dave kroetsch, aeryon

29
Infrastructure Inspection using sUAS Dave Kroetsch, CEO sUSB Expo 2015 - May 1, 2015

Upload: suas-news

Post on 18-Jul-2015

144 views

Category:

Technology


1 download

TRANSCRIPT

Infrastructure Inspection using sUAS

Dave Kroetsch, CEOsUSB Expo 2015 - May 1, 2015

Overview

Aeryon Labs - Company Background

Challenges of Power Line Inspection

Benefits of UAS Technology

In-Field Examples

Aerial Inspection in Other Industries

Aeryon Labs builds

rugged, easy-to-use sUASfor the

backpack of the soldier trunk of the

power line inspectorand the

Aeryon Labs Inc.

• Founded in 2007, Aeryon Scout sUAS since 2009

• Aeryon SkyRanger sUAS introduced in 2013

• Aeryon HDZoom30 Payload - 2015

• Global Customers – Comm’l, Public Safety, Military

Archeology Dig in Saskatchewan

Stellar Sea Lions in Bering Sea

Libyan RebelsTripoli Advance

BP Oil Spill Response

US Coast Guard Fuel Delivery

Mapping Christ the Redeemer Statue

Aeryon Philosophy

Anyone Can Fly

• Intuitive touchscreen navigation & camera control

• Advanced automated features, fail-safes

• Minimal training

Fly Anywhere, Anytime

• Single user transport, deployment, operation

• Integrated payloads & industry solutions

• Reliable in high winds & extreme weather conditions

Aeryon SkyRanger™

Aeryon SkyRanger

• 50 minute flight time

• Wind Tolerance

o 40mph/65kmh sustained

o 55mph/90kmh gusts

• All-weather

o -22 to 122oF (-30 to 50oC)

• 5.3 lbs (2.4 kg)

Easy-to-use, minimal training

Simple systemstatus display

Single operator control

Pre-planned flight paths or ad-hoc

GPS cameratargeting

Touchscreen map-based navigation

Real-timedigital video

Power Line Inspection

• Inspect tower structure

Detect cracks, deterioration

Read lot codes/serial numbers

• Inspect insulator

Locate broken insulators

Detect contamination

• Inspect fastening hardware

Locate cotter pins

Count exposed bolt threads

Challenges of Power line Inspection

• Remote and hard to reach structures

• High-value infrastructure

cost of failure is extraordinary

• Using manned aircraft or manual towers inspection can be:

Expensive

Dangerous

Limited by ability to get close to structure

Challenges (cont’d)

• High electrical potential (kV) in power lines

Risk for proximate people/objects

Potential flashover

• Magnetic interference

• Obstacles

Towers & power lines

Increase risk during operations especially beyond line of sight

Overcoming the Challenges

• The Hard Way - Close proximity

Multiple sensors – obstacle avoidance, etc

Very precise positioning – skilled pilots

High resolution, wide FOV imagery

• The Right Way

Maintain reasonable standoff distance

HDZoom30

Solution Profile

• SkyRanger with HDZoom30 Safe standoff distance

Clear, precise, detailed imagery

Ease of use

• Class-leading endurance On station longer

Capture more imagery

Operate further from launch

• Class-leading wind and environmental tolerance High altitude

Operations are not constrained by wind/weather

Take-off location

The Tower

Inspection Scenario

• 500 kV live power line

• 400m from operator

Standoff distance 7m

Reading Serial Numbers

Example 2

• ~1000 ft (300m) away • On top of a mountain• Standoff of 65ft (20m)

Power Line Inspection

Insulator Inspection

EO/IR Capability

Common Challenges

Mirrored in other industries:

Solar farms

Wind power generation

Chemical plants

Common Challenges

Cell phone towers

Flare stacks

Pipelines

FAA Approved Applications

• Multiple FAA 333 Exemptions

Flare stack (on and offshore)

Power line

Plant inspection

• State-wide blanket COAs

Inspection Applications Worldwide

Thank You

www.aeryon.com.

Aeryon Labs Inc.575 Kumpf DriveWaterloo ON N2V 1K3Canada

Sales Inquires:[email protected]

General Information:[email protected]

Head Office: 519-489-6726Fax: 519-489-6726

x320 - sales