data sheet & sld
DESCRIPTION
For PanelTRANSCRIPT
DATA SHEET
FOR
POWER AND MOTOR CONTROL CENTRE
Mangala Field Development Project
Enchance Oil Recovery Pilot (EORP)Project
B 12.02.2010 NAK BPR ADS -
A 08.02.2010 NAK BPR ADS -
REV DATE BY CHK'D APPR CLIENT
TOTAL OR PARTIAL REPRODUCTION AND / OR UTILISATION OF THIS DOCUMENTATION ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER
DESCRIPTION
Issued for Review / Comments
Issued for DIC/IDR
Document No:
EORP-EL-J-001
DOC. NO: EORP-EL-J-001 2 of 4
SERVICE: Power & Motor Control Centre TAG NO : EORP-PMCC NO OF UNITS: 1
1. GENERAL DATA
Installation : Onshore
Ref. Specification No. : EORP-EL-S-001 Altitude : Less than 1000 m m
Codes and Standard : Location Indoor
IS IEC Outdoor
Ambient temp. : Max/Min : Outdoor
Design ambient temp. : Seismic Zone : Zone - III
Relative Humidity :
Atmosphere : Desert area, Humid and Corrosive
2. RATING 4.ACCESSORIES
Supply Voltage & Variation : 415V (+/-) 10% Panel Space Heater Name Plate as per specification
Frequency & Variation : 50HZ (+/-) 5% Grounding Stud Lifting Lugs
Number of Phases : 3Ph + Netrual FloorFrame Internal Receptacle
System Earthing : Reistance Earthed, 750mA Limit Internal Lighting Breaker Trolley
Bus Bar Rating : 1200A Anchor Bolts Colour mark for Buses
Supply system fault level (MVA/KA): 50 kA for 1 sec Fuse Pullers Closing Rectifier
Control Voltage : 240V, AC
Heater Circuit : 240V, AC 5.ADDITIONAL TEST
3. TYPE According to Specification EORP-EL-001
Applied Standard
Enclosure Metal Enclosed 1
DATA SHEET
FOR POWER AND MOTOR CONTROL CENTRE
PAGE NO:
23 TO 74 %
50 / -2 deg. C.
42/10.6 deg C
Metal Clad 2
3
Degree of Protection IP 42
6.OTHER
Circuit Breaker MCCB (Outgoing)
Air Circuit Breaker (Incomers) Painting Colour Manufacture's Standard
Unit Mounting Single Front As per Spec. (SUPP-ST-S-001)
Double Front Painting Method Manufacture's Standard
LV Switchboard (Incoming, Outgoing) Draw Out Type (Incomers) As per Spec. (SUPP-ST-S-001)
Fixed Type (Outgoing)
Form of Construction Form 4
Configuration / Feeder Arrangement
Feeder List
(EORP-EL-K-001) 1. All status signals from PMCC to Instrument PLC will be through potential
Key Single Line Diagram free contacts.
(EORP-EL-D-001) 2. ON / OFF commands from instrument PLC to individual motor starters shall
be through potential free contacts.
Protective Relay 3. ESD Trip commands from Instrument PLC to air circuit breakers shall be
Microprocessor based through 24 VDC powered signal.
Incoming feeder connection point Top
Bottom
Cable
Bus Duct
Main Busbar Location
Bottom
Bottom
Cable
7. NOTES
Electromechanical /
Top
Outgoing feeder connection point
12.02.2010 ADS08.02.2010 ADS
Rev Date ApprovedPrepared Description Checked
AB
NAK Issued for DIC/IDR BPRNAK Issued for Review / Comments BPR
DOC. NO: EORP-EL-J-001 3 of 4
SERVICE: Power & Motor Control Centre TAG NO : EORP-PMCC NO OF UNITS: 1
1 Equipment Tag No. : 18.7 Mechanical life :
2 Make : 19 CONTACTOR
3 Type / Designation : 19.1 Rated Current
4 Overall dimensions of PMCC - AC-3 Duty : A
- Width : mm - AC-4 Duty : A
- Depth : mm 19.2 Making Capacity :
- Height : mm 19.3 Breaking Capacity :
5 Total Weight of PMCC : Kg 19.4 Coil consumption - Pick up : VA at pf
6 Weight and Dimensions of largest 19.5 Coil consumption - Hold on : VA at pf
shipping section 19.6 No. of auxiliary contacts : NO + NC
- Weight : Kg 20 THERMAL OVERLOAD RELAY
- Width : mm 20.1 Setting range :
- Depth : mm 20.2 Single phasing preventor :
- Height : mm 20.3 Temperature compensation :
7 Recommended clearances for PMCC feature
- Front : mm 21 Heat Load of PMCC : Watts
- Rear : mm 22 AIR CIRCUIT BREAKERS
- Top : mm 22.1 Rated current : A
- Sides : mm 22.2 Rated SC making capacity - Icm : kA
8 Clearance in air 22.3 Rated service SC breaking : kA
8.1 Phase to Phase : mm capacity - Ics
8.2 Phase to Earth : mm 22.4 Type of built-in control unit :
9 Main Horizontal Busbars 22.5 Auxiliary contacts :
DATA SHEET
FOR POWER AND MOTOR CONTROL CENTRE
PAGE NO:
DATA TO BE FILLED BY VENDOR
9.1 Main busbar current rating : A 22.6 Closing & Trip Coil
9.2 Main busbar size : sqmm - Voltage :
9.3 Main bas bar material : Cu - Power Consumption :
9.4 : 23 Protective relays provided as : Yes / No
10 Vertical Busbars per SLD
10.1 Busbar current rating : 24 Indications / Alarms provided as : Yes / No
10.2 Busbar size : sqmm per SLD
10.3 : 25 Interlocks and synchronizing : Yes / No
11 Insulating material of busbars : facility privided as per SLD
12 Earth Busbars 26 Total Power Consumption for :
12.1 Earth bus size : mm space heaters in PMCC
12.2 Earth bus material : Cu 27 Mechanical life :
13 1 min. power frequency voltage : kV 28 Cable Glands with check nuts
14 1.2/50 μs Impulse withstand voltage : kV 28.1 Material / Type :
15 1 sec. short circuit withstand : kA 28.2 Provided for all I/C & O/G :
capacity power & control cables
16 Peak dynamic withstand : kA 29 Cable Lugs
capacity 29.1 Material / Type :
17 Safety shutter provided for test : Yes / No 29.2 Provided for all I/C & O/G :
and drawout positions power & control cables
18 MCCB
18.1 Rated current : A
18.2 Rated SC making capacity - Icm : kA
18.3 Rated service SC breaking :
capacity - Ics
18.4 Thermal release setting range :
18.5 Short circuit release :
setting range Note:
18.6 Accessories Typical control schematic drawings for each type of feeder (motor feeder
- Auxiliary contacts : as well as power feeder) shall be prepared by vendor and submitted for
- Shunt release : Purchaser’s review and approval.
- Undervoltage release :
- Trip alarm contacts :
- Rotary operating mechanism :
Busbar material
Top
A
kA
Main bus bar location
Cu
12.02.2010 ADS08.02.2010 ADS
Rev Date Approved
BPR
Prepared CheckedChecked
NAKIssued for DIC/IDR
Description
A NAK BPRBPRB Issued for Review / Comments
DOC. NO: EORP-EL-J-001 4 of 4
SERVICE: Power & Motor Control Centre TAG NO :EORP-PMCC NO OF UNITS: 1
S.No
1 Electromechanical Relays Alstom / ABB / Siemens / Easun Reyrolle
2 Auxiliary relays Alstom / ABB / Siemens / Easun Reyrolle
3 Breaker control switch Alstom / RECOM
4 Power switches Alstom / L&T / Siemens / Stromberg / Control & switchgear
5 Control switches Alstom / L&T / Siemens / Kaycee
6 DC Switches Kaycee or equivalent
7 CTs / PTs AEP / Precise Electrical / Prayog / Silkans / Pragati
8 Meters AEP / Simco / IMP / MECO
9 PB & indicating lights Siemens / L&T / Tecknic / BCH
10 Air circuit breakers L&T / Siemens / Alstom / Control & switchgear
11 Contactors L&T / Siemens / BCH / Telemechanique
12 Bimetallic relay L&T / Siemens / BCH / Telemechanique
13 Heavy duty switches / fuse switches / motor duty switches Siemens / L&T / Alstom
14 MCB MDS / HAVELL / Indo-Asian
15 Timer for re-acceleration BCH / Concord
16 Power fuse & base Siemens / L&T / Alstom
17 Control fuse & base Siemens / L&T / Alstom
18 MCCB Siemens / L&T / Alstom
19 Terminals ELMEX / TOSHA / Connectwell
20 Control transformer INDCOIL / AEP / Kappa / Precise Electrical
21 Battary (Ni-Cd) AMCO / HBL-NIFE
22 Battery charger HBL-NIFE / Chhabi / Universal Industrial Products
VendorItem
MAKE OF EQUIPMENT / COMPONENTS
DATA SHEET
FOR POWER AND MOTOR CONTROL CENTRE
PAGE NO:
23 Cable glands Comet / Baliga / Flexpro
24 Cable lugs Dowell or equivalent
12.02.2010 ADS08.02.2010 ADS
Rev Date ApprovedPrepared Description Checked
B NAK Issued for Review / Comments BPRA NAK Issued for DIC/IDR BPR
DATA SHEET
FOR
DISTRIBUTION BOARDS
Mangala Field Development Project
Enchance Oil Recovery Pilot (EORP)Project
B 12.02.2010 NAK BPR ADS -
A 08.02.2010 NAK BPR ADS -
REV DATE BY CHK'D APPR CLIENT
TOTAL OR PARTIAL REPRODUCTION AND / OR UTILISATION OF THIS DOCUMENTATION ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER
DESCRIPTION
Issued for Review / Comments
Issued For DIC/IDR
Document No:
EORP-EL-J-002
DOC. NO: EORP-EL-J-002 2 of 3
SERVICE: Power DB TAG NO : EORP-PDB NO OF UNITS: 1
Heat Tracing DB EORP-HTDB 1
Lighting DB EORP-LDB 1
1. GENERAL DATA
Installation : Onshore
Ref. Specification No. : EORP-EL-S-002 Altitude : Less than 1000 m m
Codes and Standard : Location Indoor
IS IEC Outdoor
Ambient temp. : Max/Min : Outdoor
Design ambient temp. : Seismic Zone : Zone - III
Relative Humidity :
Atmosphere : Desert area, Humid and Corrosive
2. RATING 4.ACCESSORIES
Supply Voltage & Variation : 415V (+/-) 10% Panel Space Heater Name Plate as per specification
Frequency & Variation : 50HZ (+/-) 5% Grounding Stud Lifting Lugs
Number of Phases : 3Ph + Netrual Wall mouting Internal Receptacle
System Earthing : Reistance Earthed, 750mA Limit Internal Lighting Breaker Trolley
Bus Bar Rating : As per SLD Anchor Bolts Colour mark for Buses
Supply system fault level (MVA/KA): 10 kA for 1 sec Fuse Pullers Closing Rectifier
Control Voltage : 240V, AC
Space Heater Circuit : 240V, AC 5. TESTS
3. TYPE According to Specification EORP-EL-S-002
DATA SHEET
FOR DISTRIBUTION BOARDS
PAGE NO:
23 TO 74 %
50 / -2 deg. C.
42/10.6 deg C
Applied Standard
Enclosure Metal Enclosed 1
Metal Clad 2
3
Degree of Protection IP 42
6.OTHER
Circuit Breaker ELCB / MCB (Outgoing)
MCCB/ MCB (Incomers) Painting Colour Manufacture's Standard
Unit Mounting Single Front As per Spec. (SUPP-ST-S-001)
Double Front Painting Method Manufacture's Standard
LV Switchboard (I/C, O/G) Draw Out Type As per Spec. (SUPP-ST-S-001)
Fixed Type
Form of Construction Form 2b
Configuration / Feeder Arrangement
Single Line Diagram
(EORP-EL-D-002,003 & 004)
Protective Relay
Incoming feeder connection point Top
Bottom
Cable
Bus Duct
Main Busbar Location
Bottom
Top
Outgoing feeder connection point
Cable
Bottom
12.02.2010 ADS08.02.2010 ADS
Rev Date ApprovedPrepared Description Checked
AB
NAK Issued For DIC/IDR BPRNAK Issued for Review / Comments BPR
DOC. NO: EORP-EL-J-002 3 of 3
SERVICE: Power DB TAG NO : EORP-PDB NO OF UNITS: 1
Heat Tracing DB EORP-HTDB 1
Lighting DB EORP-LDB 1
1 Make : 14 MCCB
2 Type / Designation : 14.1 Rated current : A
3 Overall dimensions 14.2 Rated SC making capacity - Icm : kA
3.1 PDB : mm 14.3 Rated service SC breaking : kA
3.2 HTDB : mm capacity - Ics
3.3 LDB : mm 14.4 Thermal release setting range :
4 Total Weight 14.5 Short circuit release :
4.1 PDB : Kg setting range
4.2 HTDB : Kg 14.6 Accessories
4.3 LDB : Kg - Auxiliary contacts :
5 Clearance in air - Shunt release :
5.1 Phase to Phase : mm - Undervoltage release :
5.2 Phase to Earth : mm - Trip alarm contacts :
6 Busbars - Rotary operating mechanism :
6.1 Busbar current rating : A 14.7 Mechanical life :
6.2 Busbar size : sqmm 15 MCB
6.3 Bus bar material : Cu. 15.1 Rated current : A
6.4 Bus bar location : Top 15.2 Rated service SC breaking : kA
7 Insulating material of busbars : capacity - Ics
8 Earth Busbars 16 ELCB
8.1 Earth bus size : 16.1 Rated current : A
DATA TO BE FILLED BY VENDOR
DATA SHEET
FOR DISTRIBUTION BOARDS
PAGE NO:
mm
8.2 Earth bus material : Cu. 16.2 Rated service SC breaking : kA
9 1 min. power frequency voltage : kV capacity - Ics
10 1 sec. short circuit withstand : kA 16.3 Earth Leakagetrip current : mA
capacity
11 Indications provided as per SLD : Yes / No
12 Cable Glands with check nuts
12.1 Material / Type :
12.2 Provided for all I/C & O/G cables : Yes / No
13 Cable Lugs
13.1 Material / Type :
13.2 Provided for all I/C & O/G cables :
1 Meters AEP / Simco / IMP / MECO
2 Indicating lights Siemens / L&T / Tecknic / BCH
3 MCB MDS / HAVELL / Indo-Asian
4 MCCB Siemens / L&T / Alstom
5 Terminals ELMEX / TOSHA / Connectwell
6 Cable glands Comet / Baliga / Flexpro
7 Cable lugs Dowell or equivalent
8 ELCB MDS / HAVELL / Indo-Asian
Yes / No
MAKE OF EQUIPMENT / COMPONENTS
12.02.2010 ADS08.02.2010 ADS
Rev Date Approved
B NAKA NAK Issued For DIC/IDR
Prepared CheckedCheckedDescription
BPRIssued for Review / CommentsBPRBPR
Mangala Field Development Project
Enchance Oil Recovery Pilot (EORP)Project
DATA SHEET
FOR
LV MOTOR
B 09.02.2010 KA BPR ADS -
A 05.02.2010 KA BPR ADS -
REV DATE BY CHK'D APPR CLIENT
TOTAL OR PARTIAL REPRODUCTION AND / OR UTILISATION OF THIS DOCUMENTATION ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER
Issued For DIC/IDR
DESCRIPTION
Issued for Review / Comments
Document No:
EORP-EL-J-003
DOC. NO: EORP-EL-J-003 2 of 2
SERVICE: TAG NO : NO OF UNITS: 2
1. GENERAL DATA
Installation : Onshore
Ref. Specification No. : EORP-EL-S-003 Altitude : Less than 1000 m m
Codes and Standard Location Indoor
IS IEC Outdoor
Ambient temp. : Max/Min :
Design ambient temp. : Seismic Zone : Zone - III
Relative Humidity :
Atmosphere : Desert area, Humid and Corrosive
2. RATING 3.VENDOR DATA
KW rating : * kW @ °C Name of motor Manufacturer : * *
KW rating at design ambient : * kW @ °C Country of Manufacturer : *
Number of Phases : 3Ph Service Centre (at delivery Location): *
Conform to International Std : * Full load current (Amps) : *
Conform to project Standard : * Starting time at full load (sec.) : *
Supply Voltage & Variation : 415V (+/-) 10% Starting current at 100% of voltage (%): *
Frequency & Variation : 50HZ (+/-) 5% : *
Combined Voltage & frequency Variation: (+/-) 10% Starting torque (as % of FLT) : *
System Earthing : Resistance Earthed Locked rotor current at Un(Amps) : *
Supply system fault level (MVA/KA): 50 kA for 1 sec Locked rotor withstand time in sec.-cold/ Hot: *
Motor Ternimal box fault rating : * kA for * s Powe factor at 100% /75% /50% load: *
Motor full load speed : * rpm Efficiency at 100% /75% /50% load: *
23 TO 74 %
Full load Torque ( kgm)
50 / -2 deg. C.
42/10.6 deg C
DATA SHEET
FOR LV MOTOR
PAGE NO:
Variable speed drive operation : yes No Motor Cooling method / Code : TEFC / IC *
Motor speed range for VSD : No.of consecutive starts in one hour: *
Method of motor starting : DOL : *
Duty : Continuous
Direction of rotation (facing drive end (DE)) * *
Mouting type per (IS -2253) : * * * *
Motor Frame Size : * * *
Insulation Class : Class F /B * *
Temperature rise : Limited to Class B * Hours * Hours
Area Classification of installation : Zone 2 □ yes □ No □ yes □ No
Gas Group / Temperature Class : Group IIA / T3 * * EEx Protection type : EEx'd ' or EEx' e'
Atex certificate : *
Enclosure IP Protection (IEC 60034-5): IP55
Position of Power terminal Box : * Driven Equipment description :
Vibration probes : * Type of driven equipment :
RTDs for Winding (6nos.) : Coupling type :
RTD cable size & type : Moment of intertia of the load : * * kg.m2
Space heater Rating : * Absorbed power : * * kW
Space heater cable size & type : * Speed (Synchronous) : * * rpm
: Stainless Steel
Grounding stud : Required 5. NOTES:
Lifting Eyes : Required
: 2. " * * " To be furnished by Driven Equuipment Manufacturer
:
:
Routine Test as per IS : Required
Not Required
* *
1. " * " To be furnished by Motor Manufacturer
3. Motors rated above 30KW shall be provided with anti-condensation heaters.Tropical treatment required
631/632 as per IS:5/ * microns
Yes
Power Cable size
Name Plate
Lubricant type
Final Paint shade / thickness
Bearings:
4.DRIVEN EQUIPMENT DATA
Bearing type
Reacceleration
Not Required
Model no.
Bearing life
* *
* *
Insulated
DE Bearing NDE Bearing
Make
* * % to * * % □ N.A.
09.02.2010 ADS05.02.2010 ADS
Rev Date Approved
Issued For DIC/IDR BPRKA Issued for Review / Comments BPR
Prepared Description Checked
AB
KA
MANGALA FIELD DEVELOPMENT PROJECT
Enhance Oil Recovery Pilot (EORP) Project
ELECTRICAL CABLE SCHEDULE
B 01.03.2010 NAK BPR ADS -
A 12.02.2010 NAK BPR ADS -
REV DATE BY CHK'D APPR CLIENT
TOTAL OR PARTIAL REPRODUCTION AND / OR UTILISATION OF THIS DOCUMENTATION ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER
Issued for Review / Comments
Issued For DIC/IDR
DESCRIPTION
Document No:
EORP-EL-K-002
Cairn Energy India Pty Ltd
Project : MANGALA FIELD DEVELOPMENT PROJECT - ENHANCE OIL RECOVERY PILOT (EORP) PROJECT
Document Title : ELECTRICAL CABLE SCHEDULE - INDEX, GLAND DESCRIPTION, CABLE DESCRIPTION, NOTES
Document No : EORP-EL-K-002
Revision No : B
INDEX GLAND DESCRIPTION
PAGE No.
1 COVER SHEET
2 INDEX , DESCRIPTION, NOTES Flameproof (EEX'd'), double compression cable glands suitable for use in Zone 2, gas group-II A, T3 area,
3 CABLE NUMBERING made of nickel plated brass, with soft sealing nylon washer, locknut, weatherproof, outdoor heat shrinkable hood,
4, 5 CABLE SCHEDULE-POWER & MOTOR CONTROL CENTRE suitable for installation in sandy desert environment
6,7,8 CABLE SCHEDULE-LIGHTING DISTRIBUTION BOARD Double compression cable glands, made of nickel plated brass, with soft sealing nylon washer, locknut,
9 CABLE SCHEDULE- POWER DISTRIBUTION BOARD weatherproof IP55, outdoor heat shrinkable hood, suitable for installation in sandy desert environment
VP Petro6 Engineers and Consultants Pvt Ltd
TITLE TYPES OF GLAND
DESCRIPTION
G1
G29 CABLE SCHEDULE POWER DISTRIBUTION BOARD weatherproof IP55, outdoor heat shrinkable hood, suitable for installation in sandy desert environment
Indoor type Double compression cable glands, made of nickel plated brass, with soft sealing nylon washer, locknut,
IP55.
CABLE DESCRIPTION
TYPE OF CABLE
600/1100 V Grade, Plain Annealed Copper - Stranded Conductor, XLPE Insulation, Extruded & Low Smoke Inner Sheath,
Galvanized Steel Wire Armored , LSLH PVC & Flame Retardant Outer Sheath , Outer Color - Black, halogen free, heat & oil resistant,
UV resistant, power, control, and lighting FRLS cables conforming to IEC-60332-3 Cat A.
1. This Cable Schedule lists all Electrical power, control, and lighting cables which are to be installed on the MPT off spec tank-tie in mangala train-1 .
2. Cable lengths indicated are estimated route lengths only.
3. Cables data selection is based on PRIMECAB KABELS catalogue
4. Cable glands data selection is based on HAWKE cable gland catalogue.
G3
NOTES:
DESCRIPTION
A
Page 2 of 9
Cairn Energy India Pty Ltd
Project : MANGALA FIELD DEVELOPMENT PROJECT - ENHANCE OIL RECOVERY PILOT (EORP) PROJECT
Document Title : ELECTRICAL CABLE SCHEDULE - CABLE NUMBERING
Document No : EORP-EL-K-002
Revision No : B
CABLE NUMBERING :
Generator & Synchronising Panel cable Power & motor control cable
Cable Serial number reference
Cable Serial number reference Circuit reference
Distribution board/Equipemnt reference Distribution board/Equipemnt reference
VP Petro6 Engineers and Consultants Pvt Ltd
P - EORP- XX- YY-01 P - EORP- XX- 01
Enhance Oil Recovery Pilot (EORP) Project Enhance Oil Recovery Pilot (EORP) Project
Cable type : Cable type :
P - 415VAC, Power cable P - 415VAC, Power cable
C - 230VAC, Control cable C - 230VAC, Control cable
H- Anti Condensation Heater H- Anti Condensation Heater
Lighting & small power cable
Circuit reference
Distribution board reference
Enhance Oil Recovery Pilot (EORP) Project
Cable type :
L - Lighting cable
L -EORP-XX- 01
P- Power cable
Page 3 of 9
Project : MANGALA FIELD DEVELOPMENT PROJECT - ENHANCE OIL RECOVERY PILOT (EORP) PROJECT
Document Title : ELECTRICAL CABLE SCHEDULE- GENERATOR, POWER & MOTOR CONTROL CENTRE
Document No : EORP-EL-K-002
Revision No : B
NO OF CORES
COND. SIZE (Sq.mm)
TYPE OF CABLE
APPROX. OD (mm)
TOTAL LENGTH
(M)SIZE TYPE SIZE TYPE
1 P-EORP-X-809A-01 3.5 185 A 50 40 X-809A Diesel Generator M63 G3 EORP-PMCC Power & motor control centre M63 G3
2 P-EORP-X-809A-02 3.5 185 A 50 40 X-809A Diesel Generator M63 G3 EORP-PMCC Power & motor control centre M63 G3
3 P-EORP-X-809A-03 3.5 185 A 50 40 X-809A Diesel Generator M63 G3 EORP-PMCC Power & motor control centre M63 G3
4 P-EORP-X-809A-04 1 300 A 31 40 X-809A Diesel Generator (Neutral) M40 G3 EORP-PMCC NGR Cubicle (Resistor) M40 G3
5 P-EORP-X-809A-05 1 6 A 11 40 X-809A NGR Cubicle (Resistor) M20 G3 - Earth Pit -
6 C-EORP-X-809A-01 3 2.5 A 15 40 X-809A Diesel Generator (Neutral CT) M20 G3 EORP-PMCC Power & motor control centre (for 64 Relay) M20 G3
7 C-EORP-X-809A-02 7 2.5 A 15 150 EORP-PMCC Power & motor control centre (Incomer-1) M20 G3 - IRP for Control Status M20 G3ON, OFF &
Indication Status
EQUIPMENT TAG NO.
GLAND
VP Petro6 Engineers and Consultants Pvt Ltd
REMARKSSL.NO. CABLE TAG NO.
Cairn Energy India Pty Ltd
TO
EQUIPMENT TAG NO.
EQUIPMENT DESCRIPTION
GLANDDESCRIPTION OF CABLE
EQUIPMENT DESCRIPTION
FROM
7 H-EORP-X-809A-01 2 2.5 A 14 40 EORP-PMCC Power & motor control centre M20 G3 X-809A Diesel Generator (Space heater) M20 G3
8 P-EORP-X-809B-01 3.5 185 A 50 40 X-809B Diesel Generator M63 G3 EORP-PMCC Power & motor control centre M63 G3
9 P-EORP-X-809B-02 3.5 185 A 50 40 X-809B Diesel Generator M63 G3 EORP-PMCC Power & motor control centre M63 G3
10 P-EORP-X-809B-03 3.5 185 A 50 40 X-809B Diesel Generator M63 G3 EORP-PMCC Power & motor control centre M63 G3
11 P-EORP-X-809B-04 1 300 A 31 40 X-809B Diesel Generator (Neutral) M40 G3 EORP-PMCC NGR Cubicle (Resistor) M40 G3
12 P-EORP-X-809B-05 1 6 A 11 40 X-809B NGR Cubicle (Resistor) M20 G3 - Earth Pit -
13 C-EORP-X-809B-01 3 2.5 A 15 40 X-809B Diesel Generator (Neutral CT) M20 G3 EORP-PMCC Power & motor control centre (for 64 Relay) M20 G3
14 C-EORP-X-809B-02 7 2.5 A 15 150 EORP-PMCC Power & motor control centre (Incomer-2) M20 G3 - IRP for Control Status M20 G3ON, OFF &
Indication Status
14 H-EORP-X-809B-01 2 2.5 A 14 40 EORP-PMCC Power & motor control centre M20 G3 X-809B Diesel Generator (Space heater) M20 G3
15 P-EORP-PMCC-01-01 3 6 A 17 100 EORP-PMCC Power & motor control centre M25 G3 EORP-P-203A Fluid Transfer Pump A M25 G1
16 C-EORP-PMCC-01-01 3 2.5 A 15 100 EORP-PMCC Power & motor control centre M20 G3 - LCS for Fluid Transfer Pump A M20 G1
17 C-EORP-PMCC-01-02 7 2.5 A 19 150 EORP-PMCC Power & motor control centre M20 G3 - IRP for Control Status M20 G3Start, Stop &
Indication Status
18 P-EORP-PMCC-02-01 3 6 A 17 100 EORP-PMCC Power & motor control centre M25 G3 EORP-P-203B Fluid Transfer Pump B M25 G1
19 C-EORP-PMCC-02-01 3 2.5 A 15 100 EORP-PMCC Power & motor control centre M20 G3 - LCS for Fluid Transfer Pump B M20 G1
20 C-EORP-PMCC-02-02 7 2.5 A 19 150 EORP-PMCC Power & motor control centre M20 G3 - IRP for Control Status M20 G3Start, Stop &
Indication Status
21 P-EORP-PMCC-03-01 3 4 A 16 70 EORP-PMCC Power & motor control centre M25 G3 EORP-P-805A Chemical Injection Pump A M25 G1
22 C-EORP-PMCC-03-01 3 2.5 A 15 70 EORP-PMCC Power & motor control centre M20 G3 - LCS for Chemical Injection Pump A M20 G1
Page 4 of 9
Project : MANGALA FIELD DEVELOPMENT PROJECT - ENHANCE OIL RECOVERY PILOT (EORP) PROJECT
Document Title : ELECTRICAL CABLE SCHEDULE- GENERATOR, POWER & MOTOR CONTROL CENTRE
Document No : EORP-EL-K-002
Revision No : B
NO OF CORES
COND. SIZE (Sq.mm)
TYPE OF CABLE
APPROX. OD (mm)
TOTAL LENGTH
(M)SIZE TYPE SIZE TYPE
EQUIPMENT TAG NO.
GLAND
VP Petro6 Engineers and Consultants Pvt Ltd
REMARKSSL.NO. CABLE TAG NO.
Cairn Energy India Pty Ltd
TO
EQUIPMENT TAG NO.
EQUIPMENT DESCRIPTION
GLANDDESCRIPTION OF CABLE
EQUIPMENT DESCRIPTION
FROM
23 P-EORP-PMCC-04-01 3 4 A 16 70 EORP-PMCC Power & motor control centre M25 G3 EORP-P-805B Chemical Injection Pump B M25 G1
24 C-EORP-PMCC-04-01 3 2.5 A 15 70 EORP-PMCC Power & motor control centre M20 G3 - LCS for Chemical Injection Pump B M20 G1
25 P-EORP-PMCC-05-01 3 4 A 16 65 EORP-PMCC Power & motor control centre M25 G3 EORP-P-806A Chemical Injection Pump A M25 G1
26 C-EORP-PMCC-05-01 3 2.5 A 15 65 EORP-PMCC Power & motor control centre M20 G3 - LCS for Chemical Injection Pump A M20 G1
27 P-EORP-PMCC-06-01 3 4 A 16 65 EORP-PMCC Power & motor control centre M25 G3 EORP-P-806B Chemical Injection Pump B M25 G1
28 C-EORP-PMCC-06-01 3 2.5 A 15 65 EORP-PMCC Power & motor control centre M20 G3 - LCS for Chemical Injection Pump B M20 G1
29 P-EORP-PMCC-07-01 3 4 A 16 60 EORP-PMCC Power & motor control centre M25 G3 EORP-P-807A Chemical Injection Pump A M25 G1
30 C-EORP-PMCC-07-01 3 2.5 A 15 60 EORP-PMCC Power & motor control centre M20 G3 - LCS for Chemical Injection Pump A M20 G1
31 P-EORP-PMCC-08-01 3 4 A 16 60 EORP-PMCC Power & motor control centre M25 G3 EORP-P-807B Chemical Injection Pump B M25 G1
32 C-EORP-PMCC-08-01 3 2.5 A 15 60 EORP-PMCC Power & motor control centre M20 G3 - LCS for Chemical Injection Pump B M20 G1
33 P-EORP-PMCC-09-01 3 4 A 16 55 EORP-PMCC Power & motor control centre M25 G3 EORP-P-808A Chemical Injection Pump A M25 G1
34 C-EORP-PMCC-09-01 3 2.5 A 15 55 EORP-PMCC Power & motor control centre M20 G3 - LCS for Chemical Injection Pump A M20 G1
35 P-EORP-PMCC-10-01 3 4 A 16 55 EORP-PMCC Power & motor control centre M25 G3 EORP-P-808B Chemical Injection Pump B M25 G1
36 C-EORP-PMCC-10-01 3 2.5 A 15 55 EORP-PMCC Power & motor control centre M20 G3 - LCS for Chemical Injection Pump B M20 G1
37 P-EORP-PMCC-11-01 3 95 A 33 225 EORP-PMCC Power & motor control centre M40 G3 - ESP Motor VFD Panel M40 G3
38 C-EORP-PMCC-11-01 3 2.5 A 15 225 EORP-PMCC Power & motor control centre M20 G3 - LCS for ESP Motor A M20 G1
39 C-EORP-PMCC-11-02 10 2.5 A 20 15 EORP-PMCC Power & motor control centre M20 G3 - ESP Motor VFD Panel M20 G3
40 C-EORP-PMCC-11-03 7 2.5 A 14 150 EORP-PMCC ESP Motor VFD Panel M20 G3 - IRP for Control Status M20 G3Start, Stop &
Indication Status
41 P-EORP-PMCC-12-01 4 16 A 22 25 EORP-PMCC Power & motor control centre M25 G3 EORP-LDB-001 Lighting distribution board M25 G3
42 P-EORP-PMCC-13-01 4 16 A 22 25 EORP-PMCC Power & motor control centre M25 G3 EORP-PDB-001 Power distribution board M25 G3
43 P-EORP-PMCC-14-01 4 150 A 45 25 EORP-PMCC Power & motor control centre M40 G3 EORP-HTDB-001 Heat Tracing Panel M40 G3
Page 5 of 9
Project : MANGALA FIELD DEVELOPMENT PROJECT - ENHANCE OIL RECOVERY PILOT (EORP) PROJECT
Document Title : ELECTRICAL CABLE SCHEDULE- LIGHTING DISTRIBUTION BOARD
Document No : EORP-EL-K-002
Revision No : B
NO OF CORES
COND. SIZE (Sq.mm)
TYPE OF CABLE
CABLE OD (mm)
TOTAL LENGTH
(M)SIZE TYPE SIZE TYPE
1 L-EORP-LDB-01-01 2 4 A 15 250 EORP-LDB-001 Lighting distribution board at ckt - 1 M20 G3 - Junction box-1 M20 G1
2 L-EORP-LDB-01-02 2 2.5 A 14 8 - Junction box-1 M20 G1 - Light fitting-1 M20 G1
3 L-EORP-LDB-01-03 2 2.5 A 14 20 - Junction box-1 M20 G1 - Junction box-2 M20 G1
4 L-EORP-LDB-01-04 2 2.5 A 14 8 - Junction box -2 M20 G1 - Light fitting-2 M20 G1
5 L-EORP-LDB-01-05 2 2.5 A 14 20 - Junction box-2 M20 G1 - Junction box-3 M20 G1
6 L-EORP-LDB-01-06 2 2.5 A 14 8 - Junction box-3 M20 G1 - Light fitting-3 M20 G1
REMARKSEQUIPMENT TAG NO.
EQUIPMENT DESCRIPTION
GLAND
EQUIPMENT TAG NO.
GLAND
EQUIPMENT DESCRIPTION
Cairn Energy India Pty Ltd VP Petro6 Engineers and Consultants Pvt Ltd
SL.NO. CABLE TAG NO.
DESCRIPTION OF CABLE FROM TO
7 L-EORP-LDB-01-07 2 2.5 A 14 20 - Junction box-3 M20 G1 - Junction box-4 M20 G1
8 L-EORP-LDB-01-08 2 2.5 A 14 8 - Junction box-4 M20 G1 - Light fitting-4 M20 G1
9 L-EORP-LDB-01-09 2 2.5 A 14 20 - Junction box-4 M20 G1 - Junction box-5 M20 G1
10 L-EORP-LDB-01-10 2 2.5 A 14 8 - Junction box-5 M20 G1 - Light fitting-5 M20 G1
11 L-EORP-LDB-01-11 2 2.5 A 14 20 - Junction box-5 M20 G1 - Junction box-6 M20 G1
12 L-EORP-LDB-01-12 2 2.5 A 14 8 - Junction box-6 M20 G1 - Light fitting-6 M20 G1
13 L-EORP-LDB-01-13 2 2.5 A 14 20 - Junction box-6 M20 G1 - Junction box-7 M20 G1
14 L-EORP-LDB-01-14 2 2.5 A 14 8 - Junction box-7 M20 G1 - Light fitting-7 M20 G1
15 L-EORP-LDB-02-01 2 4 A 15 250 EORP-LDB-001 Lighting distribution board at ckt- 2 M20 G3 - Junction box-8 M20 G1
16 L-EORP-LDB-02-02 2 2.5 A 14 8 - Junction box-8 M20 G1 - Light fitting-8 M20 G1
17 L-EORP-LDB-02-03 2 2.5 A 14 20 - Junction box-8 M20 G1 - Junction box-9 M20 G1
18 L-EORP-LDB-02-04 2 2.5 A 14 8 - Junction box -9 M20 G1 - Light fitting-9 M20 G1
19 L-EORP-LDB-02-05 2 2.5 A 14 20 - Junction box-9 M20 G1 - Junction box-10 M20 G1
20 L-EORP-LDB-02-06 2 2.5 A 14 8 - Junction box-10 M20 G1 - Light fitting-10 M20 G1
21 L-EORP-LDB-02-07 2 2.5 A 14 20 - Junction box-10 M20 G1 - Junction box-11 M20 G1
22 L-EORP-LDB-02-08 2 2.5 A 14 8 - Junction box-11 M20 G1 - Light fitting-11 M20 G1
23 L-EORP-LDB-02-09 2 2.5 A 14 20 - Junction box-11 M20 G1 - Junction box-12 M20 G1
Page 6 of 9
24 L-EORP-LDB-02-10 2 2.5 A 14 8 - Junction box-12 M20 G1 - Light fitting-12 M20 G1
25 L-EORP-LDB-02-11 2 2.5 A 14 20 - Junction box-12 M20 G1 - Junction box-13 M20 G1
26 L-EORP-LDB-02-12 2 2.5 A 14 8 - Junction box-13 M20 G1 - Light fitting-13 M20 G1
27 L-EORP-LDB-02-13 2 2.5 A 14 20 - Junction box-13 M20 G1 - Junction box-14 M20 G1
28 L-EORP-LDB-02-14 2 2.5 A 14 8 - Junction box-14 M20 G1 - Light fitting-14 M20 G1
29 L-EORP-LDB-03-01 2 2.5 A 14 80 EORP-LDB-001 Lighting distribution board at ckt- 3 M20 G3 - Junction box-15 M20 G1
30 L-EORP-LDB-03-02 2 2.5 A 14 6 - Junction box-15 M20 G1 - Light fitting-15 M20 G1
31 L-EORP-LDB-03-03 2 2.5 A 14 12 - Junction box-15 M20 G1 - Junction box-16 M20 G1
32 L-EORP-LDB-03-04 2 2.5 A 14 6 - Junction box -16 M20 G1 - Light fitting-16 M20 G1
33 L-EORP-LDB-03-05 2 2.5 A 14 12 - Junction box-16 M20 G1 - Junction box-17 M20 G1
34 L-EORP-LDB-03-06 2 2.5 A 14 6 - Junction box-17 M20 G1 - Light fitting-17 M20 G1
35 L-EORP-LDB-03-07 2 2.5 A 14 12 - Junction box-17 M20 G1 - Junction box-18 M20 G1
36 L-EORP-LDB-03-08 2 2.5 A 14 6 - Junction box-18 M20 G1 - Light fitting-18 M20 G1
37 L-EORP-LDB-03-09 2 2.5 A 14 12 - Junction box-18 M20 G1 - Junction box-19 M20 G1
38 L-EORP-LDB-03-10 2 2.5 A 14 6 - Junction box-19 M20 G1 - Light fitting-19 M20 G1
39 L-EORP-LDB-03-11 2 2.5 A 14 12 - Junction box-19 M20 G1 - Junction box-20 M20 G1
40 L-EORP-LDB-03-12 2 2.5 A 14 6 - Junction box-20 M20 G1 - Light fitting-20 M20 G1
41 L-EORP-LDB-04-01 2 2.5 A 14 60 EORP-LDB-001 Lighting distribution board at ckt- 4 M20 G3 - Junction box-21 M20 G1
42 L-EORP-LDB-04-02 2 2.5 A 14 6 - Junction box-21 M20 G1 - Light fitting-21 M20 G1
43 L-EORP-LDB-04-03 2 2.5 A 14 12 - Junction box-21 M20 G1 - Junction box-22 M20 G1
44 L-EORP-LDB-04-04 2 2.5 A 14 6 - Junction box -22 M20 G1 - Light fitting-22 M20 G1
45 L-EORP-LDB-04-05 2 2.5 A 14 12 - Junction box-22 M20 G1 - Junction box-17 M20 G1
46 L-EORP-LDB-05-01 2 2.5 A 14 40 EORP-LDB-001 Lighting distribution board at ckt- 5 M20 G3 - Junction box-23 M20 G1
47 L-EORP-LDB-05-02 2 2.5 A 14 6 - Junction box-23 M20 G1 - Light fitting-23 M20 G1
48 L-EORP-LDB-05-03 2 2.5 A 14 10 - Junction box-23 M20 G1 - Junction box-24 M20 G1
49 L-EORP-LDB-05-04 2 2.5 A 14 6 - Junction box -24 M20 G1 - Light fitting-24 M20 G1
50 L-EORP-LDB-05-05 2 2.5 A 14 10 - Junction box-24 M20 G1 - Junction box-25 M20 G1
51 L-EORP-LDB-05-06 2 2.5 A 14 6 - Junction box-25 M20 G1 - Light fitting-25 M20 G1
52 L-EORP-LDB-05-07 2 2.5 A 14 10 - Junction box-25 M20 G1 - Junction box-26 M20 G1
53 L-EORP-LDB-05-08 2 2.5 A 14 6 - Junction box-26 M20 G1 - Light fitting-26 M20 G1
54 L-EORP-LDB-05-09 2 2.5 A 14 10 - Junction box-26 M20 G1 - Junction box-27 M20 G1
55 L-EORP-LDB-05-10 2 2.5 A 14 6 - Junction box-27 M20 G1 - Light fitting-27 M20 G1
Page 7 of 9
56 L-EORP-LDB-05-11 2 2.5 A 14 10 - Junction box-27 M20 G1 - Junction box-28 M20 G1
57 L-EORP-LDB-05-12 2 2.5 A 14 6 - Junction box-28 M20 G1 - Light fitting-28 M20 G1
58 L-EORP-LDB-05-13 2 2.5 A 14 10 - Junction box-28 M20 G1 - Junction box-29 M20 G1
59 L-EORP-LDB-05-14 2 2.5 A 14 6 - Junction box-29 M20 G1 - Light fitting-29 M20 G1
60 L-EORP-LDB-05-15 2 2.5 A 14 10 - Junction box-29 M20 G1 - Junction box-30 M20 G1
61 L-EORP-LDB-05-16 2 2.5 A 14 6 - Junction box-30 M20 G1 - Light fitting-30 M20 G1
62 L-EORP-LDB-06-01 2 2.5 A 14 15 - Lighting distribution board at ckt- 6 M20 G3 - Operator cabin lighting M20 G3
Page 8 of 9
Project : MANGALA FIELD DEVELOPMENT PROJECT - ENHANCE OIL RECOVERY PILOT (EORP) PROJECT
Document Title : ELECTRICAL CABLE SCHEDULE-POWER DISTRIBUTION BOARD
Document No : EORP-EL-K-002
Revision No : B
NO OF CORES
COND. SIZE (Sq.mm)
TYPE OF CABLE
CABLE OD (mm)
TOTAL LENGTH
(M)SIZE TYPE SIZE TYPE
1 P-EORP-PDB-01 2 2.5 A 14 20 EORP-PDB-001 Power distribution board M20 G3 - 24V DC Charger for Instrumention M20 G3
2 P-EORP-PDB-02 2 2.5 A 14 40 EORP-PDB-001 Power distribution board M20 G3 - X-809A EDG Auxiliaries M20 G3
3 P-EORP-PDB-03 2 2.5 A 14 30 EORP-PDB-001 Power distribution board M20 G3 - X-809B EDG Auxiliaries M20 G3
4 P-EORP-PDB-04 2 2.5 A 14 20 EORP-PDB-001 Power distribution board M20 G3 - Operator Cabin A/C Unit -1 M20 G3
5 P-EORP-PDB-05 2 2.5 A 14 20 EORP-PDB-001 Power distribution board M20 G3 - Operator Cabin A/C Unit -2 M20 G3
EQUIPMENT DESCRIPTION
Cairn Energy India Pty Ltd VP Petro6 Engineers and Consultants Pvt Ltd
SL.NO. CABLE TAG NO.
DESCRIPTION OF CABLE FROM TO
REMARKSEQUIPMENT TAG NO.
EQUIPMENT DESCRIPTION
GLAND
EQUIPMENT TAG NO.
GLAND
6 P-EORP-PDB-06 2 2.5 A 14 20 EORP-PDB-001 Power distribution board M20 G3 - Operator Cabin A/C Unit -3 M20 G3
7 P-EORP-PDB-07 2 2.5 A 14 20 EORP-PDB-001 Power distribution board M20 G3 - Operator Cabin A/C Unit -4 M20 G3
8 P-EORP-PDB-08 2 2.5 A 14 20 EORP-PDB-001 Power distribution board M20 G3 - 24V Charger for operation of CB & Synchronizing M20 G3
Page 9 of 9