Energy in Alaska, a Rural Perspective
Commission for Environmental Cooperation of North AmericaApril 19, 2012Yukon River Inter-Tribal Watershed Council
Energy Department
![Page 2: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/2.jpg)
Established in1997
Treaty Based
70 Tribes andFirst Nations
Almost Every dot Is a “micro-grid"
The Yukon River Inter-Tribal Watershed Council
![Page 3: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/3.jpg)
#1 Heat Energy – Fairbanks has 14,000 annual Heating Degree Days
Any guesses as to how many heating degree days in Toronto?
Major Rural Energy Challenges
![Page 4: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/4.jpg)
#2 Electricity ◦ Avg Price in Anchorage: .09/kW◦ Avg Price in Pedro Bay: .91/kWh
#3 Transportation – Subsistence?
#4 Human Nature, Perverse Incentive
Major Rural Energy Challenges
![Page 5: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/5.jpg)
Directive – Clean WaterNeeds Clean Energy
Efficiency First
Small Scale RE Projects
RE and Energy Efficiency Trainings, Education
and Capacity Building
YRITWC Energy Department
![Page 6: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/6.jpg)
Efficiency First!!!!
Nunamiut Corp DOE Tribal Energy Project
How much is this timer worth
Analyze options Waste Oil – Heat Efficient Lighting Timers/Occupancy Sensors
<- Biggest Energy Draw?
![Page 7: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/7.jpg)
New Construction Vs. Old construction Nenana School District Dormitory
Properly Evaluate your home energy use – WHERE does it go!?
Windows, Air Leaks, no insulation
Insulate and Seal
![Page 8: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/8.jpg)
What’s the difference?
Heat Lamp Flood Lamp LED
Lighting
![Page 9: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/9.jpg)
What’s the difference?
Classic Model Newer Model
100+ year old technology
![Page 10: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/10.jpg)
The Economics of Energy Efficiency
![Page 11: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/11.jpg)
The Economics of Energy Efficiency
![Page 12: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/12.jpg)
EDUCATION
…If a tree falls in the forest…
![Page 13: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/13.jpg)
Solar Thermal, Solar PV, Heating upgrade Nenana Youth Rec Center
Projects!
![Page 14: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/14.jpg)
# of Panels: 20
Panel Type: Trinna 220watt
Total Array Size: 4.4 kW
Energy Produced: 5,100 kWh/yr
Cost of Electricity in Nenana: $.20/kWh
Energy Value per year: $1020
Cost of equipment and supplies: $15,000
Simple Payback: $15k/$1020 = 14.7yrs
Solar PV Energy Production:
![Page 15: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/15.jpg)
# of bulbs: 132
Tube bulb Type: 15 watt LED tubes
Total Time for Change-out: 12 person-hours
Energy SAVED: 12,000 kWh/yr
Cost of Electricity in AKP: $.35/kWh
Energy Value per year: $4200
Cost of equipment and supplies: $6,600
Simple Payback: $6600/$4200 = 1.6yrs
Lifetime Energy Saved (bulbs 50k hrs): $40k-50k
Lighting Change-out
![Page 16: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/16.jpg)
Free Heat during the summer
How much do we pay to heat water during the summer?
Solar Thermal
![Page 17: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/17.jpg)
Village Scale Wind - Issues?
![Page 18: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/18.jpg)
SkyStream 3.7 Wind Turbines
Class 6 Wind
6.7 m/s Avg windspeed
Hooper Bay Small Wind
![Page 19: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/19.jpg)
600 kWh/month
Energy in Hooper Bay $.514/kWh
Turbine Cost $20k
Yearly Energy Value 600kWh X 12 mo = 7,200 kWh
7,200 kWh x $.514/kWh = $3,700
PAYBACK: $20,000 / $3,700 = 5.4 yrs
Hooper Bay Small Wind
![Page 20: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/20.jpg)
How Hard is it to instal?
![Page 21: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/21.jpg)
Every 1$ spent on Energy Efficiency is worth $5 spent on Renewable Energy Projects
Somebody should do something about that…
Take-Aways
![Page 22: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/22.jpg)
Solutions?
![Page 23: Dave Pelunis-Messier: Energy in Alaska, A Rural Perspective](https://reader034.vdocuments.us/reader034/viewer/2022051312/547954bdb4af9f3c5e8b45bb/html5/thumbnails/23.jpg)
Quyana, Merci, Gracias, Thank you