Daily Weld Report LNG CANADA PROJECT 28-Jan-2022 AFI No. DWR No: DWR-COOEC-0158339 Date: 18-Oct-2021 ROOT FILL / CAP Spool Drawing No. Rev No. Sheet No. Joint No. Spool No. Lines Class Size Thickness Fit-Up Date Welded Date Weld Type Weld Process Welder 1 Welder 2 Welder 3 Welder 4 Weld Process Welder 1 Welder 2 Welder 3 Welder 4 WPS No. Base Metal 1 Heat No. 1 Base Metal 2 Heat No. 2 VI DI Work Code 2TA180CBE-1G425004-30 0 1 001 101 11472C1 25.000 SCH80 12-Oct-2021 17-Oct-2021 FF T YH0011 T YH0011 LTCS-101F 90 degree elbow ACBZ Pipe P090829 ACC ACC OW Abbreviation Note: Inspection Result: Legend: VI = Visual Inspection ACC = Accepted Production Joint DI = Dimension Inspection REJ = Rejected Weld Type: Work Code: SB = Shop Butt Weld SOL - Shop Olet Weld FT - Field Threaded FFR - Field FRP Joint OW - Original Welding FB - Field Butt Weld FOL - Field Olet Weld FTF - Field Thread Requires Seal Weld FGR - Field GRE Joint R1 - 1st Repair SF - Shop Fillet Weld SS - Shop Support Weld SBG - Shop Bridge Weld SJK - Shop Jacket Pipe Joint R2 - 2nd Repair FF - Field Fillet Weld FS - Field Support Weld FBG - Field Bridge Joint R3 - 3rd Repair SR - Shop Reinforcement Pad Weld For Main Pipe SRB - Shop Reinforcement Pad Weld For Main Pipe & Branch Pipe WELDING FOREMAN Chen Baoyu On 18-Oct-2021 08:44 COOEC QC INSPECTOR Yu Yong Sheng On 19-Oct-2021 10:44 JFJV QC INSPECTOR Jiqing Zhu On 19-Oct-2021 17:12 Copyright MODS 2022 Page 1 of 2

Upload: others

Post on 28-Jan-2022

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Date: Spool Drawing No. Rev No. Sheet Joint Spool Lines

Daily Weld ReportLNG CANADA PROJECT

28-Jan-2022

AFI No. DWR No: DWR-COOEC-0158339Date: 18-Oct-2021

ROOT FILL / CAP

Spool Drawing No. Rev No. SheetNo.

JointNo.

SpoolNo. Lines Class Size Thickness Fit-Up Date Welded Date Weld Type Weld

Process Welder 1 Welder 2 Welder 3 Welder 4 WeldProcess Welder 1 Welder 2 Welder 3 Welder 4 WPS No. Base Metal 1 Heat No. 1 Base Metal 2 Heat No. 2 VI DI Work Code

2TA180CBE-1G425004-30 0 1 001 101 11472C1 25.000 SCH80 12-Oct-2021 17-Oct-2021 FF T YH0011 T YH0011 LTCS-101F 90 degreeelbow ACBZ Pipe P090829 ACC ACC OW

Abbreviation Note: Inspection Result: Legend:

VI = Visual Inspection ACC = Accepted Production Joint

DI = Dimension Inspection REJ = Rejected

Weld Type: Work Code:

SB = Shop Butt Weld SOL - Shop Olet Weld FT - Field Threaded FFR - Field FRP Joint OW - Original WeldingFB - Field Butt Weld FOL - Field Olet Weld FTF - Field Thread Requires Seal Weld FGR - Field GRE Joint R1 - 1st RepairSF - Shop Fillet Weld SS - Shop Support Weld SBG - Shop Bridge Weld SJK - Shop Jacket Pipe Joint R2 - 2nd RepairFF - Field Fillet Weld FS - Field Support Weld FBG - Field Bridge Joint R3 - 3rd RepairSR - Shop Reinforcement Pad Weld For Main PipeSRB - Shop Reinforcement Pad Weld For Main Pipe & Branch Pipe

WELDING FOREMAN

Chen Baoyu On 18-Oct-2021 08:44COOEC QC INSPECTOR

Yu Yong Sheng On 19-Oct-2021 10:44JFJV QC INSPECTOR

Jiqing Zhu On 19-Oct-2021 17:12