0

R2/161 W2/161 30 87 30 87 0.0 0.0 30 87 30 87 0.0 0.0

34 FALLODEN WAY

R3/161 W3/161 30 88 30 88 0.0 0.0

R3/161 W4/161 16 23 16 23 0.0 0.0 30 88 30 88 0.0 0.0

R4/161 W5/161 19 19 19 19 0.0 0.0 19 19 19 19 0.0 0.0

R5/161 W6/161 21 21 21 21 0.0 0.0

R5/161 W7/161 18 21 18 21 0.0 0.0 23 26 23 26 0.0 0.0

36 FALLODEN WAY

R6/161 W8/161 19 19 19 19 0.0 0.0

R6/161 W9/161 23 23 23 23 0.0 0.0 24 24 24 24 0.0 0.0

R7/161 W10/161 19 19 19 19 0.0 0.0 19 19 19 19 0.0 0.0

R8/161 W11/161 12 22 12 22 0.0 0.0

R8/161 W12/161 30 87 30 87 0.0 0.0 30 87 30 87 0.0 0.0

Page 24: Daylight and Sunlight Report - HGS · PDF fileSite Layout Planning for Daylight and Sunlight ... and the daylight and sunlight will be one of a number of planning considerations which

DEC 2016BUTE MEWS DEVELOPMENT

BARNET

LONDON

SUNLIGHT ANALYSIS

PROPOSED SCHEME RECEIVED 01/12/16

Window Room

Existing Proposed Existing Proposed

Room Winter Annual Winter Annual Winter Annual Winter Annual Winter Annual Winter Annual

Room Window Use APSH APSH APSH APSH %Loss %Loss APSH APSH APSH APSH %Loss %Loss

38 FALLODEN WAY

R9/161 W13/161 30 87 30 87 0.0 0.0

R9/161 W14/161 16 23 16 23 0.0 0.0 30 87 30 87 0.0 0.0

R10/161 W15/161 19 19 19 19 0.0 0.0 19 19 19 19 0.0 0.0

R11/161 W16/161 21 21 21 21 0.0 0.0

R11/161 W17/161 18 21 18 21 0.0 0.0 23 26 23 26 0.0 0.0