day2session3a regala nha standards for housing design construction
DESCRIPTION
NHA STANDARDS FOR HOUSING GUIDELINES/GUIDELINES FOR HOUSING/NHATRANSCRIPT
-
STANDARDS FOR HOUSINGSTANDARDS FOR HOUSINGDESIGNAND CONSTRUCTIONDESIGNAND CONSTRUCTIONRelevance/Applicability in View of New Normal
A presentationby Ar. Maria Benita O. Regala. fuap
Manager, Housing Technology Development Office (HTDO), NHAto the Technical Workshop on Holistic Solutions for Resilient Low-Cost Housing
at The Oracle Hotel, Quezon Cityon 03 April 2014
-
OUTLINE OF PRESENTATION
Standards from BP 220 Site Selection Criteria and Planning Principlesbeing applied for NHA Projects
22 m Row House Model with 11 m Loftdeveloped as a disaster-resilient housing
Standards from BP 220 Site Selection Criteria and Planning Principlesbeing applied for NHA Projects
22 m Row House Model with 11 m Loftdeveloped as a disaster-resilient housing
2
-
BP 220 Standards
A. Site Criteria (Sec. 5, BP 220)1. Availability of Basic Needs (Water, Movement
and Circulation, Storm Drainage, Solid and LiquidWaste Disposal, Parks/Playground, Power)
2. Conformity with Zoning Ordinances/ City orMunicipality Land Use Plan
3. Physical Suitability4. Accessibility
A. Site Criteria (Sec. 5, BP 220)1. Availability of Basic Needs (Water, Movement
and Circulation, Storm Drainage, Solid and LiquidWaste Disposal, Parks/Playground, Power)
2. Conformity with Zoning Ordinances/ City orMunicipality Land Use Plan
3. Physical Suitability4. Accessibility
3
-
BP 220 Standards
B. Planning Considerations (Sec. 5, BP 220)1. Area Planning2. Site Preservation/ Alteration
a. Slopeb. Preservation of Site Assetsc. Ground Cover
3. Easements4. Circulation
B. Planning Considerations (Sec. 5, BP 220)1. Area Planning2. Site Preservation/ Alteration
a. Slopeb. Preservation of Site Assetsc. Ground Cover
3. Easements4. Circulation
4
-
BP 220 Standards
B. Design Parameters (Sec. 5, BP 220)1. Land Allocation2. Lot Requirement3. Length of Block4. Shelter Component5. Setback/ Yard6. Water Supply7. Electrical Power Supply
B. Design Parameters (Sec. 5, BP 220)1. Land Allocation2. Lot Requirement3. Length of Block4. Shelter Component5. Setback/ Yard6. Water Supply7. Electrical Power Supply
5
8.Sewage Disposal System9. Drainage Disposal System10. Garbage Disposal System11. Firefighting
-
SITE SELECTION CRITERIA LOCATION
With consideration of both the regional and localcontext Housing projects shall be within suitable sites forhousing and outside potential hazard prone andprotection areas
ACCESSIBILITY FROM MAJOR TRANSPORTATIONFACILITIES Site shall have an existing legal road right of way froma major thoroughfare
6
LOCATION With consideration of both the regional and localcontext Housing projects shall be within suitable sites forhousing and outside potential hazard prone andprotection areas
ACCESSIBILITY FROM MAJOR TRANSPORTATIONFACILITIES Site shall have an existing legal road right of way froma major thoroughfare
-
SITE SELECTION CRITERIA ZONING AND LAND USE CLASSIFICATION
Classification shall be Residential as defined underapproved CLUP
TOPOGRAPHY AND SOIL CHARACTERISTICS Must be relatively flat (or filling requirement forrolling terrain shall not exceed max cost) Slopes should not exceed 15% max gradient. For highdensity, slope should be below 5%. Soil characteristics must conform to the suitabilitystandards for construction by DENR through itsBureau of Mines and Geo-Sciences
7
ZONING AND LAND USE CLASSIFICATION Classification shall be Residential as defined underapproved CLUP
TOPOGRAPHY AND SOIL CHARACTERISTICS Must be relatively flat (or filling requirement forrolling terrain shall not exceed max cost) Slopes should not exceed 15% max gradient. For highdensity, slope should be below 5%. Soil characteristics must conform to the suitabilitystandards for construction by DENR through itsBureau of Mines and Geo-Sciences
-
SITE SELECTION CRITERIA WATER SUPPLY FACILITIES
Source of potable water should be establishedwhether from local water company, from the ground,or other alternative source
POWER SUPPLY FACILITIES Presence of power utility company that will serve theneeds of new community
DRAINAGE Natural waterways and outfalls shall be established onground
8
WATER SUPPLY FACILITIES Source of potable water should be establishedwhether from local water company, from the ground,or other alternative source
POWER SUPPLY FACILITIES Presence of power utility company that will serve theneeds of new community
DRAINAGE Natural waterways and outfalls shall be established onground
-
SITE PLANNING PRINCIPLES Compliance to all existing laws, rules andregulations on housing (local or national)
Adoption of the green infrastructure andpreservation of existing natural assets of the land(e.g., trees, ground cover, vegetation, naturalwaterways)
Promotion of walkable communities
9
Compliance to all existing laws, rules andregulations on housing (local or national)
Adoption of the green infrastructure andpreservation of existing natural assets of the land(e.g., trees, ground cover, vegetation, naturalwaterways)
Promotion of walkable communities
-
SITE PLANNING PRINCIPLES Promotion of appropriate community facilitiesand infrastructure To serve the socio-economic needs and culturalactivities of the beneficiaries as well as encouragethe implementation of environmentalmanagement programs in the housing sites
NHA shall provide the minimum requirements forcommunity facilities
10
Promotion of appropriate community facilitiesand infrastructure To serve the socio-economic needs and culturalactivities of the beneficiaries as well as encouragethe implementation of environmentalmanagement programs in the housing sites
NHA shall provide the minimum requirements forcommunity facilities
-
SITE PLANNING PRINCIPLES LAND USE ALLOCATION PER SITE
66% Saleable Residential housing development
34% Non-Saleable Circulation/ Road Network Parks and Playgrounds Community Facilities
11
LAND USE ALLOCATION PER SITE66% Saleable
Residential housing development
34% Non-Saleable Circulation/ Road Network Parks and Playgrounds Community Facilities
-
SITE PLANNING PRINCIPLES LAND USE ALLOCATION PER SITE
66% Saleable Residential housing development
34% Non-Saleable Circulation/ Road Network Parks and Playgrounds Community Facilities
12
LAND USE ALLOCATION PER SITE66% Saleable
Residential housing development
34% Non-Saleable Circulation/ Road Network Parks and Playgrounds Community Facilities
-
SITE PLANNING PRINCIPLES MAXIMUM ALLOWABLE DENSITY PER HECTARE
Horizontal Development 1-Storey Row House (Loftable) : 160 units/ha. 1-Storey Row House (with loft) : 160 units/ha. 2-Storey Row House : 160 units/ha.
Vertical Development (Low Rise Buildings) 2-Storey LRB : 225 units/ha. 3-Storey LRB : 245 units/ha. 4-Storey LRB : 325 units/ha. 5-Storey LRB : 405 units/ha.
13
MAXIMUM ALLOWABLE DENSITY PER HECTARE Horizontal Development
1-Storey Row House (Loftable) : 160 units/ha. 1-Storey Row House (with loft) : 160 units/ha. 2-Storey Row House : 160 units/ha.
Vertical Development (Low Rise Buildings) 2-Storey LRB : 225 units/ha. 3-Storey LRB : 245 units/ha. 4-Storey LRB : 325 units/ha. 5-Storey LRB : 405 units/ha.
-
HOUSING UNIT DESIGN GUIDELINES MINIMUM FLOOR AREA
22.0 square meters loftable 22.0 square meters with 11 sq.m loft 24.0 square meters (for LRBs) Models for lots along major roads may be modified toinclude provision of a space for home-based economicactivity, but should not exceed cost parameters If new technology or material substitute: must havepassed AITECH (Accreditation of InnovativeTechnologies for Housing)
HIGHER THANBP 220 MINIMUMHIGHER THAN
BP 220 MINIMUM
14
MINIMUM FLOOR AREA 22.0 square meters loftable 22.0 square meters with 11 sq.m loft 24.0 square meters (for LRBs) Models for lots along major roads may be modified toinclude provision of a space for home-based economicactivity, but should not exceed cost parameters If new technology or material substitute: must havepassed AITECH (Accreditation of InnovativeTechnologies for Housing)
-
STANDARDS FOR COMMUNITY FACILITIES Provision of community facilities shall bedetermined based on the needs of targetbeneficiaries
Based on existence of public infrastructure within the5-km radius of the site
For horizontal development: 1 covered basketball court/ multi-purpose center 1 day care center w/ 2 classrooms 1 MRF 1 tricycle terminal
15
Provision of community facilities shall bedetermined based on the needs of targetbeneficiaries Based on existence of public infrastructure within the5-km radius of the site
For horizontal development: 1 covered basketball court/ multi-purpose center 1 day care center w/ 2 classrooms 1 MRF 1 tricycle terminal
-
OTHER FACTORS IN PROJECT PLANNINGFactors that Help Ensure Effective Project Planningand Management for Disaster Resilient Homes:
Local Inter-Agency Committeewith POs and NGOs organized atthe start of the projectLocal Inter-Agency Committeewith POs and NGOs organized atthe start of the project
A Planning Team and a ProjectManagement Composite Team wereset up by NHAA Planning Team and a ProjectManagement Composite Team wereset up by NHA
16
Local Inter-Agency Committeewith POs and NGOs organized atthe start of the projectLocal Inter-Agency Committeewith POs and NGOs organized atthe start of the project
Securing of all EnvironmentalClearances and Permits prior toconstruction:*ECC from DENR*Clearance from PHIVOLCS*Devt/ Building Permit from LGUs
Securing of all EnvironmentalClearances and Permits prior toconstruction:*ECC from DENR*Clearance from PHIVOLCS*Devt/ Building Permit from LGUs
A Planning Team and a ProjectManagement Composite Team wereset up by NHA
Community Representatives weremade part of project monitoringduring and after constructionCommunity Representatives weremade part of project monitoringduring and after construction
Individual beneficiaries accepttheir housing units prior topayment to ContractorsIndividual beneficiaries accepttheir housing units prior topayment to Contractors
-
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
LOT SIZE:40 sq. m.
(10.00m x 4.00m)BUILDING
FOOTPRINT:22 sq. m.
(5.50m x 4.00m)TOTAL FLOOR AREA: 33 sq. m.(GROUND FLOOR AND LOFT)
17
REVISED 06 MAR 2014
LOT SIZE:40 sq. m.
(10.00m x 4.00m)BUILDING
FOOTPRINT:22 sq. m.
(5.50m x 4.00m)TOTAL FLOOR AREA: 33 sq. m.(GROUND FLOOR AND LOFT)
-
DISASTER RESILIENT HOUSING STRUCTURAL DESIGN STANDARDSDESIGN PARAMETER ONE-STOREY TWO- STOREY 3-STOREYS OR
MOREWIND LOAD 250 KPH 250 KPH 250 KPHSTRENGTH OF WALLANDSUPERSTRUCTURE
3,000 PSI 3,000 PSI 3,000 PSI
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
STRENGTH OF WALLANDSUPERSTRUCTURESOIL BEARINGCAPACITY
95 KPA 95 KPA 95 KPA
SEISMIC LOAD ZONE 4 ZONE 4 ZONE 4LOADINGS 50 PSF 50 PSF 50 PSFFIRE RESISTANCE 2 HOURS 2 HOURS 2 HOURSThis is one of the outputs generated from the consultation meetings of theNHA TWG on Disaster-Resilient Housing in November to December 2013.
-
PROPOSED LOT SIZE:40 sq. m. (10.00m x 4.00m)
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
SITE DEVELOPMENT PLAN
-
GROUND FLOOR AREA22 sq. m. (5.50m x 4.00m)
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
GROUND FLOOR PLAN
-
LOFT FLOOR AREA11 sq. m. (2.75m x 4.00m)
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
LOFT FLOOR PLAN
-
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
CROSS SECTION
-
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
LONGITUDINAL SECTION
-
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
FRONT ELEVATION
-
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
REARELEVATION
-
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
TYPHOON SHUTTER DETAILSFRONT ELEVATION
-
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
TYPHOON SHUTTER DETAILSSECTIONSIDE
ELEVATION
-
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
TYPHOON SHUTTER DETAILSWINDOW SILL DETAILS
-
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
CONCRETE GUTTER DETAIL
-
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
INCLINED ROOF BEAM DETAILS
-
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
PURLIN EMBEDMENT DETAILS
-
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
ROOFING SHEETSOVERLAP DETAIL
-
OUTLINE SPECIFICATIONSSTRUCTURAL : RC BEAM, COLUMN & FOOTINGRC WALL FOOTINGRC FLOOR SLAB, 100MM thk. WITH 10mmRSB @ 400mm BOTHWAYSWALLS : 150mm thk. CHB (FIREWALL)
100mm thk. CHB, PLASTER FINISH (EXTERIOR)100mm thk. CHB, TOOL JOINT FINISH (INTERIOR)
ROOFING : 0.404mm thk CORR. G.I. ROOFING SHEETS at 82.0mm X 50mm X 150mm C-PURLINS WITH12mm SAGROD @ MIDPOINT
DOORS(OPTIONAL) : 1 FLUSH DOOR TYPE1 PANEL DOOR TYPE1 PVC DOOR TYPEWINDOWS (OPTIONAL) : ALUMINUM JALOUSIE TYPE with TYPHOON SHUTTERS
: 4 x 8 x 8 CONCRETE LOUVER BLOCKSFINISHES : EXTERIOR WALL PLASTERED AND PAINTED FINISH
T & B FLOOR 200mm X 200mm FLOOR TILESPLUMBING : WATER LINE uPVC PIPES
SANITARY & DRAINAGE LINES PVC PIPESTOILET BOWL PAIL FLUSH TYPE LAVATORY
SEPTIC TANK : PURIFYING POLYTHYLENE SEPTIC TANK
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
OUTLINE SPECIFICATIONSSTRUCTURAL : RC BEAM, COLUMN & FOOTINGRC WALL FOOTINGRC FLOOR SLAB, 100MM thk. WITH 10mmRSB @ 400mm BOTHWAYSWALLS : 150mm thk. CHB (FIREWALL)
100mm thk. CHB, PLASTER FINISH (EXTERIOR)100mm thk. CHB, TOOL JOINT FINISH (INTERIOR)
ROOFING : 0.404mm thk CORR. G.I. ROOFING SHEETS at 82.0mm X 50mm X 150mm C-PURLINS WITH12mm SAGROD @ MIDPOINT
DOORS(OPTIONAL) : 1 FLUSH DOOR TYPE1 PANEL DOOR TYPE1 PVC DOOR TYPEWINDOWS (OPTIONAL) : ALUMINUM JALOUSIE TYPE with TYPHOON SHUTTERS
: 4 x 8 x 8 CONCRETE LOUVER BLOCKSFINISHES : EXTERIOR WALL PLASTERED AND PAINTED FINISH
T & B FLOOR 200mm X 200mm FLOOR TILESPLUMBING : WATER LINE uPVC PIPES
SANITARY & DRAINAGE LINES PVC PIPESTOILET BOWL PAIL FLUSH TYPE LAVATORY
SEPTIC TANK : PURIFYING POLYTHYLENE SEPTIC TANK
-
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
STRUCTURAL DRAWINGS
INCREASE BEAM WIDTH FROM150mmto175mm
INCREASE SIZE OF REINFORCING STEELBARS FROM12 mm
TO16 mm DIAMETER
-
DPWH COMMENTS AND RECOMMENDATIONS
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
STRUCTURAL DRAWINGS
INCREASE COLUMN WIDTH FROM150mmto175mmINCREASE SIZE OF LOFT WOODEN FLOORJOISTS FROM2 x 3 to2 x 6
-
DPWH COMMENTS AND RECOMMENDATIONS
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
STRUCTURAL DRAWINGSCHANGE ROOFING SCREWS FROM
TEKSCREW TO J-BOLT
-
DPWH COMMENTS AND RECOMMENDATIONS
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
ARCHITECTURAL DRAWINGS
REVISED STAIR RISER HEIGHT TOACCOMMODATE LARGER FLOOR JOIST
AND BEAMINCREASE FLOOR TO FLOOR HEIGHT TOACCOMMODATE LARGER FLOOR JOISTAND BEAM (FROM 5.30M TO 5.50M)
-
COMPARATIVE ANALYSIS22 sq.m.LOFTABLEROWHOUSE
22 sq.m.ROWHOUSEWITH LOFT
COST Php 125,000.00 Php 219,723.63TOTAL FLOOR AREA 22sq.m. 33 sq.m.
(22 sq.m. G/F AREAand 11 sq.m. LOFT)
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
COST Php 125,000.00 Php 219,723.63TOTAL FLOOR AREA 22sq.m. 33 sq.m.
(22 sq.m. G/F AREAand 11 sq.m. LOFT)
COST PER SQ. M. Php 5,681.81 Php 6,658.29
-
22 sq.m. LOFTABLEROWHOUSE
22 sq.m. ROWHOUSEWITH LOFT
ARCHITECTURALArchitectural Features Structural Provision
for Loft and StairsLoft, Stairs, WoodenTyphoon Shutters
COMPARATIVE ANALYSIS
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
Structural Provisionfor Loft and Stairs
Loft, Stairs, WoodenTyphoon Shutters
G/F Floor to LoftFloor Finish Height
2.40meters 2.60meters
Gutter No Gutter andDownspout
Concrete Gutter(3 inches thick) andDownspout
Height of Firewall 4.80meters 5.80metersRoof Thickness 0.30millimetersthk.
Corrugated GI Sheet0.40millimetersthk.Corrugated GI Sheet
Roof Purlins 1.2 x 100 x 50mm 2.0 x 150 x 65mm
-
22 sq.m. LOFTABLEROWHOUSE
22 sq.m. ROWHOUSEWITH LOFT
STRUCTURALColumn Size 200 x 150 mm, with
4-12 mm reinforcingbar
250 x 175 mm, with4-16 mm reinforcingbar
COMPARATIVE ANALYSIS
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
200 x 150 mm, with4-12 mm reinforcingbar
250 x 175 mm, with4-16 mm reinforcingbar
Beam Size B-1: 250 x 150 mm,with 4-12 mm reinforcing bar
B-1 and B-3:300 x 175 mm andB-2: 250 x 175 mm,with4-16 mm reinforcingbar
Footing Size 400 x 400mm 800 x 800mmWall Footing Size 300mm 400mm
-
22 sq.m. LOFTABLEROWHOUSE
22 sq.m. ROWHOUSEWITH LOFT
ELECTRICALNumber of LightingOutlets
3 4
COMPARATIVE ANALYSIS
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
Number of LightingOutletsNumber ofConvenience Outlets
3 4
Number of Switches 2 2Service Entrance 2-5.5 mm THW +
1-3.5 mm TW in 20mm PVC CONDUIT
2-5.5 mm THHN +1-5.5 mm THHN(G) in 20 mm RSCCONDUIT
-
DESCRIPTION MATERIALCOST LABOR COSTESTIMATED
DIRECT COSTTOTAL INDIRECT
COST TOTAL COST
I. EARTHWORKSSUB-TOTAL 2,418.00 1,943.63 4,361.63 610.63 4,972.25
II. CONCRETE/STRUCTURAL WORKSSUB-TOTAL 65,420.75 19,135.65 84,556.41 11,837.90 96,394.30
III. FORMWORKSSUB-TOTAL 3,460.00 720.78 4,180.78 585.31 4,766.09
IV. ROOFING WORKSSUB-TOTAL 16,105.00 3,952.28 20,057.28 2,808.02 22,865.30
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
SUB-TOTAL 16,105.00 3,952.28 20,057.28 2,808.02 22,865.30V. DOORS AND JAMBS
SUB-TOTAL 13,000.00 1,741.89 14,741.89 2,063.86 16,805.75VI. WINDOWS
SUB-TOTAL 7,008.00 1,321.43 8,329.43 1,166.12 9,495.55VII. PLUMBING WORKS
SUB-TOTAL 14,557.32 4,805.39 19,362.70 2,710.78 22,073.48VIII. ELECTRICAL WORKS
SUB-TOTAL 12,881.00 4,127.43 17,008.43 2,381.18 19,389.61IX. ARCHITECTURAL WORKS
SUB-TOTAL 17,880.74 2,260.76 20,141.49 2,819.81 22,961.30
TOTAL 152,730.81 40,009.22 192,740.02 26,983.60 219,723.63
-
THE DPWH APPROVAL OF THE PLAN IS BASED ONTHE REVIEW OF DESIGN CONCEPT AND DESIGNANALYSIS SUBMITTED BY NHA.
CLOSE SUPERVISION DURING CONSTRUCTIONSHOULD BE UNDERTAKEN BY NHA TO ENSURECOMPLIANCE TO THE APPROVED PLANS.
SUFFICIENT TESTING OF MATERIALS SHOULD BECONDUCTED TO VERIFY COMPLIANCE TO STANDARDDPWH STANDARDS.
DPWH NOTES
22 SQ. M. ROW HOUSE MODEL FOR TYPHOON22 SQ. M. ROW HOUSE MODEL FOR TYPHOONYOLANDA VICTIMSYOLANDA VICTIMS (WITH 11 SQ. M. LOFT)(WITH 11 SQ. M. LOFT)
THE DPWH APPROVAL OF THE PLAN IS BASED ONTHE REVIEW OF DESIGN CONCEPT AND DESIGNANALYSIS SUBMITTED BY NHA.
CLOSE SUPERVISION DURING CONSTRUCTIONSHOULD BE UNDERTAKEN BY NHA TO ENSURECOMPLIANCE TO THE APPROVED PLANS.
SUFFICIENT TESTING OF MATERIALS SHOULD BECONDUCTED TO VERIFY COMPLIANCE TO STANDARDDPWH STANDARDS.