DATE: January 18, 2017
TO: Interested Firms
FROM: Alan Weaver, CPPO, Sr. Procurement Specialist
SUBJECT: Addendum 4: Invitation for Bid 28902, Upper Ocklawaha River Basin Moss Bluff Dam Rehabilitation Project
Please be advised that the date set for receipt of bids has been extended as follows:
1. Request for information. Clarify in clause 1.03(B)6 of section 14611 (EXHIBIT 1 — VERTICAL LIFT GATE OPERATING SYSTEMS), the hoist capacity or lifting force is not given in the specs kindly provide the same.
Answer: Sheet S24, Under the Cable Drum Hoist notes, add the following note: “8. The operating forces for the gate hoist shall be determined based on an unbalanced head condition of 13 feet.” Refer to Exhibit 9 — USACE Nationwide Permit Number 33, attached.
2. Question: Does the engineer’s estimate of $1,750,000.00 include all the alternates/additive items?
Answer: No.
3. Revise Drawings: Sheet S1: Under Paints and Protective Coatings Note 3, delete the final sentence and replace with the following: “DURING SURFACE PREPARATION, CONTRACTOR SHALL TAKE APPROPRIATE MEASURES TO CAPTURE PAINT PARTICLES AND BLAST MEDIA AND DISPOSE OFFSITE AT A MUNICIPAL OR COMMERCIAL LANDFILL.”
NOTE: Please acknowledge receipt of this Addendum in your Bid.
If you have any questions regarding this addendum, contact Alan Weaver at (386) 329-4271 or via email at [email protected].
mailto:[email protected]
-
Regulatory Division West Branch Tampa Permits Section SAJ-2003-11245 (NW-RGH) Ann B. Shortelle Executive Director St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 Dear Ms. Shortelle:
The U.S. Army Corps of Engineers (Corps) assigned your application for a Department of the Army permit, which the Corps received on December 1, 2016, the file number SAJ-2003-11245. A review of the information and drawings provided indicates that the proposed work would maintain and repair the Moss Bluff structure (S-251), including clearing sediment and debris, sealing concrete, painting, repairing gates, and other related tasks. The proposed work includes temporary cofferdams to allow dewatering. The upstream cofferdam is a cellular or comparable structure that will impact 2,000 square feet or less of surface waters. The downstream cofferdam impacts include 200 square feet of fill for sheetpiles. Special construction techniques, including sheetpile weirs, cellular cofferdams, and other innovative technologies may be used to maintain a temporary footprint to work in the surface waters. The project is located at SE 96th Lane Road, in Section 23, Township 16 South, Range 24 East, Ocklawaha, Marion County, Florida
Your project, as depicted on the enclosed drawings, is authorized by Nationwide Permit (NWP) Number 33. In addition, project specific conditions have been enclosed. This verification is valid until March 18, 2017. Furthermore, if you commence or are under contract to commence this activity before the date that the relevant nationwide permit is modified or revoked, you will have 12 months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this nationwide permit. Please access the U.S. Army Corps of Engineers' (Corps) Jacksonville District's Regulatory Internet page to access Internet links to view the Final Nationwide Permits, Federal Register Vol. 77, dated February 21, 2012, specifically pages 10270 – 10290, the Corrections to the Final Nationwide Permits, Federal Register 77, March 19, 2012, and the List of Regional Conditions. The Internet page address is:
http://www.saj.usace.army.mil/Missions/Regulatory.aspx
Please be aware this Internet address is case sensitive and should be entered as it appears above. Once there you will need to click on “Source Book”; and, then click on “Nationwide Permits.” These files contain the description of the Nationwide Permit authorization, the Nationwide Permit general conditions, and the regional conditions, which apply specifically to this verification for NWP 33. Enclosed is a list of the 6 General
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
10117 PRINCESS PALM AVE, SUITE 120
TAMPA, FLORIDA 33610-8302
January 13, 2017 REPLY TO
ATTENTION OF
-
-2-
Conditions, which apply to all Department of the Army authorizations. You must comply with all of the special and general conditions and any project specific condition of this authorization or you may be subject to enforcement action. In the event you have not completed construction of your project within the specified time limit, a separate application or re-verification may be required.
The following special conditions are included with this verification:
1. Reporting Addresses: The Permittee shall submit all reports, notifications, documentation and correspondence required by the general and special conditions of this permit to the following address:
a. For standard mail: U.S. Army Corps of Engineers, Regulatory Division, Special Projects & Enforcement Branch, 2833 NW 41st Street, Unit 130, Gainesville, Florida 32606.
b. For electronic mail: [email protected] (not to exceed 10 MB). Files over 10MB can be uploaded to our web application at https://safe.amrdec.army.mil/safe. Permittee shall reference this permit number, SAJ-2003-11245 (NW-RGH), on all submittals.
2. Commencement Notification: Within 10 days from the date of initiating the work
authorized by this permit the Permittee shall provide a written notification of the date of commencement of authorized work to the Corps at the address provided in Special Condition #1.
3. Self-Certification: Within 60 days of completion of the authorized work or at the expiration of the construction authorization of this permit, whichever occurs first, the Permittee shall complete the attached “Self-Certification Statement of Compliance” form and submit to the Corps at the address provided in Special Condition #1. In the event that the completed work deviates, in any manner, from the authorized work, the Permittee shall describe, on the Self-Certification Form, the deviations between the work authorized by the permit and the work as constructed. Please note that the description of any deviations on the Self- Certification Form does not constitute approval of any deviations by the Corps.
4. Erosion Control: Prior to the initiation of any work authorized by this permit, the Permittee shall install erosion control measures along the perimeter of all work areas to prevent the displacement of fill material outside the work area into waters of the United States. Immediately after completion of the final grading of the land surface, all slopes, land surfaces, and filled areas shall be stabilized using sod, degradable mats, barriers, or a combination of similar stabilizing materials to prevent erosion. The erosion control measures shall remain in place and be maintained until all authorized work is completed and the work areas are stabilized.
5. Fill Material: The Permittee shall use only clean fill material for this project. The fill material shall be free from items such as trash, debris, automotive parts, asphalt, construction materials, concrete block with exposed reinforcement bars, and soils
-
-3-
contaminated with any toxic substance, in toxic amounts in accordance with Section 307 of the Clean Water Act.
6. Posting of Permit: The Permittee shall ensure that all contractors, subcontractors, and entities associated with the implementation of the project review, understand, and comply with the approved plans and special conditions made part of this permit. The Permittee shall inform all parties associated with the activity of the construction area boundaries and the location of adjacent wetlands to be avoided. Complete copies of the permit and approved plans shall be available at the construction site at all times. Failure to comply with the approved plans and permit special conditions may subject the Permittee to enforcement action.
7. Agency Changes/Approvals: Should any other agency require and/or approve changes to the work authorized or obligated by this permit, the Permittee is advised a modification to this permit instrument is required prior to initiation of those changes. It is the Permittee’s responsibility to request a modification of this permit from the Tampa Permits Section. The Corps reserves the right to fully evaluate, amend, and approve or deny the request for modification of this permit.
8. Assurance of Navigation and Maintenance: The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.
9. Cultural Resources/Historic Properties: No structure or work shall adversely affect impact or disturb properties listed in the National Register of Historic Places (NRHP) or those eligible for inclusion in the NRHP.
a. If during the ground disturbing activities and construction work within the permit area, there are archaeological/cultural materials encountered which were not the subject of a previous cultural resources assessment survey (and which shall include, but not be limited to: pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal implements, dugout canoes, evidence of structures or any other physical remains that could be associated with Native American cultures or early colonial or American settlement), the Permittee shall immediately stop all work and ground-disturbing activities within a 100-meter diameter of the discovery and notify the Corps within the same business day (8 hours). The Corps shall then notify the Florida State Historic Preservation Officer (SHPO) and the appropriate Tribal Historic Preservation Officer(s) (THPO(s)) to assess the significance of the discovery and devise appropriate actions.
-
-4-
b. Additional cultural resources assessments may be required of the permit area in the case of unanticipated discoveries as referenced in accordance with the above Special Condition ; and if deemed necessary by the SHPO, THPO(s), or Corps, in accordance with 36 CFR 800 or 33 CFR 325, Appendix C (5). Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CFR Part 325.7. Such activity shall not resume on nonfederal lands without written authorization from the SHPO for finds under his or her jurisdiction, and from the Corps.
c. In the unlikely event that unmarked human remains are identified on non-federal lands, they will be treated in accordance with Section 872.05 Florida Statutes. All work and ground disturbing activities within a 100-meter diameter of the unmarked human remains shall immediately cease and the Permittee shall immediately notify the medical examiner, Corps, and State Archeologist within the same business day (8-hours). The Corps shall then notify the appropriate SHPO and THPO(s). Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CFR Part 325.7. Such activity shall not resume without written authorization from the State Archeologist and from the Corps.
This letter of authorization does not obviate the necessity to obtain any other
Federal, State, or local permits, which may be required. Prior to the initiation of any construction, projects qualifying for this Nationwide permit must qualify for an exemption under section 403.813(1), Florida Statutes or 373.406, Florida Statutes, or otherwise be authorized by the applicable permit required under Part IV of Chapter 373, Florida Statutes, by the Department of Environmental Protection, a water management district under section 373.069, Florida Statutes, or a local government with delegated authority under section 373.441, Florida Statutes, and receive Water Quality Certification and applicable Coastal Zone Consistency Concurrence or waiver thereto, as well as any authorizations required for the use of state-owned submerged lands under Chapter 253, Florida Statutes, and, as applicable, Chapter 258, Florida Statutes. You should check State-permitting requirements with the Florida Department of Environmental Protection or the appropriate water management district.
This letter of authorization does not include conditions that would prevent the ‘take’ of a state-listed fish or wildlife species. These species are protected under sec. 379.411, Florida Statutes, and listed under Rule 68A-27, Florida Administrative Code. With regard to fish and wildlife species designated as species of special concern or threatened by the State of Florida, you are responsible for coordinating directly with the Florida Fish and Wildlife Conservation Commission (FWC). You can visit the FWC license and permitting webpage (http://www.myfwc.com/license/wildlife/) for more information, including a list of those fish and wildlife species designated as species of special concern or threatened. The Florida Natural Areas Inventory (http://www.fnai.org/ ) also maintains updated lists, by county, of documented occurrences of those species.
http://www.myfwc.com/license/wildlife/http://www.fnai.org/
-
-5-
This letter of authorization does not give absolute Federal authority to perform the work
as specified on your application. The proposed work may be subject to local building restrictions mandated by the National Flood Insurance Program. You should contact your local office that issues building permits to determine if your site is located in a flood-prone area, and if you must comply with the local building requirements mandated by the National Flood Insurance Program.
If you are unable to access the internet or require a hardcopy of any of the conditions, limitations, or expiration date for the above referenced NWP, please contact Ryan Hendren by telephone at 813-769-7075 or electronic mail at [email protected].
Thank you for your cooperation with our permit program. The Corps Jacksonville District Regulatory Division is committed to improving service to our customers. We strive to perform our duty in a friendly and timely manner while working to preserve our environment. We invite you to complete our automated Customer Service Survey at http://corpsmapu.usace.army.mil/cm_apex/f?p=regulatory_survey. Please be aware this Internet address is case sensitive; and, you will need to enter it exactly as it appears above. Your input is appreciated – favorable or otherwise.
Sincerely, Ryan Hendren Project Manager Enclosures: General Conditions Permit Transfer Request Self-Certification Statement of Compliance Permit Drawings Copy Furnished: Rebecca L. Trudeau - St. Johns River Water Management District bcc: CESAJ-RD-PE
mailto:[email protected]://corpsmapu.usace.army.mil/cm_apex/f?p=regulatory_survey
-
GENERAL CONDITIONS 33 CFR PART 320-330
1. The time limit for completing the work authorized ends on March 18, 2017. 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort of if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit you must obtain the signature of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization. 5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions. 6. You must allow a representative from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.
-
DEPARTMENT OF THE ARMY PERMIT TRANSFER REQUEST
PERMIT NUMBER: SAJ-2003-11245 (NW-RGH) When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. Although the construction period for works authorized by Department of the Army permits is finite, the permit itself, with its limitations, does not expire. To validate the transfer of this permit and the associated responsibilities associated with compliance with its terms and conditions, have the transferee sign and date below and mail to the U.S. Army Corps of Engineers, Enforcement Section, Post Office Box 4970, Jacksonville, FL 32232-0019. ___________________________________ ___________________________ (TRANSFEREE-SIGNATURE) (SUBDIVISION) ___________________________________ _________ ____________ (DATE) (LOT) (BLOCK) __________________________ ___________________________________ (STREET ADDRESS) (NAME-PRINTED) ___________________________________ ___________________________________ (MAILING ADDRESS) ___________________________________ (CITY, STATE, ZIP CODE)
-
SELF-CERTIFICATION STATEMENT OF COMPLIANCE
Permit Number: SAJ-2003-11245 (NW-RGH)
Permittee’s Name & Address (please print or type):___________________________________ ____________________________________________________________________________ ____________________________________________________________________________ Telephone Number:____________________________________________________________ Location of the Work:___________________________________________________________ ____________________________________________________________________________ Date Work Started:____________________ Date Work Completed:______________________ PROPERTY IS INACCESSIBLE WITHOUT PRIOR NOTIFICATION: YES ______ NO_______ TO SCHEDULE AN INSPECTION PLEASE CONTACT _______________________________ AT __________________________ Description of the Work (e.g. bank stabilization, residential or commercial filling, docks, dredging, etc.):________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ Acreage or Square Feet of Impacts to Waters of the United States: ______________________ Describe Mitigation completed (if applicable): ________________________________________ ____________________________________________________________________________ Describe any Deviations from Permit (attach drawing(s) depicting the deviations): ____________________________________________________________________________ ____________________________________________________________________________
******************** I certify that all work, and mitigation (if applicable) was done in accordance with the limitations and conditions as described in the permit. Any deviations as described above are depicted on the attached drawing(s).
______________________________ Signature of Permittee
______________________________ Date
-
Hammock
Lake
Lake
Griffin
Lake
Yale
Ella
Lake
Nicotoon
Lake
Little Lake
Weir
Lake
Weir
Lake
Mary
Doe
Lake
OCALA
NATIONAL
FOREST
MOSS BLUFF
Project
Location
Halfmoon
Lake
Lake
Bryant
Wells
Pond
MARION COUNTY
LAKE COUNTY
464
25
42
441
314A
25
25
452
450
464
VICINITY MAP
I:\E
NG
DA
TA
\D
ES
IG
N\U
OR
B\M
OS
SB
LU
F\D
AM
R
EH
AB
IL
IT
AT
IO
N 2
01
6\D
am
R
eh
ab
P
erm
it.d
wg
DATE:
P.E. NUMBER:
ST. JOHNS RIVER WATER MANAGEMENT DISTRICT
UPPER OCKLAWAHA RIVER BASIN
MOSS BLUFF DAM REHABILITATION
MARION COUNTY, FLORIDA
1 OF 6
WILLIAM R. COTE
53746
NOVEMBER 29, 2016
SAJ-2003-11245(NW-RGH)*01/13/2017
-
16
'-0
"
AP
PR
OA
CH
A
PR
ON
FL
OW
OPERATING PLATFORM EL. 83.0
CONTRACTION JOINT
60
-0
"
SERVICE BRIDGE
8'-0
"
DIS
CH
AR
GE
AP
RO
N
EL
. 3
0.0
25'-0" RIPRAP
25'-0" RIPRAP
WITH CONC. FILL
5 S
EC
TIO
N
GU
AR
DR
AIL
GU
AR
DR
AIL
PO
ST
3
3
'
-
0
"
6 S
EC
TIO
NS
GU
AR
DR
AIL
EL
. 6
3.0
EL
. 6
3.0
2
4
"
R
I
P
R
A
P
EL
. 5
2.0
EL
. 5
2.6
C A
NC
HO
R
WA
LL
L
PA
IN
T D
OW
NS
TR
EA
M
WIN
GW
AL
L
1
O
N
3
1 ON 3
EL
. 3
2.0
SL
OP
E
CONTRACTION JOINT
18
" R
IP
RA
P O
N
9" B
ED
DIN
G
18
" R
IP
RA
P O
N
9" B
ED
DIN
G
33
'-0
"
18
" R
IP
RA
P O
N
9" B
ED
DIN
G
C S
PIL
LW
AY
L
C A
NC
HO
R W
AL
L
L
1 O
N 3
PA
IN
T U
PS
TR
EA
M
WIN
GW
AL
L
18
" R
IP
RA
P
1
4
UPSTREAM
FACE OF WEIR
15
'-0
"
C C
UT
O
FF
WA
LL
L
UP
ST
RE
AM
FA
CE
O
F
ST
RU
CT
UR
E
18
" R
IP
RA
P O
N
9" B
ED
DIN
G
30
'-0
"
35
'-0
"
25'-0" RIPRAP
25'-0" RIPRAP
WITH CONC. FILL
5 S
EC
TIO
N
GU
AR
DR
AIL
3
3
'
-
0
"
2
4
"
R
I
P
R
A
P
EL
. 5
2.0
EL
. 5
2.6
C A
NC
HO
R
WA
LL
L
PA
IN
T
DO
WN
ST
RE
AM
WIN
GW
AL
L
1
O
N
3
1 ON 3
18
" R
IP
RA
P O
N
9" B
ED
DIN
G
1
O
N
3
1 O
N 3
18
" R
IP
RA
P
1
O
N
3
1
4
1 O
N 3
GU
AR
DR
AIL
PO
ST
C C
UT
O
FF
W
AL
L
L
35
'-0
"
43
'-3
"
EL
. 3
0.0
ST
RA
IN
ER
EL
.3
4.0
RE
PL
AC
E S
UP
PO
RT
PIL
E A
ND
S
TA
FF
G
AG
E
ST
RA
IN
ER
EL
. 5
0.0
RE
PL
AC
E S
UP
PO
RT
PIL
E A
ND
S
TA
FF
G
AG
E
24
" B
AN
K
PR
OT
EC
TIO
N
ST
ON
E
18
" R
IP
RA
P O
N
9" B
ED
DIN
G
3" S
TIL
LIN
G W
EL
L
FIL
L L
IN
E E
L. 3
4.0
TO
E
L. 5
0.0
5 S
EC
TIO
N
GU
AR
DR
AIL
C L
AD
DE
R
L
LA
DD
ER
&
BA
SK
ET
G
UA
RD
CO
NT
RO
L
HO
US
E
3 B
AR
RIE
R
PO
ST
S
FL
US
HIN
G V
AL
VE
BO
X E
L. 3
3.0
VA
LV
E
BO
X
VA
LV
E
BO
X
3" S
TIL
LIN
G W
EL
L
FIL
L L
IN
E E
L. 3
4.0
FL
OA
TIN
G T
UR
BID
IT
Y B
AR
RIE
R
TO
S
HO
RE
LIN
E T
HE
N S
IL
T
FE
NC
E T
O T
OP
O
F S
LO
PE
(T
YP
.).
FL
OA
TIN
G T
UR
BID
IT
Y
BA
RR
IE
R T
O S
HO
RE
LIN
E
TH
EN
S
IL
T F
EN
CE
T
O
TO
P O
F S
LO
PE
(T
YP
.).
IN
ST
AL
L U
PS
TR
EA
M
CO
FF
ER
DA
M T
/W
EIR
IN
ST
AL
L D
OW
NS
TR
EA
M
CO
FF
ER
DA
M T
/W
EIR
NE
W U
PS
TR
EA
M S
AF
ET
Y
BA
RR
IE
R D
EM
O. E
XIS
T.
BA
RR
IE
R A
ND
P
IL
IN
GS
.
NE
W D
OW
NS
TR
EA
M S
AF
ET
Y
BA
RR
IE
R D
EM
O. E
XIS
T.
BA
RR
IE
R A
ND
P
IL
IN
GS
.
MO
DIF
Y A
ND
P
AIN
T G
AT
ES
PA
IN
T U
PS
TR
EA
M
WIN
GW
AL
L
RE
PA
IR
CO
NC
RE
TE
SU
RF
AC
ES
RE
MO
VE
S
ED
IM
EN
T A
ND
D
EB
RIS
F
RO
M
TH
E W
OR
K A
RE
A A
ND
D
IS
PO
SE
O
FF
SIT
E
IN
A
CC
OR
DA
NC
E W
IT
H A
LL
L
OC
AL
,
ST
AT
E, A
ND
F
ED
ER
AL
R
EG
UL
AT
IO
NS
.
TO
B
E
DE
TE
RM
IN
ED
TO
B
E
DE
TE
RM
IN
ED
SL
OP
E
1 O
N 3
1 O
N 3
1 O
N 3
1 ON 3
1
O
N
3
1
O
N
3
1 ON 31 ON 3
1 ON 3
2200 S
Q. F
T. S
UR
FA
CE
W
AT
ER
IM
PA
CT
F
OR
U
PS
TR
EA
M A
ND
DO
WN
ST
RE
AM
C
OF
FE
R D
AM
S
I:\E
NG
DA
TA
\D
ES
IG
N\U
OR
B\M
OS
SB
LU
F\D
AM
R
EH
AB
IL
IT
AT
IO
N 2
01
6\D
am
R
eh
ab
P
erm
it.d
wg
DATE:
P.E. NUMBER:
SITE PLAN
SCALE: 1" = 30'
2 OF 6
WILLIAM R. COTE
53746
NOVEMBER 29, 2016
SAJ-2003-11245(NW-RGH)*01/13/2017
-
16'-0"
AP
PR
OA
CH
A
PR
ON
FLO
W
OPERATING PLATFORM EL. 83.0
CONTRACTION JOINT
60-0"
SERVICE BRIDGE
8'-0"
DIS
CH
AR
GE
AP
RO
N
EL. 30.0
25'-0" RIPRAP
25'-0" RIPRAP
WITH CONC. FILL
5 S
EC
TIO
N
GU
AR
DR
AIL
GU
AR
DR
AIL
PO
ST
3
3
'
-
0
"
6 S
EC
TIO
NS
GU
AR
DR
AIL
EL. 63.0
EL. 63.0
2
4
"
R
I
P
R
A
P
EL. 52.0
EL. 52.6
C A
NC
HO
R
WA
LL
L
PA
IN
T D
OW
NS
TR
EA
M
WIN
GW
AL
L
1
O
N
3
1 ON 3
EL. 32.0
SLO
PE
CONTRACTION JOINT
18" R
IP
RA
P O
N
9" B
ED
DIN
G
18" R
IP
RA
P O
N
9" B
ED
DIN
G
33'-0"
18" R
IP
RA
P O
N
9" B
ED
DIN
G
C S
PILLW
AY
L
C A
NC
HO
R W
ALL
L
1 O
N 3
PA
IN
T U
PS
TR
EA
M
WIN
GW
AL
L
18" R
IP
RA
P
1
4
UPSTREAM
FACE OF WEIR
15'-0"
C C
UT
O
FF
WA
LL
L
UP
ST
RE
AM
FA
CE
O
F
ST
RU
CT
UR
E
18" R
IP
RA
P O
N
9" B
ED
DIN
G
30'-0"
35'-0"
25'-0" RIPRAP
25'-0" RIPRAP
WITH CONC. FILL
5 S
EC
TIO
N
GU
AR
DR
AIL
3
3
'
-
0
"
2
4
"
R
I
P
R
A
P
EL. 52.0
EL. 52.6
C A
NC
HO
R
WA
LL
L
PA
IN
T
DO
WN
ST
RE
AM
WIN
GW
AL
L
1
O
N
3
1 ON 3
18" R
IP
RA
P O
N
9" B
ED
DIN
G
1
O
N
3
1 O
N 3
18" R
IP
RA
P
1
O
N
3
1
4
1 O
N 3
GU
AR
DR
AIL
PO
ST
C C
UT
O
FF
W
ALL
L
35'-0"
43'-3"
EL. 30.0
ST
RA
IN
ER
EL.34.0
RE
PL
AC
E S
UP
PO
RT
PIL
E A
ND
S
TA
FF
G
AG
E
ST
RA
IN
ER
EL. 50.0
RE
PL
AC
E S
UP
PO
RT
PIL
E A
ND
S
TA
FF
G
AG
E
24" B
AN
K
PR
OT
EC
TIO
N
ST
ON
E
18" R
IP
RA
P O
N
9" B
ED
DIN
G
3" S
TILLIN
G W
ELL
FILL LIN
E E
L. 34.0
TO
E
L. 50.0
5 S
EC
TIO
N
GU
AR
DR
AIL
C LA
DD
ER
L
LA
DD
ER
&
BA
SK
ET
G
UA
RD
CO
NT
RO
L
HO
US
E
3 B
AR
RIE
R
PO
ST
S
FLU
SH
IN
G V
ALV
E
BO
X E
L. 33.0
VA
LV
E
BO
X
VA
LV
E
BO
X
3" S
TILLIN
G W
ELL
FILL LIN
E E
L. 34.0
FL
OA
TIN
G T
UR
BID
IT
Y B
AR
RIE
R
TO
S
HO
RE
LIN
E T
HE
N S
IL
T
FE
NC
E T
O T
OP
O
F S
LO
PE
(T
YP
.).
FL
OA
TIN
G T
UR
BID
IT
Y
BA
RR
IE
R T
O S
HO
RE
LIN
E
TH
EN
S
IL
T F
EN
CE
T
O
TO
P O
F S
LO
PE
(T
YP
.).
IN
ST
AL
L U
PS
TR
EA
M
CO
FF
ER
DA
M T
/W
EIR
IN
ST
AL
L D
OW
NS
TR
EA
M
CO
FF
ER
DA
M T
/W
EIR
NE
W U
PS
TR
EA
M S
AF
ET
Y
BA
RR
IE
R D
EM
O. E
XIS
T.
BA
RR
IE
R A
ND
P
IL
IN
GS
.
NE
W D
OW
NS
TR
EA
M S
AF
ET
Y
BA
RR
IE
R D
EM
O. E
XIS
T.
BA
RR
IE
R A
ND
P
IL
IN
GS
.
MO
DIF
Y A
ND
P
AIN
T G
AT
ES
PA
IN
T U
PS
TR
EA
M
WIN
GW
AL
L
RE
PA
IR
CO
NC
RE
TE
SU
RF
AC
ES
RE
MO
VE
S
ED
IM
EN
T A
ND
D
EB
RIS
F
RO
M
TH
E W
OR
K A
RE
A A
ND
D
IS
PO
SE
O
FF
SIT
E
IN
A
CC
OR
DA
NC
E W
IT
H A
LL
L
OC
AL
,
ST
AT
E, A
ND
F
ED
ER
AL
R
EG
UL
AT
IO
NS
.
TO
B
E
DE
TE
RM
IN
ED
TO
B
E
DE
TE
RM
IN
ED
SLO
PE
1 O
N 3
1 O
N 3
1 O
N 3
1 ON 3
1
O
N
3
1
O
N
3
1 ON 3
1 ON 3
1 ON 3
2200 S
Q. F
T. S
UR
FA
CE
W
AT
ER
IM
PA
CT
F
OR
U
PS
TR
EA
M A
ND
DO
WN
ST
RE
AM
C
OF
FE
R D
AM
S
I:\E
NG
DA
TA
\D
ES
IG
N\U
OR
B\M
OS
SB
LU
F\D
AM
R
EH
AB
IL
IT
AT
IO
N 2
01
6\D
am
R
eh
ab P
erm
it.d
wg
DATE:
P.E. NUMBER:
SITE PLAN
SCALE: 1" = 30'
3 OF 6
WILLIAM R. COTE
53746
NOVEMBER 29, 2016
SAJ-2003-11245(NW-RGH)*01/13/2017
-
T/WEIR EL. 59.25' MAX. NORMAL EL. 59.25'
MIN. NORMAL EL. 58.0'
B/CHANNEL EL. 42.5'
SECTION UPSTREAM COFFERDAM
T/WEIR EL. 39.5'
B/CHANNEL EL. 30.0'
SECTION DOWSTREAM COFFERDAM
NORMAL EL. 35.0'
I:\E
NG
DA
TA
\D
ES
IG
N\U
OR
B\M
OS
SB
LU
F\D
AM
R
EH
AB
IL
IT
AT
IO
N 2
01
6\D
am
R
eh
ab
P
erm
it.d
wg
DATE:
P.E. NUMBER:
SECTIONS
NOT TO SCALE
4 OF 6
WILLIAM R. COTE
53746
NOVEMBER 29, 2016
SAJ-2003-11245(NW-RGH)*01/13/2017
-
TEMPORARY SILT FENCE DETAIL
OPTIONAL POST
POSITIONS
FILTER FABRIC
VE
RT
IC
AL
FILTER FABRIC (IN
CONFORMANCE WITH
SEC. 985 FDOT SPEC.)
POST OPTIONS: SOFTWOOD 2
1
2
"DIA.
SOFTWOOD 2" X 4"
HARDWOOD 1
1
2
" X 1
1
2
"
STEEL 1.33 LBS/FT
ELEVATION SECTION
TYPE III SILT FENCE
PRINCIPLE POST
TOWARD FLOW)
SILT FENCE
SILT FENCE PROTECTION IN
DITCHES WITH INTERMITTENT FLOW
SILT FENCE PROTECTION
AROUND DITCH BOTTOM INLETS
SILT FENCE APPLICATIONS
NOTES FOR SILT FENCES
1. TYPE III SILT FENCE TO BE USED AT MOST LOCATIONS. WHERE USED IN DITCHES, THE SPACING FOR TYPE III SILT FENCE
SHALL BE IN ACCORDANCE WITH CHART 1, SHEET 1 (FDOT INDEX NO. 102).
2. TYPE IV SILT FENCE TO BE USED WHERE LARGE SEDIMENT LOADS ARE ANTICIPATED. SUGGESTED USE IS WHERE FILL
SLOPE IS 1:2 OR STEEPER AND LENGTH OF SLOPE EXCEEDS 25 FEET. AVOID USE WHERE THE DETAINED WATER MAY BACK
INTO TRAVEL LANES OR OFF THE RIGHT OF WAY.
3. DO NOT CONSTRUCT SILT FENCES ACROSS PERMANENT FLOWING WATERCOURSES. SILT FENCES ARE TO BE AT UPLAND
LOCATIONS AND TURBIDITY BARRIERS USED AT PERMANENT BODIES OF WATER.
4. WHERE USED AS SLOPE PROTECTION, SILT FENCE IS TO BE CONSTRUCTED ON 0% LONGITUDINAL GRADE TO AVOID
CHANNELIZING RUNOFF ALONG THE LENGTH OF THE FENCE.
5 SILT FENCE TO BE PAID FOR UNDER THE CONTRACT UNIT PRICE FOR STAKED SILT FENCE, (LF).
SILT FENCE
3' O
R M
OR
E
15
" T
O 1
8"
8"
12
" M
IN
.
6' MAX.
STORMWATER RUNOFF
W
A
T
E
R
C
O
U
R
S
E
S
I
L
T
F
L
O
W
SILT FLOW
I:\E
NG
DA
TA
\D
ES
IG
N\U
OR
B\M
OS
SB
LU
F\D
AM
R
EH
AB
IL
IT
AT
IO
N 2
01
6\D
am
R
eh
ab
P
erm
it.d
wg
DATE:
P.E. NUMBER:
EROSION & SEDIMENT CONTROL
NOT TO SCALE
5 OF 6
WILLIAM R. COTE
53746
NOVEMBER 29, 2016
SAJ-2003-11245(NW-RGH)*01/13/2017
-
D2
D1
D2
6'
5' O
R M
OR
E
18"
MIN
.
3'
8"
STAKED TURBIDITY BARRIER
TURBIDITY BARRIER APPLICATIONS
LEGEND
FLOATING TURBIDITY BARRIERS
STRESS
PLATE
SLOTTED PVC CONNECTOR PIPE
(METAL COLLAR REINFORCED)
5
16
" VINYL SHEATHED EAW STEEL CABLE (9800 LBS.
BREAKING STRENGTH WITH GALVANIZED CONNECTORS
(TOOL FREE DISCONNECT)
CLOSED CELL SOLID PLASTIC FOAM
FLOATATION (8" DIA. EQUIV.) (17 LBS.
PER FT. BUOYANCY)
5
16
" GALVANIZED CHAIN
5
8
" POLYPRO
ROPE (600 LB.
BREAKING
STRENGTH)
CLOSED CELL SOLID PLASTIC FOAM
FLOATATION (6" DIA. EQUIV.) (12 LBS.
PER FT. BUOYANCY)
1
4
" GALV.
CHAIN
D1= 5' STD. (SINGLE PANEL FOR DEPTHS 5' OR LESS).
D2= 5' STD. (ADDITIONAL PANEL FOR DEPTHS > 5')
CURTAIN TO REACH BOTTOM UP TO DEPTHS OF 10 FEET TWO (2) PANELS TO BE USED FOR DEPTHS GREATER THAN 10 FEET
UNLESS SPECIAL DEPTH CURTAINS SPECIFICALLY CALLED FOR IN THE PLANS OR AS DETERMINED BY THE ENGINEER.
NOTICE: COMPONENTS OF TYPE I AND II MAY BE SIMILAR OR IDENTICAL TO PROPRIETARY DESIGN. ANY INFRINGEMENT ON THE
PROPRIETARY RIGHTS OF THE DESIGNER SHALL BE THE SOLE RESPONSIBILITY OF THE USER. SUBSTITUTIONS FOR TYPES I AND
II SHALL BE AS APROVED BY THE ENGINEER.
STRUCTURE ALIGNMENT
PROPOSED TOE
OF SLOPE
LIMITS OF CONST.
SHORE LINELIMITS OF CONST.
SHORE LINE
GENERAL NOTES:
1. FLOATING TURBIDITY BARRIERS ARE TO BE PAID FOR UNDER THE
CONTRACT UNIT PRICE FOR FLOATING TURBIDITY BARRIER, LF.
2. STAKED TURBIDITY BARRIERS ARE TO BE PAID FOR UNDER THE
CONTRACT UNIT PRICE FOR STAKED TURBIDITY BARRIER, LF.
NOTES:
1. TURBIDITY BARRIERS ARE TO BE USED IN ALL PERMANENT BODIES OF WATER REGARDLESS OF WATER DEPTH.
2. NUMBER AND SPACING OF ANCHORS DEPENDENT ON CURRENT VELOCITIES.
3. DEPLOYMENT OF BARRIER AROUND PILE LOCATIONS MAY VARY TO ACCOMMODATE CONSTRUCTION
OPERATIONS.
4. NAVIGATION MAY REQUIRE SEGMENTING BARRIER DURING CONSTRUCTION OPERATIONS.
5. TURBIDITY BARRIERS SHALL CONFORM TO SECTION 104 OF THE FLORIDA DEPARTMENT OF TRANSPORTATION
STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION.
POST (OPTIONS 2"x4" OR 2
1
2
" MIN. DIA.
WOOD: STEEL 1.33 LBS.
1
2
FT. MIN.)
18 Oz. NYLON REINFORCED
PVC FABRIC (300 PSI TEST)
NOTES:
TURBIDITY BARRIERS FOR FLOWING STREAMS AND TIDAL
CREEKS MAY BE EITHER LOATING, OR STAKED TYPES OR ANY
COMBINATIONS OF TYPES THAT WILL SUIT SITE CONDITIONS
AND MEET EROSION CONTROL AND WATER QUALITY
REQUIREMENTS. THE BARRIER TYPE(S) WILL BE AT THE
CONTRACTORS OPTIONS UNLESS OTHERWISE SPECIFIED IN
THE PLANS, HOWEVER PAYMENT WILL BE UNDER THE PAY
ITEM(S) ESTABLISHED IN THE PLANS FOR FLOATING TURBIDITY
BARRIERS TO BE INSTALLED IN VERTICAL POSITION UNLESS
OTHERWISE DIRECTED BY THE DISTRICT.
18 Oz. NYLON
REINFORCED
PVC FABRIC
(300 PSI TEST)
18 Oz. NYLON
REINFORCED
PVC FABRIC
(300 PSI TEST)
TYPE II TYPE I
S
T
R
E
A
M
O
R
T
I
D
A
L
C
R
E
E
K
TURBIDITY
BARRIERS
CURRENT
EXISTING
CAUSEWAY
1
0
0
'
(
T
Y
P
.
)
100'
(T
YP
.)
1
0
0
'
1
0
0
'
PILE LOCATIONS
DREDGE OR FILL AREA
MOORING BUOY W/ANCHOR
ANCHOR
BARRIER MOVEMENT DUE
TO CURRENT ACTION
I:\E
NG
DA
TA
\D
ES
IG
N\U
OR
B\M
OS
SB
LU
F\D
AM
R
EH
AB
IL
IT
AT
IO
N 2
01
6\D
am
R
eh
ab
P
erm
it.d
wg
DATE:
P.E. NUMBER:
EROSION & SEDIMENT CONTROL
NOT TO SCALE
6 OF 6
WILLIAM R. COTE
53746
NOVEMBER 29, 2016
SAJ-2003-11245(NW-RGH)*01/13/2017
28902 Add 4 - Exhibit 9 USACE Nationwide Permit Number 33.pdfSAJ-2003-11245-RGH_NW33_Verification_LetterPages from 20161201 Application