data uji tanah
DESCRIPTION
Data Uji TanahTRANSCRIPT
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project Check by
Location Date
Specific of gravity (Gs)
No. Sample 1
Location
No. 11 12
Wt of picnometer 24.47 26.70
Wt of picnometer + dry soil 33.03 36.64
Wt of picnometer + soil + water 79.92 82.37
Wt of picnometer + water 74.71 76.29
Wt of dry soil 8.56 9.94
Spasific of gravity 2.555 2.575
Average 2.565
Temperature 26 26
Corection 0.9983 0.9983
Average of Gs 2.450
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project Check by
Bor location Date
Atterberg LimitsNo. Sample : 1
Location : 0
Testing Liquid Limit (LL) Plastic Limit (PL)
No. 1 2 3 4 1
Wt of can 15.82 15.78 15.67 15.33 15.65
Wt of wet soil + can 36.84 33.34 33.13 31.81 25.57
Wt of dry soil + can 31.40 29.03 28.91 27.99 23.84
Wt of moisting 5.44 4.31 4.22 3.82 1.73
Wt. of dry soil 15.58 13.25 13.24 12.66 8.19
Water content 34.92 32.53 31.87 30.17 21.12
Average 21.47
Number of blow 10 20 29 39
Limit value LL = 32.00 PL =
1 0
Plastic Limit (PL = 21.47 %
Liquid Limit (LL) = 32.00 %
10 10026
28
30
32
34
36
Flow Curve
Number of Blow
Wa
ter
co
nte
nt
[%]
Plastic lndex (PI = 14.50 %
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Atterberg Limits
1
0
Plastic Limit (PL)
2
15.68
25.62
23.84
1.78
8.16
21.81
21.47
21.47
10 10026
28
30
32
34
36
Flow Curve
Number of Blow
Wa
ter
co
nte
nt
[%]
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORYJl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project Check byLocation Date
Grain Size Analysis
No. Sample : Sieve 100.07 gram
Sieve No. Diametre [mm] Wt. retained [gram] % Retained % passing
4 4.750 0.05 0.05 99.9510 2.000 0.08 0.08 99.8720 0.840 2.59 2.59 97.2840 0.425 16.28 16.27 81.0160 0.250 12.28 12.27 68.74
100 0.150 19.14 19.13 49.62200 0.074 11.30 11.29 38.32
61.72 61.68 100.00
No. Sample : 0 0 Hydrometre 35.88
Date Time Rh T C Rh + C Zr M D N N'
0 37.0 24.5 0 37.0 6.071 0.0100 0.0000 169.19 64.840.25 36.5 24.5 0 36.5 6.205 0.0100 0.0500 166.90 63.960.5 36.0 24.5 0 36.0 6.339 0.0100 0.0358 164.62 63.091 35.0 24.5 0 35.0 6.608 0.0100 0.0258 160.05 61.332 33.5 24.5 0 33.5 7.011 0.0100 0.0188 153.19 58.715 32.0 24.5 2.5 34.5 6.742 0.0100 0.0117 157.76 60.46
10 30.0 24.5 0.5 30.5 7.817 0.0100 0.0089 139.47 53.4520 27.0 24.5 0.3 27.3 8.676 0.0100 0.0066 124.84 47.8440 23.5 24.5 0.7 24.2 9.509 0.0100 0.0049 110.66 42.4160 22.0 24.5 0 22.0 10.100 0.0100 0.0041 100.60 38.55
180 20.0 24.5 0 20.0 10.637 0.0100 0.0024 91.45 35.051140 0.0 24.5 0 0.0 16.009 0.0100 0.0012 0.00 0.00
Wtotal :
Wd =
0.0001 0.001 0.01 0.1 1 10
0
10
20
30
40
50
60
70
80
90
100
Diametre [mm]
% F
iner
Gra
velSand
SiltCMF
Clay
0.0001 0.001 0.01 0.1 1 10
0
10
20
30
40
50
60
70
80
90
100
Diametre [mm]
% F
iner
0.0001 0.001 0.01 0.1 1 10
0
10
20
30
40
50
60
70
80
90
100
Diametre [mm]
% F
iner
0.0001 0.001 0.01 0.1 1 10
0
10
20
30
40
50
60
70
80
90
100
Diametre [mm]
% F
iner
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORYJl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project Hammer weight : 2.5 kg Check by
Location Number of Layer : 3 lapis Date
Type Blows perlayer : 25x
COMPACTION
Water content calculation
Location Standard Test
Add. of water 6% 9% 12% 15% 18%
No. 1 2 1 2 1 2 1 2 1 2
Weight of can 16.64 15.70 15.69 15.64 15.72 15.20 15.90 15.71 15.69 15.68
Weight of wet soil + can 57.43 58.50 54.77 45.38 50.62 53.02 56.51 50.30 44.13 51.21
Weight of dry soil + can 41.98 42.33 41.47 36.38 36.46 37.66 39.82 36.05 37.24 32.92
Weight of moisting 15.45 16.17 13.30 9.00 14.16 15.36 16.69 14.25 6.89 18.29
Weight of dry soil 25.34 26.63 25.78 20.74 20.74 22.46 23.92 20.34 21.55 17.24
Water content 60.97 60.72 51.59 43.39 68.27 68.39 69.77 70.06 31.97 106.09
Average 60.85 47.49 68.33 69.92 69.03
Density calculation Gs = 2.59
Sample No. 1 2 3 4 5
Add. of water 6% 9% 12% 15% 18%
Water content, w (%) 60.85 47.49 68.33 69.92 69.03
Weight of soil + Muolder (g 4747.8 4807 5737.2 5867.2 5797.5
Weight of Muolder (gr) 3651.7 3651.7 4475.3 4555.5 4475.3
Diametre of Moulder (cm) 10.050 10.050 10.050 10.050 10.050
Height of Moulder (cm) 11.600 11.600 11.600 11.600 11.600
920.20 920.20 920.20 920.20 920.20
Weight of soil (gr) 1096.1 1155.3 1261.9 1311.7 1322.2
1.191 1.255 1.371 1.425 1.437
0.741 0.851 0.815 0.839 0.850
1.005 1.161 0.935 0.921 0.929
60.85 0.741 1.005
47.49 0.851 1.161
68.33 0.815 0.935
69.92 0.839 0.921
69.03 0.850 0.929
MDD = 1.49
OMC = 13 %
Volume of soil (cm3)
Density (g) (gr/cm3)
Dry density (gd) gr/cm3
gzav
gr/cm3
5 7 9 11 13 15 17
1.15
1.20
1.25
1.30
1.35
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
Compaction curve
Column NPolynomial (Column N)Column OPolynomial (Column O)
Water content [%]
Dry
Den
sity
[g
r/cm
3]
5 7 9 11 13 15 17
1.15
1.20
1.25
1.30
1.35
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
Compaction curve
Column NPolynomial (Column N)Column OPolynomial (Column O)
Water content [%]
Dry
Den
sity
[g
r/cm
3]
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORYJl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project Hammer weight OMC :
Location Number of Layer Check by
Type Blows perlayer Date
CBR Unsoaked
Blows perlayer 1 2 3
t Penetration Ring Load Ring Load Ring Load
menit inch div kg div kg div kg
0.00 0.000 0 0.0 0 0.0 0 0.0
0.25 0.013 4 20.7 3 15.5 2.5 ### 12.9
0.50 0.025 5 25.9 5 25.9 2.5 ### 12.9
1.00 0.050 8 41.4 7.5 38.8 2.5 ### 12.9
1.50 0.075 9.2 47.6 8 41.4 2.8 ### 14.5
2.00 0.100 10.05 52.0 8.2 42.4 3 ### 15.5
3.00 0.150 13.2 68.2 8.5 43.9 3.5 ### 18.1
4.00 0.200 16 82.7 8.5 43.9
6.00 0.300 16.2 83.8 8.7 45.0
8.00 0.400 16.3 84.3
10.00 0.500 16.3 84.352.0 121.16 200.0 466
0.1 "
63 15 x =1.73 %
112 30 x =1.41 %
287 65 x =0.52 %
0.2 "
91 15 x =1.84 %
166 30 x =0.98 %
287 65 x =0.00 %
CBR Value
0.0 0.1 0.2 0.3 0.4 0.5 0.60
10
20
30
40
50
60
70
80
90
CBR Curve
1
2
3
Penetration [inch]
Lo
ad [
kg]
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORYJl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project Hammer weight OMC : 13.00 %
Location Number of Layer Check by
Type Blows perlayer Date
CBR UnsoakedWater content calculation
Number of Blows 10 x 25 x 56 x
No. 1 2 1 2 1 2
Weight of can 22.02 21.99 21.82 22.39 22.08 22.04
Weight of can + wet soil 41.81 46.79 46.02 42.96 47.29 40.62
Weight of can + dry soil 39.77 44.23 43.53 40.85 44.69 38.72
Weight of water 2.04 2.56 2.49 2.11 2.60 1.90
Weight of dry soil 17.75 22.24 21.71 18.46 22.61 16.68
Water content 11.49 11.51 11.47 11.43 11.50 11.39
Average 11.50 11.45 11.45
Dry Density calculation
Number of Blows 15 30 65
Opt.moisture content / OMC 0.00 0.00 0.00
Water content, w (%) 13.00 13.00 13.00
Weight of soil + muolder(gr) 17345 16657 18783
Weight of moulder (gr) 14350 13415 15710
Diametre of moulder (cm) 15.20 15.40 15.10
Height of moulder (cm) 12.90 12.70 11.50
2341 2365.6 2059.4
Weight of soil (gr) 2995 3242 3073
1.28 1.37 1.49
1.13 1.21 1.32
1.73###1.41###0.00###
Volume of soil (cm3)
Density (g) (gr/cm3)
Dry density (gd) (gr/cm3)
0.0 0.1 0.2 0.3 0.4 0.5 0.60
10
20
30
40
50
60
70
80
90
CBR Curve
1
2
3
Penetration [inch]
Lo
ad [
kg]
5 7 9 11 13 15 17
1.80
1.82
1.84
1.86
1.88
1.90
1.92
1.94
1.96
1.98
2.00
Compaction curve
CompactionPolynomial (Compaction)ZAVPolynomial (ZAV)
Water content [%]
Dry
Den
sity
[gr
/cm
3]
0 5
1.001.051.101.151.201.251.301.351.401.451.50
Density Vs CBR
CBR %
De
g/c
m3
ns
ity
MDD = 1.900 gr/cm3 OMC = 13.0 17.0 %CBRdesign =
5 7 9 11 13 15 17
1.80
1.82
1.84
1.86
1.88
1.90
1.92
1.94
1.96
1.98
2.00
Compaction curve
CompactionPolynomial (Compaction)ZAVPolynomial (ZAV)
Water content [%]D
ry D
ensi
ty [
gr/c
m3]
0 5
1.001.051.101.151.201.251.301.351.401.451.50
Density Vs CBR
CBR %
De
g/c
m3
ns
ity
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORYJl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Dinamic Cone PenetrometerNama Proyek : Dikerjakan:
Lokasi : Tanggal:
STA : 0 + 000
Lp Hrs 5 cmLPA Klass A 15 cmLPB KlassB 20 cmSG Klass C cm
N DP=D/N CBR h Ö(cbr) hÖ(cbr) cbr
( mm ) Lapisan cm %
0 9
1 11 20 8.98 2 2.08 4.16 78.164
2 12.9 9.5 23.51 1.9 2.86 5.44
3 14.9 6.6667 37.16 2 3.34 6.67
4 17.3 6 42.58 2.4 3.49 8.38
5 19.6 4.6 60.04 2.3 3.92 9.01
6 22 4 71.93 2.4 4.16 9.98
7 24.8 4 71.93 2.8 4.16 11.64
8 27.7 3.625 81.70 2.9 4.34 12.58
9 30.9 3.5556 83.77 3.2 4.38 14.00
10 34.2 3.3 92.25 3.3 4.52 14.91
11 37.4 2.9091 108.58 3.2 4.77 15.27
12 41.3 3.25 94.09 3.9 4.55 17.74
13 44.7 2.6154 124.60 3.4 4.99 16.98
14 48.2 2.5 132.09 3.5 5.09 17.82
15 53 3.2 95.99 4.8 4.58 21.98
16 54.9 1.1875 345.86 1.9 7.02 13.34
17 57.8 1.7059 216.52 2.9 6.00 17.41
18 63.4 3.1111 99.55 5.6 4.63 25.95
19 71.2 4.1053 69.56 7.8 4.11 32.08
20 80.3 4.55 60.90 9.1 3.93 35.80
21 91.3 5.2381 50.76 11 3.70 40.73
Jumlah 82.3 90.63 351.89
Nama Proyek : Dikerjakan
Lokasi : Tanggal :
STA : 0 + 200
Lp cm
LPA cm
LPB cm
SG cm
N DP=D/N CBR h Ö(cbr) hÖ(cbr) cbr
( mm ) Lapisan cm %
0 7
1 10.6 36 4.20 3.6 1.61 5.81 147.71
2 11.9 6.5 38.40 1.3 3.37 4.39
3 13.4 5 53.91 1.5 3.78 5.67
4 13.9 1.25 323.66 0.5 6.87 3.43
5 17.6 7.4 32.47 3.7 3.19 11.80
6 20.5 4.8333 56.32 2.9 3.83 11.12
7 23.4 4.1429 68.74 2.9 4.10 11.88
8 26.5 3.875 74.95 3.1 4.22 13.07
9 30.8 4.7778 57.17 4.3 3.85 16.56
10 35.7 4.9 55.33 4.9 3.81 18.67
11 40.8 4.6364 59.43 5.1 3.90 19.90
12 43.5 2.25 151.37 2.7 5.33 14.39
13 45.6 1.6154 232.33 2.1 6.15 12.91
14 47.5 1.3571 291.01 1.9 6.63 12.59
1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.00
10
20
30
40
50
60
70
80
90
100
CBR vs Kedalaman
CBR (%)
Ked
alam
an (
mm
)]
0.0 2.0 4.0 6.0 8.0 10.00
10
20
30
40
50
60
70
80
90
100
CBR vs Kedalaman
CBR (%)
Ked
alam
an (
mm
)]
15 49.4 1.2667 318.17 1.9 6.83 12.97
16 51.6 1.375 286.14 2.2 6.59 14.50
17 53.8 1.2941 309.47 2.2 6.76 14.88
18 55.7 1.0556 402.75 1.9 7.38 14.03
19 57.9 1.1579 357.34 2.2 7.10 15.61
20 59.4 0.75 626.54 1.5 8.56 12.84
21 61.9 1.1905 344.74 2.5 7.01 17.53
22 64.6 1.2273 331.44 2.7 6.92 18.69
23 67 1.0435 408.79 2.4 7.42 17.81
24 70 1.25 323.66 3 6.87 20.60
25 73.9 1.56 243.05 3.9 6.24 24.34
26 78.7 1.8462 195.49 4.8 5.80 27.86
27 84.2 2.037 172.13 5.5 5.56 30.60
28 89.9 2.0357 172.28 5.7 5.56 31.72
29 95.6 1.9655 180.27 5.7 5.65 32.20
Jumlah 88.6 160.89 468.35
Nama Proyek : Dikerjakan
Lokasi : Tanggal :
STA : 0 + 200
Lp cm
LPA cm
LPB cm
SG cm
N DP=D/N CBR h Ö(cbr) hÖ(cbr) cbr
( mm ) Lapisan cm %
0 11
1 12.2 12 17.38 1.2 2.59 3.11 ###
2 14.3 10.5 20.65 2.1 2.74 5.76
3 21.6 24.333 6.97 7.3 1.91 13.94
4 25.3 9.25 24.33 3.7 2.90 10.72
5 28.8 7 34.89 3.5 3.27 11.44
6 34.5 9.5 23.51 5.7 2.86 16.33
7 38 5 53.91 3.5 3.78 13.22
8 41.8 4.75 57.60 3.8 3.86 14.68
9 46.4 5.1111 52.39 4.6 3.74 17.21
10 53 6.6 37.65 6.6 3.35 22.12
11 58.5 5 53.91 5.5 3.78 20.78
12 64.1 4.6667 58.94 5.6 3.89 21.79
13 67.6 2.6923 120.02 3.5 4.93 17.26
14 70.25 1.8929 189.27 2.65 5.74 15.22
15 73.1 1.9 188.35 2.85 5.73 16.34
16 76.2 1.9375 183.65 3.1 5.68 17.62
17 79.4 1.8824 190.64 3.2 5.76 18.42
18 83 2 176.27 3.6 5.61 20.18
19 86.3 1.7368 211.54 3.3 5.96 19.66
20 89 1.35 293.01 2.7 6.64 17.93
21 91.3 1.0952 383.99 2.3 7.27 16.72
Jumlah ### 92.00 330.45
Nama Proyek : Dikerjakan
Lokasi : Tanggal :
STA : 0 + 200
Lp cm
LPA cm
LPB cm
SG cm
N DP=D/N CBR h Ö(cbr) hÖ(cbr) cbr
( mm ) Lapisan cm %
0 11
1 14 30 5.31 3 1.75 5.24 85.184
2 16 10 22.00 2 2.80 5.60
3 18 6.6667 37.16 2 3.34 6.67
0.0 2.0 4.0 6.0 8.0 10.00
10
20
30
40
50
60
70
80
90
100
CBR vs Kedalaman
CBR (%)
Ked
alam
an (
mm
)]
0.0 2.0 4.0 6.0 8.0 10.00
10
20
30
40
50
60
70
80
90
100
CBR vs Kedalaman
CBR (%)
Ked
alam
an (
mm
)]
0.0 2.0 4.0 6.0 8.0 10.00
10
20
30
40
50
60
70
80
90
100
CBR vs Kedalaman
CBR (%)
Ked
alam
an (
mm
)]
4 21 7.5 31.91 3 3.17 9.52
5 25.4 8.8 25.95 4.4 2.96 13.03
6 30.9 9.1667 24.62 5.5 2.91 16.00
7 35.5 6.5714 37.86 4.6 3.36 15.45
8 40 5.625 46.29 4.5 3.59 16.16
9 44.4 4.8889 55.49 4.4 3.81 16.78
10 48.6 4.2 67.54 4.2 4.07 17.10
11 51.5 2.6364 123.32 2.9 4.98 14.43
12 54.2 2.25 151.37 2.7 5.33 14.39
13 57 2.1538 160.16 2.8 5.43 15.21
14 60.5 2.5 132.09 3.5 5.09 17.82
15 64 2.3333 144.41 3.5 5.25 18.36
16 68.5 2.8125 113.43 4.5 4.84 21.78
17 72.8 2.5294 130.11 4.3 5.07 21.79
18 76.6 2.1111 164.36 3.8 5.48 20.82
19 80.6 2.1053 164.95 4 5.48 21.94
20 84.2 1.8 201.99 3.6 5.87 21.12
21 87.3 1.4762 261.04 3.1 6.39 19.81
22 90.2 1.3182 302.18 2.9 6.71 19.46
Jumlah 79.2 90.97 348.48
Nama Proyek : Dikerjakan
Lokasi : Tanggal :
STA : 0 + 200
Lp cm
LPA cm
LPB cm
SG cm
N DP=D/N CBR h Ö(cbr) hÖ(cbr) cbr
( mm ) Lapisan cm %
0 12.8
1 14.2 14 14.24 1.4 2.42 3.39 125.28
2 16.2 10 22.00 2 2.80 5.60
3 18.2 6.6667 37.16 2 3.34 6.67
4 20 4.5 61.77 1.8 3.95 7.12
5 22.4 4.8 56.83 2.4 3.84 9.23
6 24.8 4 71.93 2.4 4.16 9.98
7 26.9 3 104.35 2.1 4.71 9.89
8 29.5 3.25 94.09 2.6 4.55 11.83
9 31.9 2.6667 121.51 2.4 4.95 11.89
10 34.6 2.7 119.58 2.7 4.93 13.30
11 38 3.0909 100.40 3.4 4.65 15.80
12 42 3.3333 91.06 4 4.50 18.00
13 46.3 3.3077 91.97 4.3 4.51 19.41
14 49.8 2.5 132.09 3.5 5.09 17.82
15 53.8 2.6667 121.51 4 4.95 19.81
16 57.8 2.5 132.09 4 5.09 20.37
17 61.3 2.0588 169.78 3.5 5.54 19.38
18 64.4 1.7222 213.86 3.1 5.98 18.54
19 67.4 1.5789 239.28 3 6.21 18.62
20 70 1.3 307.66 2.6 6.75 17.55
21 73.8 1.8095 200.62 3.8 5.85 22.25
22 78.9 2.3182 145.63 5.1 5.26 26.83
23 82.6 1.6087 233.58 3.7 6.16 22.79
24 87.6 2.0833 167.20 5 5.51 27.55
25 93.8 2.48 133.47 6.2 5.11 31.68
Jumlah 81 98.78 405.30
0.0 2.0 4.0 6.0 8.0 10.00
10
20
30
40
50
60
70
80
90
100
CBR vs Kedalaman
CBR (%)
Ked
alam
an (
mm
)]
0.0 2.0 4.0 6.0 8.0 10.00
10
20
30
40
50
60
70
80
90
100
CBR vs Kedalaman
CBR (%)
Ked
alam
an (
mm
)]
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project Chek by
Location Date
CBR Test by DCP
N0 STA CBR Ave CBR STDCBR Desg =
RemaksCBR ave - 1.2 STD
1 0 + 0 78.16 11.90 19.918 Segmen - 12 + 100 6.543 + 200 6.674 + 300 7.125 + 400 6.136 + 500 5.197 + 600 5.938 + 700 5.679 + 800 6.71
10 + 900 6.7711 1 + 0 5.9812 + 100 7.1213 + 200 6.7214 + 300 3.45 4.70 0.582 Segmen 215 + 400 3.6516 + 500 4.3217 + 600 4.1218 + 700 5.1419 + 800 5.2320 + 900 4.2221 2 + 0 4.6722 + 100 4.7223 + 200 5.1224 + 300 5.2325 + 400 5.1226 + 500 4.1227 + 600 4.1728 + 700 4.1629 + 800 4.7630 + 900 4.2431 3 + 0 4.7632 + 100 5.2333 + 200 5.1234 + 300 5.4535 + 400 5.2736 + 500 5.6737 + 600 5.1238 3 + 700 4.48
Lembar Pengujian
LABORATORIUM TANAHJURUSAN TEKNIK SIPIL POLITEKNIK NEGERI BANDUNG
RING TUBE TESTNama Proyek : Dikerjakan
Lokasi : Tanggal
STA
No Uraian Satuan 0+ 50 0+ 100 0+ 150
Menentukan Volume Lubang
1 Diameter Ring cm 10 10
2 Tinggi Ring cm 10 10
3 Volume Ring 78.5 78.5
Rata-rata 78.5
Menentukan Berat Isi ,berat isi kering dan Derajat Kepadatan
4 Berat tanah dlm lubang gr 130.0
5 Berat Isi tanah (4)/(3) 1.66
6 Berat Tanah + Can gr 53.25
7 Barat Tang kering + Can gr 49.67
8 Berat Can gr 15.15
9 Barat Tang kering ( 7- 8 ) gr 34.52
10 Berat Air (8- 7 ) gr 3.58
11 Kadar Air (10 :9 )x100% % 10.37
12 Berat Isi kering Lap ( (5) : (1 +(11)) 1.50
13 Berat Isi kering Lab 1.65
14 Derajat Kepadatan ( 12 : 13)x100% % 90.94
STA
No Uraian Satuan 0+ 200 0+ 200 0+ 250
Menentukan Volume Lubang
1 Diameter Ring cm 10 10
2 Tinggi Ring cm 10 10
3 Volume Ring 78.5 78.5
Rata-rata 78.5
Menentukan Berat Isi ,berat isi kering dan Derajat Kepadatan
4 Berat tanah dlm lubang gr 130.0
5 Berat Isi tanah (4)/(3) 1.66
6 Berat Tanah + Can gr 53.25
7 Barat Tang kering + Can gr 49.67
8 Berat Can gr 15.15
9 Barat Tang kering ( 7- 8 ) gr 34.52
10 Berat Air (8- 7 ) gr 3.58
11 Kadar Air (10 :9 )x100% % 10.37
12 Berat Isi kering Lap ( (5) : (1 +(11)) 1.50
13 Berat Isi kering Lab 1.49
14 Derajat Kepadatan ( 12 : 13)x100% % 100.70
cm³
cm³
gr/cm³
gr/cm³
gr/cm³
cm³
cm³
gr/cm³
gr/cm³
gr/cm³
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORYJl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
RUBBER BALLOON TESTNama Proyek : Dikerjakan
Lokasi : Tanggal
STA
No Uraian Satuan 0+ 000 0+ 050 0+ 100
Menentukan Volume Lubang
1 Pembacaan Awal gr 1500 1750
2 Pembacaan akhir gr 750 740
3 Volume Lubang 750 1010
880
Menentukan Berat Isi ,berat isi kering dan Derajat Kepadatan
4 Berat tanah dlm lubang gr 1350.00
5 Berat Isi tanah (4)/(3) 1.53
6 Berat Tanah + Can gr 53.25
7 Barat Tang kering + Can gr 49.67
8 Berat Can gr 15.15
9 Barat Tang kering ( 7- 8 ) gr 34.52
10 Berat Air (8- 7 ) gr 3.58
11 Kadar Air (10 :9 )x100% % 10.37
12 Berat Isi kering Lap ( (5) : (1 +(11)) 1.39
13 Berat Isi kering Lab 1.65
14 Derajat Kepadatan ( 12 : 13)x100% % 84.24
STA
No Uraian Satuan 0+ 150 0+ 200 0+ 250
Menentukan Volume Lubang
1 Pembacaan Awal gr 1500 1750
2 Pembacaan akhir gr 750 740
3 Volume Lubang 750 1010
880
Menentukan Berat Isi ,berat isi kering dan Derajat Kepadatan
4 Berat tanah dlm lubang gr 1350.00
5 Berat Isi tanah (4)/(3) 1.53
6 Berat Tanah + Can gr 53.25
7 Barat Tang kering + Can gr 49.67
8 Berat Can gr 15.15
9 Barat Tang kering ( 7- 8 ) gr 34.52
10 Berat Air (8- 7 ) gr 3.58
11 Kadar Air (10 :9 )x100% % 10.37
12 Berat Isi kering Lap ( (5) : (1 +(11)) 1.39
13 Berat Isi kering Lab 1.49
14 Derajat Kepadatan ( 12 : 13)x100% % 93.28
cm³
gr/cm³
gr/cm³
gr/cm³
cm³
gr/cm³
gr/cm³
gr/cm³
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORYJl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
SAND CONE TESTNama Proyek : Dikerjakan
Lokasi : Tanggal
STA
No Uraian Satuan 0+ 000 0+ 050 0+ 100
Menentukan Berat Pasir dalam Corong
dan Berat isi pasir
1 Berat Botol + Pasir + Corong gr 10010 10100
2 Berat Pasir sisa dalam Botol + corong gr 8278 8355
3 Berat Pasir dalam (Silinder kalbrasi + corong) (1-2) gr 4970 5040
4 Berat Pasir dalam Silinder kal+ Silinder kal gr 1576 1570
5 Berat Silinder Kalibrasi gr 1269 1269
6 Berat Pasir dalam Silinder ( 4 - 5) gr 307 301
7 Brt Pasir dlm corong (3)-(6) gr 4663 4739
8 Voleme Silinder Kalibrasi 1170.24 1170.24
9 Berat isi Pasir 0.26 0.26
10 Berat isi Pasir rata 0.26
Menentukan Volume Lubang
dan Berat Tanah Dlm Lubang
11 Berat Tanah Dalam Lubang gr 2650
12 Berat Botol + Pasir gr 4500
13 Berat Pasir sisa dalam Botol gr 1400
14 Berat Pasir dlm Lubang dan Corong (12 - 13 ) gr 3100
15 Berat Pasir dalam Lubang (14 - 7) gr -1563
16 Volume Lubang ( 15: 10 ) -6016.73
Menentukan Berat Isi ,berat isi kering
dan Derajat Kepadatan
17 Berat Isi tanah (11 : 17} -0.44
18 Berat Tanah + Can gr 53.25
19 Barat Tang kering + Can gr 49.67
20 Berat Can gr 15.15
21 Barat Tang kering ( 19 - 20 ) gr 34.52
22 Berat Air (18 - 19 ) gr 3.58
23 Kadar Air (22 :21 ) % 10.37
24 Berat Isi kering Lap ( (17) : (1 +(23)) -0.40
25 Berat Isi kering Lab 1.49
26 Derajat Kepadatan ( 24 : 25)x100% % -26.78
cm³
gr/cm³
gr/cm³
cm³
gr/cm³
gr/cm³
gr/cm³
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project Check byCheck by
Location Date Date
Laboratory Test Resume No. Sample 1
Depth 0
Indek Properties symbol unit
1 Specific of gravity Gs - 2.450
2 Liquid limit LL % 32.00
Plastic Limit PL % 21.47
Plasticity index PI % 10.53
3 Grainsize Gravel G % 0.05
Sand S % 61.63
Silt M % 3.27
Clay C % 35.05
Engineering properties STD MODIF
4 Compaction 1.490
% 13.00
5 CBR Unsoaked 0.1" 10 x % 1.73
25 x % 1.41
56 x % 0.52
0.2" 10 x % 1.84
25 x % 0.98
56 x % 0.00
% 17.00
6 Sand Cone -0.40
% 10.37
Degree of Density DR % -26.78
7 Rubber Balloon 1.39
% 10.37
Degree of Density DR % 93.28
8 Ring Tube 1.50
% 10.37
gd g\cm3
wopt
CBRdsgn
gd g\cm3
wopt
gd g\cm3
wopt
gd g\cm3
wopt
Degree of Density DR % 100.70
Compatibility Report for data kelompok Pak Djuwadi.xlsRun on 1/14/2012 6:21
Minor loss of fidelity # of occurrences
40
The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format.
Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned.
'AL '!B7:B8'Gradasi '!K23:K34
'Gradasi '!M23:M34
'CBR '!C92:D96'CBR '!G96'CBR '!G98
'Resume '!G7:G8